ENVIRONMENTAL MANAGEMENT CONSTRUCTION SITE REGULATIONS *
Table of Provisions (26)
Statutory Text (26 Articles)
SUBSIDIARY LEGISLATION 552.09
ENVIRONMENTAL MANAGEMENT
CONSTRUCTION SITE REGULATIONS *
1st November, 2007 †
LEGAL NOTICE 295 of 2007, as amended by Legal Notices 358, 371
and 426 of 2007; Act XV of 2009; and Legal Notice 426 of 2012.
PART I
Preliminary
The title of these regulations is the Environmental
Management Construction Site Regulations.
L.N. 358 of 2007;
Regulation 7
Reducing Nuisance to Neighbours
1. Three weeks before any construction work commences which will
take longer than four weeks to complete, the owner shall ensure that there
shall be erected on the street boundary of the site a permanent A2 sized
notice board, as specified below, on which shall be affixed, and suitably
protected from the weather, the development permit number, the particulars
of the "Owner", "Site Manager" and "Perit" in charge and the contractor or
contractors including their telephone numbers. A template of such notice
can be obtained from the Ministry or its designated entity or downloaded
from the Ministry’s web site or that of its designated entity. The details on
the notice board must be legible from the road level with a minimum font
size of 100 point. Such notice board shall be maintained in good condition at
all times until all works on site are completed or until such time as deemed
appropriate by the Authority. Such notice shall also include
the start date; and
a.
a contact number.
b.
If the site is larger than 1,000 square metres, or has a frontage bordering
any road or roads in excess of 25 metres, such information shall be
displayed on a billboard which must be at least 1.5 metres by 2.5 metres, and
shall also include dates of completion of the principal stages of the project.
This billboard shall be placed in such a way that it does not obstruct or
hinder the safety and easy flow of traffic pedestrians and general public.
Moreover a copy of the development permit and its renewal or renewals, if
any, together with copies of all plans and elevations as approved, shall be
kept on site and the same shall at all reasonable times be available for
inspection and use by the Enforcement Officers.
Environmental Management Construction Site Regulations
Template for Notice Board / Billboard as stipulated by Schedule I, paragraph 1
DEVELOPMENT TITLE
PERMIT NUMBER
CONSTRUCTION
COMMENCEMENT
DATE
NAME OF SITE
24 HOUR
NUMBER
LEAD CONTRACTOR
Insert
name
of Insert
name
of Insert
name
of
CONTRACTORS
contractor 2
contractor 3
contractor 4
PERIT/FIRM OF PERITI
OWNER
OHSA Health & Safety Officer
Address & Contact Details
Address & Contact Details
Contact Details
In case of difficulty kindly contact the Local Council on telephone number
2. Cutting of stones and bricks may be allowed on site.
Provided that
all machinery and tools not listed in Schedule IX shall be
a.
equipped with dust extraction and recovery systems, to ensure
that dust is not dispersed onto public areas and third party
property; in combination with either of the provisions of
subparagraphs (b) or (c) below;
upon roofing of the lowest floor of the structure, all
b.
mechanical cutting of stone and brick cutting shall take place
within the building and all external apertures are to be boarded
up with an impermeable material;
stone and brick cutting is carried out in a temporary enclosed
c.
impermeable structure erected on the construction site.
Transportation
3. Screed sand and other loose building materials shall be transported,
and deposit of deposited and stored on site in rigid containers with suitable covers or
loose building flexible sturdy containers that can be appropriately sealed, which material
can support the weight being contained, to permit the total enclosure of such
materials at all times and which shall be kept sealed when not in use.
4. Without prejudice to any other law, no building material, waste,
machinery or plant shall be allowed to obstruct the pavement or the smooth
flow of traffic in the vicinity of the site on which works are in progress or
complete. Depositing of building materials for loading or unloading
purposes and placing of equipment in the street along the frontage of the site
has to be authorised by the Local Council at the time responsible for such
authorisation.
5. Without prejudice to any other law and in addition to the
requirements emanating from the work place (Minimum Health and Safety
Requirements for work at Construction Sites) Regulations, where a hazard
to vehicular traffic on a public way is created by work on, or associated
with, the site building works, one or more of the following shall be provided
to direct the traffic as is considered appropriate and is approved by the
respective Local Council, and where appropriate the Authority for Transport
in Malta
one or more law enforcement officers;
a.
warning signs;
b.
barriers;
c.
lane control devices; and/or
d.
flashing lights or flares located at a suitable distance from the
e.
hazard.
When there is no agreement between the respective Local Council and the
Authority for Transport in Malta the decision of the competent authority as
defined by local legislation shall prevail.
Moreover only signs as indicated in the Traffic Signs and Carriage Way
Markings Regulations are allowed.
6. Adequate facilities and measures shall be undertaken to ensure that
clean the site. the site and its immediate vicinity are kept clean.
any trash or debris shall be contained on site and disposed of
a.
in closed waste receptacles to avoid wind, rain or any other
movement related to the construction process from carrying it
off site into any public area;
the construction activity shall not create any discharge of
b.
cleaning agents, paints, oil, other pollutants or hazardous
waste to public areas or into the sewerage system, or into the
sea;
the immediate mopping up of spills;
c.
street sweeping or washing or vacuuming;
d.
concrete or mortar mixers wash out pits and chemical holding
e.
areas are to be located away from areas that drain to systems
and waterways or third party property; and
prior to any vehicular movement from within the site to any
f.
public area, all wheeled plant shall be obliged to have their
tyres washed of any material, dirt, grime or any other material
that may be carried out into the public area and deposited
thereon.
Rodent control.
7. All necessary requirements need to be undertaken for initial
deratting and subsequent rodent control at construction sites to the
satisfaction of the competent authority.
The following minimum measures are to be undertaken
preventing any discharge of sewage and, or, the closing off of
a.
any access to the main sewer;
organic waste shall be disposed off immediately so as not to
b.
allow rodents to infest the site; and
installation of rodent monitoring (bait/trap) stations at the site
c.
perimeter and storage locations. Subsurface (manhole) baiting
may be necessary if utility systems are impacted.
These regulations have the scope of limiting environmental
de g r a d a t i o n t h r o ug h a p p r o pr ia te c o n s t r u c t i on m a na g e m e nt
practices that cause the least nuisance to neighbours, minimising
the risk of injury to the public, protecting the property belonging to
the Government and Local Councils, and as much as possible
reducing the harm to the environment. The provisions of these
Regulations shall in no way be construed as having any bearing on
the responsibilities related to construction sites emanating from
other legislative instruments.
(Regulation 6)
Hoardings for
1. For any building not exceeding 2 floors and a semi basement in
buildings less height from road level, it shall be mandatory to erect hoarding, made of
t h a n 7 m i n suitable rigid material that is free-standing and independent of the building
itself up to a height of 3 metres. Such hoarding shall be designed in a
manner that conceals the site and protects adjacent areas from the egress of
dust and from falling materials from within the site.
Hoardings for
2. For any building that is to be constructed over 3 floors in height from
buildings more road level, it shall be mandatory to erect hoarding, made of suitable rigid
t h a n 7 m i n material up to the full height of the building, Such hoarding shall, in the
absence of a nationally approved code of practice by the competent
authority, be designed in a manner that entirely conceals the site and
protects adjacent areas from the egress of dust and from falling materials
from within the site, provided that for tall buildings higher than 8 floors, as
an alternative to hoarding to full height, the hoarding is to be provided up to
the 8th floor and from the 9th floor upwards all windows and balcony door
openings are to be boarded up to prevent the egress of dust. For sites that are
recessed from the road, semi-detached or detached, such hoarding is to
enclose the whole of the site.
The hoarding shall, as a minimum, be erected in a manner that ensures
that it extends to at least one metre above the highest floor level within the
construction site as measured in the vertical plane.
In the instances where demolition activity is carried out the hoarding has
to be erected upfront to the full height of the building or as appropriate to
the competent authority to ensure public safety and the least inconvenience
to the neighbours. Hoarded structures should also be provided with an
adequate amount of interlocking waste chutes to deliver waste material from
any level within the construction site to the closest possible level of
destination of the waste receptacles without causing any inconvenience or
hazard to any person or third party property.
Moreover, a chute shall be
closed if it is inclined more than 45 degrees with the
a.
horizontal; and
be kept closed or covered at its entrance when not in use.
b.
3. Hoarded structures shall be constructed in timber or metal frame and
shall be covered with suitable mesh or material that precludes any visual
impact of the internal on-goings within the site.
Moreover
all hoarding screens must form a barrier against the egress of
a.
dust and debris from the construction site to the surrounding
environment;
hoardings are to be designed to withstand up to gale wind
b.
loads (Force 8 and above) with any anchorage as necessary to
prevent overturning and ensure stability. In addition hoardings
adjoining excavations are to be designed to withstand any
external impacts;
hoardings and barricades must be in good condition to fulfil
c.
their purpose;
all construction work must be contained within the hoarding;
d.
and
advertisements on the hoardings are allowed subject to
e.
advertising laws and regulations.
Operations that
4. Where construction work-related operations extend beyond, or
extend beyond, affect, the perimeter surrounding the construction site, work shall not
o r a f f e c t , t h e commence on the construction, alteration or demolition of a building until a
perimeter
covered way has been provided in accordance with the provisions of
s u r r o u n d i n g regulation 5 below to protect the public, except where
the
the work and ancillary machinery is carried out within a solid
a.
construction
enclosure; and
site.
the construction works and their ancillary machinery are at a
b.
distance of two metres or more from a public way used by
pedestrians.
Covered ways.
5. A covered way shall
have a clear height of not less than 2.2 metres;
a.
have a clear width of not less than 1.2 metres or the width of
b.
the public way whichever is the lesser, but sufficient to ensure
accessibility for pushchairs and the disabled. Ramps, suitable
for wheelchair access shall also be in place, where applicable,
to bridge any difference in levels with a slope not steeper than
8.5%;
include appropriate signage acceptable to the Authority or its
c.
designated authority and lighting in a manner that provides an
equivalent illumination as the prevalent street lighting, both
for the attention of pedestrians and motorists. Such signage
and lighting shall alert and direct motorists around any
obstruction whilst indicating alternative entry and exist routes
to pedestrians whilst providing sufficient lighting to enable
them to navigate through the walkway;
have non-slip floors and an even surface in line with national
d.
standards;
be designed and constructed to support safely all loads that
e.
may reasonably be expected to be applied to it, but in no case
less than 2.4 kN per metre squared on its roof;
have a weather-tight roof sloped towards the site, or if flat, be
f.
equipped with a splash board not less than 200 millimetres
high on the road side;
be totally enclosed on the site side with an enclosure having a
g.
smooth surface facing the public way;
have a finished metal or timber hand rail 1 metre high on the
h.
road side where the covered way is supported by posts on the
road side to support pedestrians navigating through;
be adequately lit between sunset and sunrise in a manner that
i.
provides an equivalent illumination as the prevalent street
lighting; and
ENVIRONMENTAL MANAGEMENT CONSTRUCTION SITE
be left free from any material or any other objects which will
j.
obstacle or hinder the free movement of pedestrians at all
times.
6. The owner shall erect a timber or metal barricades to block the way
and prevent access to unauthorised persons as stipulated in the following
sub-regulations
6.1 Barricades shall be strongly constructed and not less than 2
metres high and erected between the site and the public way or
to isolate completely the open sides of a construction site so as
to safeguard the public or third party moveable or immovable
property.
6.2 Barricades shall have smooth surfaces facing the public way
and shall be without openings except those required for
authorised access.
6.3 Access openings through barricades shall be blocked with
gates which shall be kept closed and locked when the entry to
the site is unattended and shall be maintained in place until
completion of the construction activity to the satisfaction of
the Authority. Such gates must be designed in such a manner
that prohibits public access, especially children.
6.4 Access gates into the site used by construction machinery
should have warning lights lit up during entry and egress of
such machinery or provision of banksmen to warn motorists or
the general public during passage of construction equipment.
7. The owner shall ensure a safe passage past the site.
7.1 Where the construction necessitates the obstruction of the
pedestrian pavement, and this is approved by the Local
Council, a temporary pedestrian pavement shall be provided
and it shall be kept clear of obstruction at all times.
In these regulations, unless the context otherwise requires
"the Act" means the Development Planning Act or the
Environment Protection Act as applicable;
"areas of high development intensity" means those localities
which are listed in Schedule VII;
"the Authority" means the Malta Environment and Planning
Authority or any other authority that may, from time to time, be
designated as having responsibility for these regulations;
"the Commissioner" means a Commissioner for Justice in terms
of the Commissioners for Justice Act;
"construction" includes works, activities, events and practices
for, or in connection with, the building, alteration, renovation,
finishing, demolition, excavation or removal within any site or
building within any type of construction works as defined in
Schedule Vl;
"construction site" means a site where construction is being
carried out whether it is public or private land;
"contractor" means an individual, partnership, company, or any
other legal entity who is engaged to perform any type of
construction works or related services by an owner on a
* These Regulations have been repealed by Legal Notice 341 of 2022.
†By virtue of Legal Notice 296 of 2007, all the provisions of these regulations, other
than Schedule III section 1(b) and Schedule IV section 1(a) and (b), are in force in
relation to Type A and Type B developments listed in Schedule VI.
construction site;
" C o u r t " i n cl u d e s a L o c a l Tr i b u n a l e s t a b l i s h e d u n d e r t h e
Commissioners for Justice Act;
"emergency" means an unexpected situation, or a sudden,
unforeseen happening which requires immediate action to correct
in order to protect lives and, or property and, or economic
livelihood;
"footprint" means the space contained within the external walls
of a building at ground floor level, including internal yards, shafts,
terraces or courtyards totally enclosed or surrounded by the
building, but excluding terraces, backyards, yards and pool decks
not totally enclosed or surrounded by the building;
"Government" means both the Government of Malta and Local
Councils established under the Local Government Act;
"hazardous material" is any item or agent (biological, chemical,
physical) which has the potential to cause harm to humans, animals
or the environment either by itself or through interaction with other
factors as defined in local legislation;
"hoarding" means a temporary structure enclosing a construction
site during construction works, to restrict access and provide
protection to the public;
"immediate vicinity" means the area within thirty metres from
any site, and includes the footprint of the site in question, referred
to in regulation 12 and where by way of irregular construction site
m anagement demeans the social, hi stori c or environmental
importance of the site or area referred to in that regulation;
"Joint Committee" has the same meaning as that in the Local
Government Act;
"Local Council" has the same meaning given in the Local
Government Act;
"locality" has the same meaning given in the Local Government
Act, and includes, for the purpose of these regulations, arterial and
distributor roads and all other areas excluded from the competence
of local councils under the same Act;
"the Minister" means the Minister responsible for the
Environment or that Minister who may, from time to time, be
designated as having responsibility for these regulations;
"the Ministry" means the Ministry responsible for the
Environment;
"nuisance" means any act, omission or thing which is visually
offensive or causes smells or noise, or occasioning or likely to
occasion injury, annoyance, offence, harm, danger, or damage of
whatever nature, or whi ch is or is likely to be inju rious or
dangerous to health or the environment or buildings;
"offender" means that person or legal entity to whom a citation
has been issued;
"officer" means any person authorised by the Minister to issue
charges related to these regulations and shall include
(a) a Police officer; and
(b) an Enforcement Officer, Community Officer or any
other person appointed by the Minister, or his
delegated authority, to carry out the enforcement of
these regulations as established under the
Development Planning Act;
"owner" shall have the same meaning as that construed in the
Development Planning Act;
"private property" includes any land, whether developed or
otherwise, or any other permanent structure whose ownership is
vested in a private person or entity;
"public property" includes any place to which the public has
access;
“site manager” means a person carrying out the duty or duties
derived from the provisions of these regulations. Such person shall
be nominated by, and responsible on behalf of, the owner for
ensuring the correct implementation of these regulations.
The appointed site manager may be either of the following
(a) the owner himself;
(b) the project supervisor as construed in the work place
(Minimum Health and Safety Requirements for Work
and Construction Sites) Regulations;
(c) a Perit as defined under the Periti Act; or
(d) any other competent person;
"stop notice" shall have the same meaning as that construed in
the Development Planning Act;
"street" includes any road, alley, square, footpath, pavement,
bridge, shore front, quay, or other place of public passage or
access;
"tourism zone" shall refer to those areas defined by the
competent authority responsible for tourism as tourism zones.
(Regulation 5)
Reducing Pollution
1. The permissible hours of work for construction works where noise
generated from that activity can be heard from outside the site boundary will
be as follows
(a) Construction shall not commence before 7.00 am and shall
cease at 8.00 p.m.
(b) Site activities generating more than 65dB measured
immediately outside the site shall cease between 2pm and
4pm.
(c) During the period between 15th June and 30th September,
demolition works or excavation shall not be allowed in
tourism zones as may from time to time be defined by the
competent authority for tourism.
(d) No construction work shall be carried out on Sundays and
Public Holidays.
(e) In the case of emergencies construction works may take place
at any other time whilst it shall be mandatory to inform the
Authority during its first hour of subsequent business.
(f)
Any deviations from the provisions of paragraphs (a), (b), (c),
(d) and (e) shall require the approval by the Authority and
may require the setting of specific conditions for such works.
Deviations for works in tourism zones shall also require the
clearance of the competent authority responsible for tourism.
(g) Where the clear distance from the nearest habitable space
exceeds 1 kilometre, construction shall not be subject to any
of the aforementioned constraints.
2. No person shall undertake any construction without utilizing the
following dust control measures
application of water or pre-soaking and/or, chemical dust
a.
stabilizers or any other appropriate dust control technique,
during construction in such a manner as to limit any
generation of dust to within the site boundary;
prior to leaving the site the owner must on a daily basis
b.
remove any spillages resulting from the construction activity
along or across a public way;
prior to leaving the site, the owner must ensure that on a daily
c.
basis public sidewalks and public areas within 10 metres from
either side of the extremities of the construction site including
sidewalks and roads are swept or vacuumed; and
paint chips, sanding residue, grit and dust must be prevented
d.
from coming into contact with storm-water runoff and surface
water bodies.
3. Without prejudice to any other law, any person undertaking any
sanding activity whether manual or mechanical shall ensure that dust
emissions are controlled by equipping all mechanical equipment with dust
extraction and recovery systems; in combination with
(a) for outdoor areas - all areas be totally covered around the
whole working area with material that must form a barrier
against the emission of dust or particulate matter into the
environment;
(b) for indoor areas - all external apertures must be boarded with
an impermeable material that must form a barrier against the
escape of fugitive dust emissions outdoors prior to
commencing any sanding operations.
4. Mechanical fair facing of building stones is not permitted on site.
5. Adequate facilities and measures shall be undertaken to ensure that
clean the site. the site and its immediate vicinity are kept clean at all times during
construction.
These regulations apply to any construction, water mining,
or any other disturbances to the soil, including land clearing,
scraping, ground excavation, land levelling, grading, cut and fill
operations, and ancillary activities that include travel to the
construction site, travel on access roads to and from the
construction site and demolition activities.
PART II
General Conditions
(Regulation 7(g))
Technical Guidelines and Site Preparation
1. The level of noise emitted from any construction site shall
(a) respect the levels as established by the Work Place (Minimum
Health and Safety Requirements for the Protection of Workers
from Risks resulting from Exposure to noise) Regulations, at
any point measured immediately outside the site retaining the
methodologies established by the said regulations in respect of
weekly noise exposure level and daily noise exposure level.
Any measurement shall follow prescribed standards as
approved by the competent authority responsible for issuing
such standards. Should a locally approved standard not be
available, an equivalent standard to the satisfaction of the
appropriate competent authority shall apply.
(b) Moreover to minimise noise and vibration levels all
equipment must have functional exhaust or muffler systems.
(c) Unnecessary noise, such as leaving noisy idle machinery
operating, shouting, loud radios or excessive revving of
engines shall be avoided.
2. The owner must ensure that the following health and hygiene
provisions are adhered to
2.1 Removal of waste material
The clearing away of waste material shall be carried out in a routine
manner, quickly and effectively, and shall be
carried out in a manner that does not cause any damage or
a.
spillage to public areas or third party property;
carried out using receptacles that are fully enclosed or using
b.
open skips which are securely covered with canvas or any
other material which would not allow the dispersal of dust
particles or the waste being handled and that does not permit
any spillage thereof; and
guided into an enclosed shaft or chute conforming with
c.
regulation 2 outlined in Schedule II.
All waste material shall be removed from the immediate vicinity of the
site by the owner and suitably disposed of daily unless the Site Manager can
provide sufficient reasons to the Authority to justify an extension of this
period.
2.2 Hazardous material
Notwithstanding any provisions governing any other law regulating
hazardous material, where a hazardous material is utilised on site
measures are taken to properly store and isolate any hazardous
a.
material to prevent contamination of the site and surrounding
sites, storm water and the potable water courses particularly
with regards to hazardous wastes which are water soluble or
may become airborne;
where hazardous material is stored on site there shall be
b.
erected on the street boundary of the site, adjacent to the
notice board or billboard defined in Schedule I paragraph 1, an
A4 sized caution sign indicating the presence of hazardous
waste on site.
2.3 Point Source Pollution from Storm Water
In order to ensure that the site under construction does not become a point
s o u r c e o f p o l l u t i on du e t o t h e s ur f a c e r u n o ff i t g e n e r a t e s d ur i n g
construction, the following minimum prevention measures shall be
undertaken accordingly in order to mitigate against circumstances such as
the
contamination of road surfaces with particulate matter that is
a.
washed out from within the site;
clogging of any public or private storm water drains with
b.
suspended solids washed out from within the site;
wash out of hazardous waste and non-hazardous material to
c.
the marine environment;
wash out of hazardous waste onto permeable land; and
d.
any other form of pollution caused from the storm water run
e.
off generated from the construction site.
Owners are therefore obliged to ensure that the site is equipped with the
necessary collection sumps and pumps that enable any water discharged
within the site to be collected and pumped there, avoiding the spillage of
such waste water onto public or private areas.
For the purpose of enabling adherence to these regulations,
the temporary provision of water meters may be provided, by a
licensed operator of a public water distribution network, only to
sites where the owner has written confirmation from the Authority
that the construction site is subject to a valid building permit.
PART III
Other Conditions
Amended by
L.N. 426 of 2007.
(Regulation 14)
For the purposes of Regulation 14, the bank guarantee shall be computed as
For construction works consisting of the
Length of frontage (meters) multiplied
addition of one or more floors covering
by ]46.59
more than 50% of the building footprint
on existing developments
For construction works involving
(length of frontage in m etre s plus
demolition and/or excavation works and
twenty meters) multiplied by ]46.59
additional floors
At the start of each calendar year, the value of ]46.59 in this Schedule shall be
revised by multiplying by a factor equivalent to RPI (for December of the preceding
year )/RPI(December 2007).
(1) The provisions of these regulations shall be applicable
to all construction works which are not exempt in Schedule VI and
as may be brought into force by the Minister in part or in whole.
(2) Where there is conflict between, these regulations and a
construction management plan duly approved by MEPA and, or
c o n d i t i o n s s e t b y M E PA i n t h e d e v e l o p m e n t p e r m i t , t h e
Construction Management Plan shall prevail.
Amended by
L.N. 358 of 2007;
(Regulation 1)
L.N. 371 of 2007.
All construction works for buildings that equal or exceed any one of
shall refer to
the following criteria
a built-up footprint which is or will be upon construction
a.
more than 1,000 sq. m.; or
a height of 4 storeys, excluding the penthouse and the
b.
basement, or more measured from the lowest point of the
street level bordering the construction works; or
construction sites having excavations more than 2 storeys
c.
below street level.
02 Type B
All other construction works in areas of high development intensity.
shall refer to
03 Type C
All other construction works not included in Types A and B.
shall refer to
04 Exemptions
All construction works
carried that involve the trenching of ducts not exceeding 3
a.
metres in depth and which are to be used for the purpose
of installation of infrastructure related to the provision of
potable water, sewerage services, storm water discharges,
electrical energy and telecommunications
Provided that the above mentioned trenching works could
only be carried out in designated tourism zones as defined
by the Ministry responsible for tourism during the period
15th June to the 30th September upon approval by the
Ministry responsible for Tourism following consultation
with representatives of tourism establishments in the
affected area.
carried out in tourism zones which are granted an
b.
exemption from all or part of these Regulations by the
Ministry responsible for Tourism; and
falling under any other categories that may be from time
c.
to time established by the Minister under this Schedule are
exempted from these regulations.
Without prejudice to specific requirements set out in the
Development Planning Act, any owner carrying out or
commissioning construction works shall ensure that the work is
carried out in a manner that causes the least nuisance by ensuring
that the provisions included under Schedule I, II, III and IV are
adhered to.
(Regulation 3)
In terms of the definition of areas of high development intensity, as per regulation
3, the following localities are being designated as areas of high development
intensity, the boundaries of which are those that may prevail, from time to time, in
the Local Government Act.
1. Marsalforn within the locality of Zebbug Gozo
2. Marsascala
3. Mellieha
4. Sliema
5. St. Julians
6. St. Paul’s Bay
7. Swieqi
8. Gzira
9. Valletta
All streets or other public property, within a distance of 10
metres from the site, that are damaged by operations relating to
construction works shall be repaired or replaced by the owner to a
condition that is at least as good as that found prior to construction
and must be restored to their original condition with similar
materials and in accordance with any other regulations. Such limit
does not preclude any other obligation on the part of the owner to
make good for any other damages that extent beyond the 10 meter
distance and which are proven to be a direct consequence of that
construction activity. Any obstructions shall be removed when the
need for such obstruction is no longer required which shall include
any temporary signage put up during construction work.
Regulation 9(6)
Change of owner/Site
Manager in accordance with
the Environment Construction
Site Management Regulations
Development Application number
PA
(where applicable)
Description of works
Address of site
Original Owner
I ........................................... declare that as from today onwards, am not the owner
of the site indicated above and exonerate my self from any responsibility regarding
the management of this construction site, and according to the Environmental
Management Construction Site Regulations.
Signature ................................................
Date ....................................
ID No. ....................................................
Site Manager
For the purpose of regulation 9(1) I am appointing ...............................................
as Site Manager
Signature of original Owner ....................
Date .......................................
Signature of Site Manager ......................
Date .......................................
New Owner
I the undersigned, declare that as from today onwards am the new owner of the
construction site and am assuming responsibility as requested by the
Environmental Management Construction Site Regulations.
Signature of new Owner: ........................
Date .......................................
ID No. ..................................
PLEASE READ THE FOLLOWING CLAUSE BEFORE SIGNING
Data Protection clause
In terms of the Data Protection Act, Cap. 586, we will process any personal and/
or sensitive data supplied on/ in this application, request or notification form or
subsequently supplied by yourself, whether orally or in writing, for all or any of the
following
1. The proper processing of your application, request and/or notice as
submitted;
2. Preventing, detecting and/or prosecuting fraud and any other criminal
activity which the Authority is bound to report and/or act upon whilst
meeting any other specific legal or regulatory obligations;
3. Establishing, exercising or defending any legal action;
4. Internal management, research and statistics, systems administration,
the development and improvement of our services;
5. The protection and promotion of our legitimate interests and the proper
conduct of our obligations arising under any law or statutory
instrument; and
6. To make public the necessary information as specified in the relevant
law and/or instrument.
Relevant data will be disclosed or shared as appropriate with all our employees
and with other third parties if pertinent to any of the purposes listed above.
Every field on the form is mandatory. Should you fail to fill in any mandatory
field, we reserve the right to refuse the application. Should any field be inapplicable
to your particular circumstances please mark that field with the letters “N/A”.
You have the right to require that we provide you with access to your personal data
as well as the right to rectify, or, in appropriate circumstances, erase any inaccurate,
incomplete or immaterial personal data which is being processed. However, you are
required to inform us immediately of any alterations relating to your personal data
which we are processing.
By signing this form, you confirm that you are giving your explicit consent, in
terms of the Data Protection Act, on behalf of yourself and all the other persons
specified in this form for the Authority to process your respective personal
information as outlined above and you confirm that you have brought this Data
Protection notice to the attention of these other persons and obtained their respective
consents.
We undertake to implement appropriate measures and safeguards for the purpose
of protecting the confidentiality, integrity and availability of all data processed.
(1) The owner shall have the obligation to appoint a site
manager who shall be responsible, on behalf of the owner, to ensure
that the construction site and its construction activities are in
conformity with all the provisions of these regulations.
(2) The owner shall submit to the Authority together with the
commencement notice in the first instance and subsequently in
writing for any change of site manager
(a) the name of the site manager
(b) the site manager’s a legally valid identification
document number; and,
(c) a declaration of acceptance duly signed by the site
manager that he has undertaken to accept this role and
that he has read and understood the provisions of these
regulations.
(3) For the purposes of these regulations, the site manager shall
not be entitled to assume any of the responsibilities associated with
the profession of a perit as defined in the Periti Act, unless the
appointed site manager is a perit.
(4) The Minister may, from time to time, make specific
regulations to create a Register of Site Managers, to stipulate their
qualifications, Code of Conduct and programme of continuous
development.
(5) In the absence of a nomination for the appointment of a site
manager, the owner will ipso facto be deemed to be the site
manager for the purpose of these regulations.
(6) If the owner has changed because the construction site is
sold, or for any other reason, when construction works are still to
be carried out or are being carried out the original owner has the
duty to inform the Authority by completing Notice Form - Change
of Owner/Site Manager, in Schedule VIII, which form can be
obtained from the Ministry or its designated entity or downloaded
from the Ministry’s website or that of its designated entity, and
sending it by registered mail to the Authority or handing it in
person to the Authority within one month of the transfer of
ownership of the property. The same form should be duly signed by
the new owner as a declaration of acceptance of his responsibilities
as the new owner in terms of these regulations. Until such notice
form is received by the Authority the original owner would be held
responsible for any contravention to these regulations.
(7) If during the period of construction, the site manager
changes for whatsoever reason, he shall be obliged to inform the
Authority in writing. Until such notice is received by the Authority,
he would still be assumed to be the nominated site manager for the
construction site.
(8) The site manager shall be responsible, on behalf of the
owner, for ensuring that any permits, certifications, authorisations
or any such approvals required for any portion of the construction
works as required by the provisions of these Regulations are in
place and that any temporary structures used to implement the
provisions of these regulations to be duly certified for their
soundness.
PART IV
Enforcement
(Schedule I, regulation 2)
Band Saw
(1) Any person who contravenes any of the provisions
contained in Schedules I and, or III and, or IV shall be guilty of an
offence, and shall be liable, on conviction to a fine (multa) of not
less than two hundred and thirty-two euro and ninety-four cents
(€232.94) and not exceeding one thousand and one hundred and
sixty-four euro and sixty-nine cents (€1,164.69).
(2) Any person who contravenes any of the provisions
contained in Schedule II shall be guilty of an offence, and shall be
liable, on conviction, to a fine (multa) of not less than two thousand
and three hundred and twenty-nine euro and thirty-seven cents
(€2,329.37) but not exceeding eleven thousand and six hundred and
forty-six euro and eighty-seven cents (€11,646.87) for the offence
committed together with any fine under subregulation (1).
(3) The issue of a citation in terms of subregulations (1) and (2)
automatically are to be considered as an immediate instruction to
cease such behaviour and to conform to the provisions of these
Regulations. Should the offender fail to comply with these
R e g u l a t i o ns up o n be i ng i s s ue d w i t h a ci t a t i o n , h e s h a l l be
considered to be guilty of an aggravating circumstance and he shall
be liable to a fine (multa) of not less than fifty-eight euro and
twenty-three cents (€58.23) and not more than one hundred and
sixteen euro and forty-seven cents (€116.47), as the Commissioner
may fix, for every day the default continues from the date of issue
of the citation.
Without prejudice to the Act, or to any other law, any
person who by any means whatsoever, hinders or obstructs any
officer from the exercise of his powers and functions under these
regulations or fails to comply with any reasonable requirement
demanded of him by any such person as aforesaid or otherwise to
assist him in the carrying out of his duties or furnishes such person
with false information or neglects of refuses to give any
information required for the purpose aforesaid, shall be liable, on
conviction, to a fine (multa) of one hundred and sixteen euro and
forty-seven cents (€116.47).
(1) Where an offence is committed in one or more of the
sites listed in the next subregulation, the offender shall, on
conviction, be liable to an additional penalty of two hundred and
thirty-two euro and ninety-four cents (€232.94) to the established
fine (multa) due to the historical and environment importance of
the site.
(2) The aggravating circumstances referred to in the preceding
subregulation relate to an offence in
(a) the immediate vicinity of a scheduled building as
declared so by the Authority, public monument,
museum, place of worship, hospital or school;
(b) the immediate vicinity of a World Heritage Site
declared by UNESCO or an urban conservation area
declared by the Authority;
(c) the immediate vicinity of a Natural Reserve, Heritage
Park, National Park, public garden, or playing field;
(d) the immediate
vicinity
of
a
public
beach
or
promenade; or
(e) in the vicinity of any other site, area, place or open
space which the Minister may establish from time to
time.
In accordance with the provisions of any other law, and in
accordance with the powers conferred by the Minister in
accordance with the Act, any officer authorised to act under these
provisions and in whose opinion an offence has been committed
under these regulations, may proceed against the offender in terms
of article 5 of the Commissioners for Justice Act which provisions
shall apply mutatis mutandis to any proceedings in respect of
offences charged under these regulations.
For the purpose of ensuring that the street is properly
restored, the owner shall deposit, prior to the issue of the
development permit, at the Authority, a bank guarantee in favour of
the Authority, the amount of which shall be determined according
to the provisions of Schedule V. The amount of the bank guarantee
shall be either -
(a) for two hundred and thirty-two euro and ninety-four
cents (€232.94), or
(b) calculated on the basis of the method outlined in
Schedule V,
whichever is the higher
Provided that if the owner fails to carry out or complete the
restoration works within such period as the Authority may deem
suitable in consideration of the level of finishing being opted for by
the owner, such works may be completed by the Authority or
Government, or an appointed agent that has been duly authorised
by the Authority. Upon order by the Authority the cost of such
works, as certified by the aggrieved entity’s architect (perit), shall
be met in part or whole from the bank guarantee.
Provided further, in the case where a temporary water meter
has been provided on site, the release of the bank guarantee shall be
affected only following the written confirmation of the removal of
the temporary meter.
In accordance with article 19(4)(d) of the Environment
Protection Act, and article 10(3) and (5) of the Commissioners for
Justice Act, the Authority shall place into the Environment Fund
thirty percent of all the monies received from contraventions to
these regulations, and such monies shall be so placed within one
month from receipt of payment of the fines and penalties derived
from such contraventions. Moreover, the Authority shall forward
twenty per cent of all the monies received from contraventions to
the Joint Committee under whose jurisdiction the offence has
occurred.
No certificate of development on any development or part
thereof may be issued by the Authority unless all fines as may be
due by reason of offence against these regulations have been paid.
Moreover the transfer of owner or site manager as defined in
regulation 9(6) and (7) may not be endorsed by the Authority
pending the payment of outstanding fines.