DEVELOPMENT PLANNING (FEES) REGULATIONS
Table of Provisions (12)
Statutory Text (12 Articles)
SUBSIDIARY LEGISLATION 552.12
DEVELOPMENT PLANNING (FEES)
REGULATIONS
16th July, 2010
LEGAL NOTICE 356 of 2010, as amended by Legal Notices 48 and 58 of
2011, 268 of 2012, 126 of 2013 and 163 of 2016, 81 of 2017, 21 of 2019
and 83 of 2022.
(1) The title of these regulations is the Development
Planning (Fees) Regulations.
(2)
These regulations shall apply to
(a) all applications which are received on or after the coming
into force of these regulations * ; or
(b) all applications which have been received before the
coming into force of these regulations but which have not
yet been validated before the coming into force of these
regulations, notwithstanding that a fee has already been
paid. A refund of the difference shall be due where the
amount already paid is higher than the fees under these
regulations; or
(c) all applications received prior to the coming into force
of these regulations and where a bill for fees has been
issued by the Authority on or after the date of coming
into force of these regulations, and such fees are not
paid by the 28th February 2011.
(3) These regulations shall not apply to any new fees which the
Authority may request on or after the coming into force of these
regulations for changes requested by the Authority on any pending
applications which were subject to the fees regulated by the
Building Levy Regulations, 1996. These new fees shall be subject
to the rates applicable under the Building Levy Regulations, 1996.
Amended by
L.N. 48 of 2011;
L.N. 58 of 2011;
L.N. 126 of 2013;
L.N. 163 of 2016;
L.N. 81 of 2017;
L.N. 21 of 2019;
L.N. 83 of 2022.
1. Except as otherwise provided, the relevant fees at the rates specified in this
Schedule, shall be paid in respect of applications for development permission according
to the nature of the development and calculated as herein provided
Category A
DPF
Sewer
Street
Environ-
Maximum
ment Fee
Development
Rate (€)
Rate (€)
Rate (€)
Rate (€)
Rate (€)
Per
Per
Per
Per
Per
Per
Per
Per
DPF
ENV
m 2
m 2
m 2
m 2
Unit
Unit
Unit
Unit
Fee
Advertisements
50.00
-
-
-
-
-
5.00
-
-
-
Agriculture
0.80
-
1.80
-
0.80
-
0.10
-
-
-
Boathouse for Registered
Fisherman
0.80
-
1.80
-
0.80
-
0.10
-
-
-
Bungalow
10.00
-
2.78
-
4.63
-
0.12
-
-
-
Change of Use to Garage
(ancillary)
1.24
-
-
-
-
-
0.12
-
-
-
Change of use to Non-
25,000 (1) 2,000 (1)
Residential
6.40
-
-
-
-
-
0.60
-
Change of Use to Social/
Cultural/Educational/
Forced Relocation/Sports
Projects
4.00
-
-
-
-
-
0.12
-
25,000
2,000
Commercial
Development (incl. ext.) -
Floor Area
6.40
-
3.00
-
2.00
-
0.60
-
-
-
Commercial
Development (incl. ext.) -
Site Area
4.00
-
-
-
-
-
0.40
-
-
-
Disposal of Construction
& Demolition Waste
1.42
-
-
-
-
-
0.30
-
15,000
3,000
Engineering Operations
0.36
-
-
-
-
-
0.20
-
35,000
13,000
Film Set
2.12
-
-
-
-
-
0.15
-
-
-
Flat/Terraced House/
Maisonette
1.24
-
2.60
-
1.70
-
0.12
-
-
-
Garages ancillary to other
uses on site
1.24
-
2.60
-
1.70
-
0.12
-
-
-
Greenhouse
0.60
-
-
-
-
-
0.06
-
-
-
Industrial Development
(incl. ext) in areas
designated for industrial
development in the Local
Plans - Floor Area
3.00
-
-
-
-
-
-
-
-
-
DPF
Sewer
Street
Environ-
Maximum
ment Fee
Development
Rate (€)
Rate (€)
Rate (€)
Rate (€)
Rate (€)
Per
Per
Per
Per
Per
Per
Per
Per
DPF
ENV
m 2
m 2
m 2
m 2
Unit
Unit
Unit
Unit
Fee
Industrial Development
(incl. ext) in areas
designated for industrial
development in the Local
Plans - Site Area
1.00
-
-
-
-
-
-
-
-
-
In lieu of PC application
3.00
-
-
-
-
-
-
-
-
-
Land Reclamation for
Agriculture
0.40
-
-
-
-
-
0.24
-
6,000
1,000
Livestock Farm Building
0.80
-
-
-
0.80
-
0.10
-
-
-
Other Garages
1.24
-
2.60
-
1.70
-
0.12
-
-
-
Penthouse
10.00
-
7.50
-
3.96
-
0.12
-
-
-
Plant and Machinery
0.57
-
-
-
-
-
0.30
-
25,000
13,000
Public Car Park
5.00
-
3.00
-
2.40
-
0.30
-
-
-
Quarry (New/Horizontal
Extension)
1.00
-
-
-
0.40
-
0.30
-
40,000
13,000
Social/Cultural/
Educational/Forced
Relocation/Sports Projects
4.00
-
2.20
-
1.20
-
0.12
-
35,000
2,000
Temporary Structure/Use
of Land
2.00
-
-
-
-
-
0.16
-
-
-
Villa (Semi/Fully
Detached - 2 dwelling
units)/Farmhouse
6.50
-
1.80
-
2.67
-
0.12
-
-
-
Waste Disposal
1.42
-
-
-
-
-
0.30
-
15,000
3,000
Satellite dishes above 2m
diameter or
telecommunication
150.0
antennae
-
-
-
-
-
-
5.00
-
-
Other development not
150.0
otherwise specified
-
-
-
-
-
-
5.00
-
-
Vending Machine
150.0
10.0
-
-
-
-
-
-
-
-
Only where the change of use solely involves the use of land.
Category B
DPF
Sewer
Street
Environment
Fee
Development
Rate (€)
Rate (€)
Rate (€)
Rate (€)
Per
Per
Per m 2
Per m 2
Application
Application
Correction of Site, CPPS
Request
150.00
-
-
-
Extensions to dwellings,
Alterations, Renewal, Amended
Applications
&
Minor
Amendments
150.00
-
-
(1)
In these regulations, unless the context otherwise
requires -
"the Act" means the Development Planning Act, or any Act
superseding this Act;
"the Authority" means the Planning Authority;
"alterations" means structural interventions to the interior and, or
exterior of a building which do not result in an increase in the floor
area of the building being altered;
"amended application" means an application for amendments to
a development, relating to changes in the internal layout or external
appearance, for which permission has already been granted and is
still valid
*16th April, 2013.
(a) in respect of the same site and involving development
of the same general character and description; and
(b) which does not involve a different use or an increase in
the number of dwelling units, and increase in floor
area;
"agricultural building" means a building used for agricultural
purposes, including the storage of agricultural implements, but not
for
(a) the keeping of livestock or animal husbandry;
(b) the slaughter of animals; and
(c) the processing of animals or animal products;
"application" means an application for development permission;
"boathouse for a registered fisherman" means a boathouse used
for the storage of fishing boats and equipment used in the course of
the registered occupation;
"bungalow" means a single dwelling unit, whether detached or
semi-detached, where appropriate, consisting of not more than one
habitable floor unless it is locat ed within the development
boundaries in an area designated for more dense development;
"commercial development" means a development which is non-
residential and non-agricultural and not listed separately in any
other group in Schedule 1;
"compliance certificate" means a certificate referred to in article
61(2) of the Development Planning Act, 1992;
"demolition of a building or structure" means the pulling down
or removal of the roof and any wall forming such building, room
within a building, or structure;
"designated officer" means such officers of the P lanning
Authority designated by it to formally endorse Development Permit
Application Reports, who shall normally be the Senior Planning
Officers and Managers of the Area Teams and the Manager of the
Development Control Unit;
"Development Permit Application Report" means the report
prepared on an application for development permission which is
submitted to a designated officer or to the Development Control
Commission;
"Development Permit Fee" includes the Environment Fee;
"dwelling" means any building or unit used for residential
purposes, but excludes a hotel, guest-house, old people’s home and
commercial establishments of similar nature;
"endorsement" means the formal acceptance of a Development
Permit Application Report by a designated officer such that the
application is then forwarded for determination by the
Development Control Commission or determined by a designated
officer under the powers so delegated by the Planning Authority;
"engineering operations" include photovoltaic farms; wind farms;
the formation or laying out of roads and of means of access to
roads; the movement, re-grading or surfacing of land including the
creation of formal gardens or cemeteries; the construction or
excavation of reservoirs not ancillary to a dwelling or when the
applicant is not registered as an arable farmer with the Department
of Agriculture; the construction of bridges and similar structures;
the construction of sea defences, piers and similar structures; the
creation and replenishment of beaches and other operations
affecting beaches; the siting of moorings, and similar operations,
whether on land or on the seabed; and excludes land reclamation
for agricultural purposes;
"extension" means an increase in the floor area relating to the
same use as the existing unit being altered;
"farmhouse" means a single family dwelling used for habitation
by a registered farmer;
"film set" means the use of land, or the placing, installation or
construction on land of structures, for the purpose of the production
of films, television programmes, videos or other audio-visual
productions;
"flat" means a single dwelling unit within a building which
contains several similar units which do not have their own separate
entrance from the street but share a common access;
"floor area" means -
(a) for residential purposes, the amount of floor area
within a building determined by the external
measurements of the building, that includes the
thickness of the external walls and half the thickness
of dividing or party walls, and includes: any projecting
rooms, staircases, lifts, shafts, internal yards,
verandahs, open terraces, balconies, within the
building footprint at each level; washrooms; terraces
formed at roof level when these belong to penthouses
or to any roof structure exceeding 36m 2 (excluding
washrooms serving multiple flats); back yards, back
gardens, front gardens, estate or plot gardens, self-
imposed setbacks, at the lower level; and other
structures within the site boundaries; unless otherwise
specifically set out within these regulations; and
(b) for non-residential purposes, the amount of floor area
within the site boundaries determined by the external
measurements of the building, that includes the
thickness of the external walls and half the thickness
of dividing or party walls, and includes: any projecting
rooms, staircases, lifts, shafts, internal yards,
verandahs, open terraces, within the building footprint
at each level; plant facilities; structures at roof level
exceeding 36m 2 (excluding plant facilities); balconies;
canopies and other spaces, including open spaces, used
for commercial purposes
Provided that the void left in an intermediate level is not to
be included in the calculation of floor area
Provided further that an internal yard shall not be included
in the calculation of floor area at the upper level, when its size
exceeds the area set out in the following table
No. of floors
Area
8m
8m 2
9. 6m 2
11. 2m 2
Method of calculation of the infrastructure services contribution
for pre-1993 applications
The calculation of the Infrastructure Services Contribution paid on pre-1993
applications that fall under the provisions of clause 16(a)(ii) of Schedule 1 shall be
made as follows
1. When the site fronts on a street which is built-up on both sides, the Sewer
Contribution paid shall be calculated at the rate of €18.63 per meter of frontage of
the site. The Street Contribution shall be calculated by multiplying the frontage of
the site in meters by half the width of the street in metres by €5.24.
2. When the site fronts on a service road, the Sewer Contribution paid shall be
calculated at the rate of €27.95 per meter of frontage of the site. The Street
Contribution shall be calculated by multiplying the frontage of the site in meters by
the whole width of the service road in metres by €5.24.
3. When the site fronts on a street having a green area, a public square, or the
coast, opposite the site, the Sewer Contribution paid shall be calculated at the rate of
€27.95 per meter of frontage of the site. The Street Contribution shall be calculated
by multiplying the frontage of the site in meters by half the width of the street in
metres by €5.24.
8m 2
Additional floors
8 + [(No. of floors - 2) x 1.6];
"garage" means a garage or space used for the parking of private
cars, whether enclosed or unenclosed, and whether or not above or
below ground level;
"land reclamation for agriculture" means the reclamation of land,
including the deposit of material and the altering of the level of the
land, for the purposes of agriculture;
"livestock farm building" means a building used for the
accommodation of livestock and for the storage of fodder or
implements related to the same activity, but does not include
farmhouses, greenhouses, buildings used for agricultural purposes
or buildings used for the slaughter of animals or processing of
animals or animal products;
"maisonette" means a single dwelling unit on one or more floors,
having a separate entrance from the street, located in a building
consisting of more than one unit;
"penthouse" means a separate single dwelling which consists of
one floor constructed above height limitation on the roof of a
building, and which does not occupy the whole of the roof area and
does not have permanent access to roof level;
"planning control application" means those applications, not
being applications for development permission, which require the
approval of the Planning Authority for such changes to the Local
Plans and, or the detailed alignments of buildings and streets within
such Local Plans;
"plant and machinery" means mechanical equipment or
structures erected or placed on land but not within a building;
"public car park" means a building or area exclusively used by
the general public for parking of vehicles and is not ancillary to any
other use on site.
"registered fisherman" and "registered farmer" mean a fisherman
or a farmer registered with the Department of Agriculture and
Fisheries, as the case may be;
"relevant Department" means, for the purposes of the main sewer
c o n t r i b u t i o n , t h e D r a i n a g e S e c t i o n o f t h e Wa t e r S e r v i c e s
Corporation, and for the purposes of the street contribution,
Transport Malta and any other body which subsequently assumes
the responsibilities of these Departments or entities;
"renewal application" means an application for the renewal of a
development permission granted by the Authority in respect of the
same site which is submitted before such permission expires;
"screening" means the process during which the proposed
development is considered by the Authority prior to the submission
of the formal application;
"site area" means the total area of land which is the subject of the
application, and is marked in red on the site plan submitted with the
application;
"special building" means a building providing an institution,
clu b, society or o ther organisation of a religious, cu ltural,
philanthropic, sporting or social nature not including Government
departments or parastatal bodies with the facilities necessary for
the pursuit of its objects, including schools, hospices, homes for
the elderly, hospitals and similar buildings or uses, where the
institution, club, society or other organisation is declared as being
tax exempt by the Minister responsible for finance by regulations
made for that purpose;
"social/cultural/sports/educational/forced relocation category"
means and is limited to developments concerning
(a) hospitals/nursing homes;
(b) residential institutions;
(c) places in connection with public worship or religious
instruction or the social or recreational activities of a
religious body;
(d) educational institutions;
(e) museums;
(f)
public libraries;
(g) social clubs/societies premises (not including any
Class 6 uses bars, restaurant); or
(h) development which is required to relocate by an order of
Government or a government agency or entity;
"sports projects" means projects of sports facilities, or ancillary
structures excluding commercial ones;
"temporary structure/use of land" means the use of land for one
use or purpose, which may include the setting up of a structure
which is demountable and does not require the laying of
foundations and is placed on the ground and constructed from
impermanent materials, including canvas, other fabric, PVC and
similar materials, and includes a tent, marquee, canopy or other
structure of a similar nature such that "impermanent material"
means material which does not consist of stone, bricks or concrete
or, any other similar material
Provided that where such use of land is not specified in an
approved development plan, such use shall be carried out for four
months or less in any one calendar year;
"terraced house" means a single dwelling unit on a site
consisting of one or more storeys in a row of three or more
dwellings and includes the dwellings at the ends of the terrace;
"v ali dati on" m eans t he ackno wled gm ent by t he P l anni ng
Authority of the receipt of a valid application for development
permission, that is an application in respect of which all the
requirements for the submission of an application have been
fulfilled;
"vicinity" means a distance within 500 metres of the original
site;
"villa" means a detached or semi detached single dwelling of not
more than two habitable floors. This includes flatted dwellings
(regulated by Policy 3.5 of Development Control Policy and
Design Guidance, 2007, or future updates thereto) located in an
area designated for villa development.
(2) In either Schedule 1 or Schedule 2, any expression defined
in the Act has the same meaning as it has in the Act.
3. (1) There shall be charged by the Authority a development
permit fee (DPF) and Environment Fee as the charge to be paid in
respect of an application for permission to carry out development,
at the rates set out in Schedule 1, Categories A, B and C.
(2) The rates set out in Schedule 1, Categories A, B and C,
shall be subject to a minimum development permit fee of one
hundred and twenty euro (€120).
(3) There shall also be charged by the Authority a fee at the rates
set out in Schedule 1, Category D.
4. There shall be charged by the Authority an infrastructure
services contribution (Sewer and Street) as the rate of contribution
to be paid towards the cost of infrastructure services and other
services or facilities arising from any permission to develop land,
at the rates set out in Schedule 1.
5. (1) The applicant may request the Executive Chairperson
in writing to effect the payment of any fees, fines, contributions or
other financial payments due to the Authority by means of a credit
agreement and the Executive Chairperson may enter into such a
credit agreement with the applicant which shall specify the
staggering of such payments.
(2) A non-acceptance by the Executive Chairperson of a
request by the applicant for a credit agreement may not be appealed
against, and the applicant shall be required to pay in full any such
fee, fine, contribution or other financial payment, by no later than
such date as may be specified in the notice by the Authority.
00
Quarry - Vertical Extension
1,485.00
-
-
120.00
Special Buildings or Uses
145.00
3.08
1.68
15.00
Category C
Environment Fee
Demolition of Building or Structures
DPF
Rate (€)
Rate (€)
up to 50m 2
-
-
2 to 400 m 2
From 51m
From 401m 2 to 750 m 2
2 to 1,000 m 2
From 751m
1,000
> 1,000m
2,000.00
Category D
Fee
Rate (€)
Compliance Certificate
60.00
Dangerous Structure Notifications
60.00
Development Notification Order - Alterations
60.00
Development Notification Order - Extensions/New Development
120.00
Planning Control Applications per 150m 2
of site or part thereof
235.00
Requests for a reconsideration
3% of the Development
Permit Fee subject to a
minimum fee of €70
Requests for Revocation or Modification of Permission
€500
Provided that
1. Where a request for screening is submitted to the Planning Authority, it shall
be accompanied by the Screening Fee of €50. This fee is in no case refundable;
2. The rate regulating temporary structure/use of land shall only be applied
once, on any given site, in any one calendar year;
3. Where an application for a boathouse is not accompanied by proof of
registration of the applicant as a fisherman, the Development Permit Fee shall be
calculated at the rate of commercial development;
4. For the purposes of the calculation of floor area in relation to bungalow
development, only the build-up area, which includes the amount of floor area within
a building determined by the external measurements of the building, which includes
the thickness of the external walls and half the thickness of dividing or party walls,
and the internal shafts, internal yards, shall be considered;
5. Where garages do not share a common access with a residential/commercial
development, and parking spaces (excluding lock-up garages), forming part of a
mixed development, have a direct access to both residential and commercial
development, the rate of “other garages” shall be applied;
6. For new purely commercial development, or where the development is
solely a mix of commercial and social/cultural/educational/ sports, the floor area
shall be charged at the rate per square meter as listed in Schedule 1 and the
Development Permit Fee and Environment Fee for the site area shall be charged
separately at the commercial rate per meter square; any site area being increased in
relation to proposed extensions would also be so charged separately;
7. The area used for the placing of tables and chairs in conjunction with
commercial development shall also be considered at the same rate of the commercial
development to which the tables and chairs are ancillary to;
8. When calculating the fees required in relation to advertisements, the area to
be considered is the surface area covered by the advertisement and does not include
the footprint of any hoarding/structure used to support any such advertisement;
9. When a reservoir is not located within an agricultural holding owned and
operated by a registered farmer, it shall attract the rate of “Engineering Operations”.
This rate, however, will not be charged separately when it is already being charged
as part of site area for commercial development within the same application;
10. (1) The rate regulating the Change of Use to Non-Residential will only be
applied
(a) in the case where the permission covering the development subject of
the application for change of use is still valid, the development subject
of the application for change of use is covered by a compliance
certificate; or
(b) in the case where the permission covering the development subject of
the application for change of use has expired, the development subject
of the application for change of use is completed in accordance with the
permission on site, or is completed and the building shows as existing
as at 1968.
(2) When a residential development includes an extension having an area
exceeding 20m 2 , where applicable, the rate for Extensions to Dwellings, shall be
charged to cover 20m 2 of the area being extended, and any area in excess of 20m 3
shall be calculated at the applicable rate per square metre applicable to the type of
dwelling being extended.
(3) Where the development consists of an extension to a commercial development
which does not bring about an increase in the site area of the original development, the
rate regulating alterations to development shall also cover extensions up to 15m 2 .
Extensions larger than 15m 2 are to be calculated at the commercial rate, over and above
the rate for alterations.
(4) When more than 75% of an existing unit is proposed to be demolished and
the construction of new buildings or structures on site is also proposed, the resulting
development shall not be considered as an extension to the part of the building or
structure being retained, but shall be charged at the rate for a new unit applicable to
the type of development being proposed.
(5) Change of use into residential is to be calculated using the same rate applied
for the construction of the relevant new residential development.
(6) Change of use to use for agriculture, boathouse for registered fisherman,
livestock farm building or other garages is to be calculated using the same rates applied
for the same respective relevant new development but without including any
Infrastructure Services Contribution.
(7) When the subdivision of an existing residential or commercial unit, relative
to which fees were paid in accordance with the Building Levy Rates Regulations is
proposed, the applicable rate for the unit type is to be charged in relation to the
smallest created unit;
11. (1) The development permit fee paid in relation to an application submitted
for the amendment of a condition in a permit issued by the Authority in relation to
the payment due by the applicant in the Commuted Parking Payment Scheme shall
be refunded to the applicant if it is established that the amendment requested in the
application was actually justified;
(2) The fee paid in relation to a request for revocation or modification of a
permission issued by the Authority shall be refunded if it is established that the request
was justified.
12. For Planning Control applications relating to local plan amendments, in
cases where the applicant does not pay the standard fee over the whole site area, the
fee payable at the submission of the said local plan amendment application shall be
of €235.00. So however that applications for development permission submitted
following a Planning Control application relating to amendments to local plan
aforementioned, or a Planning Control application relating to amendments to local
plan submitted by the Authority in accordance with the provisions of regulation 6 of
Development Planning (Procedure for Minor Modifications to Subsidiary Plans)
Regulations, after the requirements of sub-regulation (3) of regulation 4 of the said
regulations, for which the provisions of this clause have been applied, a fee of €3.00
per meter squared, or part thereof, over and above any other rate established by these
regulations shall be paid in relation to such application for development permission;
13. Where an application involves more than one use or type of development,
but is not already included under paragraph 6 of this proviso, the development permit
fee to be paid shall be calculated by adding together the amounts applicable to each
type of development. When the application includes commercial development, the
fee for the commercial development shall be calculated by reference to the rate for
the commercial floor area only and shall not include the site area
14. (a) All fees shall be paid at rates calculated by reference to the development
pr oposed in the application, and no fees properly paid shall be
refundable as specified in sub-paragraphs (b) and (c) except in the
following cases
(i) the application has been invalidly made;
(ii) the application has been withdrawn by the applicant prior to
determination.
(b) When an application is withdrawn by the applicant, the percentage of
the development permit fee which shall be refunded shall be as follows
(i)
when the application is withdrawn prior to its publication on the
website of the Department of Information, 100% of the
development permit fee shall be refunded;
(ii) when the application is withdrawn after its publication on the
website of the Department of Information but prior to the
endorsement of the Development Permit Application Report or, in
the case of a Summary Procedure, of the recommendation report,
by the officer delegated by the Authority, 50% of the development
permit fee shall be refunded;
(iii) when the application is withdrawn after the endorsement of the
Development Permit Application Report or, in the case of a
Summary Procedure, of the recommendation report, by the officer
delegated by the Authority, but prior to the determination of the
same application, 25% of the development permit fee shall be
refunded;
(iv) no development permit fees shall be refunded when a notice in
terms of articles 97, 98 or 105 of the Act has been served on the
applicant or on the site to which the application relates;
15. (i) Where an application is submitted for new development on a site
(described as the new application for the purpose of this sub-paragraph)
and the applicant states in writing that -
(a) an application for development of the same type had previously
been submitted by the applicant on another site (described as the
original site for the purpose of this paragraph) in the vicinity of
the new site and had been approved, and
(b) the applicant has no interest in the development of the original
site and has not and will not exercise the permission,
the permit on the original site shall be cancelled by the Authority.
(ii) Unless the development permit fee paid on the original application has
been previously refunded, in part or in full to the applicant or to any
third party, such a fee shall be retained by the Authority in addition to
any such other fee payable by the applicant together with the
submission of the new application.
(iii) The provisions of this paragraph shall apply only if
(a) there is no difference whatsoever in the designation of the
original site and the new application;
(b) the permit on the original site has not been utilized in any manner
whatsoever; and
(c) this application is limited to the change of the site of the
previously approved development permit.
(iv) Any variations from the previously approved permit (except for the
wrong indication of the site) shall not prejudice the new application.
(v) Where the new application is withdrawn by the applicant prior to its
determination, the development permit fee shall not be refunded.
16. Where an application is for new development on a site in respect of which
there is or has been a development permission, whether or not still in force, the
infrastructure services contribution paid in relation to the previous development
permission shall be taken into consideration as follows
(a) For pre-1993 applications
(i)
If the applicant or architect submits a receipt of the infrastructure
services contribution originally paid with evidence that this is
related to a previous development permission on the same site,
the amount shown on the receipt shall be deducted from the new
infrastructure services contribution required.
(ii) If the applicant or architect does not submit a receipt of the
infrastructure services contribution originally paid with evidence
that this is related to a previous development permission on the
same site, the amount to be deducted from the new infrastructure
services contribution required shall be calculated as per Schedule
2. (b) For post-1992 applications the Infrastructure Services Contribution
recorded, on the Authority’s records, to have been originally paid on a
previous development permission on the same site, shall be deducted
from the the new infrastructure services contribution required;
17. No infrastructure services contribution shall be paid when the application
relates solely to an application by a Government entity or regulatory authority or a
body corporate established by law, including Malta Enterprise, where the applicant
gives an undertaking, in a form specified by the Planning Authority, to the same
Authority that the necessary infrastructure services will be provided by, or in
conjunction with, and with the approval of, the relevant entity or regulatory
authority and at the expense of the applicant or the relevant entity or regulatory
authority, and that the necessary maintenance of those services will also be so
carried out;
18. No main sewer contribution shall be payable in respect of applications for
sewage treatment works, pumping stations and similar structures or works provided
by the Drainage Section of the Water Services Corporation or any other body which
subsequently assumes the responsibilities of that entity or regulatory authority;
19. The infrastructure services contribution shall be reduced by 75%, where
(a) the applicant gives to the Authority an undertaking, in a form specified
by the Planning Authority, that the necessary infrastructure services will
be provided by the applicant, or by, and with the approval of, the
relevant entity or regulatory authority and at the applicant’s expense,
and that the necessary maintenance of these services will also be carried
out; or
(b) the application relates to a site where the necessary infrastructure
services have been provided at the expense of a private individual and
an undertaking, in a form specified by the Planning Authority, to
maintain these services has been given;
20. All Infrastructure Services Contributions shall be levied at rates calculated
with reference to the development proposed in the application and no contribution
shall be refundable except in the following cases
(i)
the permission applied for has been refused, unless it is a dismissal in
terms of section 52(5) of the Environment and Development Planning
Act;
(ii)
the application has been invalidly made;
(iii)
the application is withdrawn before it is determined by the Authority
Provided that in the cases mentioned in sub-paragraphs (i), (ii) and (iii)
abovementioned, 10% of the infrastructure services contributions will always be
retained to cover administrative charges and are consequently not refundable;
(iv) if it is made in respect of an application for a class of development for
which such permission is not required by or under any provision of the
Act or any regulations or orders made thereunder, and the application is
returned by the Authority to the applicant;
(v) if the application is one to which paragraph 19(a) relates, and the
applicant subsequently provides the appropriate services at his own
expense and the relevant Department has certified that the works have
been carried out to its satisfaction, a refund equal to 15% of the
infrastructure services contribution shall be paid;
(vi) if the application is one to which paragraph 19(b) relates, and the
relevant Department has certified that the works have been carried out
to its satisfaction, a refund equal to 15% of the infrastructure services
contribution shall be paid;
21. Where the Authority considers that in order to meet the extraordinary or
exceptional demands which, in the opinion of the Authority, the nature, location or
scale of the proposed development is likely to place on the infrastructure services
and other services or facilities, as well as to secure the proper planning of the area
and regulate the use of land in accordance with the policies and proposals in the
Structure Plan and any subsidiary plan, the contribution earlier specified in this
Schedule is insufficient, the Authority shall determine the contribution to be levied
to meet the cost of the services and facilities arising from the permission applied for,
and may also enter into agreement with the applicant to ensure the payment of the
contribution so determined and the proper carrying out of the development according
to the permission of the Authority;
22. (a) Applications for an Outline Development Permit with a site area of less
than or equal to 1,000 square meters shall be submitted to the Authority
together with the payment of a Development Permit Fee of €500.
(b) Applications for an Outline Development Permit with a site area of
more than 1,000 square meters shall be submitted to the Authority
together with the payment of a Development Permit Fee of €2,500.
(c) The development permit fees mentioned in paragraphs (a) and (b) shall
not be refunded but shall be deducted from the Development Permit Fee
due for the eventual full application;
23. Where an application is submitted for new development on a site (described
as the new application for the purpose of this paragraph) and the applicant states in
writing that -
(i)
an application for development of the same type had previously been
submitted by the applicant on another site (described as the original site
for the purpose of this paragraph) in the vicinity of the new site and had
been approved; and
(ii)
the infrastructure services contribution paid in relation to the
application on the original site should be taken into account in the
calculation of the Infrastructure Services Contribution due on the
application for the new site;
the permit on the original site shall be cancelled by the Authority and the
infrastructure services contribution shall be deemed not to have been paid on the
original site. The infrastructure services contribution paid on the original site shall
be taken into account in the calculation of the infrastructure services contribution to
be paid in relation to the new application;
24. When an application, relative to which a Development Permit Fee and
Environment Fee in excess of 2,000 euro was required and paid, is withdrawn prior
to it being decided and a new application is submitted by the same applicant on the
same site within three months from the date of submission of the request for
withdrawal of the original application, 40% of the Development Permit Fee and
Environment Fee paid in the original application shall be deducted from the fees due
in relation to the new application.
25. (1) No development permit fee, no Environment Fee and no Infrastructure
Services Contribution shall be charged for any application which in the opinion of
the Authority relates exclusively to restoration works related to scheduled buildings,
scheduled structures or buildings or structures within Urban Conservation Areas, or
for that part of an application which in the opinion of the Authority relates
exclusively to restoration works related to scheduled buildings, scheduled structures
or buildings or structures within Urban Conservation Areas.
(2) Any rehabilitation involving change of use which in the opinion of the
Authority is related to the restoration works, shall also not be charged.
(1) Where an application is for new development on a site in respect of
which there is in force a development permission (other than an outline development
permission), and the development so permitted has either not commenced or, if it is
has commenced, it has not yet been completed, the development permit fee payable
for the new development shall be calculated in this manner
(a) in the case of a development permission where the development has not
commenced, by subtracting the development permit fee paid on the
development permission in force, calculated by using the current rates
in these regulations, from that due on the new development application;
(b) in the case of a development permission where the development has
commenced but not yet completed, by subtracting the development
permit fee paid on that part of the development not yet commenced,
calculated by using the current rates in these regulations, from that due
on the new development application.
(2) Where the development permission in force is a renewal of a previous
permission, the development permit fee to be paid for the new development shall be
calculated by subtracting the development permit fee of the original application,
calculated by using the current rates in these regulations, from that due on the new
development application.
(1) When calculating the fees required in relation to an application for
industrial development falling under Category A in areas designated for industrial
development in the Local Plans, no other fees shall be charged other than the rates
established in Category A of the table under this Schedule for "Industrial
Development (incl. ext) in areas designated for industrial development in the Local
Plans - Floor Area" and for "Industrial Development (incl. ext) in areas designated
for industrial development in the Local Plans - Site Area.
(2) In the case of applications for a change of use to garages (ancillary), within
such designated areas, only a Development Permit Fee equivalent to €1.24 per m²
shall be charged.
(3) In the case of applications falling under Categories B, C and D within such
designated areas, the rates applicable under each category shall be charged.
Development applications including sport projects submitted or validated after
the 1st January 2021 and the applicants are either the Malta Sports Council, or a body
registered with the Malta Sports Council, are to be exempt from the payment of
Development Planning Fees (DPF) and Environment Fees (EF).
00
Minn 751 m 2 sa 1,000 m 2
1,000.00
100.00
> 1,000 m 2
2,000.00
200.00
Kategorija D
Ħlas
Rata (€)
Ċertifikati ta’ Konformità
00
Notifiki ta’ Strutturi perikoluż
60.00
Notifika ta’ Ordni ta’ Żvilupp - Alterazzjonijiet
60.00
Notifika ta’ Ordni ta’ Żvilupp - Estensjonijiet/Żvilupp Ġdid
120.00
2 tas-sit jew
Applikazzjonijiet għall-Kontroll tal-Ippjanar kull 150m
parti minnu
235.00
Talbiet għal konsiderazzjoni mill-ġdid
3% tal-ħlas għal
permess għal żvilupp
(DPF), soġġett għal
ħlas minimum ta’ €70
Talbiet għal Revoka jew Modifika ta’ Permess
€500
Iżda
1. Meta talba għal screening tiġi ppreżentata lill-Awtorità tal-Ippjanar, din
għandha tkun akkumpanjata mill-ħlas għal tali screening ta’ €50. Dan il-ħlas fl-ebda
każ ma jingħata lura;
2. Ir-rata li tirregola struttura temporanja/użu temporanju tal-art għandha tiġi
applikata darba biss, fuq kull sit partikolari, f’kull sena kalendarja waħda li tkun;
3. Meta applikazzjoni għal boathouse mhiex akkumpanjata bi prova ta’
reġistrazzjoni tal-applikant bħala sajjied, il-ħlas għal permess ta’ żvilupp għandu jiġi
ĦLASIJIET TAL-IPPJANAR TAL-IŻVILUPP
kalkulat bir-rata ta’ żvilupp kummerċjali;
4. Għall-finijiet tal-kalkolu tal-area tal-art fir-rigward ta’ żvilupp ta’
bungalow, iż-żona mibnijja biss, li tinkludi l-ammont ta’ art fi ħdan bini determinat
mill-kejl estern, li jinkludi l-ħxuna tal-ħitan esterni u nofs il-ħxuna tal-ħitan divizorji
jew ħitan ta’ terzi, u x-xaftijiet interni, btieħi interni, għandha tiġi kkunsidrata;
5. Meta garaxxijiet ma jużawx aċċess komuni ma’ residenzi/żvilupp
kummerċjali, u postijiet għall-ipparkjar (esklużi garaxxijiet lock-up), li jifforma
parti minn żvilupp mħallat, ikollhom aċċess dirett kemm ghal żvilupp residenzjali u
żvilupp kummerċjali, ir-rata ta’ "garaxxijiet oħrajn" għandha tkun applikata;
6. Għal żvilupp purament kummerċjali ġdid, jew fejn l-iżvilupp unikament
ikun taħlita ta’ żvilupp kummerċjali u żvilupp soċjali/kulturali/edukattiv/sportiv, l-
area tal-art għandha titħallas bir-rata għal kull metru kwadru kif elenkati fl-Iskeda 1
u l-ħlas għal Permess għal Żvilupp u l-Ħlas Ambjentali għall-area tas-sit għandha
tiġi kalkulata separatament bir-rata kummerċjali għal kull metru kwadru; kull area
tas-sit li tkun qegħda tiġi miżjuda minħabba fl-estenzjonijiet proposti għandha wkoll
hekk titħallas separatament;
7. Iż-żona wżata għat-tqegħid ta’ mwejjed u siġġijiet ma’ żvilupp kummerċjali
għandha titqies ukoll bl-istess rata ta’ żvilupp kummerċjali li ghalihom l-imwejjed u
siġġijiet huma anċillari;
8. Meta jiġi kalkulat il-ħlas mitlub fir-rigward ta’ reklami, il-qies li għandu jiġi
kkunsidrat huwa dak tal-area koperta mir-reklam u ma tinkludix il-footprint ta’ xi
ħżin/struttura użata biex tappoġġa xi avviż bħal dak;
9. Meta ġiebja ma tkunx tinsab fi ħdan ta’ impriża agrikola li tkun proprjetà ta’
u mħaddma minn bidwi reġistrat, għandha tattira r-rata ta’ "Operazzjonijiet ta’
Inġinerija". Din ir-rata, madankollu, mhux ser tkun debitata separatament meta hija
diġà tkun tqieset bħala parti mill-area tas-sit għall-iżvilupp kummerċjali fi ħdan l-
istess applikazzjoni;
10. (1) Ir-rata li tirregola il-Bidla ta’ Użu għal Mhux Residenzjali ser tiġi
applikata biss
(a) fil-każ meta l-permess li jkopri l-iżvilupp li hu s-soġġett tal-
applikazzjoni għall-bdil fl-użu jkun għadu validu, l-iżvilupp li hu s-
soġġett tal-applikazzjoni jkun kopert minn ċertifikat ta’ konformità; jew
(b) fil-każ meta l-permess li jkopri l-iżvilupp li hu s-so’ġġett tal-
applikazzjoni għall-bdil fl-użu jkun skada, l-iżvilupp li hu s-soġġett tal-
applikazzjoni għall-bdil tal-użu jkun sar skond permess li jkun hemm
fuq is-sit, jew ikun tlesta u l-bini jkun jidher kif kien fis-sena 1968.
(2) Meta żvilupp residenzjali jinkludi estenzjoni ta’ area li tkun iżjed minn
20m 2 , fejn ikun il-każ, ir-rata għall-Estenzjonijiet għal Residenzi għandha titħallas
biex tkopri 20m 2 tal-area li tkun qegħda tiġi estiża, u kull area li teċċedi l-20m 2
għandha titħallas skont ir-rata ta’ kull metru kwadru li tapplika għat-tip ta’ residenza
li tkun qegħda tiġi estiża.
(3) Meta l-iżvilupp ikun jikkonsisti f’estenzjoni ta’ żvilupp kummerċjali li ma
jkunx jinvolvi żjieda tal-area tas-sit tal-iżvilupp oriġinali, ir-rata li titħallas għall-
alterazzjonijiet għal żvilupp għandha tkopri wkoll estensjonijiet sa 15m 2 . Estensjonijiet
akbar minn 15m 2 għandhom jitħallsu bir-rata kummerċjali, apparti r-rata għal
alterazzjonijiet.
(4) Meta l-proposta tkun li jkun hemm twaqqiegħ ta’ iżjed minn 75% ta’ unità
eżistenti, u l-proposta tkun tinkludi wkoll il-kostruzzjoni ta’ bini jew strutturi ġodda
ĦLASIJIET TAL-IPPJANAR TAL-IŻVILUPP
fuq is-sit, dak l-iżvilupp m’għandux jitqies bħala estenzjoni tal-parti tal-bini jew
struttura li tkun ser tinżamm, iżda għandu jitħallas bir-rata ta’ unità ġdida skont it-tip
ta’ żvilupp li jkun qiegħed jiġi propost.
(5) Il-bdil ta’ użu għal wieħed residenzjali għandu jitħallas bl-istess rata li tkun
tapplika għall-kostruzzjoni ta’ dak l-iżvilupp residenzjali ġdid.
(6) Il-bdil ta’ użu għal użu għal agrikoltura, għal boathouse għal sajjied reġistrat, għal
razzett tal-bhejjem jew garaxxijiet oħra għandu jitħallas bl-istess rati li japplikaw għall-
istess żvilupp ġdid relevanti rispettivament iżda mingħajr ma tiġi inkluża ebda
kontribuzzjoni għas-servizzi ta’ infrastruttura.
(7) Meta jkun hemm proposta ta’ qasma ta’ unità residenzjali jew kummerċjali
eżistenti, u fejn ikunu tħallsu r-rati skond ir-Regolamenti dwar Rati ta’ Taxxi dwar
Bini, ir-rata li tkun tapplika għat-tip ta’ unità għandha tinħadem fuq l-iżgħar unità
oriġinata;
11. (1) Il-ħlas għal permess ta’ żvilupp imħallas fir-rigward ta’ applikazzjoni
ppreżentata għall-emenda ta’ kondizzjoni fil-permess maħruġ mill-Awtorità fir-
rigward tal-ħlas dovut mill-applikant fl-Iskema ta’ Pagament dwar Parkeġġ
Kommutat għandu jitħallas lura lill-applikant jekk jiġi stabbilit li l-emenda mitluba
fl-applikazzjoni kienet fil-fatt ġustifikata;
(2)
Il-ħlas magħmul b’rabta ma’ talba għal revoka jew modifika ta’ permess
maħruġ mill-Awtorità jintradd lura jekk jiġi stabbilit illi t-talba kienet iġġustifikata.
12. Għal applikazzjonijiet dwar il-Kontroll tal-Ippjanar, rigward l-emendi tal-
pjan lokali, fil-każijiet meta l-applikant ma jħallasx l-ħlas normali fuq l-area tas-sit
kollu, il-ħlas pagabbli meta tiġi ppreżentata l-imsemmija applikazzjoni għal emenda
tal-pjan lokali għandu jkun ta’ €235.00. Dan wkoll meta l-applikazzjonijiet għal
permess ta’ żvilupp ippreżentat wara l-applikazzjoni dwar il-Kontroll tal-Ippjanar
rigward l-emendi għall-pjan lokali msemmija hawn qabel, jew talba għal Kontroll
tal-Ippjanar rigward l-emendi għall-pjan lokali ppreżentata mill-Awtorità skond id-
disposizzjonijiet tar-regolament 6 tar-Regolamenti dwar l-Ippjanar tal-Iżvilupp
(Proċedura għal Modifiki Minuri ta’ Pjanijiet Sussidjarji), wara l-ħtiġiet tas-sub-
regolament (3) tar-regolament 4 tal-imsemmija regolamenti, li għalihom id-
dispożizzjonijiet ta’ din il-klawżola ġew applikati, ħlas ta’ €3.00 għal kull metru
kwadru, jew parti minnu, fuq kull rata oħra stabbilita b’dawn ir-regolamenti
għandhom jitħallsu fir-rigward ta’ applikazzjoni bħal din għall-permess għal
żvilupp.
13. Meta applikazzjoni tinvolvi aktar minn użu jew tip ta’ żvilupp wieħed, iżda
mhux diġà inkluż taħt il-paragrafu 6 ta’ dan il-proviso, il-ħlas ta’ permess għal żvilupp
li għandu jitħallas għandu jkun ikkalkulat billi jingħaddu flimkien l-ammonti
applikabbli għal kull tip ta’ żvilupp. Meta l-applikazzjoni tinkludi żvilupp
kummerċjali, il-ħlas għall-iżvilupp kummerċjali għandu jiġi kkalkulat b’referenza
għar-rata ta’ art kummerċjali biss u m’għandux jinkludi l-area tas-sit.
14. (a) Kull ħlas għandu jiġi mħallas bir-rati kkalkulati b’referenza għall-
iżvilupp propost fl-applikazzjoni, u l-ebda ħlas imħallas sewwa ma
għandu jingħata lura kif speċifikat fis-subparagrafi (b) u (ċ) ħlief fil-
każijiet li ġejjin
(i) l-applikazzjoni tkun ġiet invalidata;
(ii) l-applikazzjoni ġiet irtirata mill-applikant qabel ma tkun ġiet
deċiża.
(b) Meta applikazzjoni tiġi rtirata mill-applikant, il-persentaġġ mill-ħlas
tal-permess tal-iżvilupp li għandu jiġi rifuż għandu jkun kif ġej
(i)
meta l-applikazzjoni tiġi rtirata qabel il-pubblikazzjoni tagħha fuq
is-sit elettroniku tad-Dipartiment tal-Informazzjoni, 100% tal-
ħlas tal-permess tal-iżvilupp għandu jiġi rifuż;
(ii) meta l-applikazzjoni tiġi rtirata wara l-pubblikazzjoni tagħha fuq
is-sit elettroniku tad-Dipartiment tal-Informazzjoni iżda qabel l-
endorsement tar-Rapport tal-Applikazzjoni tal-Permess tal-
Iżvilupp jew, fil-każ ta’ Summary Procedure, tar-rapport ta’
rakkomandazzjoni mill-uffiċjal delegat mill-Awtorità, 50% mill-
ħlas tal-permess tal-iżvilupp għandu jiġi rifuż;
(iii) meta l-applikazzjoni tiġi rtirata wara l-endorsement tar-Rapport
tal-Applikazzjoni tal-Permess tal-Iżvilupp, jew f’każ ta’ Summary
Procedure, tar-rapport ta’ rakkomandazzjoni mill-ufficjal delegat
mill-Awtorità,
iżda
qabel
d-determinazzjoni
tal-istess
applikazzjoni, 25% mill-ħlas tal-permess tal-iżvilupp għandu jiġi
rifuż;
(iv) l-ebda ħlas tal-permess tal-iżvilupp m’għandu jiġi rifuż meta jkun
nħareġ Avviż, skont l-artikoli 97, 98 jew 105 tal-Att, fil-konfront
tal-applikant jew fil-konfront tas-sit li dwaru l-applikazzjoni tkun
tirrelata;
15. (i) Meta applikazzjoni tiġi ppreżentata dwar żvilupp ġdid fuq sit (deskritta
bħala l-applikazzjoni l-ġdida għall-fini ta’ dan is-subparagrafu) u l-
applikant bil-miktub isostni li -
(a) applikazzjoni għal żvilupp tal-istess tip kienet ġiet ppreżentata
qabel mill-applikant fuq sit ieħor (deskritt bħala s-sit oriġinali
għall-iskop ta’ dan il-paragrafu) fil-viċinanza tas-sit il-ġdid u li
kien ġie approvat, u
(b) l-applikant m’għandu l-ebda interess fl-iżvilupp tas-sit oriġinali u
ma kienx u ma jkunx ser jeżerċita l-permess,
il-permess fuq is-sit oriġinali għandu jiġi mħassar mill-Awtorità.
(ii)
Kemm-il darba l-ħlas għal permess ta’ żvilupp li ġie mħallas fuq l-
applikazzjoni oriġinali ma jkunx ingħata lura, parzjalment jew b’mod
sħiħ lill-applikant jew lil kull terzi, tali ħlas għandu jinżamm mill-
Awtorità flimkien ma’ kull tariffa pagabbli oħra mill-applikant flimkien
mal-preżentazzjoni ta’ l-applikazzjoni l-ġdida.
(iii) Id-disposizzjonijiet ta’ dan il-paragrafu għandhom japplikaw biss jekk
(a) ma jkun hemm ebda differenza fl-indikazzjoni tas-sit oriġinali u l-
applikazzjoni l-ġdida;
(b) il-permess fuq is-sit oriġinali ma jkun intuża b’ebda mod
possibbli, u
(ċ) din l-applikazzjoni tkun limitata għall-bidla tas-sit tal-permess
ghal żvilupp approvat qabel.
(iv)
Kull varjazzjoni mill-permess li jkun ġie approvat qabel (ħlief għall-
indikazzjoni żbaljata tas-sit) ma għandhiex tippreġudika l-applikazzjoni
l-ġdida.
(v) Meta l-applikazzjoni l-ġdida tkun irtirata mill-applikant qabel ma din
tiġi deċiża, il-ħlas għal permess tal-iżvilupp ma għandhomx jingħataw
lura.
16. Meta applikazzjoni għal żvilupp ġdid fuq sit li dwaru hemm jew kien hemm
permess ta’ żvilupp, kemm jekk għadu fis-seħħ jew jekk skada, il-kontribuzzjoni
ĦLASIJIET TAL-IPPJANAR TAL-IŻVILUPP
għas-servizzi ta’ infrastruttura li tkun tħalset fir-rigward tal-permess ta’ żvilupp ta’
qabel għandha tittieħed f’konsiderazzjoni kif ġej
(a) Għal applikazzjonijiet li saru qabel l-1993,
(i)
jekk l-applikant jew perit jippreżenta rċevuta tal-kontribuzzjoni
għas-Servizzi tal-Infrastruttura mħallsa oriġinarjament ma’
evidenza li dan huwa relatat ma’ permess ta’ żvilupp ta’ qabel fl-
istess sit, l-ammont muri fuq l-irċevuta għandu jitnaqqas mill-
kontribuzzjoni għas-servizzi ta’ infrastruttura ġdida meħtieġa;
(ii) jekk l-applikant jew perit ma jippreżentax irċevuta tal-
kontribuzzjoni għas-servizzi ta’ infrastruttura li ġiet mħallsa
oriġinarjament ma’ evidenza li dan huwa relatat ma’ permess ta’
żvilupp ta’ qabel fl-istess sit, l-ammont li għandu jitnaqqas mill-
kontribuzzjoni għas-Servizzi ta’ Infrastruttura ġdida meħtieġa
għandhom jiġu kalkulati skond l-Iskeda 2.
(b)
Għall-applikazzjonijiet wara l-1992 il-kontribuzzjoni għas-servizzi ta’
infrastruttura rreġistrata, fuq il-kotba tal-Awtorità, li oriġinarjament
kienet imħallsa fuq permess tal-iżvilupp ta’ qabel fl-istess sit, għandha
titnaqqas mill-kontribuzzjoni għas-servizzi ta’ infrastruttura meħtieġa;
17. Ebda kontribuzzjoni għas-Servizzi ta’ Infrastruttura ma għandha titħallas
meta l-applikazzjoni jkollha x’taqsam biss ma’ applikazzjoni minn Entità jew
Awtorità Regolatorja tal-Gvern jew enti oħra stabbilita bil-liġi, inkluż il-Malta
Enterprise, fejn l-applikant jagħti impriża, fil-forma speċifikata mill-Awtorità tal-
Ippjanar, lill-Awtorità stess li s-servizzi tal-infrastruttura meħtieġa ser jkunu
pprovduti minn, jew flimkien ma’, u bl-approvazzjoni ta’, l-entità jew awtorità
regolatorja relevanti u bi spejjeż tal-applikant jew l-entità jew awtorità regolatorja
rilevanti, u li l-manutenzjoni meħtieġa ta’ dawn is-servizzi se tkunu wkoll hekk
imwettqa;
18. Ebda kontribuzzjoni tad-drenaġġ prinċipali ma għandhom ikunu pagabbli
fir-rigward ta’ applikazzjonijiet għal xogħlijiet ta’ trattament tad-drenaġġ, tal-
istazzjonijiet tal-ippumpjar u strutturi simili jew xogħlijiet mogħtija mit-Taqsima
tad-Drenaġġ tal-Korporazzjoni tas-Servizzi tal-Ilma jew kull korp ieħor li
sussegwentement jassumi r- responsabilitajiet ta’ dik l-entità jew awtorità
regolatorja;
19. Il-kontribuzzjoni għas-servizzi ta’ infrastruttura għandha titnaqqas b’75%,
meta
(a) l-applikant jagħti lill-Awtorità garanzija, fil-formola speċifikata mill-
Awtorità tal-Ippjanar, li s-servizzi ta’ infrastruttura meħtieġa jkunu
provduti mill-applikant, jew minn, u bl-approvazzjoni tal-entità jew
awtorità regolatorja rilevanti u bi spejjeż tal-applikant, u li l-
manutenzjoni meħtieġa ta’ dawn is-servizzi se tkun wkoll imwettqa;
jew
(b) l-applikazzjoni tirrelata ma’ sit fejn is-servizzi infrastrutturali meħtieġa
jkunu ġew provduti fuq spiża ta’ individwu privat, u impriża tingħata
fil-formola speċifikata mill-Awtorità tal-Ippjanar li l-manutenzjoni ta’
dawn is-servizzi tkun ser tigi pprovduta;
20. Kull kontribuzzjoni għas-servizzi ta’ infrastruttura għandha tiġi imposta bir-
rati kalkulati b’referenza għall-iżvilupp propost fl-applikazzjoni u ebda
kontribuzzjoni ma għandha titħallas lura ħlief fil-każijiet li ġejjin
(i)
il-permess mitlub ikun ġie miċħud, sakemm ma jkunx ġie rifjutat skond
l-artikolu 52(5) tal-Att dwar l-Ambjent u l-Ippjanar tal-Iżvilupp;
(ii)
l-applikazzjoni tkun ġiet invalidata;
(iii) l-applikazzjoni tiġi rtirata qabel ma’ din tiġi deċiża mill-Awtorità
Iżda fil-każijiet imsemmija fis-sub-paragrafi (i), (ii) u (iii) hawn qabel, 10%
tal-kontribuzzjoni għas-servizzi tal-infrastruttura għandha tinżamm biex tkopri l-
ispejjeż amministrattivi u li, konsegwentement, m’hijiex rimborsabbli;
(iv) jekk issir fir-rigward ta’ applikazzjoni għal klassi ta’ żvilupp li dwarha
permess bħal dak mhux meħtieġ minn jew taħt xi disposizzjoni ta’ l-Att
jew xi regolamenti jew ordnijiet magħmulin taħtu, u l-applikazzjoni
tintbagħat lura mill-Awtorità lill- applikant;
(v) jekk l-applikazzjoni tkun waħda li għaliha jkun jirreferi il-paragrafu
19(a), u l-applikant sussegwentement jipprovdi s-servizzi xierqa bi
spejjeż tiegħu u d-Dipartiment rilevanti jkun iċċertifika li x-xogħlijiet
ġew imwettqa għas-sodisfazzjon tiegħu, għandha titħallas rifużjoni
ugwali għal 15% tal-kontribuzzjoni għas-servizzi ta’ infrastruttura;
(vi) jekk l-applikazzjoni tkun waħda li għaliha jkun jirreferi l-paragrafu
19(b), u d-Dipartiment rilevanti jkun iċċertifika li x-xogħlijiet ikunu
saru għas-sodisfazzjon tagħha, għandha titħallas rifużjoni ugwali għal
15% tal-kontribuzzjoni għas-servizzi ta’ infrastruttura;
21. Meta l-Awtorità tqis li sabiex jintlaħqu l-ħtiġiet straordinarji jew
eċċezzjonali li, fl-opinjoni tal-Awtorità, in-natura, il-post jew skala tal-iżvilupp
propost x’aktarx li jqiegħdu fuq is-servizzi ta’ infrastruttura u servizzi oħra jew
faċilitajiet, kif ukoll biex tiżgura l-ippjanar xieraq taż-żona u tirregola l-użu tal-art
bi qbil mal-policies u l-proposti fil-Pjan ta’ Struttura u kull pjan sussidjarju, il-
kontribuzzjoni preċedenti speċifikata f ’din l-Iskeda hija insuffiċjenti, l-Awtorità
għandha tistabbilixxi l-kontribuzzjoni li għandha tiġi imposta biex jilħqu l-ispiża
tas-servizzi u l-faċilitajiet li joħorġu mill-permess mitlub, u tista’ wkoll tagħmel
ftehim mal-applikant biex jiġi żgurat il-ħlas tal-kontribuzzjoni hekk deċiża u t-
twettiq tal-iżvilupp skond il-permess tal-Awtorità.
22. (a) Applikazzjonijiet għal outline development permit li jkunu jirrigwardaw
żvilupp b’site area ta’ 1,000 metru kwadru jew anqas għandhom jiġu
sottomessi lill-Awtorità flimkien mal-ħlas ta’ development permit fee ta’
€500;
(b) Applikazzjonijiet għal outline development permit li jkunu jirrigwardaw
żvilupp b’site area ta’ aktar minn 1,000 metru kwadru għandhom jiġu
sottomessi lill-Awtorità flimkien mal-ħlas ta’ development permit fee ta’
€2,500;
(ċ) Il-ħlasijiet tad-development permit fee imsemmija fil-paragrafi (a) u (b)
ma jiġux rifużi iżda jitnaqqsu mill-ħlas tal-permess tal-izvilupp dovut
fuq l-eventwali full development application li tiġi sottomessa;
22. Meta applikazzjoni tiġi sottomessa dwar żvilupp ġdid fuq sit (deskritta bħala
l-applikazzjoni l-ġdida għall-fini ta’ dan il-paragrafu) u l-applikant bil-miktub
jiddikjara li -
(i)
l-applikazzjoni għall-iżvilupp tal-istess tip kienet ġiet ppreżentata qabel
mill-applikant fuq sit ieħor (deskritt bħala s-sit oriġinali għall-iskop ta’
dan il-paragrafu) fil-viċinanza tas-sit il-ġdid u li kien ġie approvat, u
(ii) il-kontribuzzjoni tas-Servizzi ta’ Infrastruttura mħallsa fir-rigward tal-
applikazzjoni fuq il-post oriġinali għandhom jittieħdu f’kunsiderazzjoni
fil-kalkolu tal-kontribuzzjoni tas-servizzi ta’ infrastruttura dovuta fuq l-
applikazzjoni għas-sit l-ġdid;
ĦLASIJIET TAL-IPPJANAR TAL-IŻVILUPP
il-permess fuq is-sit oriġinali għandu jiġi mħassar mill-Awtorità u l-kontribuzzjoni
tas-servizzi ta’ infrastruttura għandha titqies li ma ġietx imħallsa fuq is-sit oriġinali.
Il-kontribuzzjoni tas-servizzi ta’ infrastruttura mħallsa fuq is-sit oriġinali għandha
t i t t i e ħ e d f ’ k u n s i d e r a z z j o n i f i l - k a l k o l u t a l - k o n t r i b u z z j o n i t as - se r v i z z i t a ’
infrastruttura li għandha titħallas fir-rigward ta-applikazzjoni l-ġdida;
24. Meta jkun hemm applikazzjoni, li dwarha l-Ħlas għal Permess għal Żvilupp
u l-Ħlas Ambjentali li jkun tħallas ikun iżjed minn €2,000 euro, tiġi rtirata qabel ma
jkun hemm deċiżjoni dwarha u tkun ġiet ippreżentata applikazzjoni ġdida mill-istess
applikant fuq l-istess sit fi żmien tliet xhur mid-data ta’ meta tkun saret it-talba
sabiex l-applikazzjoni oriġinali tiġi rtirata, 40% mill-Ħlas għal Permess għal
Żvilupp u l-Ħlas Ambjentali li jkun tħallas fl-applikazzjoni oriġinali għandu
jitnaqqas mill-ħlasijiet dovuti għall-applikazzjoni l-ġdida.
25. (1) Ebda ħlas għal permess għal żvilupp, ħlas ambjentali jew kontribuzzjoni
għas-servizzi ta’ infrastruttura ma għandu jitħallas għal kull applikazzjoni li skont l-
opinjoni tal-Awtorità tkun esklussivament relatata ma’ xogħol ta’ restawr fuq bini
skedat, strutturi skedati jew bini jew strutturi f’Żoni ta’ Konservazzjoni Urbana, jew
g ħ a l d i k i l - p a r t i t a ’ a p p l i k a z z j o n i l i s k o n t l - o p i n j o n i t a l - Aw t o r i t à t k u n
esklussivament relatata ma’ xogħol ta’ restawr fuq bini skedat, strutturi skedati jew
bini jew strutturi f’Żoni ta’ Konservazzjoni Urbana.
(2) Kull riabilitazzjoni li tinvolvi bidla ta’ użu li skont l-opinjoni tal-Awtorità hi
relatata ma’ xogħol ta’ restawr, ukoll ma għandu jitħallas fuqu ebda ħlas.
26. (1) Meta applikazzjoni tkun għal żvilupp ġdid fuq sit li dwaru hemm fis-
seħħ permess ta’ żvilupp (barra minn permess parzjali ta’ żvilupp), u l-iżvilupp hekk
permess jew ma jkunx inbeda jew, jekk ikun inbeda, ma jkunx għadu tlesta, il-ħlas
għal permess ta’ żvilupp għall-żvilupp il-ġdid għandu jiġi kalkulat b’dan il-mod
(a) fil-każ ta’ permess ta’ żvilupp fejn l-iżvilupp ma jkunx inbeda, billi
jitnaqqas il-ħlas għal permess ta’ żvilupp imħallas fuq il-permess ta’
żvilupp li hemm fis-seħħ, kalkulat billi jintużaw ir-rati kurrenti f’dawn
ir-regolamenti, minn dak dovut fuq l-applikazzjoni l-ġdida;
(b) fil-każ ta’ permess ta’ żvilupp fejn l-iżvilupp ikun inbeda iżda ma jkunx
tlesta, billi jitnaqqas il-ħlas għal permess ta’ żvilupp imħallas fuq il-
permess ta’ żvilupp li hemm fis-seħħ, għal dik il-parti tal-iżvilupp li ma
jkunx inbeda, kalkulat billi jintużaw ir-rati kurrenti f’dawn ir-
regolamenti, minn dak dovut fuq l-applikazzjoni l-ġdida.
(2) Meta l-permess ta’ żvilupp li jkun fis-seħħ ikun tiġdid ta’ permess ta’ qabel, il-
ħlas dovut għal permess ta’ żvilupp għandu jiġi kalkulat billi jitnaqqas il-ħlas għal
permess ta’ żvilupp imħallas fil-permess oriġinali, kalkulat billi jintużaw ir-rati kurrenti
f’dawn ir-regolamenti, minn dak dovut fuq l-applikazzjoni l-ġdida.
27. (1) Meta jkunu qed jiġu kkalkolati l-ħlasijiet dovuti fir-rigward ta’
applikazzjoni għal żvilupp industrijali li tjaqa’ fil-Kategorija A f’żoni allokati għal
żvilupp industrijali fil-Pjanijiet Lokali, l-ebda ħlas ieħor m’għandu jintalab għajr
dak dovut taħt il-Kategorija A ta’ din it-tabella ta’ din l-Iskeda għal "Żvilupp
Industrijali (li jinkludi estenzjonijiet) f ’żoni allokati għal żvilupp industrijali fil-
Pjanijiet Lokali - Area tal-Art" u għal "Żvilupp Industrijali (li jinkludi estenzjonijiet)
f’żoni allokati għal żvilupp industrijali fil-Pjanijiet Lokali - Area ta’ Sit.
(2) Għal dawk l-applikazzjonijiet f’żoni allokati għal żvilupp industrijali fil-
Pjanijiet Lokali li jinkludu bdil ta’ użu għal garaxx (anċillari), għandha tapplika biss
ir-rata ta’ €1.24 għal kull metru kwadru bħala ħlas għal permess għal żvilupp (DPF).
ĦLASIJIET TAL-IPPJANAR TAL-IŻVILUPP
(3) Għal dawk l-applikazzjonijiet f’żoni allokati għal żvilupp industrijali fil-
Pjanijiet Lokali li jaqgħu taħt il-Kategoriji B, Ċ u D, il-ħlas għandu jkun skont ir-rati
applikabbli taħt kull kategorija.
28. Applikazzjonijiet ta’ żvilupp li jinkludu proġetti sportivi li ġew sottomessi jew
validati wara l-1 ta’ Jannar 2021 u l-applikanti huma jew il-Kunsill Malti għall-iSport,
jew entità reġistrata mal-Kunsill Malti għall-iSport, għandhom jiġu eżentati mill-Ħlas għal
Permess tal-Iżvilupp (DPF) u mill-Ħlas Ambjentali (EF).