INDUSTRIAL EMISSIONS (INTEGRATED POLLUTION PREVENTION AND CONTROL) REGULATIONS
Table of Provisions (36)
Statutory Text (36 Articles)
SUBSIDIARY LEGISLATION 549.77
INDUSTRIAL EMISSIONS (INTEGRATED
POLLUTION PREVENTION AND CONTROL)
REGULATIONS
7th January, 2013 *
LEGAL NOTICE 10 of 2013, as amended by Act XXV of 2015; and Legal
Notice 45 of 2017 and 110 of 2017 and Act XXXIII of 2024.
The title of these regulations is the Industrial Emissions
(Integrated Pollution Prevention and Control) Regulations.
Categories of activities referred to in regulation 3
The threshold values given below generally refer to production capacities or
outputs. Where several activities falling under the same activity description
containing a threshold are operated in the same installation, the capacities of such
activities are added together. For waste management activities, this calculation shall
apply at the level of activities 5.1, 5.3(a) and 5.3(b).
In the application of this Schedule, the competent authority shall take into account
any guidance published by the European Commission on
(a) the relationship between waste management activities described in this
Schedule and those described in Annexes I and II to Directive 2008/98/
EC; and
(b) the interpretation of the term "industrial scale" regarding the description
of chemical industry activities described in this Schedule.
1. Energy industries
1.1. Combustion of fuels in installations with a total rated thermal input of 50
MW or more
1.2. Refining of mineral oil and gas
1.3. Production of coke
1.4. Gasification or liquefaction of
(a) coal;
(b) other fuels in installations with a total rated thermal input of 20 MW or
more.
2. Production and processing of metals
2.1. Metal ore (including sulphide ore) roasting or sintering
2.2. Production of pig iron or steel (primary or secondary fusion) including
continuous casting, with a capacity exceeding 2.5 tonnes per hour
2.3. Processing of ferrous metals
(a) operation of hot-rolling mills with a capacity exceeding 20 tonnes of
crude steel per hour;
(b) operation of smitheries with hammers the energy of which exceeds 50
kilojoule per hammer, where the calorific power used exceeds 20 MW;
(c) application of protective fused metal coats with an input exceeding 2
tonnes of crude steel per hour.
2.4. Operation of ferrous metal foundries with a production capacity exceeding
20 tonnes per day
2.5. Processing of non-ferrous metals
(a) production of non-ferrous crude metals from ore, concentrates or
secondary raw materials by metallurgical, chemical or electrolytic
processes;
(b) melting, including the alloyage, of non-ferrous metals, including
recovered products and operation of non-ferrous metal foundries, with a
melting capacity exceeding 4 tonnes per day for lead and cadmium or 20
tonnes per day for all other metals.
2.6. Surface treatment of metals or plastic materials using an electrolytic or
chemical process where the volume of the treatment vats exceeds 30 m 3
3. Mineral industry
3.1. Production of cement, lime and magnesium oxide
(a) production of cement clinker in rotary kilns with a production capacity
exceeding 500 tonnes per day or in other kilns with a production
capacity exceeding 50 tonnes per day;
(b) production of lime in kilns with a production capacity exceeding 50
tonnes per day;
(c) production of magnesium oxide in kilns with a production capacity
exceeding 50 tonnes per day.
3.2. Production of asbestos or the manufacture of asbestos-based products
3.3. Manufacture of glass including glass fibre with a melting capacity exceeding
20 tonnes per day
3.4. Melting mineral substances including the production of mineral fibres with a
melting capacity exceeding 20 tonnes per day
3.5. Manufacture of ceramic products by firing, in particular roofing tiles,
bricks, refractory bricks, tiles, stoneware or porcelain with a production capacity
exceeding 75 tonnes per day and/or with a kiln capacity exceeding 4 m 3 and with a
setting density per kiln exceeding 300 kg/m 3
4. Chemical industry
For the purpose of this section, production within the meaning of the categories of
activities contained in this section means the production on an industrial scale by
chemical or biological processing of substances or groups of substances listed in
points 4.1 to 4.6
4.1. Production of organic chemicals, such as
(a) simple hydrocarbons (linear or cyclic, saturated or unsaturated,
aliphatic or aromatic);
(b) oxygen-containing hydrocarbons such as alcohols, aldehydes, ketones,
carboxylic acids, esters and mixtures of esters, acetates, ethers,
peroxides and epoxy resins;
(c) sulphurous hydrocarbons;
(d) nitrogenous hydrocarbons such as amines, amides, nitrous compounds,
nitro compounds or nitrate compounds, nitriles, cyanates, isocyanates;
(e) phosphorus-containing hydrocarbons;
(f)
halogenic hydrocarbons;
(g) organometallic compounds;
(h) plastic materials (polymers, synthetic fibres and cellulose-based fibres);
(i)
synthetic rubbers;
(j)
dyes and pigments;
(k) surface-active agents and surfactants.
4.2. Production of inorganic chemicals, such as
(a) gases, such as ammonia, chlorine or hydrogen chloride, fluorine or
INDUSTRIAL EMISSIONS (INTEGRATED
POLLUTION PREVENTION AND CONTROL)
hydrogen fluoride, carbon oxides, sulphur compounds, nitrogen oxides,
hydrogen, sulphur dioxide, carbonyl chloride;
(b) acids, such as chromic acid, hydrofluoric acid, phosphoric acid, nitric
acid, hydrochloric acid, sulphuric acid, oleum, sulphurous acids;
(c) bases, such as ammonium hydroxide, potassium hydroxide, sodium
hydroxide;
(d) salts, such as ammonium chloride, potassium chlorate, potassium
carbonate, sodium carbonate, perborate, silver nitrate;
(e) non-metals, metal oxides or other inorganic compounds such as calcium
carbide, silicon, silicon carbide.
4.3. Production of phosphorous-, nitrogen- or potassium-based fertilisers (simple
or compound fertilisers)
4.4. Production of plant protection products or of biocides
4.5. Production of pharmaceutical products including intermediates
4.6. Production of explosives
5. Waste management
5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10
tonnes per day involving one or more of the following activities
(a) biological treatment;
(b) physico-chemical treatment;
(c) blending or mixing prior to submission to any of the other activities
listed in points 5.1 and 5.2;
(d) repackaging prior to submission to any of the other activities listed in
points 5.1 and 5.2;
(e) solvent reclamation/regeneration;
(f)
recycling/reclamation of inorganic materials other than metals or metal
compounds;
(g) regeneration of acids or bases;
(h) recovery of components used for pollution abatement;
(i)
recovery of components from catalysts;
(j)
oil re-refining or other reuses of oil;
(k) surface impoundment.
5.2. Disposal or recovery of waste in waste incineration plants or in waste
coincineration plants
(a) for non-hazardous waste with a capacity exceeding 3 tonnes per hour;
(b) for hazardous waste with a capacity exceeding 10 tonnes per day.
5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes
per day involving one or more of the following activities, and excluding
activities covered by the Urban Waste Water Treatment Regulations
(S.L. 549.22)
(i) biological treatment;
(ii) physico-chemical treatment;
(iii) pre-treatment of waste for incineration or co-incineration;
(iv)
treatment of slags and ashes;
(v)
treatment in shredders of metal waste, including waste electrical
and electronic equipment and end-of-life vehicles and their
components.
(b) Recovery, or a mix of recovery and disposal, of non-hazardous waste
with a capacity exceeding 75 tonnes per day involving one or more of
the following activities, and excluding activities covered by the Urban
Waste Water Treatment Regulations (S.L. 549.22)
(i)
biological treatment;
(ii)
pre-treatment of waste for incineration or co-incineration;
(iii)
treatment of slags and ashes;
(iv)
treatment in shredders of metal waste, including waste electrical
and electronic equipment and end-of-life vehicles and their
components.
When the only waste treatment activity carried out is anaerobic digestion, the
capacity threshold for this activity shall be 100 tonnes per day.
5.4. Landfills, as defined in the Waste Management (Landfill) Regulations (S.L.
549.29) receiving more than 10 tonnes of waste per day or with a total capacity
exceeding 25,000 tonnes, excluding landfills of inert waste
5.5. Temporary storage of hazardous waste not covered under point 5.4 pending
any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 with a total capacity
exceeding 50 tonnes, excluding temporary storage, pending collection, on the site
where the waste is generated
5.6. Underground storage of hazardous waste with a total capacity exceeding 50
6. Other activities
6.1. Production in industrial installations of
(a) pulp from timber or other fibrous materials;
(b) paper or card board with a production capacity exceeding 20 tonnes per
day;
(c) one or more of the following wood-based panels: oriented strand board,
particleboard or fibreboard with a production capacity exceeding 600
m 3 per day.
6.2. Pre-treatment (operations such as washing, bleaching, mercerisation) or
dyeing of textile fibres or textiles where the treatment capacity exceeds 10 tonnes
6.3. Tanning of hides and skins where the treatment capacity exceeds 12 tonnes
of finished products per day
6.4. (a) Operating slaughterhouses with a carcass production capacity greater
than 50 tonnes per day
(b) Treatment and processing, other than exclusively packaging, of the
following raw materials, whether previously processed or unprocessed,
intended for the production of food or feed from
(i)
only animal raw materials (other than exclusively milk) with a
finished product production capacity greater than 75 tonnes per
day;
INDUSTRIAL EMISSIONS (INTEGRATED
POLLUTION PREVENTION AND CONTROL)
(ii) only vegetable raw materials with a finished product production
capacity greater than 300 tonnes per day or 600 tonnes per day
where the installation operates for a period of no more than 90
consecutive days in any year;
(iii) animal and vegetable raw materials, both in combined and
separate products, with a finished product production capacity in
tonnes per day greater than
- 75 if A is equal to 10 or more; or
- [300- (22.5 x A)] in any other case
where "A" is the portion of animal material (in percent of weight) of the
finished product production capacity.
Packaging shall not be included in the final weight of the product.
This subsection shall not apply where the raw material is milk only.
(c) Treatment and processing of milk only, the quantity of milk received
being greater than 200 tonnes per day (average value on an annual
basis).
6.5. Disposal or recycling of animal carcases or animal waste with a treatment
capacity exceeding 10 tonnes per day
6.6. Intensive rearing of poultry or pigs
(a) with more than 40 000 places for poultry;
(b) with more than 2 000 places for production pigs (over 30 kg), or
(c) with more than 750 places for sows.
6.7. Surface treatment of substances, objects or products using organic solvents,
in particular for dressing, printing, coating, degreasing, waterproofing, sizing,
painting, cleaning or impregnating, with an organic solvent consumption capacity of
more than 150 kg per hour or more than 200 tonnes per year
6.8. Production of carbon (hard-burnt coal) or electrographite by means of
incineration or graphitisation
6.9. Capture of CO 2 streams from installations covered by this Schedule or other
regulations implementing the Industrial Emissions (Framework) Regulations, for the
purposes of geological storage pursuant to Directive 2009/31/EC
6.10. Preservation of wood and wood products with chemicals with a production
INDUSTRIAL EMISSIONS (INTEGRATED
POLLUTION PREVENTION AND CONTROL)
capacity exceeding 75 m 3 per day other than exclusively treating against sapstain
6.11. Independently operated treatment of waste water not covered by Urban
Waste Water Treatment Regulations (S.L. 549.22) and discharged by an installation
listed in this Schedule.
(1) These regulations provide for the implementation in
part of Directive 2010/75/EU of the European Parliament and of
th e C ou nc i l of 24 N ov e m be r 20 10 o n In du s t ri a l E m is s i on s
(Integrated Pollution Prevention and Control) (Recast).
(2) These regulations also provide for the implementation of
the Industrial Emissions (Framework) Regulations.
(3) These regulations lay down rules for the integrated
prevention and control of pollution arising from certain industrial
activities. They also lay down rules designed to prevent or, where
that is not practicable, to reduce emissions into air, water and land
and to prevent the generation of waste, in order to achieve a high
level of protection of the environment taken as a whole.
List of polluting substances
Air
1. Sulphur dioxide and other sulphur compounds
2. Oxides of nitrogen and other nitrogen compounds
3. Carbon monoxide
4. Volatile organic compounds
5. Metals and their compounds
6. Dust including fine particulate matter
7. Asbestos (suspended particulates, fibres)
8. Chlorine and its compounds
9. Fluorine and its compounds
10. Arsenic and its compounds
11. Cyanides
12. Substances and mixtures which have been proved to possess carcinogenic or
mutagenic properties or properties which may affect reproduction via the air
13. Polychlorinated dibenzodioxins and polychlorinated dibenzofurans
Water
1. Organohalogen compounds and
substances
which
may
form
such
compounds in the aquatic environment
2. Organophosphorus compounds
3. Organotin compounds
4. Substances and mixtures which have been proved to possess carcinogenic or
mutagenic properties or properties which may affect reproduction in or via the
aquatic environment
5. Persistent hydrocarbons and persistent and bioaccumulable organic toxic
substances
6. Cyanides
7. Metals and their compounds
8. Arsenic and its compounds
9. Biocides and plant protection products
10. Materials in suspension
11. Substances which contribute to eutrophication (in particular, nitrates and
INDUSTRIAL EMISSIONS (INTEGRATED
POLLUTION PREVENTION AND CONTROL)
phosphates)
12. Substances which have an unfavourable influence on the oxygen balance
(and can be measured using parameters such as BOD, COD, etc.)
13. Substances listed in Schedule X of the Water Policy Framework Regulations
(S.L. 423.20).
These regulations shall apply to the industrial activities set
out in Schedule 1 and, where applicable, reaching the capacity
thresholds set out in that Schedule.
Criteria for determining best available techniques
1. The use of low-waste technology;
2. The use of less hazardous substances;
3. The furthering of recovery and recycling of substances generated and used
in the process and of waste, where appropriate;
4. Comparable processes, facilities or methods of operation which have been
tried with success on an industrial scale;
5. Technological
advances
and
changes
in
scientific
knowledge
and
understanding;
6. The nature, effects and volume of the emissions concerned;
7. The commissioning dates for new or existing installations;
8. The length of time needed to introduce the best available technique;
9. The consumption and nature of raw materials (including water) used in the
process and energy efficiency;
10. The need to prevent or reduce to a minimum the overall impact of the
emissions on the environment and the risks to it;
11. The need to prevent accidents and to minimise the consequences for the
environment;
12. Information published by public international organisations.
The operator shall take all appropriate measures to operate
an installation in accordance with the following principles
(a) all the appropriate preventive measures are taken
against pollution;
(b) the best available techniques are applied;
(c) no significant pollution is caused;
(d) the generation of waste is prevented in accordance
with the Waste Regulations;
(e) where waste is generated, it is, in order of priority and
in accordance with the Waste Regulations, prepared
for re-use, recycled, recovered or, where that is
technically and economically impossible, it is
disposed of while avoiding or reducing any impact on
the environment;
(f)
energy is used efficiently;
(g) the necessary measures are taken to prevent accidents
and limit their consequences;
(h) the necessary measures are taken upon definitive
*see regulation 1(2) of these regulations, as originally promulgated.
cessation of activities to avoid any risk of pollution
and return the site of operation to the satisfactory state
defined in accordance with regulation 16.
Amended by
L.N. 45 of 2017.
Public participation in decision making
1. The public shall be informed (by public notices or other appropriate means
such as electronic media where available) of the following matters early in the
procedure for the taking of a decision or, at the latest, as soon as the information can
reasonably be provided
(a) the application for a permit or, as the case may be, the proposal for the
updating of a permit or of permit conditions in accordance with
regulation 15, including the description of the elements listed in
regulation 5(1);
(b) where applicable, the fact that a decision is subject to a national or
transboundary environmental impact assessment or to consultations
between Member States in accordance with regulation 21;
(c) details of the competent authorities responsible for taking the decision,
those from which relevant information can be obtained, those to which
comments or questions can be submitted, and details of the time
schedule for transmitting comments or questions;
(d) the nature of possible decisions or, where there is one, the draft
decision;
(e) where applicable, the details relating to a proposal for the updating of a
permit or of permit conditions;
(f)
an indication of the times and places where, or means by which, the
relevant information will be made available;
(g) details of the arrangements for public participation and consultation
made pursuant to point 5.
2. The competent authority shall ensure that, within appropriate time frames,
the following is made available to the public concerned
(a) in accordance with national law, the main reports and advice issued to
the competent authority or authorities at the time when the public
concerned were informed in accordance with point 1;
(b) in accordance with the Freedom of Access to Information on the
Environment Regulations (S.L. 549.39), information other than that
referred to in point 1 which is relevant for the decision in accordance
with regulation 7 of the Industrial Emissions (Framework) Regulations
(S.L. 549.76) and which only becomes available after the time the
public concerned was informed in accordance with point 1.
3. The public concerned shall be entitled to express comments and opinions to
the competent authority before a decision is taken.
4. The results of the consultations held pursuant to this Schedule must be taken
into due account in the taking of a decision.
5. The arrangements for public consultation shall be as follows
(a) The public consultation process shall be initiated through a notice in at
least one local newspaper and on the competent authority’s website.
(b) The timeframe for public consultation shall be thirty days for the
procedures described in regulation 18(1)(a) to (d) and shall be fifteen
days in all other cases where the competent authority deems
consultation necessary, provided that where the application for
reconsideration of a permit in accordance with regulation 18(1)(e)
includes a request for a substantial change, the timeframe for public
consultation shall be thirty days.
(c) During this period, the competent authority shall make available to the
public any relevant documentation, including any application and
supporting documentation submitted by the operator, on the competent
authority’s website and at the premises of the Local Council within
which the installation is located, to enable the public to comment on
them.
(d) Any objections or representations by the public shall be made in writing
to the competent authority at the address indicated in the notice
initiating the public consultation.
INDUSTRIAL EMISSIONS (INTEGRATED
POLLUTION PREVENTION AND CONTROL)
(e) The competent authority may also require the operator to organise one
or more public meetings as part of the public consultation process.
(1) An application for a permit shall include a description
of the following
(a) the installation and its activities;
(b) the raw and auxiliary materials, other substances and
the energy used in or generated by the installation;
(c) the sources of emissions from the installation;
(d) the conditions of the site of the installation;
(e) where applicable, a baseline report in accordance with
regulation 16(2);
(f)
the nature and quantities of foreseeable emissions
from the installation into each medium as well as
identification of significant effects of the emissions on
the environment;
(g) the proposed technology and other techniques for
preventing or, where this is not possible, reducing
emissions from the installation;
(h) measures for the prevention, preparation for reuse,
recycling and recovery of waste generated by the
installation;
(i)
further measures planned to comply with the general
principles of the basic obligations of the operator as
provided for in regulation 4;
(j)
measures planned to monitor emissions into the
environment;
(k) the main alternatives to the proposed technology,
techniques and measures studied by the applicant in
outline;
(l)
any other information required by the competent
authority.
(2) An application for a permit shall also include a non-
technical summary of the details referred to in sub-regulation (1).
(3) When submitting an application, the operator shall follow
the format prescribed by any application forms published by the
competent authority on its website, and shall comply with any
guidance documents published by the competent authority on its
website.
(4) Where information supplied in accordance with the
requirements provided for in the Environmental Impact Assessment
Regulations, or a safety report prepared in accordance with Control
of Major Accident Hazards Regulations, or other information
produced in response to other legislation fulfils any of the
requirements of sub-regulation (1), that information may be
included in, or attached to, the application.
Schedule of fees for new permits
Category of activity as per Schedule
Fee for new permit
1. Energy
industries,
excluding
€35,000
combustion installations (1.1 below)
1.1
Combustion installations
€5,500 with an addition of €550
for every 10 MW (rated thermal
input) or part thereof
2. Production and processing of metals,
€35,000 with an addition of €350
excluding installations for surface
for every tonne per day or part
treatment of metals and plastic
thereof of processed material
materials (2.6 below)
€5,000 with €500 for every 10m 3
2.6
Installations for surface treatment of
metals and plastic materials
treatment vat capacity or part
thereof
3. Mineral industry
€25,000 with an addition of €250
for every tonne per day or part
thereof of processed material
4. Chemical
industry,
excluding
€5,000 with €500 for every ton per
installations for the production of
day plant production capacity or
pharmaceutical products (4.5 below)
part thereof, capped at €20,000
4.5 Installations using a chemical or
€15,000
biological process for the production
of pharmaceutical products including
intermediates
5. Waste management installations
5.1 Disposal or recovery of hazardous
€20,000 for disposal operations
waste
€10,000 for recovery operations
5.2 Disposal or recovery of waste in
€10,000 for incineration of only
waste incineration plants or in waste
non-hazardous waste
coincineration plants
€20,000 in all other cases
5.3 Disposal or recovery of non-
€10,000
hazardous waste, excluding point
(b)(i)(iv) below
5.3 (b)(i)(iv) Recovery or a mix of
€5,000
recovery and disposal of non-
hazardous waste involving treatment
in shredders of metal waste,
including waste electrical and
electronic equipment and end-of-life
vehicles and their components
€ 2 0 , 0 0 0 f o r e v e r y 5 0 0 ,0 0 0 m 3
5.4 Landfills
capacity or part thereof
5.5
Temporary
storage
of
hazardous
€10,000
waste
INDUSTRIAL EMISSIONS (INTEGRATED
POLLUTION PREVENTION AND CONTROL)
Category of activity as per Schedule
Fee for new permit
5.6
Underground storage of hazardous
€10,000
waste
6. Other activities, excluding intensive
€15,000
rearing of poultry or pigs (6.6 below)
6.6
Intensive rearing of poultry or pigs
€230
In determining whether to grant or refuse the permit to an
applicant, the competent authority shall take into account the
applicant’s suitability to undertake the proposed activity, having
regard to, as the case may be
(a) his record of compliance with these regulations and
with
the
Industrial
Emissions
(Framework)
Regulations;
(b) his financial capacity to comply with all obligations
and liabilities that will or may arise from the proposed
activity under these regulations, or his ability to offer
such financial security as the competent authority may
require;
(c) his
qualifications,
experience
and
technical
competence, as well as those of his employees, to
carry out the proposed activity safely and with
minimum risk to human health and the environment,
and to abide by any conditions set in relation thereto
by the competent authority.
(1) The competent authority shall ensure that the permit
includes all measures necessary for compliance with the
requirements of regulations 4 and 11. Those measures shall include
at least the following
(a) emission limit values for polluting substances listed in
Schedule 2, and for other polluting substances, which
are likely to be emitted from the installation concerned
in significant quantities, having regard to their nature
and their potential to transfer pollution from one
medium to another;
(b) appropriate requirements ensuring protection of the
soil and groundwater and measures concerning the
monitoring and management of waste generated by the
installation;
(c) suitable emission monitoring requirements specifying
(i)
measurement methodology, frequency and
evaluation procedure; and
(ii) where the provisions of regulation 8(3)(b) are
applicable, that results of emission monitoring
are available for the same periods of time and
reference conditions as for the emission levels
associated with the best available techniques;
(d) an obligation to supply the competent authority
regularly, and at least annually, with
(i)
information on the basis of results of emission
monitoring referred to in paragraph (c) and other
required data that enables the competent
authority to verify compliance with the permit
conditions; and
(ii) where the provisions of regulation 8(3)(b) are
applicable, a summary of the results of emission
monitoring which allows a comparison with the
emission levels associated
with
the
best
available techniques
Provided that the competent authority may specify the
format of this reporting and timeframes for its
submission;
(e) appropriate requirements for the regular maintenance
and surveillance of measures taken to prevent
emissions to soil and groundwater pursuant to
paragraph
(b)
and
appropriate
requirements
concerning the periodic monitoring of soil and
groundwater in relation to relevant hazardous
substances likely to be found on site and having regard
to the possibility of soil and groundwater
contamination at the site of the installation;
(f)
measures relating to conditions other than normal
operating conditions such as start-up and shut-down
operations, leaks, malfunctions, momentary stoppages
and definitive cessation of operations;
(g) provisions on the minimisation of long-distance or
transboundary pollution;
(h) conditions for assessing compliance with the emission
limit values or a reference to the applicable
requirements specified elsewhere.
(2) For the purpose of sub-regulation (1)(a), emission limit
values may be supplemented or replaced by equivalent parameters
or technical measures ensuring an equivalent level of
environmental protection.
(3) BAT conclusions shall be the reference for setting the
permit conditions.
(4) Without prejudice to regulation 11, the competent authority
may set stricter permit conditions than those achievable by the use
o f t h e b e s t a v a i l a b l e t e c h n i q u e s a s d e s c r i b e d i n t h e B AT
conclusions. The competent authority may establish guidance
under which it may set such stricter conditions.
(5) Where the competent authority sets permit conditions on
the basis of a best available technique not described in any of the
relevant BAT conclusions, it shall ensure that
(a) that technique is determined by giving special
consideration to the criteria listed in Schedule 3; and
(b) the requirements of regulation 8 are complied with.
Where the BAT conclusions referred to in paragraph (a) do
not contain emission levels associated with the best available
techniques, the competent authority shall ensure that the technique
referred to in paragraph (a) ensures a level of environmental
protection equivalent to the best available techniques described in
the BAT conclusions.
(6) Where an activity or a type of production process carried
out within an installation is not covered by any of the BAT
conclusions or where those conclusions do not address all the
potential environmental effects of the activity or process, the
competent authority shall, after prior consultations with the
operator, set the permit conditions on the basis of the best available
techniques that it has determined for the activities or processes
concerned, by giving special consideration to the criteria listed in
Schedule 3.
(7) For installations referred to in point 6.6 of Schedule 1, sub-
regulations (1) to (6) shall apply without prejudice to the
legislation relating to animal welfare.
(1) The emission limit values for polluting substances
shall apply at the point where the emissions leave the installation,
and any dilution prior to that point shall be disregarded when
determining those values.
With regard to indirect releases of polluting substances into
water, the effect of a water treatment plant may be taken into
account when determining the emission lim it values of the
installation concerned, provided that an equivalent level of
protection of the environment as a whole is guaranteed and
provided this does not lead to higher levels of pollution in the
environment.
(2) Without prejudice to regulation 11, the emission limit
values and the equivalent parameters and technical measures
referred to in regulation 7(1) and (2) shall be based on the best
available techniques, without prescribing the use of any technique
or specific technology.
(3) The competent authority shall set emission limit values that
ensure that, under normal operating conditions, emissions do not
exceed the emission levels associated with the best available
techniques as laid down in the decisions on BAT conclusions
referred to in Article 13(5) of Directive 2010/75/EU of the
European Parliament and of the Council of 24 November 2010 on
industrial emissions (integrated pollution prevention and control)
through either of the following
(a) setting emission limit values that do not exceed the
emission levels associated with the best available
techniques. Those emission limit values shall be
expressed for the same or shorter periods of time and
under the same reference conditions as those emission
levels associated with the best available techniques; or
(b) setting different emission limit values than those
referred to under paragraph (a) in terms of values,
periods of time and reference conditions.
Where paragraph (b) is applicable, the competent authority
shall, at least annually, assess the results of emission monitoring in
order to ensure that emissions under normal operating conditions
have not exceeded the emission levels associated with the best
available techniques.
(4) By way of derogation from sub-regulation (3), and without
prejudice to regulation 11, the competent authority may, in specific
cases, set less strict emission limit values. Such a derogation may
apply only where an assessment shows that the achievement of
emission levels associated with the best available techniques as
described in BAT conclusions would lead to disproportionately
higher costs compared to the environmental benefits due to
(a) the geographical location or the local environmental
conditions of the installation concerned; or
(b) the technical
characteristics
of
the
installation
concerned.
The competent authority shall document in an annex to the
permit conditions the reasons for the application of paragraph (a)
including the result of the assessment and the justification for the
conditions imposed.
The emission limit values set in accordance with paragraph
(a) shall, however, not exceed the emission limit values set out in
the Schedule to the Industrial Emissions (Framework) Regulations,
where applicable.
The competent authority shall in any case ensure that no
significant pollution is caused and that a high level of protection of
the environment as a whole is achieved.
In the application of this sub-regulation, the competent
authority shall take into account any guidance published by the
European Commission on the criteria to be taken into account for
the application of this sub-regulation.
The competent authority shall re-assess the application of
this sub-regulation as part of each reconsideration of the permit
conditions pursuant to regulation 15.
(5) The competent authority may grant temporary derogations
from the requirements of sub-regulations (2) and (3), and from
regulation 4(a) and (b) for the testing and use of emerging
techniques for a total period of time not exceeding nine months,
provided that after the period specified, either the technique is
stopped or the activity achieves at least the emission levels
associated with the best available techniques.
(6) Pending the adoption of a relevant decision on BAT
conclusions referred to in Article 13(5) of Directive 2010/75/EU of
the European Parliament and of the Council on industrial
emissions, the conclusions on best available techniques from BAT
reference documents adopted by the European Commission prior to
6 January 2011 shall apply as BAT conclusions for the purposes of
these regulations except for sub-regulations (3) and (4).
(1) The monitoring requirements referred to in regulation
7(1)(c) shall, where applicable, be based on the conclusions on
monitoring as described in the BAT conclusions.
(2) The frequency of the periodic monitoring referred to in
regulation 7(1)(e) shall be determined by the competent authority
in a permit for each individual installation or in general binding
rules.
(3) Without prejudice to the provisions of sub-regulation (2),
periodic monitoring shall be carried out at least once every five
years for groundwater and ten years for soil, unless such
monitoring is based on a systematic appraisal of the risk of
contamination.
(1) When adopting general binding rules, the competent
authority shall ensure an integrated approach and a high level of
environmental protection equivalent to that achievable with
1. individual permit conditions.
(2) General binding rules shall be based on the best available
techniques, without prescribing the use of any technique or specific
technology in order to ensure compliance with regulations 7 and 8.
(3) The competent authority shall ensure that general binding
rules are updated to take into account developments in best
available techniques and in order to ensure compliance with
regulation 15.
(4) General binding rules adopted in accordance with sub-
regulations (1) to (3) shall contain a reference to Directive 2010/
75/EU of the European Parliament and of the Council of 24
November 2010 on Industrial Emissions (Integrated Pollution
Prevention and Control) (Recast), or be accompanied by such a
reference on the occasion of their official publication.
Where an environmental quality standard requires stricter
conditions than those achievable by the use of the best available
techniques, the competent authority shall include additional
measures in the permit, without prejudice to other measures which
may be taken to comply with environmental quality standards.
The competent authority shall follow developments in best
available techniques and the publication of any new or updated
BAT conclusions and shall make that information available to the
public concerned.
(1) The operator shall inform the competent authority of
any planned change in the nature or functioning, or an extension of
the installation which may have consequences for the environment.
Where appropriate, the competent authority shall update the
permit.
(2) No substantial change planned by the operator shall be
made without a permit granted in accordance with these
regulations.
The application for a permit and the decision by the
competent authority shall cover those parts of the installation and
those details listed in regulation 5 which may be affected by the
substantial change.
(3) Any change in the nature or functioning or an extension of
an installation shall be deemed to be substantial if the change or
extension in itself reaches the capacity thresholds set out in
Schedule 1.
A permit shall not be transferred from one operator to
another unless the approval of the competent authority has been
sought and granted.
(1) Permits shall be valid for such a time as the competent
authority may specify, provided that where the operator has
sub mi tted all th e in format ion necessary f or the purpose of
reconsidering permit conditions within the timeframe specified by
the competent authority pursuant to sub-regulation (3), the validity
of the permit shall be extended until such a time as the competent
authority decides on the reconsideration of the permit conditions.
(2) The competent authority shall periodically reconsider, in
accordance with sub-regulations (3) to (6), all permit conditions
and, where necessary to ensure compliance with these regulations,
update those conditions.
(3) Prior to the expiry of the permit or at the request of the
competent authority, the operator shall submit all the information
necessary for the purpose of reconsidering the permit conditions,
including, in particular, results of emission monitoring and other
data, that enables a comparison of the operation of the installation
with the best available techniques described in the applicable BAT
conclusions and with the emission levels associated with the best
available techni ques, and any o ther additional information
requested by the competent authority. The operator shall submit
this information according to the timeframe specified by the
competent authority.
When reconsidering permit conditions, the competent
authority shall use any information resulting from monitoring or
inspections.
(4) Within four years of publication of decisions on BAT
conclusions in accordance with Article 13(5) of Directive 2010/75/
EU of the European Parliament and of the Council on industrial
emissions relating to the main activity of an installation, the
competent authority shall ensure that
(a) all the permit conditions for the installation concerned
are reconsidered and, if necessary, updated to ensure
compliance with these regulations, in particular, with
regulation 8(3) and (4), where applicable;
(b) the installation complies with those permit conditions.
The reconsideration shall take into account all the new or
updated BAT conclusions applicable to the installation and adopted
in accordance with Article 13(5) of Directive 2010/75/EU since the
permit was granted or last reconsidered.
(5) Where an installation is not covered by any of the BAT
conclusions, the permit conditions shall be reconsidered and, if
necessary, updated where developments in the best available
techniques allow for the significant reduction of emissions.
(6) The permit conditions shall be reconsidered and, where
necessary, updated at least in the following cases
(a) where the pollution caused by the installation is of
such significance that the existing emission limit
values of the permit need to be revised or new such
values need to be included in the permit;
(b) where the operational safety requires other techniques
to be used;
(c) where it is necessary to comply with a new or revised
environmental quality standard in accordance with
regulation 11;
(d) where the validity of a permit has elapsed.
(1) Without prejudice to the Water Policy Framework
Regulations, the Prevention and Remedying of Environmental
Damage Regulations, and the Protection of Groundwater Against
Pollution and Deterioration Regulations, and to relevant national or
European Union legislation on soil protection, the competent
authority shall set permit conditions to ensure compliance with
sub-regulations (3) and (4) upon definitive cessation of activities.
(2) Where the activity involves the use, production or release
of r e le v a n t h a z a r d o u s su b s t a n ce s an d ha v in g r e g a r d t o t h e
possibility of soil and groundwater contamination at the site of the
installation, the operator shall prepare and submit to the competent
a u t h o r i t y a b a s e l i n e r e p o r t b e f o r e st a r t i n g o p e r a t i o n o f an
installation or before a permit for an installation is updated for the
first time after 7 January 2013.
The baseline report shall contain the information necessary
to determine the state of soil and groundwater contamination so as
to make a quantified comparison with the state upon definitive
cessation of activities provided for under sub-regulation (3).
The baseline report shall contain at least the following
information
(a) information on the present use and, where available,
on past uses of the site;
(b) where available, existing information on soil and
groundwater measurements that reflect the state at the
time the report is drawn up or, alternatively, new soil
and groundwater measurements having regard to the
possibility of soil and groundwater contamination by
those hazardous substances to be used, produced or
released by the installation concerned.
Where information produced pursuant to other national or
European Union law fulfils the requirements of this sub-regulation,
that information may be included in, or attached to, the submitted
baseline report.
In the preparation of the baseline report, the operator shall
take into account any g uidanc e published by t he E uropean
Commission on the content of the baseline report.
(3)
(a) Upon definitive cessation of the activities, the operator
shall assess the state of soil and groundwater
contamination by relevant hazardous substances used,
produced or released by the installation. Where the
installation has caused significant pollution of soil or
groundwater by relevant hazardous substances
compared to the state established in the baseline report
referred to in sub-regulation (2), the operator shall take
the necessary measures to address that pollution so as
to return the site to that state. For that purpose, the
technical feasibility of such measures may be taken
into account.
(b) Without prejudice to paragraph (a), upon definitive
cessation of the activities, and where the
contamination of soil and groundwater at the site poses
a significant risk to human health or the environment
as a result of the permitted activities carried out by the
operator before the permit for the installation is
updated for the first time after 7 January 2013 and
taking into account the conditions of the site of the
installation established in accordance with regulation
5(1)(d), the operator shall take the necessary actions
aimed at the removal, control, containment or
reduction of relevant hazardous substances, so that the
site, taking into account its current or approved future
use, ceases to pose such a risk.
(4) Where the operator is not required to prepare a baseline
report referred to in sub-regulation (2), the operator shall, upon
definitive cessation of the activities, take the necessary actions
aimed at the removal, control, containment or reduction of relevant
hazardous substances, so that the site, taking into account its
current or approved future use, ceases to pose any significant risk
to human health or the environment due to the contamination of
soil and groundwater as a result of the permitted activities and
taking into account the conditions of the site of the installation
established in accordance with regulation 5(1)(d).
(1) The competent authority shall set up a system of
environmental inspections of installations addressing the
examination of the full range of relevant environmental effects
from the installations concerned.
Operators shall afford the competent authority and any
other authorities having competence in accordance with regulation
19 all necessary assistance to enable officials of these authorities to
carry out any site visits, to take samples and to gather any
information necessary for the performance of their duties for the
purposes of these regulations.
(2) The competent authority shall ensure that all installations
are covered by an environmental inspection plan at national,
regional or local level and shall ensure that this plan is regularly
reviewed and, where appropriate, updated.
(3) Each environmental inspection plan shall include the
following
(a) a general assessment
of
relevant
significant
environmental issues;
(b) the geographical area covered by the inspection plan;
(c) a register of the installations covered by the plan;
(d) procedures for drawing up programmes for routine
environmental inspections pursuant to sub-regulation
(4);
(e) procedures for non-routine environmental inspections
pursuant to sub-regulation (5);
(f)
where necessary, provisions on the co-operation
between different inspection authorities, in particular
the authorities identified in regulation 19.
(4) Based on the inspection plans, the competent authority
shall regularly draw up programmes for routine environmental
inspections, including the frequency of site visits for different
types of installations.
The period between two site visits shall be based on a
systematic appraisal of the environmental risks of the installations
concerned and shall not exceed one year for installations posing the
highest risks and three years for installations posing the lowest
risks.
If an inspection has identified an important case of non-
compliance with the permit conditions, an additional site visit shall
be carried out within six months of that inspection.
The systematic appraisal of the environmental risks shall be
based on at least the following criteria
(a) the potential and actual impacts of the installations
concerned on human health and the environment
taking into account the levels and types of emissions,
the sensitivity of the local environment and the risk of
accidents;
(b) the record of compliance with permit conditions;
(c) the participation of the operator in the European Union
eco-management and audit scheme (EMAS), pursuant
to Regulation (EC) No 1221/2009.
The competent authority shall take into account any
guidance adopted by the European Commission on the criteria for
the appraisal of environmental risks.
(5) The competent authority shall carry out non-routine
environmental inspections to investigate serious environmental
complaints, serious environmental accidents, incidents and
occurrences of non-compliance as soon as possible and, where
appropriate, before the granting, reconsideration or update of a
permit.
(6) Following each site visit, the competent authority shall
prepare a report describing the relevant findings regarding
compliance of the installation with the permit conditions and
conclusions on whether any further action is necessary.
INDUSTRIAL EMISSIONS (INTEGRATED
POLLUTION PREVENTION AND CONTROL)
The report shall be notified to the operator concerned
within two months of the site visit taking place. The report shall be
made publicly available by the competent authority in accordance
with the Freedom of Access to Information on the Environment
Regulations, within four months of the site visit taking place.
Without prejudice to regulation 10(2) and (3) of the
Industrial Emissions (Framework) Regulations, the competent
authority shall ensure that the operator takes all the necessary
actions identified in the report within a reasonable period.
(1) The competent authority shall ensure that the public
concerned are given early and effective opportunities to participate
in the following procedures
(a) the granting of a permit for new installations;
(b) the granting of a permit for any substantial change;
(c) the granting or updating of a permit for an installation
where the application of regulation 8(4) is proposed;
(d) the updating of a permit or permit conditions for an
installation in accordance with regulation 15(6)(a);
(e) the updating of a permit or permit conditions for an
installation in accordance with regulation 15(3).
The procedure set out in Schedule 4 shall apply to such
participation.
(2) When a decision on granting, reconsideration or updating
of a permit has been taken, the competent authority shall make
available to the public, including via the internet in relation to
paragraphs (a), (b) and (f), the following information
(a) the content of the decision, including a copy of the
permit and any subsequent updates;
(b) the reasons on which the decision is based;
(c) the results of the consultations held before the decision
was taken and an explanation of how they were taken
into account in that decision;
(d) the title of the BAT reference documents relevant to
the installation or activity concerned;
(e) how the permit conditions referred to in regulation 7,
including the emission limit values, have been
determined in relation to the best available techniques
and emission levels associated with the best available
techniques;
(f)
where a derogation is granted in accordance with
regulation 8(4), the specific reasons for that
derogation based on the criteria laid down in that sub-
regulation and the conditions imposed.
(3) The competent authority shall also make available to the
public, including via the internet at least in relation to paragraph
(a) relevant information on the measures taken by the
operator upon definitive cessation of activities in
accordance with regulation 16;
(b) the results of emission monitoring as required under
the permit conditions and held by the competent
authority.
(4) Sub-regulations (1), (2) and (3) shall apply subject to the
restrictions laid down in regulation 7(1) and (2) of the Freedom of
Access to Information on the Environment Regulations.
(1) In case of applications where the competent authority
considers that other authorities also have competence in any of the
proposed activities, the competent authority shall
(a) notify these authorities of applications according to
their area of competence;
(b) submit to these authorities an electronic copy of the
application submitted by the operator for their review;
(c) invite these authorities to propose conditions
regarding their area of competence for inclusion in the
permit.
Where the conditions stipulated in the permit drafted by the
Environment and Resources Authority and the conditions proposed
by other authorities are in conflict, the Environment and Resources
Aut horit y sh all seek t o resol ve t his confli ct at th e earlie st
opportunity.
Where there is sustained and justified objection against the
granting of a permit for a particular installation by an authority
deemed as having competence, the Environment and Resources
Authority shall not grant a permit until this objection is lifted by
the authority making the objection
Provided that where the Environment and Resources
Authority does not receive any objection from other authorities
within the stipulated time-frame, those other authorities shall be
deemed to have no objection to the issue of the permit
Provided also that the responsibility for enforcing
conditions required by other authorities shall rest with those
authorities.
(2) The following shall be considered as also having
competence with regard to the application of sub-regulation (1)
(a) the authority responsible for Energy and
Water
Services in relation to all activities in Schedule 1
involving the activities regulated by legislation listed
in the First Schedule of the Regulator for Energy and
Water Services Act;
(b) the authority responsible for Agriculture, Veterinary
services and Fisheries in relation to activities 6.4, 6.5
and 6.6 in Schedule 1, and any activity for the disposal
or recovery of animal by-products;
(c) the authority responsible for Competition and
Consumer Affairs in relation to activities 1.2, 1.3, 2.1,
2.5, 2.6, 3.1, 3.2, 3.3, 3.4, 4, 6.7 and 6.10 in Schedule
1;
(d) the authority responsible for Civil Protection in
relation to all activities in Schedule 1;
(e) the authority responsible for Environmental Health in
relation to all activities in Schedule 1;
(f)
the authority responsible for Transport in Malta in
relation to activities involving release of trade effluent
into ports;
(g) the Authority responsible for health and safety at work in
relation to activities concerning occupational health
and safety and activities covered by the Control of
Major Accident Hazards Regulations;
(h) the authority responsible for all activities in Schedule
1 involving minerals and other activities regulated by
legislation listed in the Second Schedule of the
Regulator for Energy and Water Services Act;
(i)
the authority responsible for the protection of
groundwater in relation to activities involving
groundwater use and aquifer recharge.
(1) Members of the public concerned having sufficient
interest shall have access to a review procedure before the
Environment and Planning Review Tribunal to challenge the
substantive or procedural legality of decisions, acts or omissions
subject to regulation 18.
(2) An appeal may be lodged before the Tribunal within thirty
days following a decision being made on the granting,
reconsideration or updating of a permit.
(3) For the purposes of sub-regulation (1), the interest of any
n o n - g o v e r n m e n t a l o rg a n i s a t i o n p r o m o t i n g e n v i r o n m e n t a l
protection and meeting any requirements under national law shall
be deemed sufficient.
(4) Article 41 of the Environment and Development Planning
Act, shall apply to this procedure.
(5) The competent authority shall ensure that practical
information is made available to the public on access to
administrative and judicial review procedures.
(1) Where the competent authority is aware that the
operation of an installation is likely to have significant negative
effects on the environment of another European Union Member
State, or where a European Union Member State which is likely to
be significantly affected so requests, the competent authority shall
forward to the Member State any information required to be given
or made available pursuant to Schedule 4 at the same time as it
makes it available to the public.
Such information shall serve as a basis for any
consultations necessary in the framework of the bilateral relations
between Malta and the other Member State on a reciprocal and
equivalent basis.
(2) The competent authority shall ensure that in the cases
referred to in sub-regulation (1), the applications are also made
available for an appropriate period of time to the public of the
Member State likely to be affected so that it will have the right to
comment on them before the competent authority reaches its
decision.
(3) The results of any consultations pursuant to sub-regulations
(1) and (2) shall be taken into consideration when the competent
authority reaches a decision on the application.
(4) The competent authority shall inform any Member State
which has been consulted pursuant to sub-regulation (1) of the
decision reached on the application and shall forward to it the
information referred to in regulation 18(2). That Member State
shall take the measures necessary to ensure that that information is
made available in an appropriate manner to the public concerned in
its own territory.
(1) The competent authority shall, where appropriate,
encourage the development and application of emerging
techniques, in particular for those emerging techniques identified
in BAT reference documents.
(2) In the application of sub-regulation (1), the competent
authority shall take into account any guidance published by the
European Commission to assist Member States in encouraging the
development and application of emerging techniques as referred to
in sub-regulation (1).
(1) The competent authority shall charge fees in respect of
applications (including for the variation, transfer, renewal or
surrender thereof).
(2) The competent authority shall not process any application
or render any other service if the fees relative to a previous permit
or service given to the same person or in respect of an installation
or any technically connected installation have not been paid in full.
(3) The competent authority shall not process any application
or render any other service if not accompanied with the fees
stipulated in these regulations.
(1) An application fee for any new permit, variation,
transfer, renew al o r surrend er th e reo f, s ha l l be p a id to th e
competent authority on submission of the application.
(2) The fees for new permits stipulated in Schedule 5 shall
apply.
(3) Where an operator applies to transfer ownership of a permit
or for a variation to a permit, a fee of 10% of the application fee in
Schedule 5 shall be paid to the competent authority. The fee for a
variation shall not be payable if the variation is imposed by the
competent authority and not requested by the operator.
(4) Where an operator applies for a renewal of a permit, a fee
of 50% of the application fee in Schedule 5 shall be paid to the
competent authority.
(5) Where an operator applies for the surrender of a permit, a
fee of 25% of the application fee in Schedule 5 shall be paid to the
competent authority.
(6) An annual fee of 10% of the application fee in Schedule 5
shall be paid to the competent authority on the anniversary of the
date of issue of the permit. Installations having environmental
management certification recognised by the Malta Competition and
Consumer Affairs Authority shall pay a reduced annual fee of 5%.
(7) All inspection costs, whether for scheduled or additional
inspections, shall be paid by the operator to the competent
authority at a standard rate of two hundred euro (€200) per
inspection. Such inspection costs shall be added to the annual fee.
(8) The competent authority may engage consultancy services
to obtain specialised expertise on specific applications (including
the variation, transfer, renewal or surrender thereof), to obtain
assistance in carrying out compliance audits (including monitoring
and, or analysis of samples) and to carry out enforcement of
specific permits. The cost of the consultancy services will be
communicated to the applicant prior to the consultancy services
being engaged and will be borne by the applicant.
(9) In cases where an application for a permit (or variation,
transfer, renewal or surrender thereof) is withdrawn by the
applicant within ten working days of submission, 50% of the fees
paid shall be refunded. No refund shall be granted after ten working
days of submission. No refund shall be granted in respect of
consultancy fees as specified in sub-regulation (8).
(10) In the case where an application for a permit (or variation,
transfer, renewal or surrender thereof) is refused by the competent
authority, the fees paid shall not be refunded.
(11) With regard to pending applications submitted before the
coming into force of these regulations, the fees in accordance with
these regulations shall be payable prior to issue of the permit, and
in respect of permitted installations, fees for variation, renewal,
transfer, surrender and annual fees shall be due prior to the next
variation, renewal, transfer, surrender or anniversary of the permit,
respectively.
The competent authority may also require the provision by
the operator of a suitable financial guarantee to be made in favour
of the competent authority to secure the obligations under the
permit or registration, before the permit or registration is issued.
The financial guarantee may also be tied to specific requirements in
the permit.
Any person shall be guilty of an offence under these
regulations if
(a) he fails to comply with any provision of these
regulations or fails to comply with permit conditions
or with any order lawfully given in terms of any
provision of these regulations; or
(b) he contravenes any restriction, prohibition or
requirement imposed by or under these regulations; or
(c) he acts in contravention of any of the provisions of
these regulations; or
(d) he conspires or attempts, or aids, or abets, any other
person by whatever means, including advertising,
counselling or procurement to contravene the
provisions or to fail to comply with any such
provisions, including any order lawfully given in
terms of any of the provisions of these regulations, or
to contravene any restriction, prohibition or
requirement imposed by or under the said regulations.
Any person who commits an offence under these
regulations shall, on conviction, be liable
(a) on a first conviction to a fine (multa) of not less than
twenty-three thousand euro (€23,000.00) and not
greater than two hundred and thirty three thousand
euro (€233,000.00) or to imprisonment for a term not
exceeding two years, or to both such fine and
imprisonment;
(b) on a second or subsequent convictions, to a fine
(multa) of not less than forty-six thousand euro
(€46,000.00) and not greater than four hundred and
sixty six thousand euro (€466,000.00) or to
imprisonment for a term not exceeding two years, or to
both such fine and imprisonment
Provided that whenever any person is found guilty of
committing an offence under these regulations by means of a
vehicle, the owner of the said vehicle, where applicable, is held
liable in the same manner and degree
Provided further that the court shall order any person who
has been found guilty of committing an offence against these
regulations to pay for the expenses incurred by the competent
authority as a result of the said offence, the revocation of the
permit issued by the competent authority and the confiscation of
the corpus delicti, including the vehicle, if applicable.
(1) The provisions of articles 23 and 30(1) of the Criminal
Code shall, mutatis mutandis, apply to proceedings in respect of
offences against these regulations, so however that the
disqualification from holding or obtaining a licence, permit or
authority shall in no case be for less than one year.
(2) Notwithstanding the provisions of article 370 of the
C r i m i n a l C o d e , p r o c e e d i n g s f o r a n o ff e n c e a g a i n s t t h e s e
regulations shall be held before the Court of Magistrates (Malta) or
the Court of Magistrates (Gozo) as the case may be, and shall be in
accordance with the provisions of the Criminal Code regulating the
procedure before the said courts of criminal judicature.
(3) Notwithstanding the provisions of the Criminal Code, the
Attorney General shall always have a right of appeal to the Court of
Criminal Appeal from any judgement given by the Court of
Magistrates (Malta) or the Court of Magistrates (Gozo) in respect
of proceedings for any offence against these regulations.
(Omitted under the Statute Law Revision Act, 1980).
(1) The provisions of these regulations shall apply from
the 7th January, 2014 to installations carrying out the activities
referred to in Schedule 1 of the revoked regulations, which are in
operation and hold a permit before 7th January 2013, or the
operators of which have submitted a complete application for a
permit before that date, provided that those installations are put
into operation no later than 7 January 2014. Without prejudice to
regulation 15(1), permits issued under the revoked regulations shall
be construed as valid until their term of expiry or until superseded
by a permit issued under these regulations.
(2) The provisions of these regulations shall apply from 7 July
2015 for installations carrying out the activities referred to in
Schedule 1 which are not covered by sub-regulation (1), and which
are in operation before 7 January 2013. Such installations shall
apply to the competent authority for a permit by 7 July 2013 at the
latest.
INDUSTRIAL EMISSIONS (INTEGRATED
POLLUTION PREVENTION AND CONTROL)