EUROPEAN UNION GREENHOUSE GAS EMISSIONS TRADING SYSTEM FOR STATIONARY INSTALLATIONS REGULATIONS
Table of Provisions (31)
Statutory Text (31 Articles)
INSTALLATIONS
SUBSIDIARY LEGISLATION 643.02
EUROPEAN UNION GREENHOUSE GAS EMISSIONS
TRADING SYSTEM FOR STATIONARY
INSTALLATIONS REGULATIONS
1st January, 2013 *
LEGAL NOTICE 434 of 2013, as amended by Legal Notice 268 of 2019
and Act XVII of 2024 and Legal Notice 315 of 2024 and 144 of 2025.
(1) The title of these regulations is the European Union
G r e e n h o u se G a s E m i s s i o n s Tr a d i n g S y s t e m f o r St a t i o n a r y
Installations Regulations.
(2) These regulations provide for the implementation in Malta
of the European Union system for greenhouse gas emissions
allowance trading, established by Directive 2003/87/EC, for
activities listed in Schedule 1 to these regulations, for the period
commencing 1st January, 2013, and any subsequent periods.
(3)
The scope of these regulations is to
(a) transpose the provisions of
(i) Directive 2003/87/EC;
(ii) Directive 2004/101/EC amending Directive
2003/87/EC;
(iii) Directive 2008/101/EC amending Directive
2003/87/EC;
(iv) Directive 2009/29/EC amending Directive 2003/
87/EC;
(v) Decision (EU) 2015/1814 amending Directive
2003/87/EC;
(vi) Directive (EU) 2018/410 amending Directive
2003/87/EC;
(vii) Directive (EU) 2023/959 amending Directive
2003/87/EC; and
(b) implement the requirements of Regulation (EU) 2017/
2392 amending Directive 2003/87/EC.Interpretation.
For the purposes of these regulations and unless the
context otherwise requires, the following definitions shall apply
"account holder" means a natural or legal person that holds an
account in the Union registry;
"the Act" means the Climate Action Act;
"allowance" means an allowance to emit one tonne of carbon
dioxide equivalent during a specific period, which shall be valid for
the purposes of meeting the requirements of these regulations and
shall be transferable in accordance with the provisions of these
regulations;
*see regulation 1(3) of these Regulations, as originally promulgated.
INSTALLATIONS
"auctioneer" means the Debt Management Office within the
Treasury Department appointed by the Government to auction
allowances on its behalf;
"authorised representatives" means the representatives,
nominated by an account holder in respect of an account in the
Union registry, to have access to that account and undertake
processes relating to that account on behalf of the account holder;
"the Authority" means the Malta Resources Authority
established by article 3 of the Act;
"cancellation" means the definitive disposal of an allowance by
its holder or by the national registry administrator as may be
applicable;
"certified emissions reduction" or "CER" means a unit issued
pursuant to Article 12 of the Kyoto Protocol and the decisions
adopted pursuant to the UNFCCC or the Kyoto Protocol;
"Chapter II allowance" means an allowance allocated and issued
in respect of aviation activities listed in Annex I to Directive 2003/
87/EC, in accordance with Chapter II of Directive 2003/87/EC;
"Chapter III allowance" means an allowance allocated and issued
in respect of activities listed in Annex I to Directive 2003/87/EC
other than aviation activities, in accordance with Chapter III of
Directive 2003/87/EC;
"combustion" means any oxidation of fuels, regardless of the
way the heat, electrical or mechanical energy produced by this
process is used, and any other directly associated activities,
including waste gas scrubbing;
"the Commission" means the European Commission;
"confidential information" means any non-public information
deemed to be sensitive by the operator and, or, any privileged
information falling within the scope of these regulations, disclosed
only for promoting and elaborating certain purposes. It shall
include, inter alia
(a) trade secrets;
(b) any other information having a commercial value that
would be, or could reasonably be expected to be,
destroyed or diminished if the information were
disclosed; or
(c) information other than trade secrets or information
under paragraph (b) concerning a person, organisation
or undertaking in respect of their business,
professional, commercial or financial affairs;
"Decision (EU) 2015/1814" means Decision (EU) 2015/1814 of
the European Parliament and of the Council of 6 October 2015
concerning the establishment and operation of a market stability
reserve for the Union greenhouse gas emission trading scheme and
amending Directive 2003/87/EC;
"deviation" means, in respect of monitoring of annual emissions,
INSTALLATIONS
the use of a monitoring approach that is different, in full or in part,
from the approved monitoring and reporting plan, which use is of a
temporary nature;
"Directive 2003/87/EC" means Directive 2003/87/EC of the
European Parliament and of the Council of 13 October 2003
establishing a system for greenhouse gas emission allowance trading
within the Union and amending Council Directive 96/61/EC;
"Directive 2004/101/EC" means Directive 2004/101/EC of the
European Parliament and of the Council of 27 October 2004
a m e nd i n g D i r e c t iv e 2 0 0 3/ 8 7 / E C e s t a b l i s h i ng a sc h e m e f o r
greenhouse gas emission allowance trading within the Community,
in respect of the Kyoto Protocol’s project mechanisms;";
"Directive 2008/101/EC" means Directive 2008/101/EC of the
European Parliament and of the Council of 19 November 2008
amending Directive 2003/87/EC so as to include aviation activities in
the scheme for greenhouse gas emission allowance trading within the
Community;
"Directive 2009/29/EC" means Directive 2009/29/EC of the
European Parliament and of the Council of 23 April 2009 amending
Directive 2003/87/EC so as to improve and extend the greenhouse
gas emission allowance trading scheme of the Community;
"Directive 2009/31/EC" means Directive 2009/31/EC of the
European Parliament and of the Council of 23 April 2009 on the
geological storage of carbon dioxide and amending Council
Directive 85/337/EEC of the European Parliament and Council
Directives 2000/60/EC, 2001/80/EC, 2004/35/EC, 2006/12/EC,
2008/1/EC and Regulation (EC) No 1013/2006;
"Directive (EU) 2018/410" means Directive (EU) 2018/410 of the
European Parliament and of the Council of 14 March 2018 amending
Directive 2003/87/EC to enhance cost-effective emission reductions
and low-carbon investments, and Decision (EU) 2015/1814;
"Directive (EU) 2023/959" means Directive (EU) 2023/959 of the
European Parliament and of the Council of 10 May 2023 amending
Directive 2003/87/EC establishing a system for greenhouse gas
emission allowance trading within the Union and Decision (EU) 2015/
1814 concerning the establishment and operation of a market stability
reserve for the Union greenhouse gas emission trading system;
"economically justifiable demand" means the demand that does
not exceed the needs for heat or cooling and which would otherwise
be satisfied at market conditions by energy generation processes
other than cogeneration;
"electricity generator" means an installation that, on or after the
1st January, 2005, has produced electricity for sale to third parties,
and in which no activity listed in Schedule 1 is carried out other
than the combustion of fuels;
"emissions" means the release of greenhouse gases specified in
respect of an activity listed in Schedule 1, from sources in an
installation performing such activity;
INSTALLATIONS
"emission reduction unit" or "ERU" means a unit issued pursuant
to Article 6 of the Kyoto Protocol and the decisions adopted
pursuant to the United Nations Framework Convention on Climate
Change or the Kyoto Protocol;
"EU ETS" means the European Union Emissions Trading System
established by Directive 2003/87/EC;
"greenhouse gases" means the gases listed in Schedule 2 and other
gaseous constituents of the atmosphere, both natural and
anthropogenic, that absorb and re-emit infrared radiation;
"greenhouse gas emissions permit" means the permit issued
pursuant to regulation 6;
"high efficiency cogeneration" means cogeneration meeting the
criteria for high efficiency cogeneration set out in the Cogeneration
Regulations;
"installation" means a stationary technical unit where one or
more activities listed in Schedule 1 are carried out and any other
directly associated activities which have a technical connection
with the activities carried out on that site and which could have an
effect on emissions and pollution;
"Joint Implementation project activity" or "JI project activity"
means a project activity undertaken in accordance with Article 12
of the Kyoto Protocol and decisions adopted pursuant to the United
Nations Framework Convention on Climate Change or the Kyoto
Protocol;
"Kyoto Protocol" means the Kyoto Protocol to the United
Nations Framework Convention on Climate Change;
"least developed countries" means those countries included in
the list of Least Developed Countries as defined by the Committee
for Development Policy and endorsed by the Economic and Social
Council of the United Nations;
" M em b e r St at e " m e an s a st a t e w h i ch i s a m em b e r o f t he
European Union and which, for the purpose of these regulations,
includes Iceland, Liechtenstein and Norway;
"the Minister" means the Minister responsible for climate change
policy;
"modification" means, in respect of monitoring of annual
emissions, a permanent change in an approved monitoring plan, in
full or in part, and, where it is deemed to be of a significant nature,
shall require the approval of the Authority to become valid;
"National Accreditation Board - Malta" means the National
Accreditation Board established by the National Accreditation
Board (Malta) (Establishment) Regulations;
"national registry administrator" means the entity responsible for
the administering of operator holding accounts on behalf of the
Government, which operator holding accounts are under the
j u r i s d i c t i o n o f t h e G o v e r n m e n t i n t h e U n i o n r e g i s t r y, a n d
designated in accordance with relevant decisions and regulations
INSTALLATIONS
adopted by the Commission pursuant to Directive 2003/87/EC;
"new entrant" means any installation carrying out one or more of
the activities listed in Schedule 1, which has obtained a greenhouse
gas emissions permit for the first time within the period starting three
months before the date for submission of the list pursuant to regulation
11, and ending three months before the date for submission of the
subsequent list pursuant to regulation 11;
"operator" means any person who operates or controls an
installation;
"person" means any natural or legal person;
"proposed transferee" means a person who receives from another
person the greenhouse gas emissions permit, in whole or in part,
issued for the installation;
"proposed transferor" means an operator of an installation who
transfers to another person the greenhouse gas emissions permit, in
whole or in part, issued for the installation;
"the public" means one or more persons, associations,
organisations or groups of persons;
"Regulation (EC) No 765/2008" means Regulation (EC) No 765/
2008 of the European Parliament and of the Council of 9 July 2008
setting out the requirements for accreditation and market
surveillance relating to the marketing of products and repealing
Regulation (EEC) No 339/93;
"Regulation (EU) 2017/2392" means Regulation (EU) 2017/2392 of
the European Parliament and of the Council of 13 December 2017
amending Directive 2003/87/EC to continue current limitations of
scope for aviation activities and to prepare to implement a global
market-based measure from 2021;
"Regulation (EU) 2021/1119" means Regulation (EU) 2021/1119 of
the European Parliament and of the Council of 30 June 2021
establishing the framework for achieving climate neutrality and
amending Regulations (EC) No 401/2009 and (EU) 2018/1999
(European Climate Law);
"Regulation (EU) 2023/956" means Regulation (EU) 2023/956 of
the European Parliament and of the Council of 10 May 2023
establishing a carbon border adjustment mechanism;
"surrender" means the accounting of an allowance by an operator
of an installation against the verified emissions of the installation;
"tonne of carbon dioxide equivalent" means one metric tonne of
carbon dioxide (CO 2 ) or an amount of any other greenhouse gas
listed in Schedule 2 with an equivalent global-warming potential;
"the Union" or the "European Union" means the European Union
as established by the Treaty on the European Union as amended by
the Lisbon Treaty of 2009, as may be subject to subsequent
amendments;
"Union registry" means the registry established and maintained
in accordance with Article 19 of Directive 2003/87/EC as amended
INSTALLATIONS
by Directive 2009/29/EC for the execution of processes pertaining
to the maintenance of holding accounts and the allocation,
surrender and cancellation of allowances;
"Union registry" means the registry established and maintained in
accordance with Article 19 of Directive 2003/87/EC for the execution
of processes pertaining to the maintenance of holding accounts and the
allocation, surrender and cancellation of allowances;
"UNFCCC" means the United Nations Framework Convention
on Climate Change which entered into force on the 21st March,
1994;
"verifier" means a legal person or another legal entity carrying
out verification activities pursuant to these regulations and
accredited by a national accreditation body pursuant to Regulation
(EC) No 765/2008 and relevant decisions and regulations adopted
by the Commission pursuant to Directive 2003/87/EC, or a natural
person otherwise authorised, without prejudice to Article 5(2) of
Regulation (EC) 765/2008, at the time a verification report is
issued.
These regulations shall apply to operators of stationary
installations situated in the territory of Malta and carrying out one or
more activities listed in Schedule 1 resulting in emissions of the
greenhouse gases specified in respect of those activities in Schedule 1,
and to any other relevant legal bodies on which these regulations put
any obligations.
(1) No operator of an installation shall carry out any
activity listed in Schedule 1 resulting in emissions specified in
relation to that activity unless such operator holds a permit issued
by the Authority in accordance with regulation 6.
(2) Where an operator of an installation carries out any activity
listed in Schedule 1 without holding a permit in accordance with
sub-regulation (1), the operator of that installation shall be liable to
the imposition of an administrative fine
(a) where emissions of an installation during that year are
equal to or less than fifty thousand (50,000) tonnes
carbon dioxide equivalents, of ten thousand euro
(€10,000), and one hundred euro (€100) for each day
of non-compliance from the date of a notice given by
the Authority to the operator;
(b) where emissions of an installation during that year are
more than fifty thousand (50,000) tonnes of carbon
dioxide equivalents and equal to or less than five
hundred thousand (500,000) tonnes of carbon dioxide
equivalent, of fifty thousand euro (€50,000), and three
hundred euro (€300) for each day of non-compliance
from the date of a notice given by the Authority to the
operator;
(c) where emissions of an installation during that year are
more than five hundred thousand (500,000) tonnes of
carbon dioxide equivalents, of one hundred thousand
INSTALLATIONS
euro (€100,000), and six hundred euro (€600) for each
day of non-compliance from the date of a notice given
by the Authority to the operator.
(3) For the purposes of determining the administrative fine
under sub-regulation (2), where the emissions of the installation are
not known or are not reported or where the Authority is satisfied
that there is no reasonable possibility that the quantity of emissions
will be reported by the operator of the installation, the Authority
may itself determine the emissions from the activities performed in
that installation. The Authority shall use best available data and
ensure that a conservative estimate is made that does not
underestimate emissions. The operator of the installation shall be
liable to the imposition of an administrative fine equal to the
amounts established in sub-regulation (2) in respect of the quantity
of emissions estimated in terms of this sub-regulation.
(4) A permit issued by the Authority in accordance with sub-
regulation (1) shall be valid for the duration of the performance of
the activity or activities listed in Schedule 1 in respect of which the
permit is issued, unless the permit is surrendered in accordance
with regulation 9 or revoked in accordance with regulation 10.
(5) The Authority shall ensure that permits issued by it in
accordance with sub-regulation (1) shall b e ma de publicly
available.
(1) An operator of an installation carrying out an activity
listed in Schedule 1 shall apply to the Authority for a greenhouse
gas emissions permit.
(2) An operator of an installation shall submit an application
for a greenhouse gas emissions permit. The application shall be
su bm it ted at least one hun dred an d twen ty day s before th e
commencement of activities listed in Schedule 1 in respect of
which the application for a permit is to be submitted, unless
ot h e r w is e a g r e e d i n w r i t i ng b e tw e e n t h e a p pl i c a n t a n d t h e
Authority.
(3) An application made to the Authority for a greenhouse gas
emissions permit shall include, inter alia, the following
(a) information as may be requested by the Authority
about the operator of the installation;
(b) information as may be requested by the Authority
about the applicant, if different from the operator of
the installation;
(c) a description of the installation and activities listed in
Schedule 1 to be carried out in the installation,
including the technology used;
(d) the raw and auxiliary materials, the use of which, in
activities listed in Schedule 1 to be carried out in the
installation, is likely to lead to emissions of the
greenhouse gases specified in respect of those activities
in Schedule 1;
INSTALLATIONS
(e) the sources of emissions of gases listed in Schedule 1
from the installation;
(f)
a description of the measures planned to monitor and
report emissions in accordance with regulations 15 and
16;
(g) any other appropriate information requested by the
Authority;
(h) any other information that the applicant wishes the
Authority to take into account when considering the
application;
(i)
a non-technical summary of the details referred to in
paragraphs (c) to (f).
(4) Any operator who prior to the entry into force of these
regulations is in possession of a valid greenhouse gas emissions
permit issued under the European Community Greenhouse Gas
Emissions Trading Scheme Regulations, 2005, shall continue to
hold such permit under existing conditions until such conditions are
revised by the Authority
Provided that any such operator shall comply with such
revised conditions which may be issued by the Authority and with
effect from such date as the Authority shall establish.
(1) The Authority shall issue a greenhouse gas emissions
permit granting authorization to emit greenhouse gases from all or part
of an installation for which the application for a permit is made, if it is
satisfied that the operator of the installation is capable of complying
with the requirements of these regulations and the conditions of the
permit. A permit shall be issued within a period of ninety days from
the date on which the Authority received the application containing a
complete set of information in accordance with sub-regulation (3) of
regulation 5, unless otherwise agreed in writing between the operator
and the Authority.
(2) A greenhouse gas emissions permit issued by the Authority
may cover one or more installations on the same site operated by
the same operator. A greenhouse gas emissions permit may not
cover two or more installations situated on different sites. A
greenhouse gas emissions permit may not cover two or more
installations on the same site operated by different operators.
(3) The Authority shall, when issuing a greenhouse gas
emissions permit, ensure that the permit includes, inter alia, the
following
(a) the name and address of the operator;
(b) the name and address of the installation;
(c) a description of the activities and emissions covered
by the permit;
(d) a reference to monitoring, reporting and verification
requirements including the requirement to have a
monitoring plan approved by the Authority;
INSTALLATIONS
(e) an obligation to report verified emissions of
greenhouse gases specified for the activity or activities
listed in Schedule 1 for each calendar year, within
three months following the end of that year;
(f)
an obligation to surrender allowances equal to the total
emissions of the installation in each calendar year, as
verified in accordance with sub-regulation (3) of
regulation 16, by the 30th September of the subsequent
year;
(g) requirements for any notifications to be made to the
Authority;
(h) a requirement to pay penalties for non-compliance
with paragraph (f);
(i)
any other conditions that the Authority considers
appropriate to ensure compliance with the
requirements of these regulations.
(4) The Authority may, at any time, review a greenhouse gas
emissions permit issued to an operator of an installation and make
amendments to the permit as appropriate and issue an updated
permit
Provided that it shall inform the operator covered by the
permit of such amendments as early as possible prior to the issuance of
an updated permit.
(5) The Authority may, at any time, vary the conditions of a
permit in such a manner as it may deem fit, and issue an updated
permit
Provided that it shall inform the operator covered by the
permit of such variations by not later than thirty days prior to the
issuance of an updated permit.
(1) The operator of an installation for which a greenhouse
gas emissions permit has been issued shall notify the Authority of
(a) any changes planned in the nature or functioning of the
installation; or
(b) any extension or reduction of the capacity of the
installation; or
(c) in the case of a permit covering more than one
installation on the same site operated by the same
operator, any instance where one or more installations
cease carrying out all of the activities listed in
Schedule 1 covered by the permit but the operator
continues to carry out at least one activity in one
installation under that permit
Provided that any such notification must be made in writing at
least one hundred and twenty days prior to such change in the nature or
functioning of the installation, or extension or reduction of capacity of
the installation, or the one or more installations ceasing carrying out of
activities listed in Schedule 1, effectively taking place.
INSTALLATIONS
(2) The Authority shall, where appropriate, update the
greenhouse gas emissions permit accordingly, within a period of
ninety days from the date on which the Authority receives a
notification pursuant to sub-regulation (1), unless otherwise agreed
in writing between the operator and the Authority.
(3) Where there is a change in the name of the operator of an
installation, the Authority shall update the permit to include the
name and address of the new operator
Provided that the Authority shall be notified by the
operator, in writing, of the change in the name of the operator of
t h e in st al la ti o n at l ea st si x ty day s b efore su ch a c ha ng e i s
effectively to take place.
(4) An operator that allows the coming into effect of changes
listed under sub-regulation (1) without notifying the Authority of
such changes in accordance with this regulation shall be liable to
the imposition of an administrative fine of five thousand euro
(€5,000).
(5) Where a change in the name of the operator of an
installation comes into effect without such a change having been
notified to the Authority in accordance with sub-regulation (3), the
operator of the installation shall be liable to the imposition of an
administrative fine of one thousand euro (€1,000).
(6) The Authority shall notify the national registry
administrator of any changes made to a permit pursuant to this
regulation. The national registry administrator shall ensure that any
changes required are made to the account or accounts relating to the
installation or installations for which the changes to the permit
relate, so as to reflect such changes.
(1) An operator of an installation ("proposed transferor")
may transfer to another person ("proposed transferee"), in whole or
i n p a r t , t he gr e e n h o u s e g a s e m i s s io n s p e r m it i s s u e d t o t he
installation.
(2) An application for the transfer of a permit shall be
submitted to the Authority, in writing, jointly by the proposed
transferor and the proposed transferee.
(3) An application under sub-regulation (2) shall include the
following information
(a) the name and address of the proposed transferor;
(b) the name and address of the proposed transferee;
(c) the name and address of the installation to which the
greenhouse gas emissions permit relates;
(d) in the case of a request to transfer a permit in part,
information identifying the activity or activities or part
of an activity or activities to which the transfer of
permit applies.
The Authority may request any additional information it
deems necessary to process an application for the transfer of a
INSTALLATIONS
permit.
(4) The Authority shall carry out a transfer of a greenhouse gas
emissions permit, if it satisfied that the proposed transferee is
capable of complying with the requirements of these regulations
and the conditions of the permit. The transfer shall be carried out
(a) in the case of a transfer of a permit in whole, by
transferring the permit for the installation to the
proposed transferee, updated to include the name and
address of the proposed transferee as the operator of
the installation;
(b) in the case of a transfer of a permit in part, by
(i)
issuing a new greenhouse gas emissions permit
to the proposed transferee, recording the
transfer, identifying the activity or activities or
part of an activity or activities to be transferred
and identifying the proposed transferee as the
operator in respect of the activity or activities
covered by the new permit;
(ii) revising and reissuing the greenhouse gas
emission permit to the proposed transferor,
recording the transfer, and the permit shall be
updated so as to identify the activity or activities
to be carried out in the installation operated by
the proposed transferor.
(5) The transfer of a permit shall come into effect at a time
agreed between the proposed transferor, proposed transferee and
the Authority, as shall be recorded in the permit.
(6) The Authority shall notify the national registry
administrator of any application for the transfer of a permit made to
it and the coming into effect of such a transfer. The national
registry administrator shall ensure that any changes required are
made to the account or accounts relating to the installation or
installations to which the transfer of a permit relates so as to reflect
the transfer of the permit.
(1) An operator who ceases to carry out all of the activities
listed in Schedule 1 in all of the installations covered by a
greenhouse gas emissions permit shall surrender the permit.
(2) An application for the surrender of a permit shall be
submitted to the Authority, in writing, by not later than thirty days
from the date on which the operator has ceased to carry out the
activity or activities in the installation to which the greenhouse gas
emissions permit relates.
(3) An application for the surrender of a permit shall include
the following
(a) the name and address of the applicant;
(b) the name and address of the installation to which the
greenhouse gas emissions permit relates;
INSTALLATIONS
(c) the date on which the activity or activities have ceased
being carried out.
(4) The Authority shall process an application for the surrender
of a permit submitted in accordance with this regulation within
thirty days from the receipt of the application. The Authority shall
issue a notice of surrender of a permit, which shall include the
following conditions
(a) a requirement to monitor, and report by the date that
may be specified in the notice of surrender of a permit,
and in accordance with these regulations, verified
emissions for the year during which the notice
becomes effective up to the date on which the notice
becomes effective;
(b) a requirement to surrender, by the date that may be
specified in the notice of surrender of a permit, and in
accordance with these regulations, a quantity of
allowances equal to the verified emissions reported
under paragraph (a);
(c) a requirement to surrender, by the date that may be
specified in the notice of surrender of a permit, and in
accordance with these regulations, a quantity of
allowances equal to verified emissions not covered by
surrendered allowances in respect of years previous to
the year when the notice of surrender of a permit
becomes effective.
Monitoring, reporting and verification of emissions referred
to in paragraph (a) shall be carried out in accordance with
m o n it or i n g, r e p or t in g a nd ve ri f i c a t i on re qu i re m e n ts i n t he
greenhouse gas emissions permit to which the application to
surrender a permit relates.
(5) The permit shall cease to have effect from the date on
which the notice for surrender of a permit becomes effective in so
far as it authorises the carrying out of an activity or activities in the
installation or installations covered by the permit
Provided that any conditions in the permit shall remain in
effect until the Authority is satisfied that the requirements under
sub-regulation (4) have been complied with or that there is no
reasonable possibility of further allowances being surrendered by
the operator of the installation or installations to which the notice
for surrender of a permit relates.
(6) The Authority shall notify the national registry
administrator of any application for the surrender of a permit made
to it and the coming into effect of such surrender. The national
registry administrator shall ensure that any changes required are
made to the account or accounts relating to the installation or
installations to which the surrender of a permit relates so as to
reflect the surrender of the permit.
(7) When a permit for an installation is surrendered without
sufficient allowances having been surrendered in accordance with
INSTALLATIONS
regulation 19 to cover all emissions reported in respect of that
installation, the operator of that installation shall be liable to the
imposition of an administrative fine of one hundred euro (€100) for
each tonne of carbon dioxide equivalent emitted for which the
operator has not surrendered allowances.
(8) From the 1st January, 2013, where, for the year in which an
operator surrendering a permit does not surrender sufficient
allowances, the annual average Harmonised European Index of
Consumer P rices published shows a percentage increase as
compared to the latest Harmonised European Index of Consumer
Prices published for the previous year, the administrative fine shall
be increased by the same percentage. The administrative fine as
revised pursuant to this sub-regulation shall apply to subsequent
years unless further increased in accordance with the Harmonized
European Index of Consumer Prices. For the purposes of this sub-
regulation, each allowance not surrendered by the operator for a
tonne of carbon dioxide equivalent emitted shall be considered as a
separate contravention.
(9) For the purposes of determining the total administrative
fine under sub-regulation (7), where the emissions of the
installation or installations are not known, or are not reported, or
where the Authority is satisfied that there is no reasonable
possibility that a verified quantity of emissions will be reported by
the operator of the installation or installations covered by the
permit to be surrendered, the Authority may itself determine the
emissions from the activities performed in the installation or
installations. The Authority shall use best available data and ensure
that a conservative estimate is made that does not underestimate
emissions. The operator shall be liable to the imposition of an
administrative fine equal to the amount established in sub-
regulation (7) in respect of the quantity of emissions estimated in
terms of this sub-regulation.
(1) The Authority may, at any time, revoke a greenhouse
gas emissions permit issued to an operator of an installation.
(2) The Authority may revoke a permit in accordance with sub-
regulation (1) by issuing a notice of revocation of a permit to the
operator, which shall include the following
(a) information clearly identifying the operator and the
installation or installations covered by the notice;
(b) the reasons for the revocation of the greenhouse gas
emissions permit;
(c) the date on which the notice takes effect, which shall
not be earlier than fifteen days from the date of the
notice;
(d) the requirement for the operator to monitor and report,
by the date that may be specified in the notice of
revocation of a permit, and in accordance with these
regulations, verified emissions for any years in which
the operator performed the activity or activities
INSTALLATIONS
covered by the permit and for which he did not submit
a verified emissions report;
(e) the requirement for the operator to surrender, by the
date that may be specified in the notice of revocation
of a permit, and in accordance with these regulations, a
quantity of allowances equal to the amount of
emissions reported, for any years in which the operator
performed the activity or activities covered by the
permit and in respect of which he did not surrender
allowances.
(3) The permit shall cease to have effect from the date on
which the notice for revocation of a permit becomes effective in so
far as it authorises the carrying out of an activity or activities in the
installations or installations covered by the permit
Provided that any conditions in the permit shall remain in
effect until the Authority is satisfied that the requirements under
sub-regulation (2) have been complied with or that there is no
reasonable possibility of further allowances being surrendered by
the operator of the installation to which the notice for revocation of
a permit relates.
(4) The Authority shall notify the national registry
administrator of any revocation of a permit and the coming into
effect of such revocation. The national registry administrator shall
ensure that any changes required are made to the account or
accounts relating to the installation or installations to which the
revocation of a permit relates so as to reflect the revocation of the
permit.
(5) When a permit for an installation is revoked without
suff icient allowances having b een surrendered to cover all
emissions reported in respect of that installation in accordance with
regulation 19, the operator of that installation shall be liable to the
imposition of an administrative fine of one hundred euro (€100) for
each tonne of carbon dioxide equivalent emitted for which the
operator has not surrendered allowances.
(6) From the 1st January, 2013, where, for the year in which an
operator surrendering a permit does not surrender sufficient
allowances, the annual average Harmonised European Index of
Consumer Prices published shows a percentage increase as
compared to the latest Harmonised European Index of Consumer
Prices published for the previous year, the administrative fine shall
be increased by the same percentage. The administrative fine as
revised pursuant to this sub-regulation shall apply to subsequent
years unless further increased in accordance with the Harmonized
European Index of Consumer Prices. For the purposes of this sub-
regulation, each allowance not surrendered by the operator for a
tonne of carbon dioxide equivalent emitted shall be considered as a
separate contravention.
(7) For the purposes of determining the total administrative
fine under sub-regulation (5), where the emissions of the
installation or installations are not known, or are not reported, or
INSTALLATIONS
where the Authority is satisfied that there is no reasonable
possibility that a verified quantity of emissions will be reported by
the operator of the installation or installations covered by the
permit to be surrendered, the Authority may itself determine the
emissions from the activities performed in the installation or
installations. The Authority shall use best available data and ensure
that a conservative estimate is made that does not underestimate
emissions. The operator shall be liable to the imposition of an
administrative fine equal to the amount established in sub-
regulation (5) in respect of the quantity of emissions estimated in
terms of this sub-regulation.
(1) The Authority shall determine the quantity of free
Chapter III allowances to be allocated to an installation eligible to a
free allocation of Chapter III allowances pursuant to Directive 2003/
87/EC. Such an allocation shall be determined in accordance with
Directive 2003/87/EC and relevant decisions and regulations adopted
by the Commission pursuant to Directive 2003/87/EC.
(2) No free allocation shall be made in respect of any
electricity production, except for electricity produced from waste
gases.
"(2a) If an installation is covered by the obligation to conduct an
energy audit or to implement a certified energy management system
under regulation 10 of the Energy Efficiency Regulations and if the
recommendations of the audit report or of the certified energy
management system are not implemented, unless the pay-back time
for the relevant investments exceeds three (3) years or unless the
costs of those investments are disproportionate, then the amount of
free allocation shall be reduced by twenty per cent (20%). The
amount of free allocation shall not be reduced if an operator
demonstrates that it has implemented other measures which lead to
greenhouse gas emissions reductions equivalent to those
recommended by the audit report or the certified energy
management system for the installation concerned.
(2b) The free allocation determined pursuant to sub-regulation
(1) shall be reduced by twenty per cent (20%) where, by 1st May,
2024, the operator of an installation whose greenhouse gas
emission levels are higher than the 80th percentile of emissions
levels for the relevant product benchmarks, as determined by the
relevant decisions and regulation adopted by the Commission
pursuant to Directive 2003/87/EC, have not established a carbon
neutrality plan for such installation for its activities covered by
these regulations. The said plan shall be consistent with the climate
neutrality objective established in Article 2(1) of Regulation (EU)
2021/1119 and shall set out
(a)
measures and investments to reach climate-
neutrality by 2050 at installation-level, excluding the use of
carbon offset credits;
(b)
intermediate targets and milestones to measure, by
INSTALLATIONS
31st December 2025 and by 31st December of each fifth year
thereafter, progress made towards reaching climate-neutrality
as set out in paragraph (a); and
(c)
an estimate of the impact of each of the measures
and investments referred to in paragraph (a) as regards the
reduction of greenhouse gas emissions
Provided that the achievement of the targets and
milestones referred to in paragraph (b) shall be verified in respect of
the period until 31st December 2025 and in respect of each period
ending 31st December of each fifth year thereafter in accordance with
regulation 16.
(2c) No free allocation shall be given to installations in sectors
or sub-sectors to the extent that they are covered by measures
established by Regulation (EU) 2023/956.
(2d) Subject to the application of Regulation (EU) 2023/0956,
no free allocation shall be given in relation to the production of
goods listed in Annex 1 of the said Regulation.
(2e) By way of derogation from sub-regulation (2d), the
production of goods listed in Annex I to Regulation (EU) 2023/
0956 shall benefit from free allocation in reduced amounts. A
CBAM factor reducing the free allocation for the production of
those goods shall be applied, and shall be equal to 100% from the
coming into force of Regulation (EU) 2023/0956 until 31st
December 2025, to 97.5% in 2026, to 95% in 2027, to 90% in 2028,
to 77.5% in 2029, to 51.5% in 2030, to 39% in 2031, to 26.5% in
2032, to 14% in 2033, and to 0% from 2034.
(3)
No free allocation shall be given to
(a) electricity generators;
(b) installations for the capture of carbon dioxide;
(c) pipelines for transport of carbon dioxide; or
(d) carbon dioxide storage sites.
(4) No free allocation shall be made in respect of any
electricity production by new entrants.
(5) District heating and high efficiency cogeneration for
economically justifiable demand shall be eligible for free
allocation, in respect of the production of heating or cooling, in
accordance with Directive 2003/87/EC and relevant decisions and
regulations adopted by the Commission pursuant to Directive 2003/
87/EC.
(6) No free allocation shall be given to an installation that has
ceased operating. An installation for which the greenhouse gas
emissions permit has been surrendered or revoked or for which the
operation or resumption of operation is technically impossible shall be
considered to have ceased operations.
(7)
The Authority shall, by 30th September, 2019, submit to the
INSTALLATIONS
Commission a list of installations covered by these regulations for the
period of five years beginning on 1st January, 2021, including free
allocations as determined in accordance with this regulation. The
Authority shall submit to the Commission lists of installations for each
subsequent period of five years every five years thereafter.
(8) The Authority may, where applicable, request from an
operator of an installation information it deems appropriate in
accordance with relevant decisions and regulations adopted by the
Commission pursuant to Directive 2003/87/EC.
(9) Upon approval by the Commission of the lists submitted to the
Commission pursuant to sub-regulation (7), the Authority shall ensure
that the lists of installations, including any free allocation for each
installation, are published.
(1) The quantity of Chapter III allowances that will not be
allocated free of charge, as determined for Malta in accordance
with Directive 2003/87/EC, shall be auctioned by the auctioneer in
accordance with the relevant decisions and regulations adopted by
the Commission pursuant to Directive 2003/87/EC.
(2) The auctioneer shall act in accordance with the relevant
decisions and regulations adopted by the Commission pursuant to
Directive 2003/87/EC.
A beneficiary of funding of any action or project funded from
EU ETS auctioning revenues shall ensure the visibility of such source
of funding.
(1) Allowances issued to operators of installations in
terms of these regulations shall be held in the Union registry. An
operator of an installation shall have an operator holding account in
respect of that installation in the Union registry.
(2) The national registry administrator shall perform its
functions in accordance with the relevant decisions and regulations
adopted by the Commission pursuant to Directive 2003/87/EC
Provided that, in respect of operator holding accounts of
operators of installations to which these regulations apply, the
Authority shall act as the national registry administrator
Provided also that, where the Authority acts as the national
registry administrator there shall be no conflict of interest between
the Authority and holders of operator holding accounts.
(3) A request to open an operator holding account shall be
made by the Authority or the operator of the installation to the
national registry administrator.
(4) A request for the opening of an operator holding account
shall include all information required by the national registry
administrator in accordance with the relevant decisions and
regulations adopted by the Commission pursuant to Directive 2003/
87/EC and any requirements and terms and conditions made by the
national registry administrator.
INSTALLATIONS
(5) The national registry administrator shall open and
administer an operator holding account for an operator of an
installation in accordance with the relevant decisions and
regulations adopted by the Commission pursuant to Directive 2003/
87/EC and any terms and conditions it may make. The national
registry administrator shall not open an account unless it is
satisfied that the request is in accordance with the requirements of
this regulation.
(6) An operator holding account holder and its nominated
authorised representatives shall act in accordance with the relevant
decisions and regulations adopted by the Commission pursuant to
Directive 2003/87/EC and any terms and conditions made by the
national registry administrator.
(7) Where an operator of an installation fails to comply with
any requirements of decisions and regulations adopted by the
Commission in respect of registries or terms and conditions made
by the national registry administrator in respect of registries, the
natio nal registry adm inistrator may p revent the tran sfer of
allowances or other accounting units into or out of any operator
holding account held by that operator until any non-compliance is
rectified
Provided that the national registry administrator shall not
prevent the surrender or cancellation of allowances in accordance
with regulation 22.
(1) The Authority shall, by 30th June of each year, issue the
quantity of free Chapter III allowances that are to be allocated for
that year to each installation included in the list referred to in sub-
regulation (8) of regulation 11, as determined in accordance with
regulation 11
Provided that the allowances allocated to each installation
are issued to the operator holding account opened in respect of that
installation in accordance with regulation 13
Provided further that no allowances may be issued to an
installation whose inscription in the list referred to in sub-regulation
(8) of regulation 11 has not been approved by the Commission.
(2) Issuance of allowances shall be carried out in accordance
w ith the r el evant decisions and reg ulatio ns adop ted by the
European Commission pursuant to Directive 2003/87/EC.
(3)
Where –
(a) an installation has ceased its operations, unless the
operator demonstrates to the Authority that this
installation will resume production within a specified
and reasonable time; or
(b) a permit has been changed, in accordance with
regulation 7, in such a way that it no longer applies to
an installation; or
(c) a permit has been surrendered in accordance with
regulation 9; or
INSTALLATIONS
(d) a permit has been revoked in accordance with regulation
10, the Authority shall inform the national registry
administrator. The national registry administrator shall
ensure that no further allowances are issued to the
operator in respect of an installation subject to any of the
conditions under this sub-regulation, for the first year
after the year when the installation ceases its operations,
or the change in the permit, the surrender of the permit or
the revocation of the permit has come into effect, and for
subsequent years.
(4) Chapter III allowances issued in accordance with sub-
regulation (1) in respect of the period beginning 1st January, 2013 and
subsequent periods shall be valid indefinitely. Allowances issued as
from 1st January, 2021 in a ten-year period shall be valid for emissions
from the first year of that period onwards.
(1) The operator of an installation shall submit to the
Authority a monitoring plan setting out measures to monitor and
report emissions of greenhouse gases specified in respect of the
activities carried out in that installation as listed in Schedule 1.
These measures shall be in accordance with
(a) the principles set out in Schedule 3;
(b) relevant decisions and regulations adopted by the
Commission pursuant to Directive 2003/87/EC; and
(c) any other requirements made by the Authority in
respect of monitoring and reporting of emissions of
greenhouse gases from activities listed in Schedule 1.
(2) The operator of an installation shall submit a monitoring
and reporting plan for the first time to the Authority at the same
time as an application is made for a greenhouse gas emissions
permit in accordance with regulation 4.
(3) The monitoring plan submitted by an operator of an
installation pursuant to sub-regulation (1) shall be approved by the
Authority if it is satisfied that the plan is in accordance with the
requirements set out under this regulation. The Authority may
request from the operator of t he installation any additional
information it deems appropriate for the approval of the plan.
(4) An operator of an installation shall notify the Authority of
any deviations from the monitoring plan that may occur at any time
after the approval of the plan by the Authority
Provided that the Authority shall be notified of any
deviation from the plan
(a) as early as possible before the deviation occurs, if the
deviation is known to the operator or is made known to
the operator prior to its occurrence; or
(b) immediately after the deviation occurs if the
occurrence of the deviation is not known to the
operator or is not made known to the operator before
or at the time of its occurrence.
INSTALLATIONS
(5) An operator of an installation shall maintain a documented
record, which shall include information in accordance with
requirements that may be established by the Authority, of any
deviations that occur during a monitoring year and shall submit
such record to the Authority together with the annual emissions
report submitted pursuant to regulation 16.
(6) The operator of an installation shall regularly check if the
approved monitoring plan reflects the nature and function of the
installation. An operator may at any time after the approval of the
monitoring plan of an installation, submit to the Authority
proposed modifications that have to be made to the plan, in
accordance with the relevant decisions and regulations adopted by
the Commission pursuant to Directive 2003/87/EC. The operator
shall maintain a documented record of all modifications to the
monitoring plan. No proposed significant modifications to an
approved plan shall be valid without the approval of the Authority.
(7) Where it deems appropriate, the Authority may request the
submission of a revised plan.
(8) An operator of an installation shall monitor emissions from
that installation during each monitoring year.
(9) Without prejudice to sub-regulation (4), an operator of an
installation shall monitor annual emissions in accordance with the
monitoring plan approved by the Authority in accordance with this
regulation. The Authority may take any action it deems necessary
under these regulations to ensure that an operator is monitoring and
reporting annual emissions in accordance with the approved
monitoring plan.
(1) An operator of an installation shall report annual
emissions, monitored in accordance with regulation 15, for each
monitoring year in accordance with
(a) the principles set out in Schedule 3; and
(b) relevant decisions and regulations adopted by the
Commission pursuant to Directive 2003/87/EC; and
(c) any other requirements made by the Authority in
respect of reporting of emissions of greenhouse gases
from activities listed in Schedule 1.
(2) An operator of an installation shall submit to the Authority an
annual report on the emissions from that installation for a monitoring
year by not later than 31st March of the subsequent year.
(3) The report submitted by an operator of an installation
pursuant to sub-regulation (2) shall be verified by a verifier in
accordance with
(a) the principles set out in Schedule 4; and,
(b) relevant decisions and regulations adopted by the
Commission pursuant to Directive 2003/87/EC; and
(c) any other requirements made by the Authority in
respect of verification of annual emission reports for
INSTALLATIONS
emissions from installations.
The verifier shall issue a verification report.
(4) A verification report shall be submitted by the operator of an
installation to the Authority with an annual emissions report
submitted. The operator shall also enter the amount of emissions
reported in the verified annual emissions report for a monitoring year
into the Union Registry, by 31st March of the subsequent year.
(5) Where an operator of an installation fails to submit an
annual emissions report for a monitoring year that has been verified
as satisfactory by the 31st March of the subsequent year, the
national registry administrator shall not allow the transfer of
allowances or any other accounting units out of the operator
holding account until a report from the operator in respect of that
installation has been verified as satisfactory
Provided that the national registry administrator shall not
prevent the surrender or cancellation of allowances in accordance
with regulation 19, or the issuance of allowances in exchange for
CERs or ERUs in accordance with regulation 20.
(6) The operator of an installation for which an annual emissions
report is to be verified shall notify the Authority and the National
Accreditation Board – Malta of the planned date and place of the
verification and the identity of the verifier who will perform the
verification, by not later than thirty days prior to the date when the
verification is to be performed.
(1) The Authority may perform any checks it deems
necessary to ensure that a report submitted by an operator is in
accordance with regulation 16.
(2) The Authority shall, on the basis of the information included
in the annual emissions report and the verification report submitted in
accordance with regulation 16 and its own checks, without undue
delay, determine whether it can accept the submitted annual emissions
report. The Authority shall not accept a report of annual emissions
which has not been verified as satisfactory or for which a verification
report has not been submitted. The Authority shall inform the operator,
in writing or through other documented means, of its decision. Where
it deems necessary, the Authority may require the submission of a
revised annual emissions report. The revised annual emissions report
shall be verified in accordance with regulation 16. Where necessary
the operator shall also update the amount of emissions entered into the
Union Registry.
(3) Where, in respect of any monitoring year, an operator of an
installation does not submit a verified annual emissions report in
accordance with regulation 16, or where it is deemed that the
operator has not submitted an annual emissions report which is in
accordance with the requirements set out in regulation 16, the
Authority may, unless there is written agreement between the
Authority and the operator providing otherwise, itself determine
the emissions for activities performed in that installation for that
monitoring year. The Authority shall use best available data and
INSTALLATIONS
ensure that a conservative estimate is made that does not
underestimate emissions. When annual emissions are determined
u nder t his sub-reg ulat io n, th e A uth ority shal l co nsid er the
requirements set out in Schedules 3 and 4
Provided that the Authority shall notify the operator of the
installation of the emissions as determined and the methodology
used to determine such emissions
Provided further that the Authority shall enter the amount of
emissions as determined in accordance with this sub-regulation into
the Union Registry.
(4) Where the verification report submitted with an annual
emissions report states outstanding non-conformities or
recommendations for improvements, the operator of the installation
shall submit to the Authority, by not later than 30th June of the year
w h e n t h e v e r i f i c a t i o n r e p o r t i s i s s u e d b y t h e v e r i f i e r, a n
improvement report describing how and when the operator has
rectified or plans to rectify the non-conformities identified by the
verifier and to implement recommended improvements.
(5) The Authority shall, within a reasonable time, approve the
improvement report and inform the operator of the installation of its
approval. Where it deems necessary, the Authority may require the
submission of a revised improvement report.
(1) An operator of an installation who fails to submit a
monitoring plan in accordance with regulation 15 in respect of the
period beginning the 1st January, 2013 or a subsequent period, shall
be liable to the imposition
(a) for an operator of an installation for which emissions
for the first calendar year of the period for which the
plan relates or for the first year of performing an
activity covered by these regulations during the period
for which the plan relates are equal to or less than fifty
thousand (50,000) tonnes carbon dioxide equivalents,
of an administrative fine of five thousand euro
(€5,000) and, or, one hundred euro (€100) for each day
of non-compliance, from the date of a notice given by
the Authority to the operator;
(b) for an operator of an installation for which emissions
for the first calendar year of the period for which the
plan relates or for the first year of performing an
activity covered by these regulations during the period
for which the plan relates are more than fifty thousand
(50,000) tonnes of carbon dioxide equivalents and
equal to or less than five hundred thousand (500,000)
tonnes of carbon dioxide equivalent, of an
administrative fine of ten thousand euro (€10,000)
and, or, three hundred euro (€300) for each day of non-
compliance, from the date of a notice given by the
Authority to the operator;
(c) for an operator of an installation for which emissions
for the first calendar year of the period for which the
INSTALLATIONS
plan relates or for the first year of performing an
activity covered by these regulations during the period
for which the plan relates are more than five hundred
thousand (500,000) tonnes of carbon dioxide
equivalents, of an administrative fine of fifty thousand
euro (€50,000) and, or, six hundred euro (€600) for
each day of non-compliance, from the date of a notice
given by the Authority to the operator.
(2) An operator of an installation who fails to monitor annual
emissions during a year in accordance with regulation 15 or fails to
submit a verified annual emissions report in respect of a year in
accordance with regulation 16, shall be liable to the imposition
(a) for an operator of an installation for which emissions
for that year are equal to or less than fifty thousand
(50,000) tonnes carbon dioxide equivalents, of an
administrative fine of five thousand euro (€5,000) and,
or, one hundred euro (€100) for each day of non-
compliance, from the date of a notice given by the
Authority to the operator;
(b) for an operator of an installation for which emissions
for that year are more than fifty thousand (50,000)
tonnes of carbon dioxide equivalents and equal to or
less than five hundred thousand (500,000) tonnes
carbon dioxide equivalents, of an administrative fine
of ten thousand euro (€10,000) and, or, three hundred
euro (€300) for each day of non-compliance, from the
date of a notice given by the Authority to the operator;
(c) for an operator of an installation for which emissions
for that year are more than five hundred thousand
(500,000) tonnes carbon dioxide equivalents, of an
administrative fine of fifty thousand euro (€50,000)
and, or, six hundred euro (€600) for each day of non-
compliance, from the date of a notice given by the
Authority to the operator.
(3) For the purposes of determining the administrative fine
under this regulation, where the emissions of the installation are
not known or where the Authority is satisfied that there is no
reasonable possibility that a verified quantity of emissions will be
reported by the operator of the installation, the Authority may itself
determine the emissions from the activities performed in that
installation. The Authority shall use best available data and ensure
that a conservative estimate is made that does not underestimate
emissions. The operator of the installation shall be liable to the
imposition of an administrative fine equal to the amounts
established in sub-regulations (1) and (2) in respect of the quantity
of emissions estimated by the Authority in terms of this sub-
regulation.
INSTALLATIONS
(1) For the period ending 31st December, 2020, an operator
of an installation shall, by 30th September of each year, surrender a
number of allowances, other than Chapter II allowances, that is equal
to the total emissions from that installation during the preceding
calendar year as verified in accordance with regulation 16, or as
determined by the Authority in accordance with regulation 17. An
operator of an installation shall not surrender Chapter II allowances for
the period ending 31st December, 2020.
(1a) For the period starting 1st January, 2021, and subsequent
periods, an operator of an installation shall, by 30th April each
year, surrender a number of allowances that is equal to the total
emissions from that installation during the preceding calendar year
as verified in accordance with regulation 16, or as determined by
the Authority in accordance with regulation 17. For the period
starting 1st January, 2021, and subsequent periods, an operator of
an installation shall not be prohibited from surrendering Chapter II
allowances.
(1b) Allowances issued by a competent authority of another
Member State shall be recognized by the Authority for the purpose
of meeting the obligations of an operator of an installation under
sub-regulations (1) and (1a).
(1c) Where necessary, and for as long as is necessary, in accordance
with relevant decisions and regulations adopted by the Commission
pursuant to Directive 2003/87/EC, an operator of an installation shall
not surrender allowances that are issued by a Member State in respect
of which there are obligations arising from Directive 2003/87/EC
which are lapsing.
(2) The national registry administrator shall cancel allowances
surrendered in accordance with sub-regulation (1).
(3) The national registry administrator shall cancel allowances
at any time at the request of an operator of an installation holding
those allowances.
(4) An obligation to surrender allowances shall not arise in
respect of emissions verified as captured and transported for
permanent storage to a facility for which a permit is in force in
accordance with Directive 2009/31/EC.
(4a) An obligation to surrender allowances shall not arise in
respect of emissions of greenhouse gases which are considered to have
been captured and utilised in such a way that they have become
permanently chemically bound in a product so that they do not enter
the atmosphere under normal use, including any normal activity taking
place after the end of the life of the product , as determined in
accordance with the relevant decisions and regulations adopted
pursuant to Directive 2003/87/EC.
(5) Surrender and cancellation of allowances shall be carried
out in accordance with the relevant decisions and regulations
adopted by the Commission pursuant to Directive 2003/87/EC.
(6)
The Authority shall publish the name of any operator who is in
INSTALLATIONS
breach of the requirement to surrender sufficient allowances under
sub-regulations (1) or (1a).
(7) An operator who does not surrender sufficient allowances as
required under sub-regulations (1) or (1a) to cover its emissions during
the preceding year, or who has not yet surrendered allowances to cover
its emissions during any previous year, shall be liable to the imposition
of an administrative fine of one hundred euro (€100) for each tonne of
carbon dioxide equivalent emitted for which the operator has not
surrendered allowances.
(8) From the 1st January, 2013, where, for the year in which an
operator of an installation does not surrender sufficient allowances
to cover emissions during that year in accordance with sub-
regulation (1), the annual average Harmonized European Index of
Consumer P rices published shows a percentage increase as
compared to the latest Harmonized European Index of Consumer
Prices published for the previous year, the administrative fine shall
be increased by the same percentage. The administrative fine as
revised pursuant to this sub-regulation shall apply to subsequent
years unless further increased in accordance with the Harmonized
European Index of Consumer Prices. For the purposes of this sub-
regulation, each allowance not surrendered by the operator for a
tonne of carbon dioxide equivalent emitted shall be considered as a
separate contravention.
(9) The imposition of an administrative fine as prescribed in
sub-regulation (7) shall not release the operator from the obligation
to surrender an amount of allowances equal to those excess
emissions in respect of which the administrative fine is paid when
surrendering allowances in relation to the following calendar year.
(10) Where an operator of an installation fails to surrender
allowances in accordance with sub-regulations (1) or (1a), the
national registry administrator shall not allow the transfer of
allowances or any other accounting units out of the operator
holding account opened in respect of that installation until the
operator complies with the requirement to surrender allowances
Provided that the national registry administrator shall not
prevent the surrender of allowances in accordance with sub-
regulations (1) and (1a) or the cancellation of allowances in
accordance with sub-regulation (4), or the issuance of allowances in
exchange for CERs or ERUs in accordance with regulation 20.
(1) To the extent that the levels of CER and ERU use,
allowed to an operator of an installation for the period from 2008 to
2012, have not been used up, or where an entitlement to use credits
is granted under sub-regulation (5), the operator may request to be
issued allowances valid from 2013 onwards in exchange for CERs
and ERUs issued in respect of emission reductions up until 2012
2020. from project types which were eligible for use in the Union scheme
during the period from 2008 to 2012. Until the 31st March, 2015,
the Authority shall make such an exchange on request.
(2) To the extent that the levels of CER and ERU use, allowed
to an operator of an installation for the period 2008 to 2012, have
INSTALLATIONS
not been used up, or where an entitlement to use credits is granted
under sub-regulation (5), the operator may exchange CERs and
ERUs issued in respect of emission reductions from 2013 onwards
from project types that were registered before 2013 and which were
eligible for use in the Union scheme during the period from 2008 to
2012, for allowances valid from 2013 onwards.
(3) To the extent that the levels of CER and ERU use, allowed
to an operator of an installation for the period from 2008 to 2012,
have not been used up, or where an entitlement to use credits is
granted under sub-regulation (5), the operator may exchange CERs
issued in respect of emission reductions from 2013 onwards from
project types started from 2013 onwards in least developed
countries and which were eligible for use in the Union scheme
during the period from 2008 to 2012, for allowances valid from
2013 onwards. This sub-regulation shall apply until such countries
have ratified a relevant agreement with the Union or until 2020,
whichever is the earlier.
(4) To the extent that the levels of CER and ERU use, allowed
to an operator of an installation for the period from 2008 to 2012,
have not been used up, or where an entitlement to use credits is
granted under sub-regulation (5), the operator may use credits from
projects or other emission reducing activities in accordance with
any agreements that may be concluded by the Union with third
countries, up to levels of use as specified in such agreements, to
comply with obligations under these regulations.
(5) For the period from 2013 to 2020 an operator of an
installation shall be entitled to use an additional quantity of CERs
and ERUs up to an amount corresponding to a percentage of its
verified emissions during the period from the 1st January, 2013 to
the 31st December, 2020, as may be established by the Commission
pursuant to Directive 2003/87/EC.
(6) For the purposes of this regulation, operators shall not use
CERs or ERUs for which restrictions on use apply in accordance
with relevant decisions and regulations adopted by the Commission
pursuant to Directive 2003/87/EC.
No CERs or ERUs shall be issued for reductions or
limitations of greenhouse gas emissions with respect to activities
that fall within the scope of these regulations.
Decisions related to the allocation of allowances to
operators of installations and reports of emissions submitted in
accordance with regulation 17 shall be made available to the public
in accordance with the Freedom of Access to Information on the
Environment Regulations
Provided that any access to personal data shall be made in
accordance with the Data Protection Act and that information
covered by professional secrecy may not be disclosed to any other
person or authority except by virtue of the applicable laws,
regulations, administrative provisions and, or, the provisions of the
Professional Secrecy Act
INSTALLATIONS
Provided also that without prejudice to this regulation and
to the obligation which may be imposed on the Authority to
disclose any information, the Authority shall not disclose any
c o n f i d e n t i a l i n f o r m a t i o n o r an y p a r t s t h e r e o f o r a n y o t h e r
information which should be treated as commercially confidential
Provided further that any information which shall be treated
as commercially confidential shall be made known at all times to
the Authority.
The Authority may require that submissions of applications,
monitoring and reporting plans and reports under these regulations
are made in the form and manner and by means of the medium as
specified by it.
The revenue from the auctioning of allowances, after
deducting the audited costs to administer the EU ETS agreed between
the Minister responsible for finance and the Authority, shall accrue to
the Consolidated Fund.
The Administrative Review Tribunal shall have
jurisdiction to hear and determine appeals from decisions of the
Authority made under these regulations in terms of the Administrative
Justice Act, which appeal shall be filed by not later than twenty (20)
days from the service of the said Authority’s decision, wherein the
aggrieved person shall specify the reasons on the basis of which the
said decision of the Authority should be cancelled or modified
Provided that any party to the proceedings before the
Administrative Review Tribunal who feels aggrieved by a decision of
the said Tribunal, may appeal to the Court of Appeal on a point of law
in accordance with the Code of Organization and Civil Procedure.
(1) Where an operator of an installation has reported, for
that installation, verified emissions of less than twenty five
thousand (25,000) tonnes of carbon dioxide equivalent, and where
that installation carried out combustion activities, has a rated
thermal input below thirty five (35) MW, excluding emissions from
biomass, in each of the three years preceding a notification under
sub-regulation (8) of regulation 11, the Authority may, after
consultation with the operator of the installation and the Minister,
propose to exclude that installation from the EU ETS
Provided that the installation shall be subject to
equivalent measures that will achieve a contribution to emissions
reductions that is equivalent to these regulations
Provided further that arrangements for monitoring of
emissions are in place to assess whether the installation to which the
equivalent measures apply emits twenty-five thousand (25,000) tonnes
or more of carbon dioxide equivalent, excluding emissions from
biomass, in any one calendar year
INSTALLATIONS
Provided further that the Authority may establish
simplified monitoring, reporting and verification measures for an
installation to which equivalent measures apply if the average annual
verified emissions of that installation between 2008 and 2010 are
below five thousand (5,000) tonnes a year.
(2)
The Authority shall notify the Commission of an
installation for which an exclusion in accordance with regulation (1) is
proposed, before the list of installations pursuant to sub-regulation (8)
of regulation 11 is to be submitted or, at the latest, when that list is
submitted to the Commission, specifying the equivalent measures
applying to that installation. The exclusion is deemed approved if the
Authority does not receive an objection from the Commission in
accordance with Directive 2003/87/EC.
(3)
The installation shall be excluded following the
surrender of allowances in respect of the period during which that
installation is in the EU ETS. The Authority shall, where applicable,
no longer issue free allowances to that installation pursuant to
regulation 14.
(4)
Where an installation excluded in accordance with sub-
regulation (1) emits twenty-five thousand (25,000) tonnes or more of
carbon dioxide equivalent, excluding emissions from biomass, in any
one calendar year, or the equivalent measures applying to that
installation are no longer in place, the installation shall be reintroduced
into the EU ETS, starting from the first calendar year following the
year when the installation emits twenty-five thousand (25,000) tonnes
or more of carbon dioxide equivalent, excluding emissions from
biomass. An installation which has been reintroduced into the EU ETS
shall stay in the EU ETS for the rest of the period referred to in
regulation 11 during which it is reintroduced.
(5)
When an installation is reintroduced into the EU ETS
pursuant to sub-regulation (4), any allowances to be allocated for free
in accordance with regulation 11 shall be granted starting from the
year when the installation is reintroduced into the EU ETS. The
allowances to be allocated to that installation shall be deducted from
the quantity of allowances to be auctioned pursuant to regulation 12.
(6)
For installations which were not in the EU ETS during
the period from 2008 to 2012, the Authority may apply monitoring,
reporting and verification requirements for determining emissions in
the three years preceding the year of a notification pursuant to sub-
regulation (2).
(7)
The Authority shall ensure that the notification to the
Commission pursuant to sub-regulation (2), a confirmation that
arrangements for monitoring of emissions of an installation excluded
in accordance with sub-regulation (1) are in place, and a confirmation
INSTALLATIONS
that if an installation excluded in accordance with sub-regulation (1)
emits twenty-five thousand (25,000) tonnes or more of carbon dioxide
equivalent, excluding emissions from biomass, in any one calendar
year, that installation will be reintroduced into the EU ETS, are made
available to the public.
(8)
The Authority may exclude a hospital from the EU ETS
Provided that the hospital is subject to equivalent
measures that will achieve a contribution to emissions reductions that
is equivalent to these regulations.
(1) Where an operator of an installation has reported, for
that installation, verified emissions of less than two thousand five
hundred (2,500) tonnes of carbon dioxide equivalent, disregarding
emissions from biomass, in each of the three years preceding a
notification under sub-regulation (8) of regulation 11, the Authority
may, after consultation with the operator of the installation and the
Minister, exclude that installation from the EU ETS
Provided that the Authority shall notify the Commission
of such an installation before the list of installations pursuant to sub-
regulation (8) of regulation 11 is to be submitted or, at the latest, when
that list is submitted to the Commission
Provided further that arrangements for monitoring of
emissions are in place to assess whether the installation emits two
thousand five hundred (2,500) tonnes or more of carbon dioxide
equivalent, disregarding emissions from biomass, in any one calendar
year.
(2)
Where an installation excluded in accordance with sub-
regulation (1) emits two thousand five hundred (2,500) tonnes or more
of carbon dioxide equivalent, disregarding emissions from biomass, in
any one calendar year, the installation shall be reintroduced into the
EU ETS, starting from the first calendar year following the year when
the installation emits two thousand five hundred (2,500) tonnes or
more of carbon dioxide equivalent, disregarding emissions from
biomass.
(3)
When an installation is reintroduced into the EU ETS
pursuant to sub-regulation (2), any allowances to be allocated for free
in accordance with regulation 11 shall be granted starting from the
year when the installation is reintroduced into the EU ETS. The
allowances to be allocated to that installation shall be deducted from
the quantity of allowances to be auctioned pursuant to regulation 12.
(4)
The Authority shall ensure that the notification to the
Commission pursuant to sub-regulation (1), a confirmation that
arrangements for monitoring of emissions of an installation excluded
in accordance with sub-regulation (1) are in place, and a confirmation
INSTALLATIONS
that if an installation excluded in accordance with sub-regulation (1)
emits two thousand five hundred (2,500) tonnes or more of carbon
dioxide equivalent, disregarding emissions from biomass, in any one
calendar year, that installation will be reintroduced into the EU ETS,
are made available to the public.
(1) Where an operator of an installation notified the
Authority of a reserve or backup unit which did not operate more
than 300 hours per year in each of the three years preceding a
notification under sub-regulation (8) of regulation 11, the Authority
may, after consultation with the operator of the installation and, the
Minister, exclude that unit from the EU ETS
Provided that the Authority shall notify the Commission
of such a unit before the list of installations pursuant to sub-regulation
(8) of regulation 11 is to be submitted or, at the latest, when that list is
submitted to the Commission
Provided further that arrangements for monitoring of
emissions are in place to assess whether the reserve or backup unit has
operated more than 300 hours in any one calendar year.
(2)
Where a reserve or backup unit excluded in accordance
with sub-regulation 1 operates more than 300 hours in any one
calendar year, the unit shall be reintroduced into the EU ETS, starting
from the first calendar year following the year when the unit has
operated more than 300 hours.
(3)
When a unit is reintroduced into the EU ETS pursuant to
sub-regulation (2), any allowances to be allocated for free in respect of
that unit in accordance with regulation 11 shall be granted starting
from the year when the unit is reintroduced into the EU ETS. The
allowances to be allocated to that unit shall be deducted from the
quantity of allowances to be auctioned pursuant to regulation 12.
(4) The Authority shall ensure that the notification to the
Commission pursuant to sub-regulation (1), a confirmation that
arrangements for monitoring of the hours of operation of a unit
excluded in accordance with sub-regulation (1) are in place, and a
confirmation that if a unit excluded in accordance with sub-regulation
(1) operates more than 300 hours in any one calendar year, that unit
will be reintroduced into the EU ETS, are made available to the public.
(1) When an installation that is included in the scope of
these regulations due to the operation of combustion units with a
total rated thermal input exceeding 20MW changes its production
processes to reduce its greenhouse gas emissions and no longer
meets that threshold, the operator may decide that such installation
shall remain within the scope of these regulations until the end of
the current five (5) year period referred to in regulation 11(7), and
the next five (5) year period referred to in regulation 11(7),
following the change to its production process. The operator of
INSTALLATIONS
such installation shall inform the Authority of such decision.
(2) The Authority shall notify the Commission with the changes to
the lists of installations in accordance with regulation 11(7) in respect
of any decision made in accordance with sub-regulation (1).
INSTALLATIONS
Schedule 1
Amended by
(regulations 1(2), 2, 3, 4(1), 4(2), 4(4), 5(1), 5(2), 5(3)(c), 5(3)(d),
L.N. 268 of 2019.
5(3)(e), 6(3)(e), 7(1)(c), 9(1), 15(1)(c), 16(1)(a), 16(1)(c), 16(3)(c))
Substituted by
L.N. 315 of 2024.
Categories of Activities to which these Regulations apply
1. Installations or parts of installations used for research, development and
testing of new products and processes are not covered by these regulations. Installations
where during the preceding relevant five (5) year period referred to in regulation 11(7),
emissions from the combustion of biomass that complies with the criteria established in
accordance with sustainability and greenhouse gas emission-saving criteria for the use of
biomass established by the Biofuels, Bioliquids and Biomass Fuels (Sustainability
Criteria) Regulations contribute on average to more than 95% of the total average
greenhouse gas emissions are not covered by these regulations.
2. The thresholds values given below generally refer to production capacities
or outputs. Where several activities falling under the same category are carried out in the
same installation, the capacities of such activities are added together.
3. When the total rated thermal input of an installation is calculated in order
to decide upon its inclusion in the EU ETS, the rated thermal inputs of all technical units
which are part of it, in which fuels are combusted within the installation, shall be added
together. Those units may include all types of boilers, burners, turbines, heaters,
furnaces, incinerators, calciners, kilns, ovens, dryers, engines, fuel cells, chemical
looping combustion units, flares, and thermal or catalytic post-combustion units. Units
with a rated thermal input under 3 MW shall not be taken into account for the purposes
of this calculation.
4. If a unit serves an activity for which the threshold is not expressed as total
rated thermal input, the threshold of this activity shall take precedence for the decision
about the inclusion in the EU ETS.
5. When the capacity threshold of any activity listed in this Schedule is found
to be exceeded in an installation, all units in which fuels are combusted, other than units
for the incineration of hazardous or municipal waste, shall be included in the greenhouse
gas emission permit.
Activities
Greenhouse gases
INSTALLATIONS
Combustion of fuels in
Carbon dioxide
installations with a total rated
thermal input exceeding 20 MW
(except in installations for the
incineration of hazardous or
municipal waste)
From 1 January 2024,
combustion
of
fuels
in
installations for the incineration
of municipal waste with a total
rated thermal input exceeding
20 MW, for the purposes of
regulations 15, 16, 17 and 18.
Refining of oil, where
Carbon dioxide
combustion units with a total
rated thermal input exceeding
20 MW are operated
Production of coke
Carbon dioxide
Metal ore (including
Carbon dioxide
sulphide ore) roasting or
sintering installations, including
pelletisation
Production of iron or
Carbon dioxide
steel (primary or secondary
fusion) including continuous
casting, with a capacity
exceeding 2.5 tonnes per hour
Production or processing
Carbon dioxide
of ferrous metals (including
ferro-alloys) where combustion
units with a total rated thermal
input exceeding 20MW are
operated. Processing includes,
inter alia, rolling mills, re-
heaters, annealing furnaces,
smitheries, foundries, coating
and pickling
Production of primary
Carbon dioxide
aluminium or alumina
Production of secondary
Carbon dioxide
aluminium where combustion
units with a total rated thermal
input exceeding 20MW are
operated
INSTALLATIONS
Production or processing
Carbon dioxide
of non-ferrous metals, including
production of alloys, refining,
foundry casting, etc., where
combustion units with a total
rated thermal input (including
fuels used as reducing agents)
exceeding 20MW are operated
Production of cement
Carbon dioxide
clinker in rotary kilns with a
production capacity exceeding
500 tonnes per day or in other
furnaces with a production
capacity exceeding 50 tonnes
per day
Production of lime or
Carbon dioxide
calcinations of dolomite or
magnesite in rotary kilns or in
other furnaces with a production
capacity exceeding 50 tonnes
per day
Manufacture of glass
Carbon dioxide
including glass fibre with a
melting capacity exceeding 20
tonnes per day
Manufacture of ceramic
Carbon dioxide
products by firing, in particular
roofing tiles, bricks, refractory
bricks, tiles, stoneware or
porcelain, with a production
capacity exceeding 75 tonnes
per day
Manufacture of mineral
Carbon dioxide
wool insulation material using
glass, rock or slag with a
melting capacity exceeding 20
tonnes per day
Drying or calcination of
Carbon dioxide
gypsum or production of plaster
boards and other gypsum
products, with a production
capacity of calcined gypsum or
dried
secondary
gypsum
exceeding a total of 20 tonnes
per day
Production of pulp from
Carbon dioxide
timber or other fibrous materials
INSTALLATIONS
Production of paper or
Carbon dioxide
cardboard with a production
capacity exceeding 20 tonnes
per day
Production of carbon
Carbon dioxide
black
involving
the
carbonisation
of
organic
substances such as oils, tars,
cracker and distillation residues
with a production capacity
exceeding 50 tonnes per day
Production of nitric acid
Carbon dioxide and nitrous oxide
Production of adipic acid
Carbon dioxide and nitrous oxide
Production of glyoxal
Carbon dioxide and nitrous oxide
and glyoxylic acid
Production of ammonia
Carbon dioxide
Production
of
bulk
Carbon dioxide
organic chemicals by cracking,
reforming, partial or full
oxidation
or
by
similar
processes, with a production
capacity exceeding 100 tonnes
per day
Production of hydrogen
Carbon dioxide
(H 2 ) and synthesis gas by
reforming or partial oxidation
with a production capacity
exceeding 5 tonnes per day
Production of soda ash
Carbon dioxide
(Na 2 CO 3 )
and
sodium
bicarbonate (NaHCO 3 )
Capture of greenhouse
Carbon dioxide
gases from installations covered
by the Directive for the purpose
of transport and geological
storage in a storage site
permitted under Directive 2009/
31/EC
Transport of greenhouse
Carbon dioxide
gases for geological storage in a
storage site permitted under
Directive 2009/31/EC, with the
exclusion of those emissions
covered by another activity
under the Directive 2003/87/EC
INSTALLATIONS
Geological storage of
Carbon dioxide
greenhouse gases in a storage
site permitted under Directive
2009/31/EC
Schedule 2
Regulation 2
Greenhouse gases
Carbon dioxide (CO 2 )
Methane (CH 4 )
Nitrous Oxide (N 2 O)
Hydrofluorocarbons (HFCs)
Perfluorocarbons (PFCs)
Sulphur Hexafluoride (SF 6 )
Schedule 3
Substituted by
(regulations 15(1)(a), 16(1)(a))
L.N. 315 of 2024.
Monitoring and reporting of emissions from stationary installations
Monitoring of carbon dioxide emissions
Emissions shall be monitored either by calculation or on the basis of
measurement.
Calculation
Calculations of emissions shall be performed using the formula
Activity data × Emission factor × Oxidation factor
Activity data (fuel used, production rate etc.) shall be monitored on the basis of
supply data or measurement.
Accepted emission factors shall be used. Activity-specific emission factors are
acceptable for all fuels. Default factors are acceptable for all fuels except non-
commercial ones (waste fuels such as tyres and industrial process gases). Seam-specific
defaults for coal, and EU-specific or producer country-specific defaults for natural gas
shall be further elaborated. IPCC default values are acceptable for refinery products. The
emission factor for biomass that complies with the sustainability criteria and greenhouse
INSTALLATIONS
gas emission-saving criteria for the use of biomass established by Directive (EU) 2018/
2001, with any necessary adjustments for application under these regulations, as set out
in the implementing acts referred to in Article 14 of Directive 2003/87/EC, shall be zero.
If the emission factor does not take account of the fact that some of the carbon is
not oxidised, then an additional oxidation factor shall be used. If activity-specific
emission factors have been calculated and already take oxidation into account, then an
oxidation factor need not be applied.
Default oxidation factors developed pursuant to Directive 2010/75/EU* * shall be
used, unless the operator can demonstrate that activity-specific factors are more
accurate.
A separate calculation shall be made for each activity, installation and for each
Measurement
Measurement of emissions shall use standardised or accepted methods, and shall
be corroborated by a supporting calculation of emissions.
Monitoring of emissions of other greenhouse gases
Standardised or accepted methods, developed by the Commission in collaboration
with all relevant stakeholders and adopted pursuant to Article 14(1) of Directive 2003/
87/EC, shall be used.
Reporting of emissions
Each operator shall include the following information in the report for an
installation
A.
Data identifying the installation, including
— Name of the installation;
— Its address, including postcode and country;
— Type and number of Schedule 1 activities carried out in the installation;
— Address, telephone, fax and email details for a contact person; and
— Name of the owner of the installation, and of any parent company.
B.
For each Schedule 1 activity carried out on the site for which emissions are
calculated
— Activity data;
* *Directive 2010/75/EU of the European Parliament and of the Council of 24 November 2010 on industrial
emissions (integrated pollution prevention and control) (recast)
INSTALLATIONS
— Emission factors;
— Oxidation factors;
— Total emissions; and
— Uncertainty.
C.
For each Schedule 1 activity carried out on the site for which emissions are
measured
— Total emissions;
— Information on the reliability of measurement methods; and
— Uncertainty.
D.
For emissions from combustion, the report shall also include the oxidation
factor, unless oxidation has already been taken into account in the
development of an activity-specific emission factor.
Schedule 4
Regulation 16(3)(a)
Criteria for Verification
General Principles
1. Emissions from each activity listed in Schedule 1 to these regulations shall
be subject to verification
2. The verification process shall include consideration of the report submitted
pursuant to regulation 16 and of monitoring during the preceding year. It shall
address the reliability, credibility and accuracy of monitoring systems and the
reported data and information relating to emissions, in particular
(a) the reported activity data and related measurements and calculations;
(b) the choice and the employment of emission factors;
(c) the calculations leading to the determination of the overall emissions;
and
(d) if measurement is used, the appropriateness of the choice and the
employment of measuring methods.
3. Reported emissions may only be validated if reliable and credible data and
information allow the emissions to be determined with a high degree of certainty. A
high degree of certainty would require the operator to show that
(a) the reported data is free of inconsistencies;
(b) the collection of data has been carried out in accordance with the
applicable scientific standards; and
(c) the relevant records of the installation are complete and consistent.
INSTALLATIONS
4. The verifier shall be given access to all sites and information in relation to
the subject of the verification.
5. The verifier shall take into account whether the installation is registered
under the Community eco-management and audit scheme (EMAS).
Methodology
Strategic analysis
6. The verification shall be based on a strategic analysis of all the activities
carried out in the installation. This requires the verifier to have an overview of all
the activities and their significance for emissions.
Process analysis
7. The verification of the information submitted shall, where appropriate, be
carried out on the site of the installation. The verifier shall use spot-checks to
determine the reliability of the reported data and information.
Risk analysis
8. The verifier shall submit all the sources of emissions in the installation to an
evaluation with regard to the reliability of the data of each source contributing to the
overall emissions of the installation.
9. On the basis of this analysis the verifier shall explicitly identify those
sources with a high risk of error and other aspects of the monitoring and reporting
procedure which are likely to contribute to errors in the determination of the overall
emissions. This especially involves the choice of the emission factors and the
calculations necessary to determine the level of the emissions from individual
sources. Particular attention shall be given to those sources with a high risk of error
and the abovementioned aspects of the monitoring procedure.
10. The verifier shall take into consideration any effective risk control methods
applied by the operator with a view to minimizing the degree of uncertainty.
Report
11. The verifier shall prepare a report on the validation process stating whether
the report submitted pursuant to regulation 16 of these regulations is satisfactory.
This report shall specify all issues relevant to the work carried out. A statement that
the report submitted pursuant to regulation 16 of these regulations is satisfactory
may be made if, in the opinion of the verifier, the total emissions are not materially
misstated.
Minimum competency requirements for the verifier
12. The verifier shall be independent of the operator, carry out his activities in a
sound and objective professional manner, and understand
(a) the provisions of these regulations, as well as relevant standards and
guidance adopted by the Authority pursuant to these regulations;
(b) the legislative, regulatory, and administrative requirements relevant to
the activities being verified; and
(c) the generation of all information related to each source of emissions in
the installation, in particular, relating to the collection, measurement,
calculation and reporting of data.