ENERGY PERFORMANCE OF BUILDINGS REGULATIONS
Table of Provisions (40)
Statutory Text (40 Articles)
SUBSIDIARY LEGISLATION 623.01
ENERGY PERFORMANCE OF
BUILDINGS REGULATIONS
13th February, 2018
LEGAL NOTICE 47 of 2018, as amended by Legal Notices 134 of 2020,
409 of 2021, 231 of 2022 305 of 2023 and 153 of 2026.
(1)
The title of these regulations is the Energy
Performance of Buildings Regulations.
(2) The scope of these regulations is to transpose Directive
2010/31/EU of the European Parliament and of the Council on the
energy performance of buildings and to give effect to its provisions.
These regulations promote the improvement of the energy
performance of buildings within the territory of Malta, taking into
account outdoor climatic and local conditions, as well as indoor
climate requirements and cost-effectiveness.
(1)
Unless otherwise stated in these regulations, the
definitions prescribed in the Act and in the Technical Document F
referred to in regulation 5, shall also apply.
(2) For the purpose of these regulations and unless the
context otherwise requires, the following definitions shall apply
"Act" means the Building and Construction Authority Act;
"advisory report" means a report made by an energy
performance of building (EPB) assessor, accompanying an Energy
Performance Certificate (EPC), worked on the basis of an assessment
of the energy performance of a building or heating or cooling
installations, and containing recommendations on how the energy
performance of the building or heating or cooling installations may
be improved in a cost-effective manner;
"air-conditioning system" means a combination of the
components required to provide a form of indoor air treatment, by
which temperature is controlled or lowered;
"asset rating" means an energy performance rating based on
(a)
data for the building as actually constructed;
(b)
calculations of the energy used in a building for
heating, cooling, ventilation, hot water and lighting; and
(c)
standard input data in relation to internal and
external climates and building occupation, and representing
the intrinsic energy performance potential of the building
under standardised conditions of weather and building
occupation;
"authorised officer" means a person authorised by the Head of
the Building and Construction Authority to monitor and ensure
compliance with these regulations;
"body corporate" means a body or legal entity, such as an
association, company, person, the government, government agencies,
corporation, or institution, identified by a particular name and
bearing a distinct and separate legal personality or legal status from
that of its members, also known as corporate entity;
"boiler" means the combined boiler body-burner unit, designed
to transmit to fluids the heat released from burning;
"building" means a roofed construction having walls, for
which energy is used to condition the indoor climate, and which may
refer to the building as a whole or part thereof which has been
designed or altered to be used separately;
"building automation and control system" means a system
comprising all products, software and engineering services that can
support energy efficient, economical and safe operation of technical
building systems through automatic controls and by facilitating the
manual management of those technical building systems;
"building element" means a technical building system or an
element of the building envelope;
"building envelope" means the integrated elements of a
building which separate its interior from the outdoor environment;
"the Building and Construction Board" means the Board as
established by article 3 of the Act;
"the Building and Construction Authority" shall have the same
meaning as assigned to it under article 5 of the Building and
Construction Authority Act;
"building unit" means a section, floor or apartment within a
building which is designed or altered to be used separately;
"cogeneration" means the simultaneous generation in one
process of thermal energy and electrical and, or mechanical energy;
"competent authority" means the Building and Construction
Authority established under article 5 of the Act, and includes any
body or other person acting on its behalf under powers delegated by
the Authority under the Act;
"compliance certificate" means a certificate issued by a
competent person in certifying that the completed building is compliant
with these regulations and with Technical Document F (2023) Part 1
Dwellings Minimum Energy Performance and Building Envelope
Requirements, Part 2 Non-Dwellings Minimum Energy Performance
and Building Envelope Requirements, and Part 3 Technical Building
Systems, as the case may be, and any other instructions issued by the
Building and Construction Authority;
"the Commission" means the European Commission as
established by the Treaty on the European Union as amended by the
Lisbon Treaty of 2009;
"cost-optimal level" means the energy performance level
which leads to the lowest cost during the estimated economic
lifecycle, where
(a)
the lowest cost is determined taking into account
energy-related investment costs, maintenance and operating
costs including, where applicable, energy costs and savings,
the category of building concerned, earnings from energy
produced, throughout the estimated economic lifecycle
together with any disposal costs, if applicable; and
(b)
the estimated economic lifecycle is determined
according to the remaining estimated economic lifecycle of a
building where energy performance requirements are set for
the building as a whole, or to the estimated economic lifecycle
of a building element where energy performance requirements
are set for building elements. The cost-optimal level shall be
deemed to be obtained where the cost benefit analysis within
the range of performance levels, calculated over the estimated
economic lifecycle, is positive;
"design rating" is an energy performance rating based on
(a)
calculations, done at the design stage, of the
energy used in a building for heating, cooling, ventilation, hot
water and lighting;
(b)
standard input data related to internal and
external climates and building occupancy; and
(c)
the design characteristics of the building as
complete with permanently installed finishes, fixtures, fittings
and mechanical and electrical installations to render that
building habitable and good for its intended use under
standardised conditions of weather and building occupancy;
"development permission application" means an application
for a development permit issued by the Planning Authority;
"Directive (EU) 2023/1791" means Directive of the European
Parliament and of the Council of 13 September 2023 on energy
efficiency and amending Regulation (EU) 2023/955 (recast);
"district heating" or "district cooling" means the distribution of
thermal energy in the form of steam, hot water or chilled liquids or
other fluids, from a central source of production through a network to
multiple buildings or sites, for the use of space or process heating or
cooling;
"dwelling" means a building or building unit used or intended
to be used for domestic purposes and usually containing eating,
living, sleeping and sanitary facilities;
"effective rated output" means the maximum calorific output,
expressed in kW, specified and guaranteed by the manufacturer as
being deliverable during continuous operation while complying with
the useful efficiency indicated by the manufacturer;
"Enemalta" means the Enemalta plc as established by the
Enemalta (Transfer of Assets, Rights, Liabilities and Obligations)
Act;
"energy from renewable sources" means energy from
renewable non-fossil sources, namely wind, solar, aerothermal,
geothermal, hydrothermal and ocean energy, hydropower, biomass,
landfill gas, sewage treatment plant gas and biogases;
"energy from renewable sources produced nearby" means
energy from renewable sources, produced within a local or district-
level perimeter of a particular building, which fulfils all of the
following conditions
(a) it may be distributed and used only within that local
and district-level perimeter through a dedicated
distribution network;
(b) it allows for the calculation of a specific primary
energy factor valid only for the energy from renewable
sources produced within that local or district-level
perimeter; and
(c) it may be used on-site through a dedicated connection
to the energy production source, where such dedicated
connection requires specific equipment for the safe
supply and metering of energy for self-use of the
building;
"energy performance assessment (EPA)" means an assessment
of the energy performance of a building carried out by an EPB
assessor for the purpose of assigning an EPC;
"energy performance certificate (EPC)" means a certificate
issued by an EPB assessor recognised by the Building and
Construction Authority or by a person designated by it and authorised
to act on its behalf. The methodology used by the EPB assessor shall
conform with the methodology adopted in accordance with regulation
4;
"energy performance of a building (EPB)" means the
calculated or measured amount of energy, needed to meet the energy
demand associated with a typical use of the building, which includes,
inter alia, energy used for heating, cooling, ventilation, hot water and
lighting;
"entrusted party" means a legal entity with delegated power
from Government or another public body to develop, manage or
operate a financing scheme on behalf of Government or any other
public body;
"EPB assessor" means a person who is duly registered with the
Building and Construction Authority after it has taken into
consideration that such person is in possession of
(a)
a warrant to practice the profession of architect
and, or civil/structural engineer, or the warrant to practice the
profession of mechanical or electrical engineer, and who has
also successfully undertaken a period of training on the
assessment of the energy performance of buildings built in
Malta, and such training is approved by the Building and
Construction Authority; or
(b)
in the case of an EU citizen, a registration
certificate as an EPB assessor in any other Member State, and
a warrant to practice the profession of architect and, or civil/
structural engineer, or the warrant to practice the profession of
mechanical or electrical engineer
Provided that in the case of a person who comes to
Malta to provide such services for the first time, the service provider
or EPB assessor shall, in terms of regulation 9(1) of the Recognition
of Professional Qualifications Regulations, inform the Building and
Construction Authority in a written declaration to be made at least
two weeks in advance. Such declaration shall be renewed each year if
the service provider intends to provide temporary or occasional
services during that year
Provided also that for the first provision of services
whether on a temporary or permanent basis, or if there is a material
change in the situation substantiated by the documents, the Building
and Construction Authority may, in terms of regulation 9(2) of the
Recognition of Professional Qualifications Regulations, require that
the declaration and the registered certificate be accompanied by the
following documents
(a)
proof of the nationality of the service provider;
(b)
an attestation certifying that the holder is legally
established in a Member State for the purpose of pursuing the
activities concerned and that he is not prohibited, even
temporarily, from practising the relevant profession and that of
an EPB assessor;
(c)
evidence of professional qualifications;
"EPC data file" means an electronic file which contains a
report on the outcome of an EPA, which is completed by an EPB
assessor and provided to the Building and Construction Authority for
the purpose of notifying it of the record to be made or updated on the
EPC register in respect of a particular building, and it shall be
deemed to include any calculations and related data or documents
accompanying such report;
"EPC record" means the current and any previous EPC, any
advisory report, any EPC data file and any related data or documents,
as the case may be, pertaining to a building;
"EPC register" means a database of EPC records and related
data or documents established, operated, and maintained by the
Building and Construction Authority;
"EPC system" means the registers, procedures and rules
established, operated, and maintained by the Building and
Construction Authority for the purpose of administering EPCs and
related activities in accordance with these regulations;
"European standard" means a standard adopted by the
European Committee for Standardisation, the European Committee
for
Electro-technical
Standardisation
or
the
European
Telecommunications Standards Institute and made available for
public use;
"existing building" means any building which
(a)
is already constructed prior to the date of entry
into force of these regulations; or
(b)
is in the course of construction or earmarked for
construction and has a valid development permit in terms of
these regulations prior to the date of entry into force of these
regulations;
"final customer" means a natural or legal person who
purchases energy based on a direct, individual contract with an
energy supplier;
"heat generator" means the part of a heating system that
generates useful heat using one or more of the following processes
(a)
the combustion of fuels in, for example, a boiler;
(b) the Joule effect, taking place in the heating elements of
an electric resistance heating system;
(c) capturing heat from ambient air, ventilation exhaust
air, or a water or ground heat source using a heat
pump;
"heat pump" means a machine, a device or installation that
transfers heat from natural surroundings such as air, water or ground
to buildings or industrial applications by reversing the natural flow of
heat, such that it flows from a lower to a higher temperature. In the
case of reversible heat pumps, it may also move heat from the
building to the natural surroundings;
"heating system" means a combination of the components
required to provide a form of indoor air treatment, by which the
temperature is increased;
"independent air-conditioning systems inspector" means a
registered air-conditioning systems inspector who is not the owner or
tenant of the air-conditioning system being inspected, or an employee
of the owner, or of any contractor responsible for the installation or
maintenance of an air-conditioning system for which an inspection is
made;
"independent energy performance assessor" means a registered
assessor of energy performance of building, who is not the owner or
tenant of the building being assessed, or an employee of the owner, or
of any contractor responsible for the construction, finishing and, or
installation of mechanical or electrical services of a building for
which an EPC is being requested or inspections of boilers, or
lighting, space heating or space cooling systems are made;
"independent heating systems inspector" means a registered
heating systems inspector who is not the owner or tenant of the
heating system being inspected, or an employee of the owner, or of
any contractor responsible for the installation or maintenance of a
heating system for which an inspection is made;
"installation" means a system providing artificial lighting,
water heating, space heating or space cooling or space ventilation in
any combination;
"major renovation or alteration" means a renovation or
alteration
(a)
which affects a building by 25% or more of its
volume before such an intervention; or
(b)
where renovation of 25% or more of windows or
roofs or external walls is made; or
ENERGY PERFORMANCE OF BUILDINGS
(c)
where renovation of 25% or more of any energy
consuming installations for artificial lighting, or heating or
cooling of air or water or space ventilation is made; or
(d)
where a change-of-use development permission
application and, or notification concerning buildings, is
submitted to the Planning Authority;
"Member State" means a state which is a member of the
European Union;
"micro isolated system" means any system with consumption
less than 500 GWh where there is no connection with other systems;
"the Minister" means the Minister responsible for the building
industry and policy;
"nearly zero-energy building" means a building that has a very
high energy performance, as determined in accordance with Schedule
I. The nearly zero or very low amount of energy required shall be
covered to a very significant extent by energy from renewable
sources, including energy from renewable sources produced on-site
or nearby;
"new building" means any building which does not fall under
any of the categories of existing building;
"non-residential building or premises" means any building or
premises, or any part of a building or premises, which is not used or
is unsuitable for use as a residential building or habitation, and
includes industrial buildings, places of assembly, offices, schools and
shops;
"on-site" means within or on a particular building, or on the
land on which that building is located;
"owner" means
(a)
a person who has the exclusive and full
ownership of the building and who is acting in his own name,
or as an agent for or on behalf of another person, who is
entitled or shall be so entitled to receive the rent of the
building;
(b)
where the building is subject to usufruct, the
bare owner or the usufructuary;
(c)
an emphyteuta;
(d)
any one of the spouses, where the building to
which the EPC relates forms part of the community of
acquests;
"owner of an air-conditioning system" means a person acting
in his own name, or as an agent for or on behalf of another person,
who has the exclusive and full ownership of the air-conditioning
system;
"owner of a heating system" means a person acting in his own
name, or as an agent for or on behalf of another person, who has the
exclusive and full ownership of the heating system;
"person" means any natural or legal person;
"Planning Authority" means the authority established under
article 5 of the Development Planning Act;
"primary energy" means energy from renewable and non-
renewable sources and which has not undergone any conversion or
transformation process;
"prospective buyer or tenant" means a person who
(a)
is in the process of entering a sale agreement
with another person or with the agent of such other person for
the purpose of purchasing a building; or
(b)
enters a promise of sale agreement with another
person or the agent of such other person for the purpose of
purchasing a building; or
(c)
enters a contract of letting and hiring, whether
verbally or written, to rent a building;
"public bodies" means national, regional or local
authorities and entities directly financed and administered by
such authorities which do not have an industrial or commercial
character;
"register of EPB assessors" means a database containing a list
of EPB assessors registered with the Building and Construction
Authority and any other related data established, operated,
maintained and owned by the Building and Construction Authority;
"registered air-conditioning systems inspector" means a person
who is duly registered with the Building and Construction Authority
as an air-conditioning systems inspector;
"registered heating systems inspector" means a person who is
duly registered with the Building and Construction Authority as a
heating systems inspector;
"technical building system" means technical equipment for
space heating, space cooling, ventilation, domestic hot water, built-in
lighting, building automation and control, on-site electricity
generation, or a combination thereof, including those systems using
energy from renewable sources, of a building or building unit;
"Technical Document F" means the minimum energy
performance requirements and technical building systems in force at
the time in accordance with sub-regulation (1) of regulation 5, as may
from time to time be amended, as the Building and Construction
Authority shall determine, which shall also be made available on the
Authority’s website. Wherever minimum energy performance
requirements are mentioned the said requirements shall refer to
Technical Document F.
"unincorporated body" means a body or business which is
privately owned, often owned by one person having unlimited
liability owing to the non-registration of the business as a company
and which on the contrary of corporate bodies lacks legal personality;
"useful floor area" means the area of the building relevant to
the official calculation methodology relevant to that building
category;
"waste heat and cold" means unavoidable heat or cold
generated as a by-product in industrial or power generation
installations, or in the tertiary sector, which would be dissipated
unused into air or water without access to a district heating or cooling
system, where a cogeneration process has been used or will be used
or where cogeneration is not feasible.
These regulations provide for requirements as regards
(a)
the common general framework
for a
methodology for calculating the integrated
energy
performance of buildings and building units;
(b)
the application of minimum requirements for the
energy performance of new buildings and new building units;
(c)
the application of minimum requirements for the
energy performance of
(i)
existing buildings, building units and
building elements which are subject to major
renovation;
(ii) building elements which form part of the
building envelope and that have a significant impact on
the energy performance of the building envelope when
they are retrofitted or replaced; and
(iii) technical building systems whenever
they are installed, replaced or upgraded;
(d)
national plans for increasing the number of
nearly zero-energy buildings;
(e)
energy certification of buildings or building
units;
(f)
regular inspection of
heating
and
air-
conditioning systems in buildings; and
(g)
independent control systems
for
energy
performance certificates and inspection reports.
The methodology for calculating the energy
performance of buildings shall be in accordance with the common
general framework set out in Schedule I as established and
implemented through the Energy Performance Rating of Dwellings in
Malta (EPRDM) and Simplified Building Energy Model (iSBEMmt),
supplemented by the User’s Guide to iSBEMmt and the Technical
Guide to iSBEM, as issued and updated from time to time and as
communicated in the Gazette.
(1)
The Building and Construction Authority shall
take the necessary measures to establish minimum energy
performance requirements for buildings and building units with a
view to achieving cost-optimal levels. The energy performance shall
be calculated in accordance with the methodology referred to in
regulation 4. Cost-optimal levels shall be calculated in accordance
with the comparative methodology framework referred to in
regulation 6. The design of buildings, the construction, the renovation
and the technical building systems shall be compliant with Technical
Document F (2023) Part 1 Dwellings Minimum Energy Performance
and Building Envelope Requirements, Part 2 Non-Dwellings
Minimum Energy Performance and Building Envelope
Requirements, and Part 3 Technical Building Systems, as the case
may be, and as may from time to time be amended, as the Building
and Construction Authority shall determine. Technical Document F
(2023) shall be made available on the Authority’s website.
(2) The Building and Construction Authority shall take the
necessary measures to establish minimum energy performance
requirements for building elements that form part of the building
envelope and which have a significant impact on the energy
performance of the building envelope when they are replaced or
retrofitted, with a view to achieving cost-optimal levels.
(3) When setting requirements, the Building and
Construction Authority shall differentiate between new and existing
buildings and between different categories of buildings. These
requirements shall take into account general indoor climate
conditions, in order to avoid possible negative effects such as
inadequate ventilation, as well as local conditions and the designated
function and the age of the building.
(4) Minimum energy performance requirements shall be
reviewed at regular intervals which shall not be longer than five years
and, if necessary, shall be updated in order to reflect technical
progress in the building sector.
(5) The following categories of buildings shall be exempted
from the requirements of sub-regulations (1), (2), (3) and (4)
(a)
buildings classified as scheduled property
(Grade 1 or 2) by the Planning Authority under article 57 of
the Development Planning Act and buildings officially
protected as part of a designated environment or because of
their special architectural or historical or contextual merit, in
so far as compliance with certain minimum energy
performance requirements would unacceptably alter their
character or appearance;
(b)
buildings used as places of worship;
(c)
temporary buildings with a time of use of two
years or less, industrial sites, workshops and non-residential
agricultural buildings with low energy demand, and non-
residential agricultural buildings which are in use by a sector
covered by a national sectoral agreement on energy
performance;
(d)
stand-alone buildings with a total useful floor
area of less than 50m 2 ;
(e)
a building constructed for the Enemalta plc, the
Water Services Corporation or any other similar entity, and
used as a generation, transmission or distribution station.
(1)
The Building and Construction Authority shall
establish standard cost-optimal levels based on macro-economic
scale and micro-economic scale of minimum energy performance
requirements using the comparative methodology framework
established in accordance with Schedule III and relevant parameters,
such as climatic conditions and the practical accessibility of energy
infrastructure, and compare the results of such standards with the
minimum energy performance requirements set out in the Technical
Document F.
(2) The Building and Construction Authority shall report to
the Commission, at regular intervals, which shall not be longer than
five years, all input data and assumptions used for such standards and
the results thereof. The report may be included in the Energy
Efficiency Action Plans (EEAP) referred to in regulation 24(2) of the
Energy Efficiency and Cogeneration Regulations.
(3) If the result of the comparison performed in accordance
with sub-regulation (2) shows that the minimum energy performance
requirements in force are significantly less energy efficient than cost-
optimal levels of minimum energy performance requirements, the
Building and Construction Authority shall justify this difference in
writing to the Commission in the report referred to in sub-regulation
(2). Such report shall, to the extent that the difference cannot be
justified, be accompanied by a plan outlining appropriate steps to
significantly reduce the difference by the next review of the energy
performance requirements as referred to in regulation 5(1), (2), (3)
and (4).
(1)
The Building and Construction Authority shall
take the necessary measures to ensure that new buildings meet the
minimum energy performance requirements as currently set in
Technical Document F. As from 1st January 2016 all newly
completed buildings that are subject to these regulations are to be
certified for compliance with these regulations with regards to the
applicable minimum energy performance requirements as set in
Technical Document F. The compliance certificate drawn up by the
responsible architect/engineer has to be submitted by the owner to the
Building and Construction Authority within one month of completion
and before the use of the building.
(2) For new buildings, the designer shall ensure that before
construction starts, the technical, environmental and economic
feasibility of high-efficiency alternative systems such as those listed
below, if available, is considered and taken into account
(a)
decentralized energy supply systems based on
energy from renewable sources;
(b)
cogeneration;
(c)
district or block heating or cooling, if available,
particularly where it is based entirely or partially on energy
from renewable sources;
(d)
heat pumps.
(3) The analysis of alternative systems referred to in sub-
regulation (2) shall be documented and available for verification
purposes and presented to the Building and Construction Authority
prior to construction
(a)
for small developments, the architect will be
required to make a self declaration following the consideration
of the alternative systems;
(b)
for major developments, an engineer’s report
will be submitted that shows the considerations taken with
regard to the alternative systems feasibility.
Such analysis of alternative systems may be carried out
for individual buildings or for groups of similar buildings or for
common typologies of buildings in the same area. As far as collective
heating and cooling systems are concerned, the analysis may be
carried out for all buildings connected to the system in the same area.
(4) Final customers for electricity and natural gas shall be
provided by their suppliers with competitively priced individual
meters that accurately reflect the final customer’s actual energy
consumption and that provide information on the actual time of use
(a)
where a new connection is made in a new
building or a building undergoes major renovations, as
established in this regulation, competitively priced
individual meters shall be provided in all such cases;
(b)
where in the assessment of the competent
authority, multi-apartment or multi-purpose buildings
supplied from district heating or district cooling, or
buildings with their own common heating or cooling
systems become prevalent, the Regulator for Energy and
Water Services shall establish transparent and publicly
available national rules on the allocation of the cost of
heating, cooling and domestic hot water consumption in
such buildings, in order to ensure transparency and
accuracy in the accounting for individual consumption
Provided that where the competent authority determines
that multi-apartment or multi-purpose buildings supplied from
district heating or district cooling, or buildings with their own
common heating or cooling systems have become prevalent, the
Regulator for Energy and Water Services shall be informed of such
decision and the competent authority shall provide the said Regulator
with all the relevant information and data for reaching such a
decision.
(1)
When buildings undergo major renovation, in
order to ensure that the renovated part thereof is upgraded to meet the
minimum energy performance requirements in force at the time, the
owner has to provide to the Building and Construction Authority a
compliance certificate drawn up by a warranted architect (perit) or
engineer or both, as the case may be, certifying such compliance,
within one month of completion of works and before the use of the
building.
(2) means technical equipment for space heating, space
cooling, ventilation, domestic hot water, built-in lighting, building
automation and control, on-site electricity generation, or a
combination thereof, including those systems using energy from
renewable sources, of a building or building unit;
(3) When a building element that forms part of the building
envelope which is -
(a)
greater than 10% of the whole building envelope
area in case of opaque elements; or
(b)
greater than 5% of the whole building envelope
area in case of glazed elements,
and is retro-fitted or replaced, in order to ensure that it meets the
minimum energy performance requirements, the owner has to
provide to the Building and Construction Authority a compliance
certificate by a warranted architect (perit) certifying such compliance
within one month of completion of works and before the use of the
building.
(1)
The Building and Construction Authority shall
establish a long-term renovation strategy to support the renovation of
the national stock of residential and non-residential buildings, both
public and private, into a highly energy efficient and decarbonised
building stock by 2050, facilitating the cost-effective transformation of
existing buildings into nearly zero-energy buildings. Each long-term
renovation strategy shall be submitted in accordance with the
applicable planning and reporting obligations and shall encompass
(a)
an overview of the national building stock, based,
as appropriate, on statistical sampling and expected share of
renovated buildings in 2020;
(b)
the identification of cost-effective approaches to
renovation relevant to the building type and climatic zone,
considering potential relevant trigger points, where applicable,
in the life-cycle of the building;
(c)
policies and actions to stimulate cost-effective
deep renovation of buildings, including staged deep renovation,
and to support targeted cost-effective measures and renovation
for example by introducing an optional scheme for building
renovation passports;
(d)
an overview of policies and actions to target the
worst performing segments of the national building stock, split-
incentive dilemmas and market failures, and an outline of
relevant national actions that contribute to the alleviation of
energy poverty;
(e)
policies and actions to target all public buildings;
(f)
an overview of national initiatives to promote
smart
technologies and well-connected buildings and
communities, as well as skills and education in the construction
and energy efficiency sectors; and
(g)
an evidence-based estimate of expected energy
savings and wider benefits, such as those related to health,
safety and air quality
Provided that to support the mobilisation of
investments into the renovation needed to achieve the goals
referred to in this regulation, the competent authorities or
bodies to which the competent authorities have delegated
responsibility, shall facilitate access to appropriate mechanisms
for
(i)
the aggregation of projects, including by
investment platforms or groups, and by consortia of
small and medium-sized enterprises, to enable investor
access as well as packaged solutions for potential clients;
(ii)
the reduction of the perceived risk of
energy efficiency operations for investors and the private
sector;
(iii)
the use of public funding to leverage
additional private-sector investment or address specific
market failures;
(iv)
guiding investments into an energy
efficient public building stock, in line with Eurostat
guidance; and
(v)
accessible and transparent advisory tools,
such as one-stop-shops for consumers and energy
advisory services, on relevant energy efficiency
renovations and financing instruments.
(2)
In its long-term renovation strategy, the Building and
Construction Authority shall set out a roadmap with measures and
domestically established measurable progress indicators, with a view
to the long-term 2050 goal of reducing greenhouse gas emissions in
the Union by 80-95% compared to 1990, in order to ensure a highly
energy efficient and decarbonised national building stock and in order
to facilitate the cost-effective transformation of existing buildings into
nearly zero-energy buildings. The roadmap shall include indicative
milestones for 2030, 2040 and 2050, and specify how they contribute
to achieving the Union’s energy efficiency targets in accordance with
Directive 2012/27/EU.
(2a) An updated version of the initial version of this strategy
shall be published by the c o m p e t e n t a uthority every three (3)
years, to be reckoned from the date of the publication of the initial
version. The updated versions shall also be submitted by the
competent authority to the Minister responsible for the Climate Action
Authority for inclusion in Malta’s integrated national energy and
climate plans required by Regulation (EU) 2018/1999 of the European
Parliament and of the Council of 11 December 2018 on the
Governance of the Energy Union and Climate Action, amending
Regulations (EC) No 663/2009 and (EC) No 715/2009 of the European
Parliament and of the Council, Directives 94/22/EC, 98/70/EC, 2009/
31/EC, 2009/73/EC, 2010/31/EU, 2012/27/EU and 2013/30/EU of the
European Parliament and of the Council, Council Directives 2009/119/
EC and (EU) 2015/652 and repealing Regulation (EU) No 525/2013 of
the European Parliament and of the Council.
(2b) The competent authority shall require the use of
minimum levels of energy from renewable sources produced on-site or
nearby, in new buildings and in existing buildings that are undergoing
major renovation or a renewal of the heating system in accordance
with these regulations, where this is economically, technically and
functionally feasible. The minimum levels may be fulfilled through
efficient district heating and cooling where it is demonstrated that this
is technically and economically feasible. In the case of existing
buildings, the minimum levels shall apply to the Armed Forces only to
the extent that their application does not in any manner conflict with
the nature and primary purposes of the activities of the Armed Forces,
and shall not apply to materials used exclusively for military purposes.
(2c) The Minister shall contribute to the achievement of the
indicative share of renewable energy by promoting the use of
renewable heating and cooling systems and equipment and may
furthermore promote innovative technology, such as smart and
renewable-based electrified heating and cooling systems and
equipment, complemented where applicable, by smart management of
energy consumption in buildings.
(3)
To support the development of the long-term renovation
strategy, the Building and Construction Authority shall carry out a
public consultation on its long-term renovation strategy prior to
submitting it to the Commission. A summary of the results of the
public consultation to the long-term renovation strategy shall be
annexed to the document intended to be submitted the Commission
Provided that the modalities for consultation shall be
established in an inclusive way during the implementation of its long-
term renovation strategy
Provided further that the details of the implementation of
its most recent long-term renovation strategy shall be annexed to the
long-term renovation strategy, including on the planned policies and
actions
Provided further that the long-term renovation strategy to
address fire safety and risks related to intense seismic activity
affecting energy efficiency renovations and the lifetime of buildings
may be made use of.
(4)
(a)
Without prejudice to regulation 8, the competent
authority shall take cost-effective measures, including deep
renovations and measures t o i n f l u e n c e t h e b e h a v i o u r change
of occupants, in order to achieve an amount of energy savings in
eligible buildings owned and occupied by public bodies, which are
at least equivalent to those required by paragraph 1 of Article 6 of
Directive (EU) 2023/1791, which amount of such energy savings shall
be reported annually to the Minister responsible for the Climate Action
Authority.
(b)
The competent authority shall estimate the
energy savings referred to in paragraphs (1) to (4) of
Article 6 of Directive (EU) 2023/1791 by using
appropriate standard values for the energy consumption
of reference public bodies before and after renovation
and according to estimates of the surface area of their
stock. The categories of reference public bodies shall be
representative of the stock of such buildings.
(c)
The Minister responsible for the Climate
Action Authority shall notify to the European
Commission the
measures that are planned to be
adopted, demonstrating how they would achieve an
equivalent improvement in the energy performance of
the public bodies.
(d)
For the purposes of establishing the
equivalence between the savings required to be achieved
in accordance with sub-regulation (1) and the energy
savings referred to in paragraphs (1) to (4) of Article 6 of
Directive EU 2023/1791, the competent authority in
collaboration with the Lands Authority, shall establish
and make publicly available an inventory of heated and,
or cooled buildings occupied by public bodies with a
total useful floor area over 250m 2 , excluding buildings
exempted pursuant to paragraph 2 of Article 6 of
Directive EU 2023/1791, containing the following
information
the floor area in metre squared (m 2 );
(i)
and
(ii)
the energy performance of each
building or relevant energy data.
(e)
The
competent
authority
shall
encourage public bodies, including social-housing
bodies governed by national law, with due regard to
their respective competences and administrative set-up
to
(i)
adopt an energy efficiency plan,
whether as a stand-alone plan or as part of a
broader climate or environmental plan, containing
specific energy saving and efficiency objectives
and measures, with a view to fulfilling the
exemplary role of public bodies as established in
this sub-regulation;
(ii)
put in place an energy management
system, including energy audits, as part of the
implementation of their plan;
(iii) use, where appropriate, energy
service companies and energy performance
contracting to finance renovations and to
implement plans a i m e d at maintaining or
improving energy efficiency in the long term.
(1)
For the purpose of optimising the energy use of
technical building systems, establishing system requirements in respect
of the overall energy performance, the proper installation, and the
appropriate dimensioning, adjustment and control of the technical
building systems which are installed in existing buildings, the system
designer shall follow Technical Document F (2023) Part 3 Technical
Building Systems, as updated and approved from time to time by the
Building and Construction Authority.
(2) System requirements are established for new, replacement
and upgrading of technical building systems and shall be applied in so
far as they are technically, economically and functionally feasible, in
accordance with Technical Document F (2023) Part 3 Technical
Building Systems, as updated and approved from time to time by the
Building and Construction Authority.
(3)
Repealed by Legal Notice 231 of 2022.
(4) Where the guidance contained in any technical
document issued in connection with these regulations relates only to
the particular requirements of these regulations, any construction
works and the installation of any permanent mechanical or electrical
services shall also comply with the requirements of any other laws
and regulations that are operative for the control of construction
works and installations.
(5) When new building services are installed in buildings, the
owner has to provide the Building and Construction Authority with a
certificate, issued by a warranted engineer, declaring compliance with
the applicable minimum energy performance requirements as set in
Technical Document F (2023) Part 3 Technical Building Systems.
(6)
Repealed by Legal Notice 231 of 2022.
(7)
Where technically and economically feasible, new
buildings shall be equipped with self-regulating devices for the
separate regulation of the temperature in each room or, where justified,
in a designated heated zone of the building unit. In existing buildings,
the installation of such self-regulating devices shall be required when
heat generators are replaced, where technically and economically
feasible.
(8)
New non-residential buildings and non-residential
buildings undergoing major renovation, with more than ten parking
spaces, shall be installed with at least one recharging point within the
meaning of Directive 2014/94/EU of the European Parliament and of
the Council and ducting infrastructure, namely conduits for electric
cables, for at least one in every five parking spaces to enable the
installation at a later stage of recharging points for electric vehicles
where
(a)
the car park is located inside the building, and, for
major renovations, renovation measures include the car park or
the electrical infrastructure of the building; or
(b)
the car park is physically adjacent to the building,
and, for major renovations, renovation measures include the car
park or the electrical infrastructure of the car park.
(9)
The Minister shall lay down requirements for the
installation of a minimum number of recharging points for all non-
residential buildings with more than twenty parking spaces, by 1
January 2025
Provided that the Minister may decide not to lay down or
apply the requirements described in sub-regulations (8) and (9) of this
regulation to buildings owned and occupied by small and medium-
sized enterprises as defined in Title I of the Annex to Commission
Recommendation 2003/361/EC.
(10) New residential buildings and residential buildings
undergoing major renovation, with more than ten parking spaces, shall
be installed with ducting infrastructure, namely conduits for electric
cables, for every parking space to enable the installation, at a later
stage, of recharging points for electric vehicles, where
(a)
the car park is located inside the building, and, for
major renovations, renovation measures include the car park or
the electric infrastructure of the building; or
(b)
the car park is physically adjacent to the building,
and, for major renovations, renovation measures include the car
park or the electrical infrastructure of the car park
Provided that the Minister may decide not to
apply sub-regulations (8), (9) and (10) to specific categories of
buildings where
(i)
with regard to sub-regulations (8) and (10),
building permit applications or equivalent applications
have been submitted by 10 March 2021;
(ii)
the cost of the recharging and ducting
installations exceeds 7% of the total cost of the major
renovation of the building;
(iii) a public building is already covered by
comparable requirements according to the transposition
of Directive 2014/94/EU;
(iv) the ducting infrastructure required would
rely on micro isolated systems if this would lead to
substantial problems for the operation of the local energy
system and would endanger the stability of the local grid.
(11)
The Minister shall
(a)
provide for measures in order to simplify the
deployment of recharging points in new and existing residential
and non-residential buildings and address possible regulatory
barriers, including permitting and approval procedures, without
prejudice to the property and tenancy law.
(b)
consider the need for coherent policies for
buildings, soft and green mobility and urban planning.
(c) ensure that, when a technical building system is
installed, replaced or upgraded, the overall energy performance of the
altered part, and where relevant, of the complete altered system, is
assessed. The results shall be documented and passed on to the
building owner, so that they remain available and can be used for the
verification of compliance with the minimum requirements laid down
pursuant to sub-regulation (1) of this Regulation and the issue of
energy performance certificates. Without prejudice to Regulation 13,
the Building and Construction Authority shall decide whether to
require the issuing of a new energy performance certificate.
(1)
The Building and Construction Authority shall
establish a system to monitor and enforce that
(a)
by 31st December 2020 all new buildings are
nearly zero-energy buildings; and
(b)
new buildings occupied and owned by public
authorities are nearly zero-energy buildings by 31st December
2018. (1a) The competent authority shall ensure that public buildings
at national, regional and local level serve as an exemplary role with
regard to the share of renewable energy used, in accordance with
these regulations and Article 6 of Directive (EU) 2023/1791.
(1b) The competent authority may allow that obligation to be
fulfilled, inter alia, by providing for the roofs of public or mixed
use private-public buildings to be used by third parties for
installations that produce energy from renewable sources, including
by coordinating with the Lands Authority in respect of buildings
which are owned by the Government.
(2) The Building and Construction Authority, in
collaboration, co-ordination with, and the participation of, the
Building and Construction Authority, shall draw up national plans for
the purpose of increasing the number of nearly zero-energy buildings.
The national plans may include targets differentiated according to the
category of building.
(3) The Board shall also develop policies and take measures
such as the setting of targets in order to stimulate the transformation
of buildings that are refurbished into nearly zero-energy buildings,
and shall draw up reports including such measures and inform the
Building and Construction Authority and the Commission about such
reports. Upon notification of the reports, the Building and
Construction Authority shall include the mentioned targets in the
national plans as set out in regulation 24(2) of the Energy Efficiency
and Cogeneration Regulations and inform the Commission about
such targets.
(4)
The national plans shall include, inter alia, the following
elements
(a)
the detailed application, in accordance with the
definition thereof, of nearly zero-energy buildings, reflecting
the national conditions, and including a numerical indicator of
primary energy use expressed in kWh/m 2 per year. Primary
energy factors used for the determination of the primary
energy use may be based on national yearly average values and
may take into account relevant European standards;
(b)
intermediate targets for improving the energy
performance of new buildings, with a view to preparing the
implementation of sub-regulation (2);
(c)
information on the policies and financial or other
measures adopted in the context of sub-regulations (2) and (3)
for the promotion of nearly zero-energy buildings, including
details of national requirements and measures concerning the
use of energy from renewable sources in new buildings and
existing buildings undergoing major renovation in the context
of regulations 7, 8, 10, 11 and 17(5) of the Promotion of
Energy from Renewable Sources Regulations.
(5) The competent authority shall introduce measures in its
building codes and regulations and, where applicable, in support
s c h e m e s , to in c re a s e t h e sh a r e o f a l l k i nd s o f e ne rg y fr o m
renewable sources in the building sector, in particular energy
produced on-site or nearby. The Minister after consultation with the
Building and Construction Authority Board may take into account,
where applicable, national measures relating to substantial
increases in renewables self-consumption, in local energy storage
and e ne rgy e fficiency, re lating to cogeneration and major
renovations which increase the number of nearly zero energy
buildings and buildings that go beyond the minimum energy
performance requirements provided for in regulation 5. These
requirements shall apply to the Armed Forces only insofar as their
application does not conflict with the nature and primary aims of
military activities, and shall not apply to material used exclusively
for military purposes.
(6) The competent authority in its building regulations and
codes, or other competent authorities by other means having
equivalent effect, shall require the use of minimum levels of energy
from renewable sources in new buildings and in existing buildings
that are subject to major renovation, insofar as this is technically,
functionally and economically feasible, and reflecting the results of
the cost-optimal calculation carried out pursuant to regulation
6,provided that this does not negatively affect indoor air quality.
(7) It shall be permitted for the minimum levels to be fulfilled,
inter alia, through efficient district heating and cooling systems
using a significant share of energy from renewable sources and
waste heat and cold.
(1)
In view of the importance of providing
appropriate financing and other instruments to catalyse the energy
performance of buildings and the transition to nearly zero-energy
buildings, the Building and Construction Authority shall take all
appropriate steps to consider the most relevant instruments in the
light of national circumstances.
(2) The Building and Construction Authority shall draw up
a list of existing and, if appropriate, proposed measures and
instruments, including those of a financial nature, other than those
required by these regulations, which promote the objectives of these
regulations. The Building and Construction Authority shall update
this list every three years and communicate these lists to the EU
Commission which may be included in the Energy Efficiency Action
Plans referred to in Directive 2006/32/EC.
(3)
The Building and Construction Authority shall link its
financial measures for energy efficiency improvements in the
renovation of buildings to the targeted or achieved energy savings, as
determined by one or more of the following criteria
(a)
the energy performance of the equipment or
material used for the renovation; in which case, the equipment
or material used for the renovation is to be installed by an
installer with the relevant level of certification or qualification;
(b)
standard values for calculation of energy savings
in buildings;
(c)
the improvement achieved due to such renovation
by comparing energy performance certificates issued before
and after renovation;
(d)
the results of an energy audit;
(e)
the results of another relevant, transparent and
proportionate method that shows the improvement in energy
performance
Provided that databases for energy performance
certificates shall allow data to be gathered on the measured or
calculated energy consumption of the buildings covered, including at
least public buildings for which an energy performance certificate, as
referred to and have been issued in accordance with regulation 12 and
regulation 13.
Provided further that at least aggregated anonymised
data compliant with Union and national data protection requirements
shall be made available on request for statistical and research
purposes and to the building owner..
(4) The provisions of these regulations shall not prevent the
Building and Construction Authority from providing incentives for
new buildings, renovations or building elements which go beyond the
cost-optimal levels.
(5) The Minister shall use all appropriate measures, tools
and incentives, including energy labels developed under Regulation
(EU) 2017/1369 of the European Parliament and of the Council of 4
July 2017 setting a framework for energy labelling and repealing
Directive 2010/30/EU, energy performance certificates established
pursuant to regulation 12, and other appropriate certificates or
standards developed at European Union or national level, and shall
ensure the provision of adequate information and advice on
renewable, highly energy efficient alternatives, as well as on financial
instruments and incentives available to promote an increased
replacement rate of old heating systems and an increased transition to
solutions based on renewable energy.
(1)
The Building and Construction Authority shall
provide all necessary measures to establish and maintain a system of
registration of the EPC. The EPC shall include the EPB and reference
values such as minimum energy performance requirements, in order
to make it possible for owners or tenants of the building or building
unit to compare and assess its energy performance.
(2) The EPC may include additional information such as the
annual energy consumption for buildings and the percentage of
energy from renewable sources in the total energy consumption.
(3) The EPC shall include recommendations for the cost-
optimal or cost-effective improvement of the EPB or building unit,
unless there is no reasonable potential for such improvement
compared to the energy performance requirements in force. The
recommendations included in the EPC shall cover
(a)
measures to be carried out in connection with a
major renovation of the building envelope or technical
building system(s); and
(b)
measures for individual building elements
independent of a major renovation of the building envelope or
technical building system(s).
(4) The recommendations included in the EPC shall be
technically feasible for the specific building and may provide an
estimate for the range of payback periods or cost-benefits over its
economic lifecycle.
(5) The EPC shall provide an indication as to where the
owner or tenant can receive more detailed information, including as
regards the cost-effectiveness of the recommendations made in the
EPC. The evaluation of cost effectiveness shall be based on a set of
standard conditions, such as the assessment of energy savings and
underlying energy prices and a preliminary cost forecast.
(6) In addition, the EPC shall contain information on the
steps to be taken to implement the recommendations. Other
information, such as energy audits or incentives of a financial or
other nature and financing possibilities, may also be provided to the
owner or tenant.
(7)
Certification for building units shall be based
(a)
on the assessment of an individual building unit
when it deals with residential buildings;
(b)
for all other non-residential uses, delineation
shall be based on use factor or ownership.
(8) Certification for single-family houses may be based on
the assessment of another representative building of similar design
and size with a similar and actual energy performance quality if such
correspondence can be guaranteed by the expert issuing the EPC.
(1)
The Building and Construction Authority shall
ensure that an EPC is issued for
(a)
buildings or building units which
are
constructed, sold or rented out to a new tenant; and
(b)
buildings where a total useful floor area over
250m 2 is occupied by a public authority and frequently
visited by the public.
(2) The requirement to issue an EPC does not apply where a
certificate, issued in accordance with these regulations, for the
building or building unit concerned, is available and valid.
(3) The owner of a building shall ensure that when buildings
or building units are constructed, sold or rented out, the EPC or a
copy thereof is shown to the prospective new tenant or buyer and
handed over to the buyer or new tenant, at the latest, before the date
of entering the promise of sale or rent agreement. As a derogation
from this same sub-regulation (3), if the new owner intends to make a
major renovation or demolish the building, the owner may request an
exemption to issue an EPC subject to the new owner making a
declaration to the Building and Construction Authority that at no time
will the existing building be used until such renovation or new
construction would have taken place. A new EPC will be required in
accordance with such renovation or new built.
(4) Where a building is sold or rented out prior to
construction, the seller shall provide a design rating EPC for the
building, and which in such case shall be handed over to the buyer or
tenant, at the latest, before the date of entering the promise of sale,
deed or rent agreement. A copy of the design rating EPC shall also be
attached to the promise of sale/deed. If alterations which change the
energy performance characteristics of the building have been made
during construction, a new EPC has to be provided to the buyer or
tenant. These alterations can only be effected by mutual agreement
between the parties and have to be recorded by a notarial deed.
(5) The owner or his agent shall ensure that where
buildings, building units and building units in a building having an
EPC are offered for sale or for rent, the energy performance indicator
of the EPC of the building or the building unit, as the case may be, is
stated in the advertisements in commercial media in compliance with
the Advertising Requirements Guidelines published by the Building
and Construction Authority and updated from time to time.
(6) The provisions of this regulation shall be implemented
in accordance with applicable national rules on joint ownership or
common property.
(7) The categories of buildings referred to in regulation 5(5)
shall be excluded from the application of sub-regulations (1), (3), (5)
and (6).
(1)
An owner or his agent shall obtain an EPC in the
form prescribed by these regulations when a building is constructed,
sold or rented.
(2) To be valid, the EPC shall be obtained from an
independent EPB assessor after it is registered with the Building and
Construction Authority.
(3) As from the date indicated in this sub-regulation, a
person or agent acting on behalf of the owner who commissions the
design of a new building shall have in his possession an EPC based
on the design rating of the building and in the form prescribed by
these regulations just prior to obtaining a full development permit
from the Planning Authority
(a)
in relation to dwellings whose development
permit application was submitted after 2nd January 2009; and
(b)
in relation to all other buildings whose
development permit application was submitted after 1st June
2009. (4) As from the date indicated in this sub-regulation, a
person or agent acting on behalf of the owner who offers a building
for sale or letting, shall provide an EPC to the prospective buyer or
tenant prior to the promise of sale or at the time of signing of the rent
agreement. The EPC shall be in the form prescribed in these
regulations and shall be based on the design rating of the building if
the building is not yet constructed and finished, or on the asset rating,
if the building is already constructed and finished
(a)
as from 2nd January 2009, in relation to dwellings; and
(b)
as from 1st June 2009, in relation to all other buildings.
(5) In the event that the person or agent indicated in sub-
regulation (4) does not provide the prospective buyer or the tenant
with an EPC within the period indicated in sub-regulation (4), the
buyer or the tenant shall have the right to engage an assessor to issue
the necessary certificate and, in all cases, the prospective buyer or
tenant shall have the right to deduct the expenses incurred for the
issue of the EPC from the amount of the sum agreed for the sale or
the payments of the rent due.
(6) Notwithstanding the provisions of sub-regulations (1),
(2), (3) and (4), the procurement of an EPC shall not apply to the
following categories of buildings
(a)
buildings classified as scheduled property
(Grade 1 or 2) by the Planning Authority under article 57 of
the Development Planning Act and buildings officially
protected as part of a designated environment or because of
their special architectural or historical or contextual merit, in
so far as compliance with certain minimum energy
performance requirements would unacceptably alter their
character or appearance;
(b)
buildings used as places of worship;
(c)
temporary buildings with a time of use of two
years or less, industrial sites, workshops and non-residential
agricultural buildings with low energy demand, and non-
residential agricultural buildings which are in use by a sector
covered by a national sectoral agreement on energy
performance;
(d)
stand-alone buildings with a total useful floor
area of less than 50m 2 ;
(e)
a building constructed for the Enemalta plc, the
Water Services Corporation or any other similar entity, and
used as a generation, transmission or distribution station.
(1)
An EPC issued in terms of these regulations
shall be valid for a period of ten years from the date of its first issue,
provided that no major renovation or alteration occur in the building.
(2) The EPC shall include reference values and shall be
accompanied by a recommendation report. The recommendation
report shall indicate cost-effective measures for improving the EPB.
(3) Any report or data file in connection with the production
of an EPC shall conform to national data protection laws in force.
(4) If after the construction of the building or the
installation of mechanical and electrical services in new buildings it
results that such construction or installation of services is different
from the design on which a design rating EPC has been obtained, a
new EPC based on the asset rating of the building shall have to be
secured by the owner before the expiry of the periods indicated in
regulation 14(4) or before the building is used. The provisions of
regulation 14(5) shall also apply.
Where a total useful floor area over 500m 2 of a
(1)
building for which an EPC has been issued in accordance with
regulation 13(1)(b) is occupied by public authorities and frequently
visited by the public, the EPC shall be displayed in a prominent place
clearly visible to the public. In such a case the threshold shall be
lowered to 250m 2 by 9 July, 2015.
(2) Where a total useful floor area over 250m 2 of a building,
for which an EPC has been issued in accordance with regulation
13(1)(b), is frequently visited by the public, the EPC shall also be
displayed in a prominent place clearly visible to the public.
(3) Public authorities are encouraged to take into account
the leading role which they should exercise in the field of EPB, inter
alia, by implementing the recommendations included in the EPC
issued for buildings occupied by them within its validity period.
(1)
The Building and Construction Authority shall
provide all the necessary measures to establish regular inspections of
the accessible parts of heating systems or of systems for combined
space heating and ventilation, with an effective rated output of over
70kW, such as the heat generator, control system and circulation
pump(s) used for heating buildings. The inspection shall include an
assessment of the efficiency and sizing of the heat generator compared
with the heating requirements of the building and, where relevant,
consider the capabilities of the heating system or of the system for
combined space heating and ventilation to optimise its performance
under typical or average operating conditions
Provided that where no changes have been made to the
heating system or to the system for combined space heating and
ventilation or to the heating requirements of the building following an
inspection carried out pursuant to this regulation, the Building and
Construction Authority may choose not to require the assessment of
the heat generator sizing to be repeated.
(2)
Technical building systems that are explicitly covered by
an agreed energy performance criterion or a contractual arrangement
specifying an agreed level of energy efficiency improvement, such as
energy performance contracting, or that are operated by a utility or
network operator and therefore subject to performance monitoring
measures on the system side, shall be exempt from the requirements
laid down in sub-regulation (1), provided that the overall impact of
such an approach is equivalent to that resulting from sub-regulation
(1).
(3)
As an alternative to sub-regulation (1) and provided that
the overall impact is equivalent to that resulting from sub-regulation
(1), the Building Regulations Office may opt to take measures to
ensure the provision of advice to users concerning the replacement of
heat generators, other modifications to the heating system or to the
system for combined space heating and ventilation and alternative
solutions to assess the efficiency and appropriate size of those systems.
Before applying these alternative measures, the Building and
Construction Authority shall, by means of submitting a report to the
Commission, document the equivalence of the impact of those
measures to the impact of the measures referred to in sub-regulation
(1). Such a report shall be submitted in accordance with the applicable
planning and reporting obligations.
(4)
The Building and Construction Authority shall lay down
requirements to ensure that, where technically and economically
feasible, non-residential buildings with an effective rated output for
heating systems or systems for combined space heating and ventilation
of over 290kW are equipped with building automation and control
systems by 2025. The building automation and control systems shall
be capable of
(a)
continuously monitoring, logging, analysing and
allowing for adjusting energy use;
(b)
benchmarking the building’s energy efficiency,
detecting losses in efficiency of technical building systems, and
informing the person responsible for the facilities or technical
building management about opportunities for energy efficiency
improvement; and
(c)
allowing communication with connected technical
building systems and other appliances inside the building, and
being interoperable with technical building systems across
different types of proprietary technologies, devices and
manufacturers.
(5)
the Building and Construction Authority may lay down
requirements to ensure that residential buildings are equipped with
(a)
the functionality of continuous electronic
monitoring that measures systems’ efficiency and informs
building owners or managers when it has fallen significantly
and when system servicing is necessary; and
(b)
effective control functionalities to ensure
optimum generation, distribution, storage and use of energy.
(6) Buildings that comply with sub-regulation (4) or sub-
regulation (5) shall be exempt from the requirements laid down in
sub-regulation (1).
(1)
The Building and Construction Authority shall
provide the necessary measures to establish regular inspections of the
accessible parts of air-conditioning systems or of systems for
combined air-conditioning and ventilation, with an effective rated
output of over 70kW. The inspection shall include an assessment of the
efficiency and sizing of the air-conditioning system compared with the
cooling requirements of the building and, where relevant, consider the
capabilities of the air-conditioning system or of the system for
combined air-conditioning and ventilation to optimise its performance
under typical or average operating conditions
Provided that where no changes have been made to the
air-conditioning system or to the system for combined air-conditioning
and ventilation or to the cooling requirements of the building
following an inspection carried out pursuant to this paragraph, the
Building and Construction Authority may choose not to require the
assessment of the sizing of the air-conditioning system to be repeated
Provided further that in the event that the Building and
Construction Authority maintains more stringent requirements
pursuant to Article 1(3) of Directive 2010/31/EU these shall be exempt
from the obligation to notify them to the Commission.
(2)
Technical building systems that are explicitly covered by
an agreed energy performance criterion or a contractual arrangement
specifying an agreed level of energy efficiency improvement, such as
energy performance contracting, or that are operated by a utility or
network operator and therefore subject to performance monitoring
measures on the system side, shall be exempt from the requirements
laid down in sub-regulation (1), provided that the overall impact of
such an approach is equivalent to that resulting from sub-regulation
(1).
(3)
As an alternative to sub-regulation (1) and provided that
the overall impact is equivalent to that resulting from sub-regulation
(1), the Building and Construction Authority may opt to take measures
to ensure the provision of advice to users concerning the replacement
of air-conditioning systems or systems for combined air-conditioning
and ventilation, other modifications to the air-conditioning system or
system for combined air-conditioning and ventilation and alternative
solutions to assess the efficiency and appropriate size of those
systems
Provided that before applying these alternative measures,
the Building and Construction Authority shall, by means of submitting
a report to the Commission, document the equivalence of the impact of
those measures to the impact of the measures referred to in sub-
regulation (1). Such a report shall be submitted in accordance with the
applicable planning and reporting obligations.
(4)
The Building and Construction Authority shall provide
requirements to ensure that, where technically and economically
feasible, non-residential buildings with an effective rated output for
systems for air-conditioning or systems for combined air-conditioning
and ventilation of over 290kW are equipped with building automation
and control systems by 2025. The building automation and control
systems shall be capable of
(a)
continuously monitoring, logging, analysing and
allowing for adjusting energy use;
(b)
benchmarking the building’s energy efficiency,
detecting losses in efficiency of technical building systems, and
informing the person responsible for the facilities or technical
building management about opportunities for energy efficiency
improvement; and
(c)
allowing communication with connected technical
building systems and other appliances inside the building, and
being interoperable with technical building systems across
different types of proprietary technologies, devices and
manufacturers.
(5)
The Building and Construction Authority may lay down
requirements to ensure that residential buildings are equipped with
(a)
the functionality of continuous electronic
monitoring that measures systems’ efficiency and informs
building owners or managers when it has fallen significantly
and when system servicing is necessary, and
(b)
effective control functionalities to ensure
optimum generation, distribution, storage and use of energy.
(6)
Buildings that comply with sub-regulation (4) or sub-
regulation (5) shall be exempt from the requirements laid down in sub-
regulation (1).
(7)
The owner of an air-conditioning system shall obtain an
inspection report by commissioning an independent air-conditioning
systems inspector, from the list of registered air-conditioning system
inspectors as published and updated by the Building and Construction
Authority at the time of inspection.
(8) The Building and Construction Authority shall establish
the methodology for the inspection of air-conditioning systems. The
Building and Construction Authority shall also set-up and approve
training courses for air-conditioning systems inspectors.
(1)
Inspectors of heating or air-conditioning systems
shall issue an inspection report after each inspection of a heating or
air-conditioning system. The inspection report shall contain the result
of the inspection performed in accordance with regulations 17 and 18
and shall include recommendations for the cost-effective
improvement of the energy performance of the inspected system.
(2) The EPC assessor and the registered inspectors,
respectively, shall in particular provide information to the owners or
tenants of buildings on energy performance certificates, including
their purpose and objectives, on cost-effective measures and, where
appropriate, financial instruments, to improve the energy
performance of the building, and on replacing fossil fuel boilers with
more sustainable alternatives. Building and Construction Authority
shall provide the information through accessible and transparent
advisory tools such as renovation advice and one-stop-shops.
(3) Inspectors of heating or air-conditioning systems shall
register each inspection report with the Building and Construction
Authority prior to handing over this inspection report to the owner of
the heating or air-conditioning system. Inspection reports will not be
considered valid unless this procedure is adhered to.
(1)
The Building and Construction Authority may
demand, from the owner of a building in terms of these regulations,
or the agent of such owner, the production of an EPC in respect of the
building or an inspection report with respect to the heating and, or
air-conditioning systems as required by these regulations, and if the
building owner or the agent of such owner, as the case may be,
refuses or fails to produce without reasonable cause the EPC or
inspection report, such person shall be guilty of an offence, unless
such person provides the requested EPC or inspection report within
sixty days after the request was made.
(2) Where a person produces an EPC or inspection report to
an authorised officer but refuses or fails to permit the said officer to
read and examine the EPC or the inspection report, such person or
other persons involved in such a case shall be guilty of an offence,
and the authorised officer may demand of the person or persons their
name and identification card number and official address.
21.(1) (a) The EPA and certification shall be carried out using
procedures, including calculation methods and software approved by
the Building and Construction Authority, as notified in the Gazette.
(b)
The inspection procedure and inspection report
for heating or air-conditioning systems shall be carried out using
procedures, approved by the Building and Construction Authority, as
notified in the Gazette.
(2)
(a)
In carrying out the EPA of a building or
installation, an assessor shall comply with any direction given by the
Building and Construction Authority in relation to the manner in
which the assessment is to be carried out.
(b)
In carrying out the inspection of a heating or air-
conditioning system, an inspector shall comply with any direction
given by the Building and Construction Authority in relation to the
manner in which this procedure is to be carried out.
(3) (a)
An EPB assessor may refuse to carry out an EPA
of a building or installation if in the opinion of the assessor any part
of the building or installation is in such a condition that it would not
be safe or practicable to carry out that assessment.
(b)
An inspector of heating or air-conditioning
systems may refuse to carry out an inspection procedure if in the
opinion of the inspector any part of the building or installation is in
such a condition that it would not be safe or practicable to carry out
that inspection.
(4) (a)
An endorsed EPC shall not be issued by the
assessor to the building owner or his agent, as the case may be, unless
and until it is accepted in the register maintained by the Building and
Construction Authority.
(b)
Inspection reports of heating or air-conditioning
systems shall be handled in accordance with regulation 19(3).
22.(1) (a)
The Building and Construction Authority may
revoke an EPC and EPC data file compiled by an EPB assessor where
it has reasonable grounds for believing that the EPC or data file was
not completed or issued in accordance with these regulations, and
shall enter such revocation in the EPC record of that building and the
register maintained by the Building and Construction Authority.
(b)
Where an EPC or EPC data file is revoked, the
Building and Construction Authority shall inform the EPB assessor,
giving reasons for the revocation, and shall also inform the person
who commissioned the EPC, the owner or tenant of the building, as
the case may be.
(c)
Where an EPC or EPC data file is revoked under
this sub-regulation
(i)
a request for the reimbursement of the
administrative fee or part thereof may be made by the
person who paid an administrative fee or contributed in
the administrative fee for the relevant EPB assessment
to the EPB assessor who carried out the assessment; and
(ii)
the EPB assessor shall be obliged to
make the reimbursement in whole or in part, as the case
may be, referred to in sub-paragraph (i), within twenty-
eight days of the receipt of the request, if such assessor
is satisfied that the fee or a contribution to the fee was
paid by the person making the request.
(2) (a)
The Building and Construction Authority may
revoke an inspection report either during the registration procedure or
during the verification process in accordance with regulation 32. The
Building and Construction Authority shall inform the respective
heating or air-conditioning systems inspector about this revocation.
(b)
The inspection report will be reinstated only
once the requested corrections are carried out to the satisfaction of
the Building and Construction Authority. All expenses related to
these corrections shall be borne by the respective heating or air-
conditioning systems inspector.
(c)
The requested corrections shall reach the
Building and Construction Authority within fourteen days. After this
period the inspector shall be removed from the list of registered
inspectors until full compliance with this sub-regulation is achieved.
23.(1) (a)
After an EPC has been registered in the EPC
register in accordance with sub-regulation (3a) of regulation 29, no
person shall either in writing, drawing or in any other manner alter,
cancel, or add anything to the registered EPC, or to any related
advisory report, or to a printed copy of a registered EPC, or to any
related advisory report or entry made therein.
(aa) A separate new EPC and, or related advisory report shall
be registered in the EPC register in accordance with sub-regulation (3a)
of regulation 29 to cater for amendments to an already registered EPC
and, or a related advisory report. This may be done by the same or a
different assessor, as the case may be. Upon registration of the
amending EPC and, or related advisory report, the previously
registered EPC, and or related advisory report shall cease to be valid.
(b)
No person shall produce
(i)
a printed copy of any EPC and related
advisory report for any building or installation, which
copy has been altered or added contrary to paragraph (a),
or upon which the figures have become illegible or the
colour has become altered by fading or otherwise; or
(ii) an EPC and related advisory report save
for those provided in relation to the particular building
for which it was issued; or
(iii)
an EPC and related advisory report
which has become void or the validity of which has
expired; or
(iv) any imitation of a registered EPC and
related advisory report.
(c)
The Building and Construction Authority may
require the owner of a building or, as the case may be, through his
agent, to surrender to it an EPC or report where the Building and
Construction Authority has reason to believe that the EPC or report
contains particulars which are not correct and, upon being so
required, the owner of the building or, as the case may be, the
owner’s agent, shall surrender the relevant documents to the Building
and Construction Authority.
(2) (a)
After an inspection report for heating or air-
conditioning systems has been registered with the Building and
Construction Authority and signed by the respective registered
inspector, no person shall
(i)
either by writing, drawing or in any
other manner alter, cancel, or add anything to this
inspection report; or
(ii) produce and present copies of an
inspection report which was altered contrary to sub-
paragraph (i).
(b)
Inspection reports which are registered with the
Building and Construction Authority may be replaced by an amended
inspection report, by the same heating or air-conditioning systems
inspector, within fourteen days after initial registration. Such
amended inspection report shall be submitted subject to prior
approval of the Building and Construction Authority.
(ba) A separate new inspection report shall be registered in
the inspection reports register in accordance with sub-regulation (3b)
of regulation 29 for any amendments required to a previously
registered inspection report, after the period referred to in paragraph
(b) has elapsed. This may be done by the same or a different
inspector, as the case may be. Upon the registration of the amending
inspection report, the report previously registered shall cease to be
valid.
(1) (a)
All data, documentation and records issued by
an EPB assessor and submitted to the Building and Construction
Authority, in relation with the carrying out of an EPC under these
regulations, shall become the property of the Building and
Construction Authority, which has the power to demand from the
assessor any such data, documentation or records as it considers
appropriate.
(b)
Every inspection report issued by an inspector of
heating or air-conditioning systems and submitted to the Building and
Construction Authority, in relation to an inspection of heating or air-
conditioning systems under these regulations, shall become the
property of the Building and Construction Authority, which has the
power to demand from the inspector of heating or air-conditioning
systems any additional data, documentation or records in relation to
such inspection report as it considers appropriate.
(2) The lawful EPC record in relation to a building and the
lawful inspection report in relation to an inspection of a heating or
air-conditioning system shall be that maintained on the respective
registers kept by the Building and Construction Authority.
(3) (a)
The most recent EPC record entered in relation
to a building on the EPC register by the Building and Construction
Authority shall be deemed to supersede any previous EPC record for
that building.
(b)
The most recent inspection report in relation to
an inspection of a heating or air-conditioning system entered on the
inspections’ register by the Building and Construction Authority
shall be deemed to supersede any previous inspection reports for that
system.
(1)
Subject to the provisions of sub-regulations (3)
and (4), the Building and Construction Authority is the only
institution legally empowered to register EPB assessors to assess the
energy performance of buildings, and as published from time to time
in the Gazette by the Building and Construction Authority.
(2) In registering an EPB assessor, the Building and
Construction Authority shall designate the type of energy
performance certification and also the category of buildings in
respect of which the EPB assessor is authorised to carry EPAs and
certifications.
(3) The Building and Construction Authority shall not
consider a person for registration as an EPB assessor unless
(a)
the person makes an application for registration
to the Building and Construction Authority in the form
specified by it for such purpose;
(b)
the application for registration is accompanied
by such fee as may be specified by the Building and
Construction Authority; and
(c)
the person meets any other requirements
specified by the Building and Construction Authority.
(4) In considering an application for registration as an EPB
assessor, the Building and Construction Authority shall be satisfied
that the applicant meets the requirements as defined in the definition
of EPB assessor in these regulations.
(5) An EPB assessor who is registered by the Building and
Construction Authority in respect of one type of certification or one
category of building may apply to the Building and Construction
Authority to be registered in respect of another type or category of
buildings, and may be so registered, subject to compliance with the
provisions set out in sub-regulations (3) and (4) and the payment of
such fee as may be specified by the Building and Construction
Authority.
(6) An EPB assessor shall be required to renew his
registration at such reasonable frequency as may be determined by
the Building and Construction Authority, subject to the payment of
such registration renewal fee as may be specified by the Building and
Construction Authority.
(7) The Building and Construction Authority shall provide
each EPB assessor with a certificate of registration for the designated
type and category of buildings to which his registration pertains, and
the certificate, if requested by the owner of a building or the owner’s
agent, or authorised officer, shall be presented for inspection to the
person making such request.
(8) Where the Building and Construction Authority
suspends or terminates the registration of a person as an EPB
assessor, it shall register the suspension or termination of the
appointment and the date on which the registration was suspended or
revoked.
(9) The Building and Construction Authority may, having
regard to all the circumstances of the case, suspend or terminate the
registration of an EPB assessor following
(a)
failure by the EPB assessor to attend a course of
periodic training if required by the Building and Construction
Authority or to satisfactorily complete such a training course;
or
(b)
failure by an EPB assessor to comply with a
direction under these regulations; or
(c)
failure by an EPB assessor to carry out a
building EPA for EPC purposes in a fit and proper manner, or
failure to maintain or provide satisfactory data, documentation
or records of any such assessment; or
(d)
the committing, or aiding or abetting the
committing, by the EPB assessor, of an offence under these
regulations; or
(e)
the forming of an opinion by the Building and
Construction Authority that the EPB assessor has ceased to be
capable of performing his functions properly and efficiently
under these regulations.
(10) A suspension or termination of registration under sub-
regulation (9) shall be notified to the person concerned in writing
including reasons for the suspension or termination and the Building
and Construction Authority shall inform the person of the appeal
procedure under sub-regulation (11).
(11) A person whose registration has been suspended or
terminated in accordance with sub-regulation (10) may, within
fourteen days from the said suspension or termination, appeal to the
Board of the Building and Construction Authority against the decision
regarding the suspension or termination taken by the Building and
Construction Authority, in accordance with article 12(1) of the Act.
(12) A person whose registration as an EPB assessor has
lapsed or been suspended or terminated may be directed by the
Building and Construction Authority to destroy any data or
documentation provided by building owners or their agents, and any
copies thereof, in relation to EPB assessments carried out by him in
his capacity as an EPB assessor. Alternatively, the Building and
Construction Authority may withdraw such data or documentation.
(13) A person who purports to be a registered EPB assessor
for a designated category of buildings, or a registered inspector for
air-conditioning or heating systems or an authorised officer under
these regulations shall be guilty of an offence in terms of these
regulations.
(14) A person who, purporting to give information to an EPB
assessor or inspector, to the Building and Construction Authority, or
to an authorised officer for the performance of his functions under
these regulations, makes a statement that he knows to be false or
misleading in a material particular, or fails to disclose a material
particular shall be guilty of an offence in terms of these regulations.
(15) An EPB assessor who issues an EPC or a registered
inspector who makes a statement or report, which he knows to be
false or misleading in a material particular, shall be guilty of an
offence in terms of these regulations.
(1)
Subject to the provisions of sub-regulation (3),
the Building and Construction Authority is the only institution legally
empowered to register inspectors of heating or air-conditioning
systems in accordance with these regulations and as published from
time to time in the Gazette by the Building and Construction
Authority.
(2) In registering an inspector of heating or air-conditioning
systems, the Building and Construction Authority shall designate the
type of system in respect of which the inspector is authorised to carry
out inspections and issue inspection reports.
(3) The Building and Construction Authority shall not
consider a person for registration as an inspector of heating or air-
conditioning systems unless
(a)
the person makes an application for registration
to the Building and Construction Authority in the form and
during the period specified by it for such purpose;
(b)
the application for registration is accompanied
by such fee as may be specified by the Building and
Construction Authority;
(c)
the person has the necessary qualifications to
apply for and successfully complete a training course provided
by the Building and Construction Authority, or a training
provider recognised by the Building and Construction
Authority as suitable for providing such training, on the
inspection of heating or air-conditioning systems installed in
Malta;
(d)
the person meets any other requirements
specified by the Building and Construction Authority.
(4) An inspector of heating or air-conditioning systems may
be required to renew his registration at such reasonable frequency
subject to the payment of such registration renewal fee as may be
specified by the Building and Construction Authority.
(5) The Building and Construction Authority shall provide
an inspector of heating or air-conditioning systems with a certificate
of registration for the designated type of system to which his
registration pertains. This certificate of registration shall also include
a unique registration number of the inspector, date of registration and
the validity period of such registration.
(6) The Building and Construction Authority may, having
regard to all the circumstances of the case, suspend or terminate the
registration of an inspector of heating or air-conditioning systems
following
(a)
failure by such inspector to comply with a
direction under this regulation and regulation 22(2); or
(b)
failure by such inspector to attend a course of
periodic training if required by the Building and Construction
Authority or to satisfactorily complete such a training course;
or
(c)
failure by such inspector to carry out an
inspection in a fit and proper manner, or failure to maintain or
provide satisfactory data, documentation or records of any
such inspection; or
(d)
the committing, or aiding or abetting the
committing, by such inspector, of an offence under these
regulations; or
(e)
the forming of an opinion by the Building and
Construction Authority that such inspector has ceased to be
capable of performing his functions properly and efficiently
under these regulations.
(6a) A person whose registration has been suspended or
terminated in accordance with sub-regulation (6) may, within
fourteen days from the said suspension or termination, appeal to the
Board of the Building and Construction Authority against the
decision regarding the suspension or termination taken by the
Building and Construction Authority, in accordance with article
12(1) of the Act.
(7) A person shall be guilty of an offence in terms of these
regulations if such person
(a)
claims falsely to be an inspector of heating or
air-conditioning systems, or an authorised officer under these
regulations; or
(b)
makes a statement that he knows to be false or
misleading in a material particular or fails to disclose a
material particular, when giving information to an inspector of
heating or air-conditioning systems, to the Building and
Construction Authority or to an authorised officer for the
performance of his functions under these regulations; or
(c)
issues an inspection report for heating or air-
conditioning systems which he knows to be false or misleading
in a material particular.
(1)
The Building and Construction Authority shall,
from time to time, issue directions to EPB assessors or inspectors of
heating or air-conditioning systems, present or prospective, in
relation to
(a)
the manner in which the EPB assessments or
inspection procedures of heating or air-conditioning systems
are to be carried out;
(b)
the manner in which an EPC and related
advisory reports are to be issued;
(c)
the manner in which inspection reports for
heating or air-conditioning systems are to be issued;
(d)
the qualifications and training requirements to
maintain or achieve such roles;
(e)
the records, data bases and documentation to be
maintained;
(f)
codes of practice to be respected; and
(g)
such other matters as are reasonably necessary
for the proper administration of these regulations.
(2) EPB assessors and inspectors of heating or air-
conditioning systems shall comply with any relevant direction given
under sub-regulation (1).
The Building and Construction Authority may specify
fees as are reasonably necessary for the registration procedures and
other administrative matters in relation to its obligations in these
regulations. The Building and Construction Authority shall be the
sole user of the revenue collected from these fees and such revenue
shall be used to defray costs incurred by it to properly establish,
operate, maintain and promote the various obligations of the Building
and Construction Authority.
(1)
The Building and Construction Authority shall
establish, operate and maintain
(a)
a register of EPB assessors, an EPC register
comprising EPCs and related advisory reports, EPC data files
and related data or documents; and
(b)
a register for inspectors of heating or air-
conditioning systems, a register of inspection reports for
heating or air-conditioning systems; and
(c)
any other register that the Building and
Construction Authority considers relevant and necessary.
(2) Any register established under sub-regulation (1) may
be held in non-legible form provided it is capable of being
reproduced in legible form.
(3) Each register established under sub-regulation (1) shall
be a public record and shall be kept under the management of the
Building and Construction Authority.
(3a) In the EPC register, an EPC shall be registered as a
single record, together with the related advisory report, with an EPC
registration number that for monitoring and verification purposes
shall be identifiable to the unique registration number of the EPB
assessor who issued and registered that same EPC
Provided that in accordance with regulation 25, only
registered EPB assessors may access the EPC register to calculate,
generate and register EPCs and related advisory reports, with the
approved calculation methods and software in accordance with
regulation 21.
(3b) In the register of inspection reports for heating or air-
conditioning systems an inspection report shall be registered as a
single record, with an inspection report registration number that for
monitoring and verification purposes shall be identifiable to the
unique registration number of the inspector of heating or air-
conditioning systems who issued and registered that same inspection
report
Provided that in accordance to regulation 26, only
registered inspectors of heating or air-conditioning systems may access
the register of inspection reports for heating and air-conditioning
systems to register inspection reports carried out in accordance with
regulation 21.
(4) In relation to the registers established under sub-
regulation (1), the following access rights shall apply
(a)
extracts from the register of the EPB assessors
and the register of inspectors of heating or air-conditioning
systems, comprising the name, contact details and the
designated type, shall be made available to the public;
(b)
subject to compliance with the provisions of the
Data Protection Act, the Building and Construction Authority
may allow publication or access, on a restricted or an open
basis, to any extract from any register maintained by the
Building and Construction Authority under these regulations
where the Building and Construction Authority is satisfied that
such publication or access is in the public interest;
(ba)
Unrestricted access, without the possibility to
modify content of the EPC register and, or to the register of
inspection reports for heating and air-conditioning systems, to
enable independent control, monitoring and verification of
EPCs and, or inspection reports in accordance with Schedule
II, shall be granted to the competent authorities or bodies to
which the Building and Construction Authority has delegated
responsibility, in accordance with sub-regulation (2) of
regulation 32, to implement the independent control systems.
(c)
other than as provided for in paragraphs (a), (b)
and (ba), a data file or other extract from a register relating to an
EPC for a particular building or an inspection report for a
particular heating or air-conditioning system, shall only be made
available to
(i)
the relevant EPB assessor or the relevant
inspector of heating or air-conditioning systems; or
(ii) an EPB assessor having been appointed
by the building owner or the agent of the building owner
to undertake any subsequent EPB assessment of the
relevant building; or
(iii) the relevant building owner, or the agent
of that building owner.
(1)
In any proceedings a certificate signed by an
authorised officer of the Building and Construction Authority
containing only information stated in that certificate to be taken from
a register maintained by the Building and Construction Authority
shall be sufficient evidence of the facts stated therein unless there is
proof to the contrary.
(2) In any proceedings a document purporting to be a
certificate under sub-regulation (1) shall be deemed to be a certificate
for all legal intents and purposes, and to have been signed by an
authorised officer of the Building and Construction Authority, unless
there is proof to the contrary.
(3) A certificate under sub-regulations (1) and (2) that
purports to bear a facsimile signature of the authorised officer of the
Building and Construction Authority or a copy of such signature
applied by means of a stamp or produced by a computer, shall be
deemed to have been signed by an authorised officer, unless there is
proof to the contrary.
(1)
The Building and Construction Authority shall
ensure that the energy performance certification of buildings and the
inspection of heating and air-conditioning systems be carried out in
an independent manner by a qualified duly registered EPB or
registered inspector of heating or air-conditioning systems.
(2) The Building and Construction Authority shall make
available to the public information on training and accreditations. It
shall ensure that regularly updated lists of qualified and, or accredited
experts are made available to the public.
(1)
The Building and Construction Authority shall
ensure that independent control systems for EPCs and reports on the
inspection of heating or air-conditioning systems are established in
accordance with Schedule II. The Building and Construction
Authority may establish separate systems for the control of EPCs and
for the control of reports on the inspection of heating and air-
conditioning systems.
(2) The Building and Construction Authority may delegate
the responsibilities for implementing the independent control
systems. Where the Building and Construction Authority decides to
do so, it shall ensure that the independent control systems are
implemented in compliance with Schedule II.
(3) (a)
Further to an independent control and the official
report issued in accordance with item 6 of Schedule II, on the basis of
errors or lack of detail identified in EPCs or inspection reports within
the respective samples, the Building and Construction Authority may
take the following actions
(i)
revoke the respective EPC or inspection
report in accordance with regulation 22;
(ii)
a new EPC incorporating amendments
necessary shall be registered and issued by the respective
assessor in accordance with paragraph (aa) of sub-
regulation 1 of regulation 23. Amendments shall be
carried out to the satisfaction of the Building and
Construction Authority. All expenses related to the new
EPC shall be borne by the respective assessor. The new
EPC shall be registered within fourteen days. If the
assessor does not comply with these requirements within
this period, he shall be removed from the list of
registered assessors until full compliance with this sub-
regulation is achieved;
(iii) impose a fine (multa) in accordance with
regulation 40;
(iv) suspend or terminate the registration of the
relevant EPB assessor in accordance with sub-regulation
(9) of regulation 25;
(v)
suspend or terminate the registration of the
relevant inspector of heating or air-conditioning systems
in accordance with sub-regulation (6) of regulation 26;
(b) Decisions of the Building and Construction Authority in
accordance with paragraph (a) may be appealed in
accordance with article 12(1) of the Act. These decisions
provided under article 12(1) of the Act shall be subject to
the right of appeal before the Building and Construction
Tribunal in accordance with the provisions of Part VIII of
the Act, or the Court of Appeal (Inferior Jurisdiction) in
accordance with article 47 of the Act, as the case may be.
(1)
Owners or tenants of buildings or building units
shall be informed of the different methods and practices that serve to
enhance energy performance as stipulated in these regulations.
(2) The EPC assessor and the registered inspectors,
respectively, shall in particular provide information to the owners or
tenants of buildings on energy performance certificates, including
their purpose and objectives, on cost-effective measures and, where
appropriate, financial instruments, to improve the energy
performance of the building, and on replacing fossil fuel boilers with
more sustainable alternatives. Building and Construction Authority
shall provide the information through accessible and transparent
advisory tools such as renovation advice and one-stop-shops.
(3) The Building and Construction Authority shall ensure
that guidance and training are made available for those responsible
for implementing these regulations. Such guidance and training shall
address the importance of improving energy performance, and shall
enable consideration of the optimal combination of improvements in
energy efficiency, use of energy from renewable sources and use of
district heating and cooling when planning, designing, building and
renovating industrial or residential areas.
(4) The competent authority, the Minister responsible for
the Climate Action Authority and entrusted party shall provide
information on available energy efficiency mechanisms and financial
and legal frameworks, which information shall be transparent and
widely disseminated to all relevant market actors, such as consumers,
builders, periti, engineers, environmental and energy auditors and
installers of building elements and shall provide information to
banks and other financial institutions on possibilities of
participating, including through the creation of public and, or private
partnerships for the financing of energy efficiency improvement
measures.
(5) The Minister responsible for the Regulator for Energy
and Water Services shall establish appropriate conditions for market
operators to provide adequate and targeted information and advice to
energy consumers on energy efficiency.
(6) The Minister responsible for Energy, with the
participation of stakeholders, including local and regional authorities,
shall promote suitable information, awareness-raising and training
initiatives to inform citizens of the benefits and practical aspects of
implementing energy efficiency improvement measures.
In order to facilitate the effective implementation of
these regulations, the Building and Construction Authority shall
consult the stakeholders involved, including local authorities, in
accordance with the relevant applicable national legislation. Such
consultation is of particular importance for the application of
regulations 10 and 33.
Any person who contravenes any of the requirements of
these regulations shall be guilty of an offence in terms of these
regulations.
(1)
The Building and Construction Authority may
appoint persons to be authorised officers for the purpose of enforcing
these regulations.
(2) An authorised officer shall be in possession of a warrant
of appointment and shall, upon request, produce the warrant of
appointment.
(1)
An officer authorised by the Building and
Construction Authority may enter, inspect and examine a building or
any part of a building or installation for the purpose of ensuring
compliance to these regulations.
(2) Such authorised officer may carry out such inspections
and examinations in relation to the building and installations, as are
reasonably necessary for the purpose of ensuring compliance to these
regulations.
(3)
A person who -
(a)
fails to permit an inspection of a building, or
installation, under these regulations;
(b)
without reasonable cause fails or refuses to
comply with any request or requirement made by an authorised
officer under these regulations;
(c)
obstructs, impedes, interferes with or assaults an
authorised officer in the exercise of a power under these
regulations;
(d)
gives to an authorised officer information which
is false or misleading in a material respect; or
(e)
alters, suppresses, or destroys any EPC data file,
related calculation, EPC, advisory report, book, document or
record, including a printed copy thereof, and including
electronic data, which the person concerned has been
requested or required to produce, or may reasonably expect to
be required to produce,
shall be guilty of an offence in terms of these regulations.
(1)
Criminal proceedings for an offence under these
regulations shall be heard either before the Court of Magistrates
(Malta) or the Court of Magistrates (Gozo), both as a Court of
Criminal Judicature, and shall be in accordance with the provisions of
the Criminal Code regulating such procedure.
(2) Where any person, whether voluntarily or negligently,
acts or purports to act as a director, manager, secretary or other
officer or member of a body, whether corporate or unincorporate, and
in so doing contravenes any provision of these regulations, such
person shall be guilty of an offence, and shall, on conviction, be
liable to the penalties in terms of regulations 39 and 40.
(3) Notwithstanding the provisions of the Criminal Code,
the Attorney General shall always have the right to appeal before the
Court of Criminal Appeal from any judgement given by the Court of
Magistrates (Malta) or the Court of Magistrates (Gozo), both as a
Court of Criminal Judicature, in respect of proceedings taken in
relation to any offence committed against these regulations.
Any administrative penalty or sanction imposed by the
Building and Construction Authority, in accordance with article 22 of
the Act, upon any person who infringes any provision of these
regulations or who fails to comply with any directive or decision
given by the Building and Construction Authority in ensuring
compliance with these regulations shall be due to the Building and
Construction Authority as a civil debt constituting an executive title
for the purpose of Title VII of Part I of Book Second of the Code of
Organization and Civil Procedure as if the payment of the debt had
been ordered by a judgement delivered by the Civil Court.
A person found guilty of an offence shall, on conviction,
be liable to
(a)
a fine (multa) of not less than five hundred euro
(€500) and not exceeding one thousand and five hundred euro
(€1,500), if contravening regulations 7(1), 8(1), 13(5), 14(1),
(3) and (4), 15(4), 16(1) and (2), 17 and 18 and other
corresponding clauses pertaining to heating and air-
conditioning systems;
(b)
a fine (multa) of not less than one thousand and
five hundred euro (€1,500) and not exceeding five thousand
euro (€5,000) if contravening regulations 20, 21(1), (2) and
(4), 22, 23, 25(12), (13) and (14), 26(7) and other
corresponding clauses pertaining to heating and air-
conditioning systems;
(c)
a fine (multa) of not less than one thousand and
five hundred euro (€1,500) and not exceeding five thousand
euro (€5,000), or to a term of imprisonment not exceeding
three months, or to both such fine and imprisonment, if
contravening regulation 37(3).
(1)
Any documents issued in relation to these
regulations may be issued either in the Maltese language or in the
English language, or in both languages.
(2) Any EPC or report issued in accordance with these
regulations shall be issued solely in the English language.
Schedule I
(Regulation 4)
Common general framework for the calculation of energy
performance of buildings
1. The energy performance of a building shall be
determined on the basis of calculated or actual energy use and shall
reflect typical energy use for space heating, space cooling, domestic
hot water, ventilation, lighting and other technical building systems.
The energy performance of a building shall be expressed by a
numeric indicator of primary energy use in kWh/(m 2 .y) for the
purpose of both energy performance certification and compliance with
minimum energy performance requirements. The methodology applied
for the determination of the energy performance of a building shall be
transparent and open to innovation.
The competent authority shall describe its national calculation
methodology following the national annexes of the overarching
standards, namely ISO 52000-1, 52003-1, 52010-1, 52016-1, and
52018-1, developed under mandate M/480 given to the European
Committee for Standardisation (CEN). This provision shall not
constitute a legal codification of those standards.
2. The energy needs for space heating, space cooling,
domestic hot water, ventilation, lighting and other technical building
systems shall be calculated in order to optimise health, indoor air
quality and comfort levels defined by the competent authority at
national or regional level.
The calculation of primary energy shall be based on primary
energy factors or weighting factors per energy carrier, which may be
based on national, regional or local annual, and possibly also seasonal
or monthly, weighted averages or on more specific information made
available for individual district system.
Primary energy factors or weighting factors shall be defined by
the competent authority. In the application of those factors to the
calculation of energy performance, the competent authority shall
ensure that the optimal energy performance of the building envelope is
pursued.
In the calculation of the primary energy factors for the purpose
of calculating the energy performance of buildings, the competent
authority may take into account renewable energy sources supplied
through the energy carrier and renewable energy sources that are
generated and used on-site, provided that it applies on a non-
discriminatory basis.
3. For the purpose of expressing the energy performance of
a building, the competent authority may define additional numeric
indicators of total, non-renewable and renewable primary energy use,
and of greenhouse gas emission produced in kgCO 2 eq/(m 2 .y).
4. The methodology shall be laid down taking into
consideration at least the following aspects
(a)
the following actual thermal characteristics of the
building including its internal partitions
(i)
thermal capacity;
(ii)
insulation;
(iii)
passive heating;
(iv)
cooling elements; and
(v)
thermal bridges;
(b)
heating installation and hot
water
supply,
including their insulation characteristics;
(c)
air-conditioning installations;
(d)
natural and mechanical ventilation which may
include air-tightness;
(e)
built-in lighting installation (mainly in the non-
residential sector);
(f)
the design, positioning and orientation of the
building, including outdoor climate;
(g)
passive solar systems and solar protection;
(h)
indoor climatic conditions, including the designed
indoor climate;
(i)
internal loads.
5. The positive influence of the following aspects shall be
taken into account
(a)
local solar exposure conditions, active solar
systems and other heating and electricity systems based on
energy from renewable sources;
(b)
electricity produced by cogeneration;
(c)
district or block heating and cooling systems;
(d)
natural lighting.
6. For the purpose of the calculation, buildings should be
adequately classified into the following categories
(a)
single-family houses of different types;
(b)
apartment blocks;
(c)
offices;
(d)
educational buildings;
(e)
hospitals;
(f)
hotels and restaurants;
(g)
sports facilities;
(h)
wholesale and retail trade services buildings;
(i)other types of energy-consuming buildings.
Schedule II
(regulation 32)
Independent control systems for energy performance
certificates and inspection reports
1. The competent authorities or bodies to which the Building
and Construction Authority has delegated the responsibility for
implementing the independent control system for inspection reports of
heating and air-conditioning systems shall, on a yearly basis, make a
random selection of at least a statistically significant percentage of all
the inspection reports issued annually and subject those reports to
verification.
2. The competent authorities or bodies to which the Building
and Construction Authority has delegated the responsibility for
implementing the independent control system for EPCs shall, on a
yearly basis, make a random selection of all the EPCs issued annually
and subject them to verification.
3. (1)
The sample shall be of a sufficient size to ensure
statistically significant compliance results to a confidence level of 95%
and a margin of error of 5%. Temporary files shall not to be considered.
(2)
The following equation shall be used to determine the
sample size for monitoring and verification purposes
Where
n = Sample size
N = Total amount of EPCs or inspection reports issued in the
year being verified
Z =
Critical value of the normal distribution at the
required confidence level. For a confidence level of 95%, Z = 1.96
p =
Sample proportion
e =
Margin of error
4. The sampling plan shall be designed so as the number of
EPCs or inspection reports to be monitored and verified are weighted
proportionally, to the extent possible, to the number of EPCs or
inspection reports issued in the year being verified by every assessor or
inspector, as the case may be.
5. The verification shall be based on the following options or
on equivalent measures
(a)
a validity check of the input data of the building
used to issue the EPC and the results stated in the certificate;
(b)
a check of the input data and verification of the
results of the EPC, including the recommendations made;
(c)
a full check of the input data of the building used
to issue the EPC, full verification of the results stated in the
certificate, including the recommendations made, and an on-site
visit of the building, if possible, to verify consistency between
specifications indicated in the EPC and the building certified.
6. The sampling plan, the sample size and the results of the
monitoring and verification conducted in implementing the
independent control shall be recorded in an official report to be
subm i tt ed to t he Bui ld in g and Co nst ru cti on A ut hori ty. F or
compliance results to be traceable, the official report shall indicate,
for each of the EPCs or inspection reports analysed within the
sample, the assessor or inspector’s unique registration number, the
certificate or report registration number, and the type of error or
lack of detail identified.
Schedule III
(Regulation 6)
Comparative methodology framework to identify cost-optimal levels
of energy performance requirements for buildings
and building elements
The comparative methodology framework shall enable
Member States to determine the energy performance of buildings and
building elements and the economic aspects of measures relating to
the energy performance, and to link them with a view to identifying
the cost-optimal level.
The comparative methodology framework shall be
accompanied by guidelines outlining how to apply this framework in
the calculation of cost-optimal performance levels. The comparative
methodology framework shall allow for taking into account use
patterns, outdoor climate conditions, investment costs, building
category, maintenance and operating costs (including energy costs
and savings), earnings from energy produced, where applicable, and
disposal costs, where applicable. It should be based on relevant
European standards relating to these regulations.
By calculating the costs of the energy efficiency measures
during the expected economic life-cycle, the cost-effectiveness of
different levels of minimum energy performance requirements is
assessed by the Member States. This will allow the determination of
cost-optimal levels of energy performance requirements.