GEOLOGICAL STORAGE OF CARBON DIOXIDE REGULATIONS
Table of Provisions (30)
Statutory Text (30 Articles)
SUBSIDIARY LEGISLATION 549.68
GEOLOGICAL STORAGE
OF CARBON DIOXIDE REGULATIONS
29th August, 2011 *
LEGAL NOTICE 346 of 2011, as amended by Legal Notice 291 of 2015.
(1) The title of these regulations is the Geological Storage
of Carbon Dioxide Regulations.
(2) These regulations transpose Directive 2009/31/EC on the
geological storage of carbon dioxide and amending Council
Directive 85/337/EEC, European Parliament and Council
Directives 2000/60/EC, 2001/80/EC, 2004/35/EC, 2006/12/EC,
2008/1/EC and Regulation (EC) No 1013/2006.
(3) The scope of these regulations is to establish a legal
framework for the environmentally safe geological storage of
carbon dioxide (CO 2 ) to contribute to the fight against climate
change. The purpose of environmentally safe geological storage of
CO 2 is permanent containment of CO 2 in such a way as to prevent
and, where this is not possible, eliminate as far as possible negative
effects and any risk to the environment and human health.
Regulation 4(2)
CRITERIA FOR THE CHARACTERISATION AND ASSESSMENT OF THE
POTENTIAL STORAGE COMPLEX AND SURROUNDING AREA REFERRED
TO IN REGULATION 4(2)
The characterisation and assessment of the potential storage complex and
surrounding area referred to in regulation 4(2) shall be carried out in three steps
according to best practices at the time of the assessment and to the following criteria.
Derogations from one or more of these criteria may be permitted by the competent
auth ori ty pro vid ed th e op erato r has demonstrated t hat the capacity of the
characterisation and assessment to enable the determinations pursuant to regulation
4 is not affected.
Step 1: Data collection
Sufficient data shall be accumulated to construct a volumetric and three-
dimensional static (3-D)-earth model for the storage site and storage complex,
including the caprock, and the surrounding area, including the hydraulically
connected areas. This data shall cover at least the following intrinsic characteristics
of the storage complex
(a) geology and geophysics;
(b) hydrogeology (in particular existence of ground water intended for
consumption);
(c) reservoir engineering (including volumetric calculations of pore volume
for CO 2 injection and ultimate storage capacity);
(d) geochemistry (dissolution rates, mineralisation rates);
(e) geomechanics (permeability, fracture pressure);
(f)
seismicity;
(g) presence and condition of natural and man-made pathways, including
wells and boreholes which could provide leakage pathways.
The following characteristics of the complex vicinity shall be documented
(h) domains surrounding the storage complex that may be affected by the
storage of CO 2 in the storage site;
(i)
population distribution in the region overlying the storage site;
(j)
proximity to valuable natural resources (including in particular Natura
2000 areas pursuant to Council Directive 79/409/EEC of 2 April 1979
on the conservation of wild birds and Council Directive 92/43/EEC of
21 May 1992 on the conservation of natural habitats and of wild fauna
and flora, potable groundwater and hydrocarbons);
(k) activities around the storage complex and possible interactions with
these activities (for example, exploration, production and storage of
hydrocarbons, geothermal use of aquifers and use of underground water
reserves);
(l)
proximity to the potential CO 2 source(s) (including estimates of the
total potential mass of CO 2 economically available for storage) and
adequate transport networks.
Step 2: Building the three-dimensional static geological earth model
GEOLOGICAL STORAGE OF CARBON DIOXIDE
Using the data collected in Step 1, a three-dimensional static geological earth
model, or a set of such models, of the candidate storage complex, including the
caprock and the hydraulically connected areas and fluids shall be built using
c om p ut e r r e s e rv oi r si m ul a t or s . T he sta tic geologica l earth model(s) sh al l
characterise the complex in terms of
(a) geological structure of the physical trap;
(b) geomechanical, geochemical and flow properties of the reservoir
overburden (caprock, seals, porous and permeable horizons) and
surrounding formations;
(c) fracture system characterisation and presence of any human-made
pathways;
(d) areal and vertical extent of the storage complex;
(e) pore space volume (including porosity distribution);
(f)
baseline fluid distribution;
(g) any other relevant characteristics.
The uncertainty associated with each of the parameters used to build the model
shall be assessed by developing a range of scenarios for each parameter and
calculating the appropriate confidence limits. Any uncertainty associated with the
model itself shall also be assessed.
St e p 3 : C h a r a c t e r i s a t i o n o f t h e s t o r a g e d y n a m i c b e h a v i o u r, s e n s i t i v i t y
characterisation, risk assessment
The characterisations and assessment shall be based on dynamic modelling,
comprising a variety of time-step simulations of CO 2 injection into the storage site
using the three-dimensional static geological earth model(s) in the computerised
storage complex simulator constructed under Step 2.
Step 3.1: Characterisation of the storage dynamic behaviour
At least the following factors shall be considered
(a) possible injection rates and CO 2 stream properties;
(b) the efficacy of coupled process modelling (that is, the way various
single effects in the simulator(s) interact);
(c) reactive processes (that is, the way reactions of the injected CO 2 with in
situ minerals feedback in the model);
(d) the reservoir simulator used (multiple simulations may be required in
order to validate certain findings);
(e) short and long-term simulations (to establish CO 2 fate and behaviour
over decades and millennia, including the rate of dissolution of CO 2 in
water).
The dynamic modelling shall provide insight into
(f)
pressure and temperature of the storage formation as a function of
injection rate and accumulative injection amount over time;
(g) areal and vertical extent of CO 2 vs time;
(h) the nature of CO 2 flow in the reservoir, including phase behaviour;
(i)
CO 2 trapping mechanisms and rates (including spill points and lateral
and vertical seals);
GEOLOGICAL STORAGE OF CARBON DIOXIDE
(j)
secondary containment systems in the overall storage complex;
(k) storage capacity and pressure gradients in the storage site;
(l)
the risk of fracturing the storage formation(s) and caprock;
(m) the risk of CO2 entry into the caprock;
(n) the risk of leakage from the storage site (for example, through
abandoned or inadequately sealed wells);
(o) the rate of migration (in open-ended reservoirs);
(p) fracture sealing rates;
(q) changes in formation(s) fluid chemistry and subsequent reactions (for
example, pH change, mineral formation) and inclusion of reactive
modelling to assess affects;
(r) displacement of formation fluids;
(s) increased seismicity and elevation at surface level.
Step 3.2: Sensitivity characterization
Multiple simulations shall be undertaken to identify the sensitivity of the
assessment to assumptions made about particular parameters. The simulations shall
be based on altering parameters in the static geological earth model(s), and changing
rate functions and assumptions in the dynamic modelling exercise. Any significant
sensitivity shall be taken into account in the risk assessment.
Step 3.3: Risk assessment
The risk assessment shall comprise, inter alia, the following
3.3.1. Hazard characterization
Hazard characterisation shall be undertaken by characterising the potential for
leakage from the storage complex, as established through dynamic modelling and
security characterisation described above. This shall include consideration of, inter
alia
(a) potential leakage pathways;
(b) potential magnitude of leakage events for identified leakage pathways
(flux rates);
(c) critical parameters affecting potential leakage (for example maximum
reservoir pressure, maximum injection rate, temperature, sensitivity to
various assumptions in the static geological Earth model(s));
(d) secondary effects of storage of CO 2 , including displaced formation
fluids and new substances created by the storing of CO 2 ;
(e) any other factors which could pose a hazard to human health or the
environment (for example physical structures associated with the
project).
The hazard characterisation shall cover the full range of potential operating
conditions to test the security of the storage complex.
3.3.2. Exposure assessment - based on the characteristics of the environment and
the distribution and activities of the human population above the storage complex,
and the potential behaviour and fate of leaking CO 2 from potential pathways
identified under Step 3.3.1.
3.3.3. Effects assessment - based on the sensitivity of particular species,
communities or habitats linked to potential leakage events identified under Step
GEOLOGICAL STORAGE OF CARBON DIOXIDE
3.3.1. Where relevant it shall include effects of exposure to elevated CO 2
concentrations in the biosphere (including soils, marine sediments and benthic
waters (asphyxiation; hypercapnia) and reduced pH in those environments as a
consequence of leaking CO 2 ). It shall also include an assessment of the effects of
other substances that may be present in leaking CO 2 streams (either impurities
present in the injection stream or new substances formed through storage of CO 2 ).
These effects shall be considered at a range of temporal and spatial scales, and
linked to a range of different magnitudes of leakage events.
3.3.4. Risk characterisation - this shall comprise an assessment of the safety and
integrity of the site in the short and long term, including an assessment of the risk of
leakage under the proposed conditions of use, and of the worst-case environment and
health impacts. The risk characterisation shall be conducted based on the hazard,
exposure and effects assessment. It shall include an assessment of the sources of
uncertainty identified during the steps of characterisation and assessment of storage
site and when feasible, a description of the possibilities to reduce uncertainty.
(1) These regulations shall apply to the geological storage
of CO 2 in Malta and on the continental shelf within the meaning of
the United Nations Convention on the Law of the Sea (Unclos).
(2) These regulations shall not apply to geological storage of
CO2 with a total intended storage below 100 kilotonnes,
undertaken for research, development or testing of new products
and processes.
(3) The storage of CO 2 in a storage site with a storage complex
extending beyond the area referred to in sub-regulation (1) shall be
prohibited.
(4)
The storage of CO 2 in the water column shall be prohibited.
Regulation 13(2)
CRITERIA FOR ESTABLISHING AND UPDATING THE MONITORING PLAN
REFERRED TO IN REGULATION 13(2) AND FOR POST-CLOSURE
MONITORING
1. Establishing and updating the monitoring plan
The monitoring plan referred to in regulation 13(2) shall be established according
to the risk assessment analysis carried out in Step 3 of the First Schedule, and
updated with the purpose of meeting the monitoring requirements laid out in
regulation 13(1) according to the following criteria
1.1. Establishing the plan
The monitoring plan shall provide details of the monitoring to be deployed at the
main stages of the project, including baseline, operational and post-closure
monitoring. The following shall be specified for each phase
(a) parameters monitored;
(b) monitoring technology employed and justification for technology
choice;
(c) monitoring locations and spatial sampling rationale;
(d) frequency of application and temporal sampling rationale.
The parameters to be monitored are identified so as to fulfil the purposes of
monitoring. However, the plan shall in any case include continuous or intermittent
monitoring of the following items
(e) fugitive emissions of CO 2 at the injection facility;
(f)
CO 2 volumetric flow at injection wellheads;
(g) CO 2 pressure and temperature at injection wellheads (to determine mass
flow);
(h) chemical analysis of the injected material;
(i)
reservoir temperature and pressure (to determine CO 2 phase behaviour
GEOLOGICAL STORAGE OF CARBON DIOXIDE
and state).
The choice of monitoring technology shall be based on best practice available at
the time of design. The following options shall be considered and used as
appropriate
(j)
technologies that can detect the presence, location and migration paths
of CO 2 in the subsurface and at surface;
(k) technologies that provide information about pressure-volume behaviour
and areal/vertical distribution of CO 2 -plume to refine numerical 3-D
simulation to the 3-D-geological models of the storage formation
established pursuant to regulation 4 and the First Schedule;
(l)
technologies that can provide a wide areal spread in order to capture
information on any previously undetected potential leakage pathways
across the areal dimensions of the complete storage complex and
beyond, in the event of significant irregularities or migration of CO 2 out
of the storage complex.
1.2. Updating the plan
The data collected from the monitoring shall be collated and interpreted.
The observed results shall be compared with the behaviour predicted in dynamic
simulation of the 3-D-pressure-volume and saturation behaviour undertaken in the
context of the security characterisation pursuant to regulation 4 and Step 3 of the
First Schedule.
Where there is a significant deviation between the observed and the predicted
behaviour, the 3-D model shall be recalibrated to reflect the observed behaviour. The
recalibration shall be based on the data observations from the monitoring plan, and
where necessary to provide confidence in the recalibration assumptions, additional
data shall be obtained.
Steps 2 and 3 of the First Schedule shall be repeated using the recalibrated 3-D
model(s) so as to generate new hazard scenarios and flux rates and to revise and
update the risk assessment.
Where new CO 2 sources, pathways and flux rates or observed significant
deviations from previous assessments are identified as a result of history matching
and model recalibration, the monitoring plan shall be updated accordingly.
2. Post-closure monitoring
Post-closure monitoring shall be based on the information collected and modelled
during the implementation of the monitoring plan referred to in regulation 13(2) and
above in item 1.2 of this Schedule. It shall serve in particular to provide information
required for the determination of regulation 18(1).
(1) Unless otherwise stated in these regulations, the
definitions in the Act shall apply.
(2)
In these regulations, unless the context otherwise requires
"the Act" means the Malta Resources Authority Act;
"closure of a storage site" means the definitive cessation of CO2
injection into that storage site;
"CO 2 plume" means the dispersing volume of CO 2 in the
geological formation;
"CO 2 stream" means a flow of substances that results from CO 2
capture processes;
*See regulation 1(4) of these Regulations as originally promulgated.
"the Commission" means the European Commission as
established by the Treaty on the European Union as amended by
subsequent Treaties;
"the Community" means the European Community as established
by the Treaty on the European Union as amended by subsequent
Treaties;
"the competent authority" m eans the Office of the Prime
Minister, and such other body or person as the Prime Minister may
prescribe and designate as the competent authority for different
purposes in terms of different provisions of these regulations;
"corrective measures" means any measures taken to correct
significant irregularities or to close leakages in order to prevent or
stop the release of CO 2 from the storage complex;
"Environment and Resources Authority" means the Environment
and Resources Aut horit y est ab lished under article 6 o f the
Environment Protection Act;
" e x p l o r a t io n " m e a n s t h e a s s e s s m e n t of p o t e n ti a l st o r a ge
complexes for the purposes of geologically storing CO 2 by means
of activities intruding into the subsurface such as drilling to obtain
geological information about strata in the potential storage
complex and, as appropriate, carrying out injection tests in order to
characterise the storage site;
"exploration permit" means a written and reasoned decision
authorising exploration, and specifying the conditions under which
it may take place, issued by the competent authority pursuant to the
requirements of these regulations and any other applicable law;
"geological formation" means a lithostratigraphical subdivision
within which distinct rock layers can be found and mapped;
"geological storage of CO 2 " means injection accompanied by
storage of CO 2 streams in underground geological formations;
"hydraulic unit" means a hydraulically connected pore space
where pressure communication can be measured by technical
means and which is bordered by flow barriers, such as faults, salt
domes, lithological boundaries, or by the wedging out or
outcropping of the formation;
"leakage" means any release of CO 2 from the storage complex;
"migration" means the movement of CO 2 within the storage
complex;
"operator" means any natural or legal, private or public person
who operates or controls the storage site or to whom decisive
economic power over the technical functioning of the storage site
has been delegated according to applicable legislation;
"post-closure" means the period after the closure of a storage
site, including the period after the transfer of responsibility to the
competent authority;
"significant irregularity" means any irregularity in the injection
or storage operations or in the condition of the storage complex
itself, which implies the risk of a leakage or risk to the environment
or human health;
"significant risk" means a combination of a probability of
occurrence of damage and a magnitude of damage that cannot be
disregarded without calling into question the purpose of these
regulations for the storage site concerned;
"storage complex" means the storage site and surrounding
geological domain which can have an effect on overall storage
integrity and security; that is, secondary containment formations;
"storage permit" means a written and reasoned decision or
decisions authorising the geological storage of CO 2 in a storage
site by the operator, and specifying the conditions under which it
may take place, issued by the competent authority pursuant to the
requirements of these regulations and any other applicable law;
"storage site" means a defined volume area within a geological
formation used for the geological storage of CO 2 and associated
surface and injection facilities;
"substantial change" means any change not provided for in the
s t o r a g e p e r m i t , w h i c h m a y h a v e s i g n i f i c a n t e ff e c t s o n t h e
environment or human health;
"transport network" means the network of pipelines, including
associated booster stations, for the transport of CO 2 to the storage
site;
" w a s t e " s h a l l h a v e t h e s a m e m e a n i n g a s i n t h e Wa s t e
Regulations;
"water column" means the vertically continuous mass of water
from the surface to the bottom sediments of a water body.
(1) The competent authority shall retain the right to
determine the areas within the meaning of regulation 2(1) from
which storage sites may be selected pursuant to the requirements of
these regulations and any other applicable law. This includes the
right of the competent authority not to allow for any storage in
parts or in the whole of those areas.
(2) The suitability of a geological formation for use as a
storage site shall be determined through a characterisation and
assessment of the potential storage complex and surrounding area
pursuant to the criteria specified in the First Schedule.
(3) A geological formation shall only be selected as a storage
site, if under the proposed conditions of use there is no significant
risk of leakage, and if no significant environmental or health risks
exist.
(1) Where the competent authority decides that exploration
is required to generate the information necessary for selection of
storage sites pursuant to regulation 4, an exploration permit issued
by the competent authority shall be required for the carrying out of
any exploration. Where appropriate, monitoring of injection tests
may be included in the exploration permit.
(2) The procedures for the granting of exploration permits shall
be open to all entities possessing the necessary capacities. Permits
shall be granted or refused by the competent authority on the basis
of objective, published and non-discriminatory criteria.
(3) The duration of a permit shall not exceed the period
necessary to carry out the exploration for which it is granted. The
competent authority may extend the validity of the permit where
the stipulated duration is insufficient to complete the exploration
concerned and where the exploration has been performed in
accordance with the permit. Exploration permits shall be granted in
respect of a limited volume area.
(4) The competent authority may include any condition in the
exploration permit as it may deem necessary and expedient.
(5) The holder of an exploration permit shall have the sole
right to explore the potential CO 2 storage complex. No conflicting
uses of the complex are to be permitted during the period of
validity of the permit.
(1) The operation of a storage site without a storage permit
shall be prohibited.
(2) Only one operator for each storage site shall be permitted
by the Competent Authority and no conflicting uses shall be
permitted on the site.
(3) The procedures for the granting of storage permits shall be
open to all entities possessing the necessary capacities. Permits
shall be granted by the competent authority on the basis of
objective, published and transparent criteria.
(4) Without prejudice to the requirements of these regulations
and of the requirements of any other applicable law, priority for the
granting of a storage permit for a particular site shall be given to
the holder of the exploration permit for that site
Provided that the exploration of that site is completed, that
any condition set in the exploration permit has been complied with,
and that the application for a storage permit is made during the
period of validity of the exploration permit.
(5) Conflicting uses of the complex during the permit
procedure shall be prohibited.
(6) The operator shall pay to the competent authority any cost
incurred in the course of the issue of the storage permit and for the
regulation of the operations so permitted.
Applications to the competent authority for storage permits
shall include at least the following information
(a) the name and address of the potential operator;
(b) proof of the technical competence of the potential
operator;
(c) the characterisation of the storage site and storage
complex and an assessment of the expected security of
the storage pursuant to regulation 4(2) and (3);
(d) the total quantity of CO 2 to be injected and stored, as
well as the prospective sources and transport methods,
the composition of CO 2 streams, the injection rates
and pressures, and the location of injection facilities;
(e) a description of measures to prevent significant
irregularities;
(f)
a proposed monitoring plan pursuant to regulation
13(2);
(g) a proposed corrective measures plan pursuant to
regulation 16(2);
(h) a proposed provisional post-closure plan pursuant to
regulation17(3);
(i)
the information provided pursuant to regulation 5 of
the Environmental Impact Assessment Regulations;
(j)
proof that the financial security or other equivalent
provision as required under regulation 19 shall be
valid and effective before the commencement of the
injection.
The competent authority shall issue a storage permit only if
the following conditions are met
(a) the competent authority, on the basis of the application
submitted pursuant to regulation 7 and of any other
relevant information, is satisfied that
(i)
all relevant requirements of these regulations
and of other relevant laws are met;
(ii) the operator is financially sound and technically
competent and reliable to operate and control the
site and that professional and technical
development and training of the operator and all
staff are provided;
(iii) in the case of more than one storage site in the
same hydraulic unit, the potential pressure
interactions are such that both sites can
simultaneously meet the requirements of these
regulations and of any other applicable law; and
(b) the competent authority has considered any opinion of
the Commission on the draft permit issued pursuant to
regulation 10.
The permit shall contain at least the following
(a) the name and address of the operator;
(b) the precise location and delimitation of the storage site
and storage complex, and information concerning the
hydraulic unit;
(c) the requirements for storage operation, the total
quantity of CO 2 authorised to be geologically stored,
the reservoir pressure limits, and the maximum
injection rates and pressures;
(d) the requirements for the composition of the CO 2
stream and the CO 2 stream acceptance procedure
pursuant to regulation 12, and, if necessary, further
requirements for injection and storage in particular to
prevent significant irregularities;
(e) the approved monitoring plan, the obligation to
implement the plan and requirements for updating it
pursuant to regulation 13 as well as the reporting
requirements pursuant to regulation 14;
(f)
the requirement to notify the competent authority in
the event of leakages or significant irregularities, the
approved corrective measures plan and the obligation
to implement the corrective measures plan in the event
of leakages or significant irregularities pursuant to
regulation 16;
(g) the conditions for closure and the approved
provisional post-closure plan referred to in regulation
17;
(h) any provisions on changes, review, updating and
withdrawal of the storage permit pursuant to
regulation 11;
(i)
the requirement to establish and maintain the financial
security or any other equivalent pursuant to regulation
(1) L-awtorità
kompetenti
għandha
tagħmel
l-
applikazzjonijiet għall-permess disponibbli għall-Kummissjoni fi
żmien xahar minn meta tkun rċevithom. L-awtorità kompetenti
għandha wkoll tagħmel disponibbli materjal relatat ieħor li għandu
jiġi meqjus mill-awtorità kompetenti meta din tkun ser tieħu
deċiżjoni dwar l-għoti ta’ permess għall-ħżin. L-awtorità
kompetenti għandha tgħarraf lill-Kummissjoni bl-abbozzi tal-
permessi għall-ħżin kollha, u b’kull materjal ieħor meqjus meta jiġi
adottat l-abbozz tad-deċiżjoni.
(2) L-awtorità kompetenti għandha tinforma bid-deċiżjoni
finali lill-Kummissjoni, u fejn tkun tvarja mill-opinjoni li tkun
ingħatat mill-Kummissjoni, hi għandha tagħti r-raġunijiet għad-
deċiżjoni tagħha.
(1) L-operatur għandu jinforma lill-awtorità kompetenti
b’kull bidla ppjanata fl-operazzjoni tas-sit tal-ħżin, inkluż tibdil li
jkun jinvolvi l-operatur. Fejn xieraq, l-awtorità kompetenti
għandha taġġorna l-permess għall-ħżin jew il-kundizzjonijiet tal-
permess.
(2) Ebda bidla sostanzjali ma tista’ tiġi implimentata mingħajr
il-ħruġ ta’ permess għall-ħżin ġdid jew aġġornat skont dawn ir-
regolamenti. Il-punt 10 tal-Iskeda 1A li tinsab mar-Regolamenti
dwar l-Istudju dwar l-Impatt Ambjentali dwar tibdil jew
estensjonijiet għal proġetti approvati għandu japplika mutatis
mutandis f’każijiet bħal dawn.
(3) L-awtorità kompetenti għandha tirrivedi u fejn meħtieġ
taġġorna jew, jekk ma jistax isir mod ieħor, tirtira l-permess għall-
ħżin
(a) jekk tkun ġiet avżata jew tkun inġibdet lilha l-
attenzjoni bi tnixxijiet jew kull irregolarità sinifikanti
skont ir-regolament 16(1);
(b) jekk ir-rapporti preżentati skont ir-regolament 14 jew
l-ispezzjonijiet ambjentali mwettqa skont ir-
regolament 15 ikunu juru nuqqas ta’ ħarsien għall-
kundizzjonijiet tal-permess jew riskji ta’ tnixxijiet jew
irregolaritajiet sinifikanti;
(ċ) jekk tkun konxja b’xi nuqqas ieħor mill-operatur li
jilħaq il-kundizzjonijiet tal-permess;
(d) jekk ikun jidher li dan ikun neċessarju abbażi tal-aktar
sejbiet xjentifiċi u progress teknoloġiku riċenti; jew
(e) mingħajr preġudizzju għall-paragrafi (a) sa (d), ħames
snin wara l-ħruġ tal-permess u wara, kull għaxar snin.
(4) Wara li jiġi rtirat permess skont is-subregolament (3), l-
awtorità kompetenti għandha jew toħroġ permess għall-ħżin ġdid
jew tagħlaq is-sit tal-ħżin skont ir-regolament 17(1)(ċ). Sakemm
ma jkunx inħareġ permess għall-ħżin ġdid, l-awtorità kompetenti
għandha temporanjament twettaq l-obbligi legali kollha relatati
mal-kriterji ta’ aċċettazzjoni meta l-awtorità kompetenti tiddeċiedi
li l-injezzjonijiet tas-CO 2 , il-monitoraġġ u l-miżuri korrettivi ma
jitwaqqfux skont il-ħtiġiet stabbiliti f ’dawn ir-regolamenti, iċ-
ċediment tal-kwoti f’każijiet ta’ tnixxija taħt ir-Regolamenti dwar
Sistema Kummerċjali tal-Unjoni Ewropea dwar l-Emissjonijiet ta’
Gassijiet Serra għal Installazzjonijiet Stazzjonarji, u azzjoni
preventiva u ta’ rimedju taħt ir-regolamenti 6 u 7 tar-Regolamenti
dwar il-Prevenzjoni u r-Rimedju għal Danni Ambjentali. L-awtorità
kompetenti għandha tirkupra kull spiża magħmula mingħand l-
o p e r a t u r p r e ċ e d e n t i u k o l l b i l l i t ag ħ m e l u ż u m i l l - g ar a n z i j a
finanzjarja msemmija fir-regolament 19. Fil-każ tal-għeluq tas-sit
tal-ħżin taħt ir-regolament 17(1), għandu japplika r-regolament
17(4).
(1) Nixxiegħa tas-CO 2 għandha tikkonsisti kważi għal
kollox f’dijossidu tal-karbonju. Għal dan il-għan, l-ebda skart jew
ħaġa oħra ma jistgħu jiġu miżjuda sabiex dak l-iskart jew ħaġa oħra
jiġu mormija. Madankollu, nixxiegħa tas-CO 2 jista’ jkun fiha
sustanzi li jkunu assocjati b’mod supplimentari mis-sors, mill-ġbir
jew mill-proċess tal-injezzjoni u sustanzi ta’ traċċi miżjuda biex
jgħinu fil-monitoraġġ u l-verifika tal-migrazzjoni tas-CO 2 . Il-
konċentrazzjonijiet tas-sustanzi kollha supplimentari u miżjuda
għandhom ikunu anqas minn livelli li
(a) ikunu jaffettwaw b’mod ħażin l-integrità tas-sit għall-
ħżin jew l-infrastruttura tat-trasport rilevanti;
(b) ikunu ta’ riskju sinifikanti għall-ambjent jew għas-
saħħa tal-bniedem; jew
(ċ) ikunu jiksru l-ħtiġiet tal-liġi Komunitarja li tkun
tapplika.
(2)
L-operatur għandu
(a) jaċċetta u jinjetta biss nixxigħat tas-CO 2 jekk ikunu
twettqu analiżi tal-kompożizzjoni, inklużi s-sustanzi
korrużivi, tan-nixxigħat, u stima tar-riskju, u jekk l-
istima tar-riskju turi li l-livelli ta’ kontaminazzjoni
jkunu skont il-kundizzjonijiet imsemmija fis-
subregolament (1);
(b) iżomm reġistru tal-kwantitajiet u l-karatteristiċi tan-
nixxiegħat tas-CO 2 li jkunu konsenjati u injettati,
inkluża l-kompożizzjoni ta’ dawk in-nixxiegħat.
(1) L-operatur għandu jwettaq monitoraġġ tal-faċilitajiet
ta’ injezzjoni, tal-kumpless tal-ħżin (ukoll fejn possibbli tal-
formazzjoni tas-CO 2 ), u fejn xieraq tal-ambjent tal-madwar għall-
fini ta’
(a) qbil bejn il-kumpless attwali u dak immuddellat tas-
CO 2 u ilma ta’ formazzjoni, fis-sit tal-ħżin;
(b) identifikazzjoni ta’ irregolaritajiet sinifikanti;
(ċ) identifikazzjoni ta’ migrazzjoni ta’ CO 2 ;
(d) identifikazzjoni ta’ tnixxija tas-CO 2 ;
(e) identifikazzjoni ta’ effetti ta’ ħsara sinifikanti għall-
ambjent tal-madwar, anki b’mod partikolari fuq l-ilma
tax-xorb, għall-popolazzjonijiet tal-bnedmin, jew
għall-utenti tal-bijosfera tal-madwar;
(f)
valutazzjoni tal-effettività ta’ kull miżura korrettiva
meħuda skont ir-regolament 16;
(g) aġġornament tal-valutazzjoni tas-sigurtà u l-integrità
tal-kumpless tal-ħżin fil-perjodu qasir u dak fit-tul,
inkluża l-valutazzjoni jekk is-CO 2 maħżun ikunx se
jkun miżmum għal kollox u b’mod permanenti.
(2) Il-monitoraġġ għandu jkun ibbażat fuq pjan ta’ monitoraġġ
imfassal mill-operatur skont il-ħtiġiet stabbiliti fit-Tieni Skeda,
inklużi dettalji dwar il-monitoraġġ skont il-linji gwida stabbiliti
taħt ir-regolament 13 tar-Regolamenti dwar Sistema Kummerċjali
tal-Unjoni Ewropea dwar l-Emissjonijiet ta’ Gassijiet Serra għal
Installazzjonijiet Stazzjonarji, preżentat lill-awtorità kompetenti u
approvat minnha skont ir-regolamenti 7(f) u 9(5)(e). Il-pjan għandu
jiġi aġġornat skont il-ħtiġiet stabbiliti fit-Tieni Skeda u f’kull każ
kull ħames snin biex jitqies t-tibdil għar-riskju vvalutat ta’ tnixxija,
tibdil fir-riskji stmati għall-ambjent u s-saħħa tal-bniedem, tagħrif
xjentifiku ġdid, u titjib fl-aħjar teknoloġija disponibbli. Għandhom
jiġu preżentati mill-ġdid pjanijiet aġġornati għall-approvazzjoni
lill-awtorità kompetenti.
L-operatur għandu jippreżenta lill-awtorità kompetenti, bi
frekwenza li għandha tiġi stabbilita mill-awtorità kompetenti, u
f’kull każ mill-inqas darba f’sena
(a) ir-riżultati kollha tal-monitoraġġ taħt ir-regolament 13
fil-perjodu tar-rappurtaġġ inkluż it-tagħrif dwar it-
teknoloġija tal-monitoraġġ li tkun tintuża;
(b) il-kwantitajiet u l-karatteristiċi tan-nixxigħat tas-CO 2
ikkonsenjati u injettati, inkluża l-kompożizzjoni ta’
dawk
in-nixxigħat,
fil-perjodu
tar-rappurtaġġ,
reġistrati skont ir-regolament 12(2)(b);
(ċ) prova tat-twaqqif u taż-żamma tal-garanzija
finanzjarja taħt ir-regolamenti 9(i) u 19;
(d) kull tagħrif ieħor li l-awtorità kompetenti tqis rilevanti
għall-finijiet tal-valutazzjoni tal-ħarsien għall-
kundizzjonijiet tal-permess għall-ħżin u taż-żjieda fit-
tagħrif dwar il-kumpless tas-CO 2 fis-sit tal-ħżin.
(1) L-awtorità kompetenti għandha torganizza sistema ta’
spezzjonijiet ta’ rutina jew mhux ta’ rutina tal-kumplessi tal-ħżin
kollha għall-fini ta’ dawn ir-regolamenti għall-finijiet ta’ verifika u
biex iħeġġu l-ħarsien għall-ħtiġiet ta’ dawn ir-regolamenti u tal-
monitoraġġ tal-effetti fuq l-ambjent u fuq is-saħħa tal-bniedem.
(2) L-ispezzjonijiet għandhom jinkludu attivitajiet bħal żjarat
tal-istallazzjonijiet tal-wiċċ, inklużi l-faċilitajiet ta’ injezzjoni, il-
valutazzjoni tal-operazzjonijiet ta’ injezzjoni u ta’ monitoraġġi
mwettqa mill-operatur, u l-verifika tar-reġistri kollha rilevanti
miżmuma mill-operatur.
(3) L-ispezzjonijiet ta’ rutina għandhom jitwettqu mill-inqas
darba fis-sena sa tliet snin wara l-għeluq u kull ħames snin sa meta
jseħħ it-trasferiment tar-responsabbiltà lill-awtorità kompetenti. L-
awtorità kompetenti għandha teżamina il-faċilitajiet ta’ injezzjoni u
ta’ monitoraġġ rilevanti kif ukoll il-firxa sħiħa tal-effetti rilevanti
mill-kumpless tal-ħżin fuq l-ambjent u fuq is-saħħa tal-bniedem.
(4)
L-ispezzjonijiet mhux ta’ rutina għandhom jitwettqu
(a) jekk l-awtorità kompetenti tkun ġiet avżata jew tkun
ġiet mgħarrfa bi tnixxijiet jew b’irregolaritajiet
sinifikanti skont ir-regolament 16(1);
(b) jekk ir-rapporti skont ir-regolament 14 ikunu wrew
nuqqas ta’ ħarsien għall-kundizzjonijiet tal-permess;
(ċ) biex jiġu investigati lmenti serji relatati mal-ambjent
jew mas-saħħa tal-bniedem;
(d) f’sitwazzjonijiet oħra fejn l-awtorità kompetenti tqis li
dan ikun xieraq.
(5) Wara kull spezzjoni, l-awtorità kompetenti għandha
tipprepara rapport dwar ir-riżultati tal-ispezzjoni. Ir-rapport għandu
jevalwa l-ħarsien għall-ħtiġiet ta’ dawn ir-regolamenti u jindika
jekk tkunx meħtieġa jew le azzjoni oħra. Ir-rapport għandu jiġi
nfurmat lill-operatur ikkonċernat u għandu jkun disponibbli
pubblikament skont il-liġi Komunitarja rilevanti fi żmien xahrejn
mill-ispezzjoni.
(1) F’każ ta’ tnixxijiet jew irregolaritajiet sinifikanti l-
operatur għandu jinforma minnufih lill-awtorità kompetenti u jieħu
l-miżuri korrettivi meħtieġa inklużi miżuri li jkollhom x’jaqsmu
mal-protezzjoni tas-saħħa tal-bniedem. Fil-każijiet ta’ tnixxijiet u
irregolaritajiet sinifikanti li jimplikaw ir-riskju ta’ tnixxija, l-
operatur għandu jinforma wkoll lill-awtorità skont ir-Regolamenti
dwar Sistema Kummerċjali tal-Unjoni Ewropea dwar l-
Emissjonijiet ta’ Gassijiet Serra għal Installazzjonijiet Stazzjonarji.
(2) Il-miżuri korrettivi msemmija fis-subregolament (1)
għandhom jittieħdu bħala minimu abbażi ta’ pjan ta’ miżuri
korrettivi preżentat lill-awtorità kompetenti u approvat minnha
skont ir-regolamenti 7(g) u 9(f).
(3) L-awtorità kompetenti tista’ f’kull waqt teħtieġ lill-
operatur biex jieħu l-miżuri korrettivi meħtieġa kif ukoll il-miżuri
relatati mal-protezzjoni tas-saħħa tal-bniedem. Dawn jistgħu jkunu
supplimentari għal jew differenti minn dawk stabbiliti fil-pjan ta’
miżuri korrettivi. L-awtorità kompetenti tista’ wkoll f ’kull waqt
tieħu miżuri korrettivi hi stess.
(4) Jekk l-operatur jonqos milli jieħu l-miżuri korrettivi
meħtieġa, l-awtorità kompetenti għandha tieħu l-miżuri korrettivi
meħtieġa hi stess.
(5) L-awtorità kompetenti għandha tiġbor l-ispejjeż li jkunu
ntnefqu fir-rigward tal-miżuri msemmija fis-subregolamenti (3) u
(4) mingħand l-operatur ukoll bl-użu tal-garanzija finanzjarja skont
ir-regolament 19.
(1) Sit tal-ħżin għandu jingħalaq
(a) jekk il-kundizzjonijiet rilevanti dikjarati fil-permess
jkunu ntlaħqu;
(b) fuq talba motivata tal-operatur, wara awtorizzazzjoni
tal-awtorità kompetenti; jew
(ċ) jekk l-awtorità kompetenti tiddeċiedi hekk wara l-
irtirar ta’ permess għall-ħżin skont ir-regolament
11(3).
(2) Wara li sit tal-ħżin jingħalaq skont is-subregolament (1)(a)
jew (b), l-operatur jibqa’ responsabbli għall-monitoraġġ, għar-
rappurtaġġ, u għall-miżuri skont il-ħtiġiet stabbiliti f ’dawn ir-
regolamenti, u għall-obbligi kollha relatati maċ-ċediment tal-kwoti
f ’każ ta’ tnixxijiet skont ir-Regolamenti dwar Sistema
Kummerċjali tal-Unjoni Ewropea dwar l-Emissjonijiet ta’ Gassijiet
Serra għal Installazzjonijiet Stazzjonarji, u azzjonijiet preventivi u
ta’ rimedju skont ir-regolamenti 6, 7, 8 u 9 tar-Regolamenti dwar
il-Prevenzjoni u r-Rimedju għal Danni Ambjentali, sakemm ir-
resp onsa bb il tà għ as-si t ta l-ħżi n ti ġi t rasferit a li ll -aw to ri tà
kompetenti taħt ir-regolament 18(1) sa (5). L-operatur għandu
wkoll ikun responsabbli għall-issiġillar tas-sit tal-ħżin u t-tneħħija
tal-faċilitajiet ta’ injezzjoni.
(3) L-obbligi msemmija fis-subregolament (2) għandhom
jintlaħqu abbażi ta’ pjan ta’ wara l-għeluq imfassal mill-operatur
ibbażat fuq l-aħjar prattika u skont il-ħtiġiet stabbiliti fit-Tieni
Skeda. Il-pjan proviżorju ta’ wara l-għeluq għandu jiġi preżentat
lill-awtorità kompetenti u jiġi approvat minnha taħt ir-regolamenti
7(h) u 9(g). Qabel l-għeluq ta’ sit tal-ħżin skont is-subregolament
(1)(a) jew (b), il-pjan proviżorju ta’ wara l-għeluq għandu jkun
(a) aġġornat kif meħtieġ, filwaqt li tingħata importanza
għall-analiżi tar-riskju, l-aħjar prattika u t-titjib
teknoloġiku;
(b) preżentat lill-awtorità kompetenti għall-approvazzjoni
tagħha; u
(ċ) approvat mill-awtorità kompetenti bħala l-pjan ta’
wara l-għeluq definittiv.
(4) Wara li sit tal-ħżin jingħalaq skont is-subregolament (1)(ċ),
l-awtorità kompetenti għandha tkun responsabbli għall-monitoraġġ
u l-miżuri korrettivi skont il-ħtiġiet stabbiliti f’dawn ir-regolamenti
u għall-obbligi kollha relatati maċ-ċediment tal-kwoti fil-każ ta’
tnixxija skont ir-Regolamenti dwar Sistema Kummerċjali tal-
Unjoni Ewropea dwar l-Emissjonijiet ta’ Gassijiet Serra għal
Installazzjonijiet Stazzjonarji, u għall-azzjoni preventiva u ta’
rimedju skont ir-regolamenti 6(1) u 7(1) tar-Regolamenti dwar il-
Prevenzjoni u r-Rimedju għal Danni Ambjentali. Il-ħtiġiet ta’ wara
l-għeluq skont dawn ir-regolamenti għandhom jintlaħqu mill-
awtorità kompetenti abbażi tal-pjan proviżorju ta’ wara l-għeluq
imsemmi fis-subregolament (3), li għandu jkun aġġornat kif
meħtieġ.
(5) L-awtorità kompetenti għandha tirkupra mill-operatur l-
ispejjeż li jkunu ntefqu fir-rigward tal-miżuri msemmija fis-
subregolament (4), ukoll bl-użu tal-garanzija finanzjarja skont ir-
regolament 19.
(1) Meta sit tal-ħżin jingħalaq taħt ir-regolament 17(1)(a)
jew (b), l-obbligi legali kollha relatati mal-monitoraġġ u l-miżuri
korrettivi skont il-ħtiġiet stabbiliti skont dawn ir-regolamenti, iċ-
ċediment tal-kwoti f’każijiet ta’ tnixxija skont ir-Regolamenti dwar
Sistema Kummerċjali tal-Unjoni Ewropea dwar l-Emissjonijiet ta’
Gassijiet Serra għal Installazzjonijiet Stazzjonarji, u l-azzjoni
preventiva u ta’ rimedju skont ir-regolamenti 6(1) u 7(1) tar-
R e g o l a m e n t i d w a r i l - P r e v e n z j o n i u r- R i m e d j u g ħ a l D a n n i
Ambjentali, għandhom jiġu trasferiti lill-awtorità kompetenti fuq
inizjattiva tagħha stess jew fuq talba mill-operatur kemm-il darba l-
kundizzjonijiet li ġejjin ikunu rispettati
(a) l-evidenza disponibbli kollha tkun tindika li s-CO 2
maħżun ser ikun miżmum għal kollox u tkun b’mod
permanenti;
(b) perjodu minimu, li għandu jiġi stabbilit mill-awtorità
kompetenti, jkun għadda. Dan il-perjodu minimu
m’għandux ikun inqas minn għoxrin sena, sakemm l-
awtorità kompetenti ma tkunx konvinta li l-kriterju
msemmi fil-paragrafu (a) jkun intlaħaq qabel ikun
għadda dan il-perjodu;
(ċ) l-obbligi finanzjarji msemmija fir-regolament 20 jkunu
ntlaħqu;
(d) is-sit ikun ġie siġġillat u l-faċilitajiet ta’ injezzjoni
jkunu tneħħew.
(2) L-operatur għandu jħejji rapport li jkollu fih l-kundizzjoni
msemmija fis-subregolament (1)(a) tkun intlaħqet u għandu
jippreżentah lill-awtorità kompetenti sabiex din tal-aħħar tapprova
t-trasferiment tar-responsabbiltà. Dan ir-rapport għandu juri, minn
tal-inqas
(a) il-qbil bejn il-kumpless attwali tas-CO 2 injettat u l-
kumpless immudellat;
(b) in-nuqqas ta’ xi tnixxija li tista’ tiġi rilevata;
(ċ) li s-sit għall-ħżin jkun qiegħed jevolvi lejn sitwazzjoni
ta’ stabbiltà fit-tul.
(3) Meta l-awtorità kompetenti tkun sodisfatta li l-
kundizzjonijiet imsemmija fis-subregolament (1)(a) u (b) ikunu
ntlaħqu, hi għandha tħejji abbozz ta’ deċiżjoni ta’ approvazzjoni
tat-trasferiment tar-responsabbiltà. L-abbozz tad-deċiżjoni għandu
j i s p e ċ if i k a l - m e t o d u b i e x j i ġ i s t a b b i l i t l i l- ku n d i z z j o n i j ie t
imsemmija fis-subregolament (1)(d) ikunu ntlaħqu kif ukoll kull
ħtieġa aġġornata għall-issiġġillar tas-sit għall-ħżin u għat-tneħħija
tal-faċilitajiet ta’ injezzjoni. Jekk l-awtorità kompetenti tqis li l-
kundizzjonijiet fis-subregolament (1)(a) u (b) ma jkunux intlaħqu,
hi għandha tinforma lill-operatur bir-raġunijiet tagħha.
(4) Meta l-awtorità kompetenti tkun sodisfatta li l-
kundizzjonijiet imsemmija fis-subregolament (1)(a) sa (d) ikunu
ntlaħqu, hi għandha tadotta d-deċiżjoni finali u tavża b’dik id-
deċiżjoni lill-operatur. L-awtorità kompetenti għandha wkoll
tinforma bid-deċiżjoni finali lill-Kummissjoni, u fejn tkun tvarja
mill-opinjoni li tkun ingħatat mill-Kummissjoni, hi għandha tagħti
r-raġunijiet għal dik id-deċiżjoni.
(5) Wara t-trasferiment tar-responsabbiltà l-ispezzjonijiet ta’
rutina st abbi liti fi r- regolament 15(3) għandho m jieqfu u l-
monitoraġġ jista’ jitnaqqas għal livell li jippermetti li jinstabu
tnixxijiet jew irregolaritajiet sinifikanti. Jekk jinstabu xi tnixxijiet
jew irregolaritajiet sinifikanti, l-monitoraġġ għandu jiġi
intensifikat kif meħtieġ biex jevalwa l-kobor tal-problema u l-
effikaċja ta’ miżuri korrettivi.
(6) F’każijiet fejn ikun hemm nuqqas min-naħa tal-operatur,
inklużi każijiet ta’ data mhix tajba biżżejjed, ħabi ta’ tagħrif
rilevanti, negliġenza, ingann bi ħsieb jew nuqqas fl-eżerċizzju ta’
diliġenza xierqa, l-awtorità kompetenti għandha tiġbor mingħand l-
operatur preċedenti l-ispejjeż li jkunu ntnefqu wara li jkun seħħ it-
trasferiment tar-responsabbiltà. Mingħajr preġudizzju għar-
regolament 20, m’għandu jkun hemm l-ebda ġbir ieħor tal-ispejjeż
preċedenti wara t-trasferiment tar-responsabbiltà.
(7) Fejn sit tal-ħżin jingħalaq skont ir-regolament 17(1)(ċ), it-
trasferiment tar-responsabbiltà għandu jitqies li jkun seħħ jekk u
meta l-evidenza kollha disponibbli tkun tindika li s-CO 2 maħżun se
jkun miżmum għal kollox u b’mod permanenti, u wara li s-sit ikun
ġie issiġillat u l-faċilitajiet ta’ injezzjoni jkunu ġew imneħħija.
10. (1) The competent authority shall make the permit
applications available to the Commission within one month after
receipt. The competent authority shall also make available to the
Commission other related material that shall be taken into account
by the competent authority when it seeks to make a decision on the
award of a storage permit. The competent authority shall inform the
Commission of all draft storage permits and any other material
taken into consideration for the adoption of the draft decision.
(2) The competent authority shall notify the final decision to
the Commission, and where it departs from the opinion delivered
by the Commission, it shall give reasons for its decision.
11. (1) The operator shall inform the competent authority of
any changes planned in the operation of the storage site, including
changes concerning the operator. Where it deems appropriate, the
competent authority shall update the storage permit or the permit
conditions.
(2) No substantial change may be implemented without a new
o r u pd a te d s to r a ge pe r m i t i ssu e d i n acc o r da n ce w i t h t h ese
regulations. Point 10 of Schedule 1A to the Environmental Impact
Assessment Regulations, regarding changes or extensions to
approved projects, shall mutatis mutandis apply in such cases.
(3) The competent authority shall review and where necessary
update or, as a last resort, withdraw the storage permit
(a) if it has been notified or made aware of any leakages
or significant irregularities pursuant to regulation
16(1);
(b) if the reports submitted pursuant to regulation 14 or
the environmental inspections carried out pursuant to
regulation 15 show non-compliance with permit
conditions or risks of leakages or significant
irregularities;
(c) if it is aware of any other failure by the operator to
meet the permit conditions;
(d) if it appears necessary on the basis of the latest
scientific findings and technological progress; or
(e) without prejudice to paragraphs (a) to (d), five years
after issuing the permit and every ten years thereafter.
(4) After a permit has been withdrawn pursuant to sub-
regulation 3, the competent authority shall either issue a new
storage permit or close the storage site pursuant to regulation
17(1)(c). Until a new storage permit has been issued, the competent
authority shall temporarily take over all legal obligations relating
to acceptance criteria where the competent authority decides to
continue CO 2 injections, monitoring and corrective measures
pursuant to the requirements laid down in these regulations, the
surrender of allowances in cases of leakage pursuant to the
European Union Greenhouse Gas Emissions Trading System for
Stationary Installations Regulations, and preventive and remedial
action pursuant to regulations 6 and 7 of the Prevention and
Remedying of Environmental Damage Regulations. The competent
authority shall recover any costs incurred from the former operator,
including by drawing on the financial security referred to in
regulation 19. In case of closure of the storage site pursuant to
regulation 17(1)(c), regulation 17(4) shall apply.
12. (1) A CO 2 stream shall consist overwhelmingly of carbon
dioxide. To this end, no waste or other matter may be added for the
purpose of disposing of that waste or other matter. However, a CO 2
stream may contain incidental associated substances from the
source, capture or injection process and trace substances added to
assist in monitoring and verifying CO 2 migration. Concentrations
of all incidental and added substances shall be below levels that
would
(a) adversely affect the integrity of the storage site or the
relevant transport infrastructure;
(b) pose a significant risk to the environment or human
health; or
(c) breach the requirements of applicable Community
legislation.
(2)
The operator shall
(a) accept and inject CO 2 streams only if an analysis of
the composition, including corrosive substances, of the
streams and a risk assessment have been carried out,
and if the risk assessment has shown that the
contamination levels are inline with the conditions
referred to in sub-regulation (1);
(b) keeps a register of the quantities and properties of the
CO 2 streams delivered and injected, including the
composition of those streams.
13. (1) The operator shall carry out monitoring of the
injection facilities, the storage complex (including where possible
the CO 2 plume), and where appropriate the surrounding
environment for the purpose of
(a) comparison between the actual and modelled
behaviour of CO 2 and formation water in the storage
site;
(b) detecting significant irregularities;
(c) detecting migration of CO 2 ;
(d) detecting leakage of CO 2 ;
(e) detecting significant adverse effects for the
surrounding environment, including in particular on
drinking water, for human populations, or for users of
the surrounding biosphere;
(f)
assessing the effectiveness of any corrective measures
taken pursuant to regulation 16;
(g) updating the assessment of the safety and integrity of
the storage complex in the short and long term,
including the assessment of whether the stored CO 2
will be completely and permanently contained.
(2) The monitoring required to be carried out by the operator in
terms of sub-regulation (1) shall be based on a monitoring plan
designed by the operator pursuant to the requirements laid down in
the Second Schedule, including details on the monitoring in
accordance with the guidelines established pursuant to regulation
13 of the European Union Greenhouse Gas Emissions Trading
System for Stationary Installations Regulations, submitted to and
approved by the competent authority pursuant to regulations 7(f)
and 9(5)(e). The plan shall be updated pursuant to the requirements
laid down in the Second Schedule and in any case every five years
to take account of changes to the assessed risk of leakage, changes
to the assessed risks to the environment and human health, new
scientific knowledge, and improvements in best available
technology. Updated plans shall be re-submitted for approval to the
competent authority.
14. The operator shall submit to the competent authority at a
frequency required by the competent authority, and in any event at
least once a year
(a) all results of the monitoring pursuant to regulation 13
in the reporting period, including information on the
monitoring technology employed;
(b) the quantities and properties of the CO 2 streams
delivered and injected, including composition of those
streams, in the reporting period, registered pursuant to
regulation 12(2)(b);
(c) proof of the putting in place and maintenance of the
financial security pursuant to regulations 9(i) and 19;
(d) any other information the competent authority
considers relevant for the purposes of assessing
compliance with storage permit conditions and
increasing the knowledge of CO 2 behaviour in the
storage site.
15. (1) The competent authority shall organise a system of
routine and non-routine inspections of all storage complexes within
the scope of these regulations for the purposes of checking and
promoting compliance with the requirements of these regulations
and of monitoring the effects on the environment and on human
health.
(2) Inspections should include activities such as visits of the
surface installations, including the injection facilities, assessing the
injection and monitoring operations carried out by the operator, and
checking all relevant records kept by the operator.
(3) Routine inspections shall be carried out at least once a year
until three years after closure and every five years until transfer of
responsibility to the competent authority has occurred. The
competent authority shall examine the relevant injection and
monitoring facilities as well as the full range of relevant effects
from the storage complex on the environment and on human health.
(4)
Non-routine inspections shall be carried out
(a) if the competent authority has been notified or made
aware of leakages or significant irregularities pursuant
to regulation 16(1);
(b) if the reports pursuant to regulation 14 have shown
insufficient compliance with the permit conditions;
(c) to investigate serious complaints related to the
environment or human health;
(d) in other situations where the competent authority
considers this appropriate.
(5) Following each inspection, the competent authority shall
prepare a report on the results of the inspection. The report shall
evaluate compliance with the requirements of these regulations and
indicate whether or not further action is necessary. The report shall
be communicated to the operator concerned and shall be publicly
available in accordance with relevant Community legislation
within two months of the inspection.
16. (1) In the event of leakages or significant irregularities,
the operator shall immediately notify the competent authority, and
shall take the necessary corrective measures, including measures
related to the protection of human health. In cases of leakages and
significant irregularities which imply the risk of leakage, the
operator shall also notify the competent authority pursuant to the
European Union Greenhouse Gas Emissions Trading System for
Stationary Installations Regulations.
(2)
The corrective measures referred to in sub-regulation (1)
shall be taken as a minimum on the basis of a corrective measures
plan submitted to and approved by the competent authority
pursuant to regulations 7(g) and 9(f).
(3) The competent authority may at any time require the
operator to take the necessary corrective measures, as well as
measures related to the protection of human health. These may be
additional to or different from those laid out in the corrective
measures plan. The competent authority may also at any time take
corrective measures itself.
(4) If the operator fails to take the necessary corrective
measures, the competent authority shall take the necessary
corrective measures itself.
(5) The competent authority shall recover the costs incurred in
relation to the measures referred to in sub-regulations (3) and (4)
from the operator, including by drawing on the financial security
pursuant to regulation 19.
17. (1) A storage site shall be closed
(a) if the relevant conditions stated in the permit have
been met;
(b) at the substantiated request of the operator, after
authorisation of the competent authority; or
(c) if the competent authority so decides after the
withdrawal of a storage permit pursuant to regulation
11(3).
(2) After a storage site has been closed pursuant to sub-
regulation (1)(a) or (b), the operator remains responsible for
monitoring, reporting and corrective measures, pursuant to the
requirements laid down in these regulations, and for all obligations
relating to the surrender of allowances in case of leakages pursuant
to the European Union Greenhouse Gas Emissions Trading System
for Stationary Installations Regulations, and preventive and
remedial action pursuant to regulations 6, 7, 8 and 9 of the
Prevention and Remedying of Environmental Damage Regulations,
until the responsibility for the storage site is transferred to the
competent authority pursuant to regulation 18(1) to (5). The
operator shall also be responsible for sealing the storage site and
removing the injection facilities.
(3) The obligations referred to in sub-regulation (2) shall be
fulfilled on the basis of a post-closure plan designed by the
operator based on best practice and in accordance with the
requirements laid down in the Second Schedule. A provisional
post-closure plan shall be submitted to and approved by the
competent authority pursuant to paragraph of regulations 7(h) and
9(g). Prior to the closure of a storage site pursuant to sub-
regulation (1)(a) or (b), the provisional post-closure plan shall be
(a) updated as necessary, taking account of risk analysis,
best practice and technological improvements;
(b) submitted to the competent authority for its approval;
and
(c) approved by the competent authority as the definitive
post-closure plan.
(4) After a storage site has been closed pursuant to sub-
regulation (1)(c), the competent authority shall be responsible for
monitoring and corrective measures pursuant to the requirements
laid down in these regulations and for all obligations relating to the
surrender of allowances in case of leakages pursuant to the
European Union Greenhouse Gas Emissions Trading System for
Stationary Installations Regulations, and preventive and remedial
action pursuant to regulations 6(1) and 7(1) of the Prevention and
Remedying of Environmental Damage Regulations. The post-
closure requirements pursuant to these regulations shall be fulfilled
by the competent authority on the basis of the provisional post-
closure plan referred to in sub-regulation (3), which shall be
updated as necessary.
(5) The competent authority shall recover from the operator the
costs incurred in relation to the measures referred to in sub-
regulation (4), including by drawing on the financial security
pursuant to regulation 19.
18. (1) Where a storage site has been closed pursuant to
reg ul a ti on 17 ( 1) (a ) or ( b), all legal obligations r elating to
monitoring and corrective measures pursuant to the requirements
laid down in these regulations, the surrender of allowances in the
event of leakages pursuant to the European Union Greenhouse Gas
Emissions Trading System for Stationary Installations Regulations,
and preventive and remedial action pursuant to regulations 6(1) and
7(1) of the Prevention and Remedying of Environmental Damage
Regulations, shall be transferred to the competent authority on its
own initiative or upon request from the operator, if the following
conditions are met
(a) all available evidence indicates that the stored CO 2
will be completely and permanently contained;
(b) a minimum period, to be determined by the Competent
Authority has elapsed. This minimum period shall be
no shorter than twenty years, unless the competent
authority is convinced that the criterion referred to in
paragraph (a) is complied with before the end of that
period;
(c) the financial obligations referred to in regulation 20
have been fulfilled;
(d) the site has been sealed and the injection facilities
have been removed.
(2) The operator shall prepare a report documenting that the
condition referred to in sub-regulation (1)(a) has been met and
shall submit it to the competent authority for the latter to approve
the transfer of responsibility. This report shall demonstrate, at
least
(a) the conformity of the actual behaviour of the injected
CO 2 with the modelled behaviour;
(b) the absence of any detectable leakage;
(c) that the storage site is evolving towards a situation of
long-term stability.
(3) Where the competent authority is satisfied that the
conditions referred to in sub-regulation (1)(a) and (b) are met, it
shall prepare a draft decision of approval of the transfer of
responsibility. The draft decision shall specify the method for
determining that the conditions referred to in sub-regulation (1)(d)
have been met as well as any updated requirements for the sealing
of the storage site and for the removal of injection facilities. If the
competent authority considers that the conditions referred to in
sub-regulation (1)(a) and (b) are not met, it shall inform the
operator of its reasons.
(4) Where the competent authority is satisfied that the
conditions referred to in sub-regulation (1)(a) to (d) are complied
with, it shall adopt the final decision and notify that decision to the
operator. The competent authority shall also notify the final
decision to the Commission, and where it departs from an opinion
which may be issued by the Commission, it shall give reasons for
such decision.
(5) After the transfer of responsibility, routine inspections
provided for in regulation 15(3) shall cease and monitoring may be
reduced to a level which allows for detection of leakages or
significant irregularities. If any leakages or significant
irregularities are detected, monitoring shall be intensified as
required to assess the scale of the problem and the effectiveness of
corrective measures.
(6) In cases where there has been fault on the part of the
operator, including cases of deficient data, concealment of relevant
information, negligence, wilful deceit or a failure to exercise due
diligence, the competent authority shall recover from the former
operator the costs incurred after the transfer of responsibility has
taken place. Without prejudice to regulation 20, there shall be no
further recovery of costs after the transfer of responsibility.
(7) Where a storage site has been closed pursuant to regulation
17(1)(c), transfer of responsibility shall be deemed to take place if
and when all available evidence indicates that the stored CO 2 will
be completely and permanently contained, and after the site has
been sealed and the injection facilities have been removed.
19. (1) The potential operator shall present proof, as part of
the application for a storage permit, that adequate provisions can be
established, by way of financial security or any other equivalent
and on the basis of arrangements established by the competent
authority which may include financial security instruments, bank
guarantees and adequate insurance cover, in order to ensure that all
obligations arising under the permit issued pursuant to these
regulations, including closure and post-closure requirements, as
well as any obligations arising from inclusion of the storage site
under the European Union Greenhouse Gas Emissions Trading
System for Stationary Installations Regulations can be met. This
financial security shall be valid and effective before
commencement of injection.
(2) The financial security shall be periodically adjusted to take
account of changes to t he assessed risk of leakage and the
estimated costs of all obligations arising under the permit issued
pursuant to these regulations as well as any obligations arising
from inclusion of the storage site under the European Union
G r e e n h o u se G a s E m i s s i o n s Tr a d i n g S y s t e m f o r St a t i o n a r y
Installations Regulations.
(3) The financial security or any other equivalent referred to in
sub-regulation (1) shall remain valid and effective
(a) after a storage site has been closed pursuant to
regulation 17(1)(a) or (b), until the responsibility for
the storage site is transferred to the competent
authority pursuant to regulation 18(1) to (5);
(b) after the withdrawal of a storage permit pursuant to
regulation 11(3)
(i) until a new storage permit has been issued;
(ii) where the site is closed pursuant to regulation
17(1)(c), until the transfer of responsibility
pursuant to regulation 18(7)
Provided that the financial obligations referred to in
regulation 20 have been fulfilled.
The operator shall, on the basis of arrangements
e s t a b l i s h e d b y t h e c o m p e t e n t a u t h o r i t y, m a k e a f i n a n c i a l
contribution available to the competent authority before the
transfer of responsibility pursuant to regulation 18 has taken place.
The contribution from the operator shall take into account those
criteria referred to in the First Schedule and elements relating to
the history of storing CO 2 relevant to determining the post-transfer
obligations, and cover at least the anticipated cost of monitoring
for a period of thirty years. This financial contribution may be used
to cover the costs borne by the competent authority after the
transfer of responsibility to ensure that the CO 2 is completely and
permanently contained in geological storage sites after the transfer
of responsibility.
(1) The competent authority shall establish and maintain
(a) a register of the storage permits granted; and
(b) a permanent register of all closed storage sites and
surrounding storage complexes, including maps and
sections of their spacial extent and available
information relevant for assessing that the stored CO 2
will be completely and permanently contained.
(2) The registers referred to in sub-regulation (1) shall be taken
into consideration by the Environment and Resources Authority in
relevant planning procedures when permitting any activity that
could affect or be affected by the geological storage of CO 2 in the
registered storage sites.
(1) The competent authority shall take the necessary
measures to ensure that potential users are able to obtain access to
transport networks and to storage sites for the purpose of
geological storage of the produced and captured CO 2 , in
accordance with sub-regulations (2), (3) and (4).
(2) The access referred to in sub-regulation (1) shall be
provided in a transparent and non-discriminatory manner
determined by the competent authority. The competent authority
shall apply the objectives of fair and open access, taking into
account
(a) the storage capacity which is or can reasonably be
made available within the areas determined under
regulation 4, and the transport capacity which is or can
reasonably be made available;
(b) the proportion of the national CO 2 reduction
obligations pursuant to international legal instruments
and to Community legislation that Malta intends to
meet through capture and geological storage of CO 2 ;
(c) the need to refuse access where there is an
incompatibility of technical specifications which
cannot be reasonably overcome;
(d) the need to respect the duly substantiated reasonable
needs of the owner or operator of the storage site or of
the transport network and the interests of all other
users of the storage or the network or relevant
processing or handling facilities who may be affected.
(3) Transport network operators and operators of storage sites
may refuse access on the grounds of lack of capacity. Duly
substantiated reasons shall be given for any refusal.
(4) The competent authority shall take the necessary measures
to ensure that the operator refusing access on the grounds of lack of
capacity or a lack of connection makes any necessary
enhancements as far as it is economic to do so or when a potential
customer is willing to pay for them
Provided this shall not negatively impact on the
environmental security of transport and geological storage of CO 2 .
(1) The Prime Minister shall designate an independent
authority for the purpose of these regulations and Directive 2009/
31/EC, and such independent authority shall have access to all
relevant information, in order to settle expeditiously all disputes
relating to access to transport networks and storage sites, taking
into account the criteria referred to in regulation 21A(2) and the
number of parties which may be involved in negotiating such
access.
(2) In the event of cross-border disputes, the dispute settlement
arrangement referred to in sub-regulation (1) shall be applied when
Malta has jurisdiction over the transport networks or the storage
site to which access has been refused. Where, in cross-border
disputes, more than one Member State covers the transport network
or storage site concerned, the competent authority shall consult
with its counterparts in the Member States concerned with a view
to ensuring the consistent application of Directive 2009/31/EC.
The competent authority shall make available to the public
environmental information relating to the geological storage of
CO 2 in accordance with the applicable Community legislation.
The competent authority may issue guidelines, in regard to
the provisions of these regulations.
(1) The competent authority may issue a compliance order
against any person who in its opinion has contravened any of the
provisions of these regulations or a condition of a licence or
authorisation issued thereunder.
(2) Any person who fails to abide by the provisions of a
compliance order issued by the competent authority shall, without
prejudice to any other liability under these regulations, the Act or
any other law, be guilty of an offence and be liable, on conviction,
to a fine (multa) of not less than one thousand euro (€1,000) and of
not more than sixty thousand euro (€60,000) for each day during
which the failure to comply subsists.
(1) Any person who contravenes any of the provisions of
these regulations or of a permit or licence condition or of an
authorisation or approval issued thereunder, shall be guilty of an
offence and shall, on conviction, be liable to a fine (multa) of not
more than sixty-nine thousand euro (€69,000) or for one thousand
and three hundred euro (€1,300) for each day during which the
offence persists.
(2) Any person who, when information with respect to these
regulations is requested or required by the competent authority,
knowingly or recklessly -
(a) gives any false, inaccurate or misleading information;
or
(b) supplies incomplete information; or
(c) fails, without reasonable cause, to supply information
requested within the time given; or
(d) prevents or hinders any investigation; or
(e) produces or furnishes, or causes or knowingly allows
to be produced or furnished, any document or
information which he knows to be false in any material
respect,
shall be guilty of an offence. and shall, on conviction, be liable to a
fine (multa) of not less than one thousand euro (€1,000) and of not
more than sixty thousand euro (€60,000) for each day during which
the offence subsists.