INDUSTRIAL EMISSIONS (WASTE INCINERATION) REGULATIONS (wasteincineration)
Table of Provisions (29)
Statutory Text (29 Articles)
SUBSIDIARY LEGISLATION 549.81
INDUSTRIAL EMISSIONS
(WASTE INCINERATION) REGULATIONS
7th January, 2013 *
LEGAL NOTICE 14 of 2013.
The title of these regulations is the Industrial Emissions
(Waste Incineration) Regulations.
DEFINITIONS
For the purpose of these schedules the following definitions shall apply
(a) "existing waste incineration plant" means one of the following waste
incineration plants
(i)
which was in operation and had a permit in accordance with
applicable European Union law before 28 December 2002,
(ii) which was authorised or registered for waste incineration and had
a permit granted before 28 December 2002 in accordance with
applicable European Union law, provided that the plant was put
into operation no later than 28 December 2003,
(iii) which, in the view of the competent authority, was the subject of a
full request for authorisation before 28 December 2002, provided
that the plant was put into operation not later than 28 December
2004;
(b) "new waste incineration plant" means any waste incineration plant not
covered by point (a).
(1) These regulations provide for the implementation in
part of Directive 2010/75/EU of the European Parliament and of
th e C ou nc i l of 24 N ov e m be r 20 10 o n In du s t ri a l E m is s i on s
(Integrated Pollution Prevention and Control) (Recast).
(2) These regulations also provide for the implementation of
the Industrial Emissions (Framework) Regulations.
(3) These regulations shall apply to waste incineration plants
and waste co-incineration plants which incinerate or co-incinerate
solid or liquid waste.
(4) These regulations shall not apply to gasification or
pyrolysis plants, if the gases resulting from this thermal treatment
of waste are purified to such an extent that they are no longer a
waste prior to their incineration and they can cause emissions no
higher than those resulting from the burning of natural gas.
(5) For the purposes of these regulations, waste incineration
plants and waste co-incineration plants shall include all
incineration lines or co-incineration lines, waste reception, storage,
on site pre-treatment facilities, waste-, fuel- and air-supply
systems, boilers, facilities for the treatment of waste gases, on-site
facilities for treatment or storage of residues and waste water,
stacks, devices and systems for controlling incineration or co-
incineration operations, recording and monitoring incineration or
co-incineration conditions.
(6) If processes other than oxidation, such as pyrolysis,
gasification or plasma process, are applied for the therm al
treatment of waste, the waste incineration plant or waste co-
incineration plant shall include both the thermal treatment process
and the subsequent incineration process.
(7) If waste co-incineration takes place in such a way that the
main purpose of the plant is not the generation of energy or
production of material products but rather the thermal treatment of
waste, the plant shall be regarded as a waste incineration plant.
AIR EMISSION LIMIT VALUES FOR WASTE INCINERATION PLANTS
1. All emission limit values shall be calculated at a temperature of 273.15 K, a
pressure of 101.3 kPa and after correcting for the water vapour content of the waste
They are standardised at 11% oxygen in waste gas except in case of incineration of
mineral waste oil as defined in regulation 4 the Waste Regulations (S.L. 549.63),
when they are standardised at 3% oxygen, and in the cases referred to in point 2.7 of
1.1. Daily average emission limit values for the following polluting substances
Gaseous and vaporous organic substances, expressed as total organic
Hydrogen chloride (HCl)
Hydrogen fluoride (HF)
Sulphur dioxide (SO 2 )
Nitrogen monoxide (NO) and nitrogen dioxide (NO 2 ), expressed as
NO 2 for existing waste incineration plants with a nominal capacity
exceeding 6 tonnes per hour or new waste incineration plants
Nitrogen monoxide (NO) and nitrogen dioxide (NO 2 ), expressed as
NO 2 for existing waste incineration plants with a nominal capacity of 6
tonnes per hour or less
1.2. Half-hourly average emission limit values for the following polluting
substances (mg/Nm³)
(100%) A (97%) B
Total dust
Gaseous and vaporous organic substances, expressed as
total organic carbon (TOC)
Hydrogen chloride (HCl)
Hydrogen fluoride (HF)
Sulphur dioxide (SO 2 )
Nitrogen monoxide (NO) and nitrogen dioxide (NO 2 ),
expressed as NO 2 for existing waste incineration plants
with a nominal capacity exceeding 6 tonnes per hour or
new waste incineration plants
1.3. Average emission limit values (mg/Nm³) for the following heavy metals
over a sampling period of a minimum of 30 minutes and a maximum of 8 hours
Cadmium and its compounds, expressed as cadmium (Cd)
Total: 0.05
Thallium and its compounds, expressed as thallium (Tl)
Mercury and its compounds, expressed as mercury (Hg)
0.05
Antimony and its compounds, expressed as antimony (Sb)
Total: 0.05
Arsenic and its compounds, expressed as arsenic (As)
Lead and its compounds, expressed as lead (Pb)
Chromium and its compounds, expressed as chromium (Cr)
Cobalt and its compounds, expressed as cobalt (Co)
Copper and its compounds, expressed as copper (Cu)
Manganese and its compounds, expressed as manganese (Mn)
Nickel and its compounds, expressed as nickel (Ni)
Vanadium and its compounds, expressed as vanadium (V)
These average values cover also the gaseous and the vapour forms of the relevant
heavy metal emissions as well as their compounds.
1.4. Average emission limits value (ng/Nm³) for dioxins and furans over a
sampling period of a minimum of 6 hours and a maximum of 8 hours. The emission
limit value refers to the total concentration of dioxins and furans calculated in
accordance with Schedule 1 of the Industrial Emissions (Framework) Regulations.
Dioxins and furans
0.1
1.5. Emission limit values (mg/Nm³) for carbon monoxide (CO) in the waste
gases
(a) 50 as daily average value;
(b) 100 as half-hourly average value;
(c) 150 as 10-minute average value.
The competent authority may authorise exemptions from the emission limit values
set out in this point for waste incineration plants using fluidised bed technology,
provided that the permit sets an emission limit value for carbon monoxide (CO) of
not more than 100 mg/Nm³ as an hourly average value.
2. Emission limit values applicable in the circumstances described in
regulation 7(6) and regulation 8.
The total dust concentration in the emissions into the air of a waste incineration
plant shall under no circumstances exceed 150 mg/Nm³ expressed as a half-hourly
average. The air emission limit values for TOC and CO set out in points 1.2 and
1.5(b) shall not be exceeded.
3. The competent authority may lay down rules governing the exemptions
provided for in this Schedule.
These regulations shall not apply to the following plants
(a) plants treating only the following wastes
*see regulation 1(2) of these regulations, as originally promulgated.
INDUSTRIAL EMISSIONS (WASTE INCINERATION)
(i)
waste listed in the paragraph (b) of the definition
of biomass laid down in regulation 5 of the
Industrial Emissions (Framework) Regulations;
(ii) radioactive waste;
(iii) animal carcasses as regulated by Regulation
(EC) No 1774/2002 of the European Parliament
and of the Council of 3 October 2002 laying
down health rules concerning animal by-
products not intended for human consumption;
(iv) waste resulting from the exploration for, and the
exploitation of, oil and gas resources from off-
shore installations and incinerated on board the
installations;
(b) experimental plants used for research, development
and testing in order to improve the incineration
process and which treat less than 50 tonnes of waste
per year.
DETERMINATION OF AIR EMISSION LIMIT VALUES
FOR THE CO-INCINERATION OF WASTE
The following formula (mixing rule) shall be applied whenever a specific total
emission limit value ‘C’ has not been set out in a table in this Schedule.
The emission limit value for each relevant polluting substance and CO in the
waste gas resulting from the co-incineration of waste shall be calculated as follows
V waste C waste + V proc C proc
= C
V waste + V proc
waste gas volume resulting from the incineration of waste only
determined from the waste with the lowest calorific value specified in
the permit and standardised at the conditions given by these
regulations.
If the resulting heat release from the incineration of hazardous waste
amounts to less than 10% of the total heat released in the plant, V waste
must be calculated from a (notional) quantity of waste that, being
incinerated, would equal 10% heat release, the total heat release being
fixed.
emission limit values for waste incineration plants set out in Schedule
2. waste gas volume resulting from the plant process including the
combustion of the authorised fuels normally used in the plant (wastes
excluded) determined on the basis of oxygen contents at which the
emissions must be standardised as set out in Union or national law. In
the absence of legislation for this kind of plant, the real oxygen
content in the waste gas without being thinned by addition of air
unnecessary for the process must be used.
emission limit values as set out in this Schedule for certain industrial
activities or in case of the absence of such values, emission limit
values of plants which comply with the national laws, regulations and
administrative provisions for such plants while burning the normally
authorised fuels (wastes excluded). In the absence of these measures
the emission limit values set out in the permit are used. In the absence
of such permit values the real mass concentrations are used.
total emission limit values at an oxygen content as set out in this
Schedule for certain industrial activities and certain polluting
substances or, in case of the absence of such values, total emission
limit values replacing the emission limit values as set out in specific
schedules of the Industrial Emissions (Integrated Pollution Prevention
and Control, IPPC) Regulations. The total oxygen content to replace
the oxygen content for the standardisation is calculated on the basis of
the content above respecting the partial volumes All emission limit
values shall be calculated at a temperature of 273.15 K, a pressure of
101.3 kPa and after correcting for the water vapour content of the
waste gases.
The competent authority may lay down rules governing the exemptions provided
for in this Schedule.
2. Special provisions for cement kilns co-incinerating waste.
2.1. The emission limit values set out in points 2.2 and 2.3 apply as daily average
values for total dust, HCl, HF, NO x , SO 2 and TOC (for continuous measurements),
as average values over the sampling period of a minimum of 30 minutes and a
maximum of 8 hours for heavy metals and as average values over the sampling
period of a minimum of 6 hours and a maximum of 8 hours for dioxins and furans.
All values are standardised at 10% oxygen.
Half-hourly average values shall only be needed in view of calculating the daily
average values.
2.2. C – total emission limit values (mg/Nm³ except for dioxins and furans) for
the following polluting substances
Polluting substance
C
Total dust
HCl
HF
NO x
500 (*)
Cd + Tl
Hg
0.05
Sb + As + Pb + Cr + Co + Cu + Mn + Ni + V
0.05
Dioxins and furans (ng/Nm³)
0.5
(*)
Until 1 January 2016, the competent authority may authorise exemptions from the
limit value for NO x for Lepol kilns and long rotary kilns provided that the permit sets a total
emission limit value for NO x of not more than 800 mg/Nm³
2.3. C – total emission limit values (mg/Nm³) for SO 2 and TOC
Pollutant
C
SO 2
TOC
The competent authority may grant derogations for emission limit values set out in
this point in cases where TOC and SO 2 do not result from the co-incineration of
waste.
2.4. C- total emission limit values for CO
The competent authority may set emission limit values for CO.
3. Special provisions for combustion plants co-incinerating waste
3.1. C proc expressed as daily average values (mg/Nm³) valid until the date set out
in regulation 21(3).
For determining the total rated thermal input of the combustion plants, the
aggregation rules as defined in the definition of "combustion plant" in Regulation 2
of the Industrial Emissions (Large Combustion Plants) Regulations shall apply. Half-
hourly average values shall only be needed in view of calculating the daily average
values.
C proc for solid fuels with the exception of biomass (O 2 content 6%)
Polluting substance
< 50
50-100
100 to 300
> 300
MW Th
MW Th
MW Th
MW Th
SO 2
-
NO x
-
Dust
C proc for biomass (O 2 content 6%)
Polluting substance
< 50
50-100
100 to 300
> 300
MW Th
MW Th
MW Th
MW Th
SO 2
-
NO x
-
Dust
C proc for liquid fuels (O 2 content 3%)
Polluting substance
< 50
50-100
100 to 300
> 300
MW Th
MW Th
MW Th
MW Th
SO 2
-
400 to 200
(linear
decrease from
100 to 300
MW Th )
NO x
-
Dust
3.2. C proc expressed as daily average values (mg/Nm³) valid from the date set out
in regulation 21(4).
For determining the total rated thermal input of the combustion plants, the
aggregation rules as defined in the definition of "combustion plant" in Regulation 2
of the Industrial Emissions (Large Combustion Plants) Regulations shall apply. Half-
hourly average values shall only be needed in view of calculating the daily average
values.
3.2.1. C proc for combustion plants referred to in regulation 21(3)(a), with the
exception of gas turbines and gas engines
C proc for solid fuels with the exception of biomass (O 2 content 6%)
Polluting substance
< 50
50-100
100 to 300
> 300
MW Th
MW Th
MW Th
MW Th
SO 2
-
400 for peat
NO x
-
300 for
pulverised
lignite: 400
Dust
25 for peat: 20
C proc for biomass (O 2 content 6%)
Polluting substance
< 50
50-100
100 to 300
> 300
MW Th
MW Th
MW Th
MW Th
SO 2
-
NO x
-
Dust
C proc for liquid fuels (O 2 content 3%)
Polluting substance
< 50
50-100
100 to 300
> 300
MW Th
MW Th
MW Th
MW Th
SO 2
-
NO x
-
Dust
3.2.2 C proc for combustion plants referred to in regulation 21(3)(b), with the
exception of gas turbines and gas engines.
C proc for solid fuels with the exception of biomass (O 2 content 3%)
Polluting substance
< 50
50-100
100 to 300
> 300
MW Th
MW Th
MW Th
MW Th
SO 2
-
400 for peat
200 for peat
150 for
300, except in
circulating or
the case of
pressurised
fluidised bed
fluidised bed
combustion
combustion
or, in case of
peat firing, for
all fluidised
bed
combustion
NO x
-
300 for peat
150 for
pulverised
lignite
combustion
Dust
10 for peat: 20
C proc for biomass (O 2 content 6%)
Polluting substance
< 50
50-100
100 to 300
> 300
MW Th
MW Th
MW Th
MW Th
SO 2
-
NO x
-
Dust
C proc for liquid fuels (O 2 content 3%)
Polluting substance
< 50
50-100
100 to 300
> 300
MW Th
MW Th
MW Th
MW Th
SO 2
-
NO x
-
Dust
3.3. C - total emission limit values for heavy metals (mg/Nm³) expressed as
average values over the sampling period of a minimum of 30 minutes and a
maximum of 8 hours (O 2 content 6% for solid fuels and 3% for liquid fuels)
Polluting substances
C
Cd + Tl
0.05
Hg
0.05
Sb + As + Pb + Cr + Co + Cu + Mn + Ni + V
0.5
3.4. C - total emission limit value (ng/Nm³) for dioxins and furans expressed as
average value measured over the sampling period of a minimum of 6 hours and a
maximum of 8 hours (O 2 content 6% for solid fuels and 3% for liquid fuels)
Polluting substance
C
Dioxins and furans
0.1
3. Special provisions for waste co-incineration plants in industrial sectors not
covered under points 2 and 3 of this Schedule.
4.1. C - total emission limit value (ng/Nm³) for dioxins and furans expressed as
average value measured over the sampling period of a minimum of 6 hours and a
maximum of 8 hours
Polluting substance
C
Dioxins and furans
0.1
4.2. C - total emission limit values (mg/Nm³) for heavy metals expressed as
average values over the sampling period of a minimum of 30 minutes and a
maximum of 8 hours
Polluting substances
C
Cd + Tl
0.5
Hg
0.5
For the purposes of these regulations, "residue" shall mean
any liquid or solid waste which is generated by a waste incineration
plant or waste co-incineration plant.
EMISSION LIMIT VALUES OR DISCHARGES OF WASTE WATER FROM THE
CLEANING OF WASTE GASES
Polluting substances
Emissions limit
values for
unfiltered
samples (mg/l
except for
dioxins and
furans)
1. Total suspended solids as defined in Annex I of Directive (95%) (100%)
91/271/EEC
2. Mercury and its compounds, expressed as mercury (Hg)
0.03
3. Cadmium and its compounds, expressed as cadmium
(Cd)
0.05
4. Thallium and its compounds, expressed as thallium (Tl)
0.05
5. Arsenic and its compounds, expressed as arsenic (As)
0.15
6. Lead and its compounds, expressed as lead (Pb)
0.2
7. Chromium and its compounds, expressed as chromium
(Cr)
0.5
8. Copper and its compounds, expressed as copper (Cu)
0.5
9. Nickel and its compounds, expressed as nickel (Ni)
0.5
10. Zinc and its compounds, expressed as zinc (Zn)
1.5
11. Dioxins and furans
0.3 ng/l
An application for a permit for a waste incineration plant
or waste co-incineration plant shall include a description of the
measures which are envisaged to guarantee that the following
requirements are met
(a) the plant is designed, equipped and will be maintained
and operated in such a manner that the requirements of
these regulations are met taking into account the
categories of waste to be incinerated or co-incinerated;
(b) the heat generated during the incineration and co-
incineration process is recovered as far as practicable
through the generation of heat, steam or power;
(c) the residues will be minimised in their amount and
harmfulness and recycled where appropriate;
(d) the disposal of the residues which cannot be prevented
reduced or recycled will be carried out in conformity
with national and European Union legislation.
MONITORING OF EMISSIONS
1. Measurement techniques
1.1. Measurements for the determination of concentrations of air and water
polluting substances shall be carried out representatively.
1.2. Sampling and analysis of all polluting substances including dioxins and
furans as well as the quality assurance of automated measuring systems and the
reference measurement methods to calibrate them shall be carried out according to
CEN-standards. If CEN standards are not available, ISO, national or other
international standards which ensure the provision of data of an equivalent scientific
quality shall apply. Automated measuring systems shall be subject to control by
means of parallel measurements with the reference methods at least once per year.
1.3. At the daily emission limit value level, the values of the 95% confidence
intervals of a single measured result shall not exceed the following percentages of
the emission limit values
Carbon monoxide
10%
Sulphur dioxide
20%
Nitrogen dioxide
20%
Total dust
30%
Total organic carbon
30%
Hydrogen chloride
40%
Hydrogen fluoride
40%
Periodic measurements of the emissions into air and water shall be carried out in
accordance with points 1.1 and 1.2.
2. Measurements relating to air polluting substances
2.1. The following measurements relating to air polluting substances shall be
carried out
(a) continuous measurements of the following substances: NOx, provided
that emission limit values are set, CO, total dust, TOC, HCl, HF, SO 2 ;
(b) continuous measurements of the following process operation
parameters: temperature near the inner wall or at another representative
point of the combustion chamber as authorised by the competent
authority, concentration of oxygen, pressure, temperature and water
vapour content of the waste gas;
(c) at least two measurements per year of heavy metals and dioxins and
furans; one measurement at least every 3 months shall, however, be
carried out for the first 12 months of operation.
2.2. The residence time as well as the minimum temperature and the oxygen
content of the waste gases shall be subject to appropriate verification, at least once
when the waste incineration plant or waste co-incineration plant is brought into
service and under the most unfavourable operating conditions anticipated.
2.3. The continuous measurement of HF may be omitted if treatment stages for
HCl are used which ensure that the emission limit value for HCl is not being
exceeded. In that case the emissions of HF shall be subject to periodic measurements
as laid down in point 2.1(c).
2.4. The continuous measurement of the water vapour content shall not be
required if the sampled waste gas is dried before the emissions are analysed.
2.5. The competent authority may decide not to require continuous measurements
for HCl, HF and SO 2 in waste incineration plants or waste co-incineration plants and
require periodic measurements as set out in point 2.1(c) or no measurements if the
operator can prove that the emissions of those pollutants can under no circumstances
be higher than the prescribed emission limit values.
The competent authority may decide not to require continuous measurements for
NO x and require periodic measurements as set out in point 2.1(c) in existing waste
incineration plants with a nominal capacity of less than 6 tonnes per hour or in
existing waste co-incineration plants with a nominal capacity of less than 6 tonnes
per hour if the operator can prove on the basis of information on the quality of the
waste concerned, the technologies used and the results of the monitoring of
emissions, that the emissions of NO x can under no circumstances be higher than the
prescribed emission limit value.
2.6. The competent authority may decide to require one measurement every 2
years for heavy metals and one measurement per year for dioxins and furans in the
following cases
(a) the emissions resulting from co-incineration or incineration of waste are
under all circumstances below 50% of the emission limit values;
(b) the waste to be co-incinerated or incinerated consists only of certain
sorted combustible fractions of non-hazardous waste not suitable for
recycling and presenting certain characteristics, and which is further
specified on the basis of the assessment referred to in point (c);
(c) the operator can prove on the basis of information on the quality of the
waste concerned and the monitoring of the emissions that the emissions
are under all circumstances significantly below the emission limit
values for heavy metals and dioxins and furans.
2.7. The results of the measurements shall be standardised using the standard
oxygen concentrations mentioned in Schedule 2 or calculated according to Schedule
3 and by applying the formula given in Schedule 6.
When waste is incinerated or co-incinerated in an oxygen-enriched atmosphere,
the results of the measurements can be standardised at an oxygen content laid down
by the competent authority reflecting the special circumstances of the individual
When the emissions of polluting substances are reduced by waste gas treatment in
a waste incineration plant or waste co-incineration plant treating hazardous waste,
the standardisation with respect to the oxygen contents provided for in the first
subparagraph shall be done only if the oxygen content measured over the same
period as for the polluting substance concerned exceeds the relevant standard
oxygen content.
3. Measurements relating to water polluting substances
3.1. The following measurements shall be carried out at the point of waste water
discharge
(a) continuous measurements of pH, temperature and flow;
(b) spot sample daily measurements of total suspended solids or
measurements of a flow proportional representative sample over a
period of 24 hours;
(c) at least monthly measurements of a flow proportional representative
sample of the discharge over a period of 24 hours of Hg, Cd, TI, As, Pb,
Cr, Cu, Ni and Zn;
(d) at least every 6 months measurements of dioxins and furans; however,
one measurement at least every 3 months shall be carried out for the
first 12 months of operation.
3.2. Where the waste water from the cleaning of waste gases is treated on site
collectively with other on-site sources of waste water, the operator shall take the
measurements
(a) on the waste water stream from the waste gas cleaning processes prior
to its input into the collective waste water treatment plant;
(b) on the other waste water stream or streams prior to its or their input into
the collective waste water treatment plant;
(c) at the point of final waste water discharge, after the treatment, from the
waste incineration plant or waste co-incineration plant.
(1)
The permit shall include the following
(a) a list of all types of waste which may be treated using
at least the types of waste set out in the European
Waste List established by Decision 2000/532/EC, if
possible, and containing information on the quantity of
each type of waste, where appropriate;
(b) the total waste incinerating or co-incinerating capacity
of the plant;
(c) the limit values for emissions into air and water;
(d) the requirements for the pH, temperature and flow of
waste water discharges;
(e) the
sampling
and
measurement
procedures
and
frequencies to be used to comply with the conditions
set for emission monitoring;
(f)
the maximum permissible period of any technically
unavoidable stoppages, disturbances, or failures of the
purification devices or the measurement devices,
during which the emissions into the air and the
discharges of waste water may exceed the prescribed
emission limit values.
(2) In addition to the requirements set out in sub-regulation (1),
the permit granted to a waste incineration plant or waste co-
incine ration p la nt us ing h aza rd o us w a s t e s h a l l i nc lu de t h e
following
(a) a list of the quantities of the different categories of
hazardous waste which may be treated;
(b) the minimum and maximum mass flows of those
hazardous wastes, their lowest and maximum calorific
values and their maximum contents of polychlorinated
biphenyls, pentachlorophenol, chlorine, fluorine,
sulphur, heavy metals and other polluting substances.
(3) The competent authority may list the categories of waste to
be included in the permit which can be co-incinerated in certain
categories of waste co-incineration plants.
(4) The competent authority shall periodically reconsider and
where necessary, update permit conditions.
FORMULA TO CALCULATE THE EMISSION CONCENTRATION AT THE
STANDARD PERCENTAGE OXYGEN CONCENTRATION
21 - O S
E M
21 - O M
E S = calculated emission concentration at the standard percentage oxygen
E M = measured emission concentration
O S = standard oxygen concentration
O M = measured oxygen concentration
(1) Waste gases from waste incineration plants and waste
co-incineration plants shall be discharged in a controlled way by
means of a stack the height of which is calculated in such a way as
to safeguard human health and the environment.
(2)
(a) Emissions into air from waste incineration plants and
waste co-incineration plants shall not exceed the
e m i s s i o n l im i t v a l u e s se t o u t i n S c h e d u l e 2 a n d
Schedule 3 or determined in accordance with Schedule
3. (b) If in a waste co-incineration plant more than 40% of
the resulting heat release comes from hazardous waste,
or the plant co-incinerates untreated mixed municipal
waste, the emission limit values set out in Schedule 2
shall apply.
(3) Discharges to the aquatic environment of waste water
resulting from the cleaning of waste gases shall be limited as far as
practicable and the concentrations of polluting substances shall not
exceed the emission limit values set out in Schedule 4.
(4)
(a) The emission limit values shall apply at the point
where waste waters from the cleaning of waste gases
are discharged from the waste incineration plant or
waste co-incineration plant.
(b) When waste waters from the cleaning of waste gases
are treated outside the waste incineration plant or
waste co-incineration plant at a treatment plant
INDUSTRIAL EMISSIONS (WASTE INCINERATION)
intended only for the treatment of this sort of waste
water, the emission limit values set out in Schedule 4
shall be applied at the point where the waste waters
leave the treatment plant. Where the waste water from
the cleaning of waste gases is treated collectively with
other sources of waste water, either on site or off site,
the operator shall make the appropriate mass balance
calculations, using the results of the measurements set
out in point 3 of Schedule 5 in order to determine the
emission levels in the final waste water discharge that
can be attributed to the waste water arising from the
cleaning of waste gases.
(c) Under no circumstances shall dilution of waste water
take place for the purpose of complying with the
emission limit values set out in Schedule 4.
(5)
(a) Waste incineration plant sites and waste co-
incineration plant sites, including associated storage
areas for waste, shall be designed and operated in such
a way as to prevent the unauthorised and accidental
release of any polluting substances into soil, surface
water and groundwater.
(b) Storage capacity shall be provided for contaminated
rainwater run-off from the waste incineration plant site
or waste co-incineration plant site or for contaminated
water arising from spillage or fire-fighting operations.
The storage capacity shall be adequate to ensure that
such waters can be tested and treated before discharge
where necessary.
(6)
(a) Without prejudice to regulation 11(4)(c), the waste
incineration plant or waste co-incineration plant or
individual furnaces being part of a waste incineration
plant or waste co-incineration plant shall under no
circumstances continue to incinerate waste for a period
of more than four hours uninterrupted where emission
limit values are exceeded.
(b) The cumulative duration of operation in such
conditions over one year shall not exceed sixty hours.
(c) The time limit set out in the paragraph (b) shall apply
to those furnaces which are linked to one single waste
gas cleaning device.
ASSESSMENT OF COMPLIANCE WITH EMISSION LIMIT VALUES
1. Air emission limit values
1.1. The emission limit values for air shall be regarded as being complied with
(a) none of the daily average values exceeds any of the emission limit
values set out in point 1.1 of Schedule 2 or in Schedule 3 or calculated
in accordance with Schedule 3;
(b) either none of the half-hourly average values exceeds any of the
emission limit values set out in column A of the table under point 1.2 of
Schedule 2 or, where relevant, 97% of the half-hourly average values
over the year do not exceed any of the emission limit values set out in
column B of the table under point 1.2 of Schedule 2;
(c) none of the average values over the sampling period set out for heavy
metals and dioxins and furans exceeds the emission limit values set out
in points 1.3 and 1.4 of Schedule 2 or in Schedule 3 or calculated in
accordance with Schedule 3;
(d) for carbon monoxide (CO)
(i)
in case of waste incineration plants
- at least 97% of the daily average values over the year do not
exceed the emission limit value set out in point 1.5(a) of
Schedule 2; and,
- at least 95% of all 10-minute average values taken in any 24-
hour period or all of the half-hourly average values taken in
the same period do not exceed the emission limit values set
out in points 1.5(b) and (c) of Schedule 2; in case of waste
incineration plants in which the gas resulting from the
incineration process is raised to a temperature of at least 1
100°C for at least two seconds, the competent authority may
apply an evaluation period of 7 days for the 10-minute
average values;
(ii) in case of waste co-incineration plants: the provisions of Schedule
3 are met.
1.2. The half-hourly average values and the 10-minute averages shall be
determined within the effective operating time (excluding the start-up and shut-down
periods if no waste is being incinerated) from the measured values after having
subtracted the value of the confidence interval specified in point 1.3 of Schedule 5.
The daily average values shall be determined from those validated average values.
To obtain a valid daily average value no more than five half-hourly average values
in any day shall be discarded due to malfunction or maintenance of the continuous
measurement system. No more than ten daily average values per year shall be
discarded due to malfunction or maintenance of the continuous measurement system.
1.3. The average values over the sampling period and the average values in the
case of periodical measurements of HF, HCl and SO 2 shall be determined in
accordance with the requirements of regulation 6(1)(e), regulation 9(3) and point 1
of Schedule 5.
2. Water emission limit values
The emission limit values for water shall be regarded as being complied with if
(a) for total suspended solids 95% and 100% of the measured values do not
exceed the respective emission limit values as set out in Schedule 4;
(b) for heavy metals (Hg, Cd, TI, As, Pb, Cr, Cu, Ni and Zn) no more than
one measurement per year exceeds the emission limit values set out in
Part 5; or, if the competent authority provides for more than 20 samples
per year, no more than 5% of these samples exceed the emission limit
values set out in Schedule 4;
(c) for dioxins and furans, the measurement results do not exceed the
emission limit value set out in Schedule 4.
In the case of a breakdown, the operator shall
(a) reduce or close down operations as soon as practicable
until normal operations can be restored;
(b) notify the competent authority immediately.
(1) The competent authority shall ensure that the
monitoring of emissions is carried out in accordance with Schedule
5 and Schedule 6.
(2) The installation and functioning of the automated
measuring systems shall be subject to control and to annual
surveillance tests as set out in point 1 of Schedule 5.
(3) The competent authority shall determine the location of the
sampling or measurement points to be used for monitoring of
emissions.
(4) All monitoring results shall be recorded, processed and
presented in such a way as to enable the competent authority to
verify compliance with the operating conditions and emission limit
values which are included in the permit.
The emission limit values for air and water shall be
regarded as being complied with if the conditions described in
Schedule 7 are fulfilled.
(1) Waste incineration plants shall be operated in such a
way as to achieve a level of incineration such that the total organic
carbon content of slag and bottom ashes is less than 3% or their
loss on ignition is less than 5% of the dry weight of the material. If
necessary, waste pre-treatment techniques shall be used.
(2)
(a) Waste incineration plants shall be designed, equipped,
built and operated in such a way that the gas resulting
from the incineration of waste is raised, after the last
in j e c t io n o f c o m b us ti o n a i r, i n a c o n t r ol l e d a nd
homogeneous fashion and even under the most
unfavourable conditions, to a temperature of at least
850°C for at least two seconds.
(b) Waste co-incineration plants shall be designed,
equipped, built and operated in such a way that the gas
resulting from the co-incineration of waste is raised in
a controlled and homogeneous fashion and even under
the most unfavourable conditions, to a temperature of
at least 850°C for at least two seconds.
(c) If hazardous waste with a content of more than 1% of
halogenated organic substances, expressed as chlorine,
is incinerated or co-incinerated, the temperature
required to comply with the first and second
subparagraphs shall be at least 1 100°C.
(d) In waste incineration plants, the temperatures set out
in paragraphs (a) and (c) shall be measured near the
inner wall of the combustion chamber. The competent
authority may authorise the measurements at another
representative point of the combustion chamber.
(3)
(a) Each combustion chamber of a waste incineration plant
shall be equipped with at least one auxiliary burner.
This burner shall be switched on automatically when
the temperature of the combustion gases after the last
injection of combustion air falls below the
temperatures set out in subregulation (2). It shall also
be used during plant start-up and shut-down operations
in order to ensure that those temperatures are
maintained at all times during these operations and as
long as unburned waste is in the combustion chamber.
(b) The auxiliary burner shall not be fed with fuels which
can cause higher emissions than those resulting from
the burning of gas oil as defined in regulation 2(1) of
the Quality of Fuels Regulations, as may be amended
from time to time, relating to a reduction in the
sulphur content of certain liquid fuels, liquefied gas or
natural gas.
(4) Waste incineration plants and waste co-incineration plants
shall operate an automatic system to prevent waste feed in the
following situations
(a) at start-up, until the temperature set out in sub-
regulation (2) or the temperature specified in
accordance with regulation 12(1) has been reached;
(b) whenever the temperature set out in sub-regulation (2)
or the temperature specified in accordance with
regulation 12(1) is not maintained;
(c) whenever the continuous measurements show that any
emission limit value is exceeded due to disturbances or
failures of the waste gas cleaning devices.
(5) Any heat generated by waste incineration plants or waste
co-incineration plants shall be recovered as far as practicable.
(6) Infectious clinical waste shall be placed straight in the
furnace, without first being mixed with other categories of waste
and without direct handling.
(7) The competent authority shall ensure that the waste
incineration plant or waste co-incineration plant is operated and
controlled by a natural person who is competent to manage the
plant.
(1) Conditions different from those laid down in
regulation 11(1), (2) and (3) and, as regards the temperature,
regulation 11(4) and specified in the permit for certain categories
of waste or for certain thermal processes, may be authorised by the
competent authority provided the other requirements of these
regulations are met. The competent authority may lay down rules
governing these authorisations.
(2) For waste incineration plants, the change of the operating
conditions shall not cause more residues or residues with a higher
content of organic polluting substances compared to those residues
which could be expected under the conditions laid down in
regulation 11(1), (2) and (3).
(3)
(a) Emissions of total organic carbon and carbon
monoxide from waste co-incineration plants,
authorised to change operating conditions according to
sub-regulation (1) shall also comply with the emission
limit values set out in Schedule 2.
(b) Emissions of total organic carbon from bark boilers
within the pulp and paper industry co-incinerating
waste at the place of its production which were in
operation and had a permit before 28 December 2002
and which are authorised to change operating
conditions according to sub-regulation (1) shall also
comply with the emission limit values set out in
Schedule 2.
(1) The operator of the waste incineration plant or waste
co-incineration plant shall take all necessary precautions
concerning the delivery and reception of waste in order to prevent
or to limit as far as practicable the pollution of air, soil, surface
water and groundwater as well as other negative effects on the
environment, odours and noise, and direct risks to human health.
(2) The operator shall determine the mass of each type of
waste, if possible according to the European Waste List established
by Decision 2000/532/EC, prior to accepting the waste at the waste
incineration plant or waste co-incineration plant.
(3) Prior to accepting hazardous waste at the waste incineration
plant or waste co-incineration plant, the operator shall collect
available information about the waste for the purpose of verifying
compliance with the permit requirements specified in regulation
6(2).
That information shall cover the following
(a) all the administrative information on the generating
process contained in the documents mentioned in
subregulation (4)(a);
(b) the physical, and as far as practicable, chemical
composition of the waste and all other information
necessary to evaluate its suitability for the intended
incineration process;
(c) the hazardous characteristics of the waste, the
substances with which it cannot be mixed, and the
precautions to be taken in handling the waste.
(4) Prior to accepting hazardous waste at the waste incineration
plant or waste co-incineration plant, at l east the following
procedures shall be carried out by the operator
(a) the checking of the documents required by the Waste
Regulations, as may be amended from time to time,
and, where applicable, those required by Regulation
(EC) No 1013/2006 of the European Parliament and of
the Council of 14 June 2006 on shipments of waste and
by legislation on transport of dangerous goods;
(b) the taking of representative samples, unless
inappropriate as far as possible before unloading, to
verify conformity with the information provided for in
sub-regulation (3) by carrying out controls and to
enable the competent authorities to identify the nature
of the wastes treated.
The samples referred to in paragraph (b) shall be kept for at least
one month after the incineration or co-incineration of the waste
concerned.
(5) The competent authority may grant exemptions from
subregulations (2), (3) and (4) to waste incineration plants or waste
co-incineration plants which are a part of an installation covered by
the Industrial Emissions (Integrated Pollution Prevention and
Control) Regulations, and only incinerate or co-incinerate waste
generated within that installation.
(1) Residues shall be minimised in their amount and
harmfulness. Residues shall be recycled, where appropriate,
directly in the plant or outside.
(2) Transport and intermediate storage of dry residues in the
form of dust shall take place in such a way as to prevent dispersal
of those residues in the environment.
(3) Prior to determining the routes for the disposal or recycling
of the residues, appropriate tests shall be carried out to establish
the physical and chemical characteristics and the polluting
potential of the residues. Those tests shall concern the total soluble
fraction and heavy metals soluble fraction.
A change of operation of a waste incineration plant or a
waste co-incineration plant treating only non-hazardous waste in an
installation covered by the Industrial Emissions (Integrated
Pollution Prevention and Control) Regulations, which involves the
incineration or co-incineration of hazardous waste shall be
regarded as a substantial change.
(1) Applications for new permits for waste incineration
plants and waste co-incineration plants shall be made available to
the public at one or more locations for an appropriate period to
enable the public to comment on the applications before the
competent authority reaches a decision. That decision, including at
least a copy of the permit, and any subsequent updates, shall also
be made available to the public.
(2) For waste incineration plants or waste co-incineration
plants with a nominal capacity of 2 tonnes or more per hour, the
information in the report referred to in Article 72 of Directive
2010/75/EU, which shall include information on the functioning
and monitoring of the plant and give account of the running of the
incineration or co-incineration process and the level of emissions
into air and water in comparison with the emission limit values,
shall be made available to the public.
(3) A list of waste incineration plants or waste co-incineration
plants with a nominal capacity of less than 2 tonnes per hour shall
be drawn up b y the com petent authority and shall be m ade
available to the public.
Any person shall be guilty of an offence under these
regulations if
(a) he fails to comply with any provision of these
regulations or fails to comply with permit conditions
or with any order lawfully given in terms of any
provision of these regulations; or
(b) he
contravenes
any
restriction,
prohibition
or
requirement imposed by or under these regulations; or
(c) he acts in contravention of any of the provisions of
these regulations; or
(d) he conspires or attempts, or aids, or abets, any other
person by whatever means, including advertising,
counselling or procurement to contravene the
provisions or to fail to comply with any such
provisions, including any order lawfully given in
terms of any of the provisions of these regulations, or
to contravene any restriction, prohibition or
requirement imposed by or under the said regulations.
Any person who commits an offence against these
regulations shall, on conviction, be liable
(a) on a first conviction to a fine (multa) of not less than
twenty-three thousand euro (€23,000) and not greater
than two hundred and thirty-three thousand euro
(€233,000) or to imprisonment for a term not
exceeding two years, or to both such fine and
imprisonment;
(b) on a second or subsequent convictions, to a fine
(multa) of not less than forty-six thousand euro
(€46,000) and not greater than four hundred and sixty-
six thousand euro (€466,000) or to imprisonment for a
term not exceeding two years, or to both such fine and
imprisonment
Provided that whenever any person is found guilty of
committing an offence under these regulations by means of a
vehicle, the owner of the said vehicle, where applicable, is held
liable in the same manner and degree
Provided further that the court may order any person who
has been found guilty of committing an offence against these
regulations to pay for the expenses incurred by the competent
authority mentioned in these regulations as a result of the said
offence, the revocation of the permit issued by the competent
authority and the confiscation of the corpus delicti, including the
vehicle, if applicable.
(1) The provisions of articles 23 and 30 of the Criminal
Code shall, mutatis mutandis, apply to proceedings in respect of
offences against these regulations, so however that the
disqualification from holding or obtaining a licence, permit or
authority shall in no case be for less than one year.
(2) Notwithstanding the provisions of article 370 of the
C r i m i n a l C o d e , p r o c e e d i n g s f o r a n o ff e n c e a g a i n s t t h e s e
regulations shall be held before the Court of Magistrates (Malta) or
the Court of Magistrates (Gozo), as the case may be, and shall be in
accordance with the provisions of the Criminal Code regulating the
procedure before the said courts as courts of criminal judicature.
(3) Notwithstanding the provisions of the Criminal Code, the
Attorney General shall always have a right of appeal to the Court of
Criminal Appeal from any judgement given by the Court of
Magistrates (Malta) or the Court of Magistrates (Gozo) in respect
of proceedings for any offence against these regulations.
(Omitted under the Statute Law Revision Act, 1980).
(1) The provisions of these regulations shall apply from 7
January 2014 to installations carrying out the activities referred to
in Schedule 1 of the Integrated Pollution Prevention and Control
Regulations, 2002, which are in operation and hold a permit before
7 January 2013, or the operators of which have submitted a
complete application for a permit before that date, provided that
those installations are put into operation no later than 7 January
2014. (2) The provisions of these regulations shall apply from 7 July
2015 for installations carrying out the activity referred to point 5.2
in Schedule 1 of the Industrial Emissions (Integrated Pollution
Prevention and Control) Regulations, which are not covered by
subregulation (1), and which are in operation before 7 January
2013. Such installations shall apply to the competent authority for a
permit by 7 July 2013 at the latest.
(3) In relation to combustion plants which co-incinerate waste,
point 3.1 of Schedule 3 shall apply until
(a) 31 December 2015, for combustion plants which have
been granted a permit before 7 January 2013, or the
operators of which have submitted a complete
application for a permit before that date, provided that
such plants are put into operation no later than 7
January 2014;
(b) 6 January 2013, for combustion plants not covered by
paragraph (a).
(4) Point 3.2 of Schedule 3 shall apply in relation to
combustion plants which co-incinerate waste, as from
(a) 1 January 2016, for combustion plants which have
been granted a permit before 7 January 2013, or the
operators of which have submitted a complete
application for a permit before that date, provided that
such plants are put into operation no later than 7
January 2014;
(b) 7 January 2013, for combustion plants not covered by
paragraph (a).