WASTE MANAGEMENT (MANAGEMENT OF WASTE FROM EXTRACTIVE INDUSTRIES AND BACKFILLING) REGULATIONS
Table of Provisions (36)
Statutory Text (36 Articles)
WASTE MANAGEMENT (MANAGEMENT OF WASTE FROM
EXTRACTIVE INDUSTRIES AND BACKFILLING)
SUBSIDIARY LEGISLATION 549.50
WASTE MANAGEMENT (MANAGEMENT OF WASTE FROM
EXTRACTIVE INDUSTRIES AND BACKFILLING)
REGULATIONS
30th May, 2010 *
LEGAL NOTICE 22 of 2009, as amended by Legal Notice 216 of 2011 and Act XXXIII of
2024. Arrangement of regulations
Regulations
Part I
General Provisions
1 - 5
Part II
Types of Waste Facilities
Part III Category A Waste Facilities
7 - 15
Part IV Category B Waste Facilities
Part V
Category C Waste Facilities
17 - 20
Part VI Inventory of Closed Waste Facilities
Part VII Backfilling into Excavation Voids
22 - 26
Part VIII Disposal into a Receiving Body of Water
Part IX Enforcement
28 - 32
*See regulation 1(2), as originally promulgated, and Legal Notice 318 of 2010.
PART I
GENERAL PROVISIONS
The title of these regulations is the Waste Management
(Management of Waste from Extractive Industries and Backfilling)
Regulations.
(Regulations 7(3)(b) and 18(3)(b))
Waste characterisation
The waste to be deposited in a facility shall be characterised in such a way as to
guarantee the long-term physical and chemical stability of the structure of the
facility and to prevent major accidents. The waste characterisation shall include,
where appropriate and in accordance with the category of the waste facility, the
following aspects
1. description of expected physical and chemical characteristics of the
waste to be deposited in the short and the long term, with particular
WASTE MANAGEMENT (MANAGEMENT OF WASTE FROM
EXTRACTIVE INDUSTRIES AND BACKFILLING)
reference to its stability under surface atmospheric/meteorological
conditions, taking account of the type of mineral or minerals to be
extracted and the nature of any overburden and, or gangue minerals that
will be displaced in the course of the extractive operations;
2. classification of the waste according to the relevant entry in the Waste
Management (Permit and Control) Regulations, with particular regard
to its hazardous characteristics;
3. description of the chemical substances to be used during treatment of
the mineral resource and their stability;
4. description of the method of deposition;
5. waste transport system to be employed.
(1) These regulations bring into effect the provisions of
Directive 2006/21/EC * of the European Parliament and of the
Council of 15 March 2006 on the management of waste from
extractive industries and amending Directive 2004/35/EC † .
(2) These regulations provide for measures, procedures and
guidance to prevent or reduce as far as possible any adverse effects
on the environment, in particular water, air, soil, fauna and flora
and landscape, and any resultant risks to human health, brought
about as a result of the management of waste from the extractive
industries or of the backfilling into excavation voids.
(3) These regulations provide additional measures, procedures
and guidance to those in the Waste Regulations.
(Regulation 6(1))
Criteria for determining the classification of waste facilities
A waste facility shall be classified under category A if
1. a failure or incorrect operation, such as the collapse of a heap or the
bursting of a dam, could give rise to a major accident, on the basis of a
risk assessment taking into account factors such as the present or future
size, the location and the environmental impact of the waste facility; or
2. it contains waste classified as hazardous under the Waste Management
(Permit and Control) Regulations, above a certain threshold; or
3. it contains substances or preparations classified as dangerous under the
the Dangerous Substances and Preparations Regulations, above a certain
threshold.
(1)
In these regulations, unless the context otherwise
requires
"the Act" means the Environment Protection Act;
"backfill" means any material, excluding waste other than
extractive waste, used for backfilling;
"backfilling" means refilling an excavation void, after extraction
of the mineral, for rehabilitation or construction purposes related to
the mineral extraction process, such as the building or maintenance
within such a void of means of access for machinery, haulage
ramps, bulkheads, safety barricades or berms; and "backfilled"
shall be construed accordingly;
"best available techniques" is as defined in regulation 2 of the
Integrated Pollution Prevention and Control Regulations;
"the competent authority" means the Environment and Resources
Authority and such other body or person as the Minister may by
order in the Gazette, prescribe and different bodies or persons may
be designated as the competent authority for different provisions
and different purposes of these regulations;
"the Community" means the European Community;
"competent person" means a natural person who has the technical
knowledge and experience, as defined by Maltese legislation, to
perform the duties arising from these regulations;
"dam" means an engineered structure designed to retain or
confine water and, or waste within a pond;
"dangerous substance" means a substance, mixture or preparation
which is dangerous within the meaning of the Dangerous
Substances and Preparations Regulations;
*OJ L 102,11.4.2006, p. 15.
†OJ L 143, 30.4.2004, p. 56.
"extractive industries" means all establishments and
undertakings engaged in surface or underground extraction of
mineral resources for commercial purposes, including extraction by
drilling boreholes, or treatment of the extracted material;
"extractive waste" means waste resulting from the prospecting,
extraction, treatment and storage of mineral resources and the
working of quarries, such as tailings (i.e. the waste solids or
slurries that remain after the treatment of minerals by a number of
techniques), waste rock and overburden (i.e. the material that
extractive operations move during the process of accessing an ore
or mineral body, including during the pre-production development
stage), and topsoil (i.e. the upper layer of the ground) provided that
they constitute waste;
"hazardous waste" means any type of waste which is marked
with an asterisk in Schedule 1 to the Waste Regulations, or which
has any of the properties which render a waste hazardous as
specified in Schedules 2 and 3 to those regulations, or which is
deemed to be hazardous by the competent authority;
"heap" means an engineered facility for the deposit of solid
waste on the surface;
"inert waste" means waste that does not undergo any significant
physical, chemical or biological transformations. Inert waste will
not dissolve, burn or otherwise physically or chemically react,
biodegrade or adversely affect other matter with which it comes
into contact in a way likely to give rise to environmental pollution
or harm human health. The total leachability and pollutant content
of the waste and the ecotoxicity of the leachate must be
insignificant, and in particular not endanger the quality of surface
water and, or groundwater;
"leachate" means any liquid percolating through the deposited
waste and emitted from or contained within a waste facility,
including polluted drainage, which may adversely affect the
environment if not appropriately treated;
"major accident" means an occurrence on site in the course of an
operation involving the management of extractive waste in any
establishment covered by these regulations, leading to a serious
danger to human health and, or the environment, whether
immediately or over time, on-site or off-site;
"mineral resource" or "mineral" means a naturally occurring
deposit in the earth’s crust of an organic or inorganic substance,
s u c h a s e n e rg y f u e l s , m e t a l o r e s , i n d u s t r i a l m i n e r a l s a n d
construction minerals, but excluding water;
"the Minister" means the Minister responsible for the
environment;
"off-shore" means that area of the sea and seabed extending from
the low water mark of ordinary or medium tides outwards;
"operator" means the natural or legal person responsible for the
management of extractive waste, in accordance with Maltese
legislation, including in respect of temporary storage of extractive
waste as well as the operational and the after-closure phases;
"pond" means a natural or engineered facility for disposing of
fine-grained waste, normally tailings, along with varying amounts
of free water, resulting from the treatment of mineral resources and
from the clearing and recycling of process water;
"prospecting" means the search for mineral deposits of economic
value, including sampling, bulk sampling, drilling and trenching,
but excluding any works required for the development of such
deposits, and any activities directly associated with an existing
extractive operation;
"the public" means one or more natural or legal persons and, in
accordance with Maltese legislation or practice, their associations,
organisations or groups;
"the public concerned" means the public affected or likely to be
affected by, or having an interest in, the environmental decision-
m aking und er r egulati ons 8 and 9; fo r t he purposes of thi s
definition, non-governmental organisations promoting
environmental protection and meeting any requirement under
Maltese legislation shall be deemed to have such an interest;
"receiving body of water" means surface waters, groundwater,
transitional waters and coastal water as defined in regulation 2(1)
of the Water Policy Framework Regulations;
"rehabilitation" means the treatment of the land affected by a
waste facility in such a way as to restore the land to a satisfactory
state, with particular regard to soil quality, wild life, natural
habitats, freshwater systems, landscape and appropriate beneficial
uses;
"site" means all land at a distinct geographic location under the
management control of an operator;
"substantial change" means a change in the structure or operation
of a waste facility that, in the opinion of the competent authority,
may have significant negative effects on human health or the
environment;
"tailings" means the waste solids or slurries that remain after the
treatment of minerals by separation processes (e.g. crushing,
grinding, size-sorting, flotation and other physico-chemical
techniques) to remove the valuable minerals from the less valuable
rock;
"treatment" means the mechanical, physical, biological, thermal
or chemical process or combination of processes carried out on
mineral resources, including from the working of quarries, with a
view to extracting the mineral, including size change,
classification, separation and leaching, and the re-processing of
previously discarded waste, but excluding smelting, thermal
manufacturing processes (other than the burning of limestone) and
metallurgical processes;
"unpolluted soil" means soil that is removed from the upper layer
of the ground during extractive activities and that is not deemed to
be polluted under Community or Maltese legislation;
"waste" in addition to what is said in the Act, means any thing,
substance, product or object, whether in solid or liquid form,
whether hazardous or otherwise, which the holder discards, or
intends, or is required to discard, or any other which is deemed to
be waste by the competent authority nominated by the Minister
responsible for the environment under the Act;
"waste facility" means any area designated for the accumulation
or deposit of extractive waste, whether in a solid or liquid state or
in solution or suspension, for the following time-periods
(i)
no time-period for Category A waste facilities and
facilities for waste characterised as hazardous in the
waste management plan;
(ii) a period of more than six months for facilities for
hazardous waste generated unexpectedly;
(iii) a period of more than one year for facilities for non-
hazardous non-inert waste;
(iv) a period of more than three years for facilities for
unpolluted soil, non-hazardous prospecting waste,
waste resulting from the extraction, treatment and
storage of peat and inert waste
Provided that such facilities are deemed to include any dam
or other structure serving to contain, retain, confine or otherwise
support such a facility, and also to include, but not be limited to,
heaps and ponds, but excluding excavation voids;
"waste holder" means the producer of the extractive waste or the
natural or legal person who is in possession of it;
"weak acid dissociable cyanide" means cyanide and cyanide
compounds that are dissociated with a weak acid at a defined pH.
(2) All other terms shall have the same meaning as that
assigned to them in regulation 2 of the Waste Regulations.
(Regolament 6(1))
Kriterji sabiex tiġi determinata l-klassifikazzjoni tal-faċilitajiet ta’ l-iskart
Faċilità ta’ l-iskart għandha tiġi klassifikata fil-kategorija A jekk
1. ħsara jew operazzjoni ħażina, per eżempju l-kollass ta’ borġ jew iċ-
ċediment ta’ diga, tista’ tikkaġuna inċident maġġuri, abbażi ta’
valutazzjoni tar-riskju filwaqt li jitqiesu l-fatturi bħad-daqs preżenti jew
futur, il-lok u l-impatt ambjentali tal-faċilità ta’ l-iskart; jew
2. ikollha skart li jkun klassifikat bħala perikoluż taħt ir-Regolamenti
għall-Prevenzjoni u l-Kontroll Integrati tat-Tniġġis ’il fuq minn ċertu
limitu; jew
3. ikollha sustanzi jew preparati li jkunu klassifikati bħala perikolużi taħt
ir-Regolamenti dwar Sustanzi u Preparamenti Perikolużi ’l fuq minn
ċertu limitu.
(1) Subject to sub-regulation (2), these regulations shall
cover extractive waste and backfill.
(2) The following shall be excluded from the scope of these
regulations
(a) waste which is generated by the prospecting,
extraction and treatment of mineral resources and the
working of quarries, but which does not directly result
from those operations, e.g. food waste, waste oil, end-
of-life vehicles, spent batteries and accumulators. The
management of such waste should be subject to the
provisions of the Waste Regulations, or the Waste
Management (Landfill) Regulations, or any other
relevant Community or Maltese legislation;
(b) waste resulting from the offshore prospecting,
extraction and treatment of mineral resources;
(c) injection of water and re-injection of pumped
groundwater as defined in regulation 11(3)(j)(i) and
(ii) of the Water Policy Framework Regulations, to the
extent authorised by that regulation.
(3) Any waste facility which has been granted a permit or
which is already in operation on 1 May 2008 shall comply with
these regulations by 1 May 2012.
(4) Any excavation void which has been granted a permit or
which is already in operation on 1 May 2008 may continue
operating in accordance with the Waste Regulations, or the Waste
Management (Landfill) Regulations, unless the competent authority
decides otherwise.
(5) Regulations 7, 8(3) to (8), 9, 10, 12(1), 14(1), (2) and (3),
17 and 18 shall not apply to those waste facilities that have stopped
accepting waste before 1 May 2006, that are completing the closure
procedures in accordance with the applicable Community or
Maltese legislation or programmes approved by the Competent
Authority, and will be effectively closed by 31 December 2010
Provided that these facilities shall be managed in a way that
does not prejudice the achievement of the objectives of these
regulations, in particular the objectives of regulation 5(1),
including the Water Policy Framework Regulations.
(6) Without prejudice to other Maltese legislation, waste which
falls within the scope of these regulations shall not be subject to the
Waste Management (Landfill) Regulations
Provided that the Waste Management (Landfill)
Regulations shall continue to apply to waste other than extractive
waste used for backfilling into excavation voids, whether created
through surface or underground extraction, as appropriate.
(7) Sub-regulation (3) shall not apply to waste facilities closed
by 1 May 2008.
(8) The competent authority shall ensure that, from 1 May 2006
and notwithstanding any closure of a waste facility after that date
and before 1 May 2008, extractive waste is managed in a way that
does not prejudice the fulfilment of regulation 5(1), and other
applicable environmental requirements set out in national and
Community legislation, including the Water Policy Framework
Regulations.
(1) Extractive waste shall be managed and excavation
voids shall be backfilled without endangering human health and
without using processes or methods which could harm the
environment, and in particular without risk to water, air, soil and
fauna and flora, without causing a nuisance through noise or odours
and without adversely affecting the landscape or places of special
interest.
(2) The abandonment, dumping, uncontrolled depositing of
extractive waste or uncontrolled backfilling into excavation voids
shall be prohibited.
(3) The operator shall take all measures necessary to prevent or
reduce as far as possible any adverse effects on the environment
and human health brought about as a result of the management of
extractive waste or backfilling into excavation voids. This includes
the management of any waste facility, also after its closure, and the
prevention of major accidents involving that facility and the
limiting of their consequences for the environment and human
health.
(4) The measures referred to in sub-regulation (3) shall be
based, inter alia, on the best available techniques, without
prescribing the use of any technique or specific technology, but
taking into account the technical characteristics of the waste
facility or excavation void, its geographical location and the local
environmental conditions.
PART II
TYPES OF WASTE FACILITIES
For the purposes of these regulations, waste facilities shall
be classified in one of the following categories
(1) Category A waste facility: any waste facility meeting
the criteria set out in Schedule 3 or any waste facility
designated for the accumulation or deposit of
hazardous waste generated unexpectedly for a period
of more than six months; or
(2) Category B waste facility: any waste facility
designated for the accumulation or deposit of non-
hazardous non-inert waste for a period of more than
one year; or
(3) Category C waste facility: any waste facility
designated for the accumulation or deposit of
unpolluted soil, non-hazardous prospecting waste,
waste resulting from the extraction, treatment and
storage of peat and inert waste for a period of more
than three years
Provided that Category A, Category B and Category C
waste facilities are deemed to include any dam or other structure
serving to contain, retain, confine or otherwise support such a
facility, and also to include, but not be limited to, heaps and ponds,
but excluding excavation voids, whether created through surface or
underground extraction.
PART III
CATEGORY A WASTE FACILITY
(1) The operator shall draw up a waste management plan
for the minimisation, treatment, recovery and disposal of extractive
waste, taking account of the principle of sustainable development.
(2)
The objectives of the waste management plan shall be
(a) to prevent or reduce waste production and its
harmfulness, in particular by considering
(i)
waste management in the design phase and in the
choice of the method used for mineral extraction
and treatment;
(ii) the changes that the extractive waste may
undergo in relation to an increase in surface area
WASTE MANAGEMENT (MANAGEMENT OF WASTE FROM
EXTRACTIVE INDUSTRIES AND BACKFILLING)
and exposure to conditions above ground;
(iii) backfilling into the excavation void, whether
created through surface or underground
extraction, after extraction of the mineral, as far
as is technically and economically feasible and
environmentally sound in accordance with
existing Community or Maltese environmental
standards and with the requirements of these
regulations where relevant;
(iv) putting topsoil back in place after the closure of
the waste facility or, if this is not practically
feasible, reusing topsoil elsewhere;
(v) using less dangerous substances for the
treatment of mineral resources;
(b) to encourage the recovery of extractive waste by
means of recycling, reusing or reclaiming such waste,
where this is environmentally sound in accordance
with existing Community or Maltese environmental
standards and with the requirements of these
regulations where relevant;
(c) to ensure short and long-term safe disposal of the
extractive waste, in particular by considering, during
the design phase, management during the operation
and after-closure of a waste facility and by choosing a
design which
(i)
requires minimal and, if possible, ultimately no
monitoring, control and management of the
closed waste facility;
(ii) prevents or at least minimises any long-term
negative effects, for example attributable to
migration of airborne or aquatic pollutants from
the waste facility; and
(iii) ensures the long-term geotechnical stability of
any dams or heaps rising above the pre-existing
ground surface.
(3) The waste management plan shall contain at least the
following elements
(a) the proposed classification for the waste facility in
accordance with the criteria laid down in regulation 6
and a document demonstrating that a major-accident
prevention policy, a safety management system for
implementing it and an internal emergency plan will
be put into effect in accordance with regulation 8(3);
(b) waste characterisation in accordance with Schedule 2
and a statement of the estimated total quantities of
extractive waste to be produced during the operational
phase;
(c) a description of the operation generating such waste
and of any subsequent treatment to which it is subject;
(d) a description of how the environment and human
health may be adversely affected by the deposit of
such waste and the preventive measures to be taken in
order to minimise environmental impact during
operation and after closure, including the aspects
referred to in regulation 11(2)(a), (b), (d) and (e);
(e) the proposed control and monitoring procedures
pursuant to regulation 11(2)(c);
(f)
the proposed plan for closure, including rehabilitation,
after-closure procedures and monitoring as provided
for in regulation 12;
(g) measures for the prevention of water status
deterioration in accordance with the Water Policy
Framework Regulations, and for the prevention or
minimisation of air and soil pollution pursuant to
regulation 13;
(h) a survey of the condition of the land to be affected by
the waste facility;
(i)
any other relevant information requested by the
competent authority.
(4) The waste management plan shall provide sufficient
information to enable the competent authority to evaluate the
operator’s ability to meet the objectives of the waste management
plan as set out in sub-regulation (2) and his obligations under these
regulations. The plan shall explain, in particular, how the option
and method chosen as mentioned in sub-regulation (2)(a)(i) will
fulfil the objectives of the waste management plan as laid down in
sub-regulation (2)(a).
(5) The competent authority may specify the format in which
such information is to be made available.
(6) The competent authority shall make this information
available in accordance with the Freedom of Access to Information
on the Environment Regulations.
(7) The waste management plan shall be reviewed every five
years and or amended, as appropriate, in the event of substantial
changes to the operation of the waste facility or to the waste
deposited. Any amendments shall be notified to the competent
authority.
(8) Plans produced pursuant to other Community or Maltese
legislation and containing the information specified in sub-
regulation (3) may be used where this obviates the unnecessary
duplication of information and the repetition of work by the
operator, on condition that all requirements under sub-regulations
(1), (2), (3), (4) and (7) are met.
(9) The competent authority shall approve the waste
management plan on the basis of procedures to be decided by the
competent authority and shall monitor its implementation.
(1) This regulation shall apply to Category A waste
facilities, save for those waste facilities falling within the scope of
the Control of Major Accident Hazard Regulations.
(2) Without prejudice to other Community or Maltese
legislation, and in particular the Protection of Workers in the
Mineral Extracting Industries through Drilling and Workers in
Surface and Underground Mineral Extracting Industries
Regulations, the competent authority established by virtue of
regulation 3(1) of the Control of Major Accident Hazard
Regulations shall ensure that major-accident hazards are identified
and that the necessary features are incorporated into the design,
construction, operation and maintenance, closure and after-closure
of the waste facility in order to prevent such accidents and to limit
their adverse consequences for human health and, or the
environment, including any transboundary impacts.
(3) For the purposes of the requirements under sub-regulation
(2), each operator shall, before the start of operations, draw up a
major-accident prevention policy for the management of extractive
waste and put into effect a safety management system
implementing it, in accordance with the elements set out in Section
1 of Schedule 1, and shall also put into effect an internal emergency
plan specifying the measures to be taken on site in the event of an
accident
Provided that, as part of that policy, the operator shall
appoint a safety manager responsible for the implementation and
periodic supervision of the major-accident prevention policy.
(4) The competent authority established by virtue of regulation
3(1) of the Control of Major Accident Hazard Regulations shall
draw up an external emergency plan specifying the measures to be
taken off-site in the event of an accident. As part of the application
for a permit the operator shall provide the competent authority
established by virtue of regulation 3(1) of the Control of Major
Accident Hazard Regulations, with the information necessary to
enable the latter to draw up that plan.
(5) The emergency plans referred to in sub-regulations (3) and
(4) shall have the following objectives
(a) to contain and control major accidents and other
incidents so as to minimise their effects, and in
particular to limit damage to human health and the
environment;
(b) to implement the measures necessary to protect human
health and the environment from the effects of major
accidents and other incidents;
(c) to communicate the necessary information to the
public and to the relevant services or authorities in the
area;
(d) to provide for the rehabilitation, restoration and clean-
up of the environment following a major accident.
(6) In the event of a major accident, the operator shall
immediately provide the competent authority established by virtue
of regulation 3(1) of the Control of Major Accident Hazard
Regulations, with all the information required to help minimise its
consequences for human health and to assess and minimise the
extent, actual or potential, of the environmental damage.
(7) The public concerned shall be given early and effective
opportunities to participate in the preparation or review of the
external emergency plan to be drawn up in accordance with sub-
regulation (4). To that end, the public concerned shall be informed
about any such proposal and relevant information shall be made
available, including, inter alia, information about the right to
participate in the decision-making process and about the Competent
Authority established by virtue of regulation 3(1) of the Control of
Major Accident Hazard Regulations, to which comments and
questions may be submitted.
(8) The public concerned shall be entitled to express comments
within reasonable time frames and, in the decision on the external
emergency plan, due account shall be taken of these comments.
(9) Information on safety measures and on the action required
in the event of an accident, containing at least the elements listed in
Section 2 of Schedule 1 shall be provided, free of charge and as a
matter of course, to the public concerned
Provided that that information shall be reviewed every three
years and, where necessary, updated.
(1) No waste facility shall be allowed to operate without a
permit granted by the competent authority.
(2) The permit shall contain the elements specified in sub-
regulation (3) and shall clearly indicate the category of the waste
facility in accordance with the criteria referred to in regulation 6
Provided that, subject to compliance with all requirements
under this regulation, any permit produced pursuant to other
Community or Maltese legislation may be combined to form a
single permit, where such a format obviates the unnecessary
duplication of information and the repetition of work by the
operator or competent authority
Provided further that, the details specified in sub-regulation
(3) can be covered by one single permit or several permits,
provided that all requirements under this regulation are complied
with.
(3) The application for a permit shall contain at least the
following details
(a) the identity of the operator;
(b) the proposed location of the waste facility, including
any possible alternative locations;
(c) the waste management plan pursuant to regulation 7;
(d) adequate arrangements by way of a financial guarantee
or equivalent, as required under regulation 14;
WASTE MANAGEMENT (MANAGEMENT OF WASTE FROM
EXTRACTIVE INDUSTRIES AND BACKFILLING)
(e) the information provided by the operator in accordance
with
the
Environmental
Impact
Assessment
Regulations, if an environmental impact assessment is
required under those regulations; and
(f)
any other relevant information requested by the
competent authority.
(4) The competent authority may specify the format in which
such information is to be made available.
(5) The competent authority shall only grant a permit if it is
satisfied that
(a) the operator complies with the relevant requirements
under these regulations;
(b) the management of waste does not conflict directly or
otherwise interfere with the implementation of the
relevant waste management plan or plans referred to in
regulation 4(3) of the Waste Regulations.
(6) The competent authority shall reconsider and, where
necessary, update permit conditions periodically
(a) where there are substantial changes in the operation of
the waste facility or the waste deposited;
(b) on the basis of monitoring results reported by the
operator pursuant to regulation 11(3) and (4) or
inspections carried out pursuant to regulation 28;
(c) in the light of information exchange on substantial
changes in best available techniques.
(7) The competent authority shall make this information
available in accordance with the Freedom of Access to Information
on the Environment Regulations
Provided that the information contained in a permit granted
under these regulations shall be made available to the competent
national and Community statistical authorities where requested for
statistical purposes.
Provided further that sensitive information of a purely
commercial nature, such as information concerning business
relations and cost components and the volume of economic mineral
reserves, shall not be made public.
(1) The public shall be informed, by public notices or
other appropriate means, such as electronic media where available,
of the following matters early in the procedure for granting a
permit or, at the latest, as soon as the information can reasonably be
provided on
(a) the application for a permit;
(b) where applicable, the fact that a decision concerning
an application for a permit is subject to consultation
with an other State in accordance with regulation 15;
(c) details of the relevant competent authorities
responsible for taking the decision, those from which
relevant information can be obtained, those to which
comments or questions can be submitted, and details
of the time schedule for transmitting comments or
questions;
(d) the nature of possible decisions;
(e) where applicable, the details relating to a proposal for
the updating of a permit or of permit conditions;
(f)
an indication of the times and places where, or the
means by which, the relevant information will be made
available;
(g) details of the arrangements for public participation
made pursuant to sub-regulation (7).
(2) Within appropriate time frames, the following shall be
made available to the public concerned
(a) in accordance with Maltese legislation, the main
reports and advice transmitted to the Competent
Authority at the time when the public was informed in
accordance with sub-regulation (1);
(b) in accordance with the provisions of the Freedom of
Access to Information on the Environment
Regulations, any information in addition to that
referred to in sub-regulation (1) which is relevant for
the decision in accordance with regulation 9 and which
only becomes available after the time the public have
been informed in accordance with sub-regulation (1).
(3) The public shall be informed, in accordance with sub-
regulation (1) of an update of permit conditions in accordance with
regulation 9(6).
(4) The public concerned shall be entitled to express comments
and opinions to the competent authority before a decision is taken.
(5) The results of the consultations held pursuant to this
regulation shall be duly taken into account in the taking of a
decision.
(6) When a decision has been taken the competent authority
shall, in accordance with the appropriate procedures, inform the
public concerned and shall make the following information
available to the public concerned
(a) the content of the decision, including a copy of the
permit;
(b) the reasons and considerations on which the decision
is based.
(7) The detailed arrangements for public participation under
this regulation shall be determined by the competent authority so as
to enable the public concerned to prepare and participate
effectively.
(1) The management of a waste facility shall be in the
hands of a competent person and technical development and
training of staff shall be provided.
(2) In constructing a new waste facility or modifying an
existing waste facility, the operator shall ensure that
(a) the waste facility is suitably located, taking into
account in particular Community or Maltese
obligations relating to protected areas, and geological,
hydrological,
hydrogeological,
seismic
and
geotechnical factors, and is designed so as to meet the
necessary conditions for, in the short and long-term
perspectives, preventing pollution of the soil, air,
groundwater or surface water, taking into account
especially the Pollution Caused by Certain Dangerous
Substances discharged into the Aquatic Environment
Regulations, the Protection of Groundwater against
Pollution caused by Certain Dangerous Substances
Regulations, and the Water Policy Framework
Regulations, 2and ensuring efficient collection of
contaminated water and leachate as and when required
under the permit, and reducing erosion caused by
water or wind as far as it is technically possible and
economically viable;
(b) the waste facility is suitably constructed, managed and
maintained to ensure its physical stability and to
prevent pollution or contamination of soil, air, surface
water or groundwater in the short and long-term
perspectives as well as to minimise as far as possible
damage to landscape;
(c) there are suitable plans and arrangements for regular
monitoring and inspection of the waste facility by
competent persons and for taking action in the event of
results indicating instability or water or soil
contamination
Provided that records of monitoring and inspections
shall be kept, together with permit documentation, in
order to ensure the appropriate hand-over of
information, particularly in the event of a change of
operator;
(d) suitable arrangements are made for the rehabilitation
of the land and the closure of the waste facility; and
(e) suitable arrangements are made for the after-closure
phase of the waste facility.
(3) The operator shall, without undue delay and in any event
not later than forty-eight hours thereafter, notify the competent
authority of any events likely to affect the stability of the waste
facility and any significant adverse environmental effects revealed
by the control and monitoring procedures of the waste facility.
(4) The operator shall implement the internal emergency plan,
where applicable, and follow any other instruction from the
competent authority as to the corrective measures to be taken.
(5)
The operator shall bear the costs of the measures to be
undertaken.
(6) At least once a year, the operator shall report, on the basis
of aggregated data, all monitoring results to the competent
authority for the purposes of demonstrating compliance with permit
conditions and increasing knowledge of waste and waste facility
behaviour. On the basis of this report the competent authority may
decide that validation by an independent expert is necessary.
(1) A waste facility shall only start the closure procedure
if one of the following conditions is satisfied
(a) the relevant conditions stated in the permit are met;
(b) authorisation is granted by the competent authority, at
the request of the operator;
(c) the competent authority issues a reasoned decision to
that effect.
(2) A waste facility may be considered as finally closed only
after the competent authority has, without undue delay, carried out
a final on-site inspection, assessed all the reports submitted by the
operator, certified that the land affected by a waste facility has been
rehabilitated and communicated to the operator its approval of the
closure
Provided that this approval shall not in any way reduce the
operator ’s obligations under the conditions of the permit or
otherwise in law.
(3) The operator shall be responsible for the maintenance,
monitoring, control and corrective measures in the after-closure
phase for as long as may be required by the competent authority,
taking into account the nature and duration of the hazard, save
where the competent authority decides to take over such tasks from
the operator, after a waste facility has been finally closed and
without prejudice to any Community or Maltese legislation
governing the liability of the waste holder.
(4) When considered necessary by the competent authority, in
order to fulfil relevant environmental requirements set out in
Community or Maltese legislation, in particular those in the
Pollution Caused by Certain Dangerous Substances discharged
into the Aquatic Environment Regulations, the Protection of
Groundwater against Pollution caused by Certain Dangerous
S u b s t a n c e s R e g u l a t i o n s , a n d t h e Wa t e r P o l i c y F r a m e w o r k
Regulations, following closure of a waste facility, the operator
shall, inter alia, control the physical and chemical stability of the
facility and minimise any negative environmental effect, in
particular with respect to surface and groundwater, by ensuring
that
(a) all the structures pertaining to the facility are
monitored and conserved, with control and measuring
apparatus always ready for use;
(b) where applicable, overflow channels and spillways are
kept clean and free.
(5)
Following closure of a waste facility, the operator shall,
without delay, notify the Competent Authority of any events or
developments likely to affect the stability of the waste facility, and
any significant adverse environmental effects revealed by the
relevant control and monitoring procedures.
(6) The operator shall implement the internal emergency plan,
where applicable, and follow any other instruction from the
competent authority as to the corrective measures to be taken
Provided that the operator shall bear the costs of the
measures to be undertaken.
(7) In cases and at a frequency to be determined by the
competent authority, the operator shall report, on the basis of
aggregated data, all monitoring results to the relevant competent
authorities for the purposes of demonstrating compliance with
permit conditions and increasing knowledge of waste and waste
facility behaviour.
(1) The operator shall take the necessary measures in
order to meet Community or Maltese environmental standards, in
p a r t i c u l a r to p r e v e n t, i n a c c or d an c e wi t h t h e Wa te r P o l i cy
Framework Regulations, the deterioration of current water status,
inter alia, by
(a) evaluating the leachate generation potential, including
contaminant content of the leachate, of the deposited
waste during both the operational and after-closure
phase of the waste facility, and determining the water
balance of the waste facility;
(b) preventing or minimising leachate generation and
surface water or groundwater and soil from being
contaminated by the waste; and
(c) collecting and treating contaminated water and
leachate from the waste facility to the appropriate
standard required for their discharge.
(2) The operator shall take adequate measures to prevent or
reduce dust and gas emissions.
(3) On the basis of an assessment of environmental risks, when
taking into account, in particular, the Pollution Caused by Certain
Dangerous Substances discharged into the Aquatic Environment
Regulations, the Protection of Groundwater against Pollution
caused by Certain Dangerous Substances Regulations, or the Water
Policy Framework Regulations, as applicable, the competent
authority has decided that collection and treatment of leachate is
not necessary or it has been established that the waste facility poses
no potential hazard to soil, groundwater or surface water, the
requirements set out in sub-regulation (1)(b) and (c) may be
reduced or waived accordingly.
(4) In the case of a pond involving the presence of cyanide, the
operator shall ensure that the concentration of weak acid
dissociable cyanide in the pond is reduced to the lowest possible
level using best available techniques and, in any case, at waste
facilities which have previously been granted a permit or have
already been in operation on 1 May 2008 that the concentration of
weak acid dissociable cyanide at the point of discharge of the
tailings from the processing plant into the pond does not exceed 50
ppm as from 1 May 2008, 25 ppm as from 1 May 2013, 10 ppm as
from 1 May 2018 and 10 ppm at waste facilities which are granted a
permit after 1 May 2008
Provided that, if the competent authority so requests, the
operator shall demonstrate, through a risk assessment that takes
site-specific conditions into account, that those concentration limits
need not be further lowered.
(1) The competent authority shall, prior to the
commencement of any operations involving the accumulation or
deposit of extractive waste in a waste facility, require a financial
guarantee (such as in the form of a financial deposit, including
industry-sponsored mutual guarantee funds) or the equivalent, in
accordance with procedures to be decided by the competent
authority, so that
(a) all obligations under the permit issued pursuant to
these regulations, including after-closure provisions,
are discharged; and
(b) there are funds readily available at any given time for
the rehabilitation of the land affected by the waste
facility, as described in the waste management plan
prepared pursuant to regulation 7 and required by the
regulation 9 permit.
(2) The calculation of the guarantee referred to in sub-
regulation (1) shall be made on the basis of
(a) the likely environmental impact of the waste facility,
taking into account in particular the category of the
waste facility, the characteristics of the waste and the
future use of the rehabilitated land; and
(b) the assumption that independent and suitably qualified
third parties will assess and perform any rehabilitation
work needed.
(3) The size of the guarantee shall be periodically adjusted in
accordance with any rehabilitation work needed to be carried out
on the land affected by the waste facility, as described in the waste
management plan prepared pursuant to regulation 7 and required by
the regulation 9 permit.
(4) Where the competent authority approves closure in
accordance with regulation 12(2), it shall provide the operator with
a written statement releasing him from the guarantee obligation
referred to in sub-regulation (1) with the exception of after-closure
obligations as referred to in regulation 12(3).
(1) Where the Minister is aware that the operation of a
Category A waste facility in Malta is likely to have significant
adverse effects on the environment of, and any resultant risks to
human health in, another State, or where a State likely to be thus
affected so requests, the Minister shall forward the information
provided pursuant to regulation 9 to the other State at the same time
as when the public is informed in terms of regulation 10(1)
Provided that such information shall serve as a basis for any
consultation necessary within the context of bilateral relations
between Malta and the other State on a reciprocal and equivalent
basis.
(2) Within the framework of their bilateral relations, the
Minister shall ensure that in the cases referred to in sub-regulation
(1) the applications are also made available for an appropriate
period of time to the public concerned of the State likely to be
affected so that they will have the right to comment on them before
the competent authority reaches its decision.
(3) The Minister shall ensure that, in the event of an accident
involving a waste facility as referred to in sub-regulation (1),
information provided by the operator to the competent authority
pursuant to regulation 8(5) and (6) shall be immediately forwarded
to the other State in order to help minimise the consequences of the
accident for human health and to assess and minimise the extent of
the actual or potential environmental damage.
PART IV
CATEGORY B WASTE FACILITY
Category B waste facility shall be subject to all regulations
under Part III of these regulations, except regulation 11(3) and (4),
regulation 12(4), (5), (6) and (7), regulation 13(4), regulation 14
and regulation 15.
PART V
CATEGORY C WASTE FACILITY
(1) No waste facility shall be allowed to operate without a
permit granted by the competent authority.
(2) The permit shall contain the elements specified in sub-
regulation (3) and shall clearly indicate the category of the waste
facility in accordance with the criteria referred to in regulation 6
Provided that, subject to compliance with all requirements
under this regulation, any permit produced pursuant to other
Community or Maltese legislation may be combined to form a
single permit, where such a format obviates the unnecessary
duplication of information and the repetition of work by the
operator or competent authority
Provided further that, the details specified in sub-regulation
(3) can be covered by one single permit or several permits,
provided that all requirements under this regulation are complied
with.
(3) The application for a permit shall contain at least the
following details
(a) the identity of the operator;
(b) the proposed location of the waste facility, including
any possible alternative locations;
(c) the waste management plan pursuant to regulation 18;
and
(d) any other relevant information requested by the
competent authority.
(4) The competent authority may specify the format in which
such information is to be made available.
(5) The competent authority shall only grant a permit if it is
satisfied that
(a) the operator complies with the relevant requirements
under these regulations;
(b) the management of waste does not conflict directly or
otherwise interfere with the implementation of the
relevant waste management plan or plans referred to in
regulation 4(3) of the Waste Regulations.
(6) The competent authority shall reconsider and, where
necessary, update permit conditions periodically
(a) where there are substantial changes in the operation of
the waste facility or the waste deposited;
(b) on the basis of inspections carried out pursuant to
regulation 29;
(c) in the light of information exchange on substantial
changes in best available techniques.
(7) The competent authority shall make this information
available in accordance with the Freedom of Access to Information
on the Environment Regulations
Provided that the information contained in a permit granted
under these regulations shall be made available to the competent
national and Community statistical authorities where requested for
statistical purposes
Provided further that sensitive information of a purely
commercial nature, such as information concerning business
relations and cost components and the volume of economic mineral
reserves, shall not be made public.
(1) The operator shall draw up a waste management plan
for the minimisation, treatment, recovery and disposal of extractive
waste, taking account of the principle of sustainable development.
(2)
The objectives of the waste management plan shall be
(a) to prevent or reduce waste production and its
harmfulness, in particular by considering
(i)
waste management in the design phase and in the
choice of the method used for mineral extraction
and treatment;
(ii) the changes that the extractive waste may
undergo in relation to an increase in surface area
and exposure to conditions above ground;
WASTE MANAGEMENT (MANAGEMENT OF WASTE FROM
EXTRACTIVE INDUSTRIES AND BACKFILLING)
(iii) backfilling into the excavation void, whether
created through surface or underground
extraction, after extraction of the mineral, as far
as is technically and economically feasible and
environmentally sound in accordance with
existing Community or Maltese environmental
standards and with the requirements of these
regulations where relevant;
(iv) putting topsoil back in place after the closure of
the waste facility or, if this is not practically
feasible, reusing topsoil elsewhere;
(v) using less dangerous substances for the
treatment of mineral resources;
(b) to encourage the recovery of extractive waste by
means of recycling, reusing or reclaiming such waste,
where this is environmentally sound in accordance
with existing Community or Maltese environmental
standards and with the requirements of these
regulations where relevant;
(c) to ensure short and long-term safe disposal of the
extractive waste, in particular by considering, during
the design phase, the management during the operation
and after-closure of a waste facility and by choosing a
design which
(i)
requires minimal and, if possible, ultimately no
monitoring, control and management of the
closed waste facility;
(ii) prevents or at least minimises any long-term
negative effects, for example attributable to
migration of airborne or aquatic pollutants from
the waste facility; and
(iii) ensures the long-term geotechnical stability of
any dams or heaps rising above the pre-existing
ground surface.
(3) The waste management plan shall contain at least the
following elements
(a) the proposed classification for the waste facility in
accordance with the criteria laid down in regulation 6
and sufficient information justifying that a Category A
waste facility is not required, including an
identification of possible accident hazards;
(b) waste characterisation in accordance with Schedule 2
and a statement of the estimated total quantities of
extractive waste to be produced during the operational
phase;
(c) a description of the operation generating such waste
and of any subsequent treatment to which it is subject;
(d) a description of how the environment and human
health may be adversely affected by the deposit of
such waste and the preventive measures to be taken in
order to minimise environmental impact during
operation and after closure, including the aspects
referred to in regulation 19(a), (b), (d) and (e);
(e) the proposed control and monitoring procedures
pursuant to regulation 19(c);
(f)
measures for the prevention of water status
deterioration in accordance with the Water Policy
Framework Regulations, and for the prevention or
minimisation of air and soil pollution pursuant to
regulation 20;
(g) a survey of the condition of the land to be affected by
the waste facility;
(h) any other relevant information requested by the
competent authority.
(4) The waste management plan shall provide sufficient
information to enable the competent authority to evaluate the
operator’s ability to meet the objectives of the waste management
plan as set out in sub-regulation (2) and his obligations under these
regulations. The plan shall explain, in particular, how the option
and method chosen as mentioned in sub-regulation (2)(a)(i) will
fulfil the objectives of the waste management plan as laid down in
sub-regulation (2)(a).
(5) The competent authority may specify the format in which
such information is to be made available.
(6) The competent authority shall make this information
available in accordance with the Freedom of Access to Information
on the Environment Regulations.
(7) The waste management plan shall be reviewed every five
years and, or amended, as appropriate, in the event of substantial
changes to the operation of the waste facility or to the waste
deposited. Any amendments shall be notified to the competent
authority.
(8) Plans produced pursuant to other Community or Maltese
legislation and containing the information specified in sub-
regulation (3) may be used where this obviates the unnecessary
duplication of information and the repetition of work by the
operator, on condition that all requirements under sub-regulations
(1), (2), (3), (4) and (7) are met.
(9) The competent authority shall approve the waste
management plan on the basis of procedures to be decided by the
competent authority and shall monitor its implementation.
In constructing a new waste facility or modifying an
existing waste facility, the operator shall ensure that
WASTE MANAGEMENT (MANAGEMENT OF WASTE FROM
EXTRACTIVE INDUSTRIES AND BACKFILLING)
(a) the waste facility is suitably located, taking into
account in particular Community or Maltese
obligations relating to protected areas, and geological,
hydrological,
hydrogeological,
seismic
and
geotechnical factors, and is designed so as to meet the
necessary conditions for, in the short and long-term
perspectives, preventing pollution of the soil, air,
groundwater or surface water, taking into account
especially the Pollution Caused by Certain Dangerous
Substances discharged into the Aquatic Environment
Regulations, the Protection of Groundwater against
Pollution caused by Certain Dangerous Substances
Regulations, and the Water Policy Framework
Regulations, and ensuring efficient collection of
contaminated water and leachate as and when required
under the permit, and reducing erosion caused by
water or wind as far as it is technically possible and
economically viable;
(b) the waste facility is suitably constructed, managed and
maintained to ensure its physical stability and to
prevent pollution or contamination of soil, air, surface
water or groundwater in the short and long-term
perspectives as well as to minimise as far as possible
damage to landscape;
(c) there are suitable plans and arrangements for regular
monitoring and inspection of the waste facility by
competent persons and for taking action in the event
of results indicating instability or water or soil
contamination
Provided records of the monitoring and inspections
shall be kept, together with permit documentation, in
order to ensure the appropriate hand-over of
information, particularly in the event of a change of
operator;
(d) suitable arrangements are made for the rehabilitation
of the land and the closure of the waste facility;
(e) suitable arrangements are made for the after-closure
phase of the waste facility.
(1) The operator shall take the necessary measures in
order to meet Community or Maltese environmental standards, in
p a r t i c u l a r to p r e v e n t, i n a c c or d an c e wi t h t h e Wa te r P o l i cy
Framework Regulations, the deterioration of current water status,
inter alia, by
(a) evaluating the leachate generation potential, including
contaminant content of the leachate, of the deposited
waste during both the operational and after-closure
phase of the waste facility, and determining the water
balance of the waste facility;
(b) preventing or minimising leachate generation and
surface water or groundwater and soil from being
contaminated by the waste; and
(c) collecting and treating contaminated water and
leachate from the waste facility to the appropriate
standard required for their discharge.
(2) The operator shall take adequate measures to prevent or
reduce dust and gas emissions.
(3) Where, on the basis of an assessment of environmental
risks, taking into account, in particular, the Pollution Caused by
Certain Dangero us Sub st an ces di scharged in to t he Aquati c
Environment Regulations, the Protection of Groundwater against
Pollution caused by Certain Dangerous Substances Regulations, or
the Water Policy Framework Regulations, as applicable, the
competent authority has decided that collection and treatment of
leachate is not necessary or it has been established that the waste
facility poses no potential hazard to soil, groundwater or surface
water, the requirements set out in sub-regulation (1)(b) and (c) may
be reduced or waived accordingly.
PART VI
INVENTORY OF CLOSED WASTE FACILITIES
The competent authority shall draw up and periodically
update an inventory of closed waste facilities, including abandoned
waste facilities, which cause serious negative environmental
impacts or have the potential of becoming in the medium or short
term a serious threat to human health or the environment
Provided that such an inventory, to be made available to the
public, shall be carried out by 1 May 2012.
PART VII
BACKFILLING INTO EXCAVATION VOIDS
(1) No excavation void, whether created through surface
or underground extraction, shall be allowed to be backfilled
without a permit granted by the competent authority.
(2) The permit shall contain the elements specified in sub-
regulation (3)
Provided that, subject to compliance with all requirements
under this regulation, any permit produced pursuant to other
Community or Maltese legislation may be combined to form a
single permit, where such a format obviates the unnecessary
duplication of information and the repetition of work by the
operator or competent authority
Provided further that, the details specified in sub-regulation
(3) can be covered by one single permit or several permits,
provided that all requirements under this regulation are complied
with.
(3) The application for a permit shall contain at least the
following details
(a) the identity of the operator;
WASTE MANAGEMENT (MANAGEMENT OF WASTE FROM
EXTRACTIVE INDUSTRIES AND BACKFILLING)
(b) the location of the excavation void, whether created
through surface or underground extraction;
(c) the backfilling plan pursuant to regulation 23; and
(d) any other relevant information requested by the
competent authority.
(4) The competent authority may specify the format in which
such information is to be made available.
(5) The competent authority shall only grant a permit if it is
satisfied that
(a) the operator complies with the relevant requirements
under these regulations;
(b) the backfilling into the excavation void, whether
created through surface or underground extraction,
does not conflict directly or otherwise interfere with
the implementation of the relevant waste management
plan or plans referred to in the Waste Regulations.
(6) The competent authority shall reconsider and, where
necessary, update permit conditions periodically
(a) where there are substantial changes in the backfilling
into the excavation void, whether created through
surface or underground extraction, or the backfill;
(b) on the basis of inspections carried out pursuant to
regulation 29;
(c) in the light of information exchange on substantial
changes in best available techniques.
(7) The competent authority shall make this information
available in accordance with the Freedom of Access to Information
on the Environment Regulations
Provided that the information contained in a permit granted
under these regulations shall be made available to the competent
national and Community statistical authorities when requested for
statistical purposes
Provided further that sensitive information of a purely
commercial nature, such as information concerning business
relations and cost components and the volume of economic mineral
reserves, shall not be made public.
(1) The operator shall draw up a backfilling plan for the
backfilling into the excavation void, whether created through
surface or underground extraction.
(2)
The objectives of the backfilling plan shall be
(a) to ensure that the backfilling into the excavation void,
whether created through surface or underground
extraction, is carried out in accordance with existing
Community or Maltese environmental standards and
with the requirements of these regulations where
relevant; and
(b) to encourage material recovery by means of
backfilling, where this is environmentally sound in
accordance with existing Community or Maltese
environmental standards and with the requirements of
these regulations where relevant.
(3) The backfilling plan shall contain at least the following
elements
(a) a description of how the environment and human
health may be adversely affected by the backfilling
into the excavation void, whether created through
surface or underground extraction, including the
relocation of temporary constructions, and the
preventive measures to be taken in order to minimise
environmental impact during operation and after
closure, including the aspects referred to in regulation
24(a), (b), (d) and (e);
(b) the proposed control and monitoring procedures
pursuant to regulations 24, 25, 26 and 27, when
applicable;
(c) the proposed plan for closure, including rehabilitation,
after-closure procedures and monitoring as provided
for in regulation 26;
(d) measures for the prevention of water status
deterioration in accordance with the Water Policy
Framework Regulations, and for the prevention or
minimisation of air and soil pollution pursuant to
regulation 25;
(e) a survey of the condition of the land to be affected by
the backfilling;
(f)
any other relevant information requested by the
competent authority.
(4) The backfilling plan shall provide sufficient information to
enable the competent authority to evaluate the operator’s ability to
meet the objectives of the backfilling plan as set out in sub-
regulation (2) and his obligations under these regulations.
(5) The competent authority may specify the format in which
such information is to be made available.
(6) The competent authority shall make this information
available in accordance with the Freedom of Access to Information
on the Environment Regulations.
(7) Plans produced pursuant to other Community or Maltese
legislation and containing the information specified in sub-
regulation (3) may be used where this obviates the unnecessary
duplication of information and the repetition of work by the
operator, on condition that all requirements under sub-regulations
(1), (2), (3) and (4) are met.
(8) The competent authority shall approve the backfilling plan
on the basis of procedures to be decided by the competent authority
and shall monitor its implementation.
WASTE MANAGEMENT (MANAGEMENT OF WASTE FROM
EXTRACTIVE INDUSTRIES AND BACKFILLING)
In backfilling into an excavation void, whether created
through surface or underground extraction, the operator shall
ensure that
(a) the excavation void, whether created through surface
or underground extraction, is suitably located, taking
into account in particular Community or Maltese
obligations relating to protected areas, and geological,
hydrological,
hydrogeological,
seismic
and
geotechnical factors, and is backfilled in such a way so
as to meet the necessary conditions, in the short and
long-term perspectives, preventing pollution of the
soil, air, groundwater or surface water, taking into
account especially the Pollution Caused by Certain
Dangerous Substances discharged into the Aquatic
Environment
Regulations,
the
Protection
of
Groundwater against Pollution caused by Certain
Dangerous Substances Regulations, and the Water
Policy Framework Regulations, and ensuring efficient
collection of contaminated water and leachate as and
when required under the permit, and reducing erosion
caused by water or wind as far as it is technically
possible and economically viable;
(b) the excavation void, whether created through surface
or underground extraction, is suitably backfilled to
ensure its physical stability and to prevent pollution or
contamination of soil, air, surface water or
groundwater in the short and long-term perspectives as
well as to minimise as far as possible damage to
landscape; and
(c) there are suitable plans and arrangements for regular
monitoring and inspection of the excavation void,
whether created through surface or underground
extraction, by competent persons and for taking action
in the event of results indicating instability or water or
soil contamination
Provided records of the monitoring and inspections
shall be kept, together with permit documentation, in
order to ensure the appropriate hand-over of
information, particularly in the event of a change of
operator;
(d) suitable arrangements are made for the rehabilitation
of the land and the closure of the excavation void,
whether created through surface or underground
extraction; and
(e) suitable arrangements are made for the after-closure
phase of the excavation void, whether created through
surface or underground extraction.
(1) The operator shall take the necessary measures in
order to meet Community or Maltese environmental standards, in
p a r t i c u l a r to p r e v e n t, i n a c c or d an c e wi t h t h e Wa te r P o l i cy
Framework Regulations, the deterioration of current water status,
inter alia, by
(a) evaluating the leachate generation potential, including
contaminant content of the leachate, of the backfill
during both the operational and after-closure phase of
the excavation void, whether created through surface
or underground extraction, and determining the water
balance of the excavation void, whether created
through surface or underground extraction;
(b) preventing or minimising leachate generation and
surface water or groundwater and soil from being
contaminated by the backfill; and
(c) collecting and treating contaminated water and
leachate from the excavation void, whether created
through surface or underground extraction, to the
appropriate standard required for their discharge.
(2) Where, on the basis of an assessment of environmental
risks, taking into account, in particular, the Pollution Caused by
Certain Dangero us Sub st an ces di scharged in to t he Aquati c
Environment Regulations, the Protection of Groundwater against
Pollution caused by Certain Dangerous Substances Regulations, or
the Water Policy Framework Regulations, as applicable, the
competent authority has decided that collection and treatment of
leachate is not necessary or it has been established that the
backfilling into the excavation void, whether created through
surface or underground extraction, poses no potential hazard to
soil, groundwater or surface water, the requirements set out in sub-
regulation (1)(b) and (c) may be reduced or waived accordingly.
(3) When backfilling into excavation voids, whether created
through surface or underground extraction, which will be allowed
to flood after closure, the operator shall take the necessary
measures to prevent or minimise water status deterioration and soil
pollution in accordance, mutatis mutandis, with sub-regulations (1)
and (2)
Provided that the operator shall provide the competent
authority with the information necessary to ensure compliance with
Community or Maltese obligations, in particular those in the Water
Policy Framework Regulations.
(1) The operator shall be responsible for the maintenance,
monitoring, control and corrective measures in the after-closure
phase for as long as may be required by the competent authority,
taking into account the nature and duration of the hazard, save
where the competent authority decides to take over such tasks from
the operator, after an excavation void, whether created through
surface or underground extraction, has been finally closed and
without prejudice to any Community or Maltese legislation
governing the liability of the operator.
(2) When considered necessary by the competent authority, in
order to fulfil relevant environmental requirements set out in
Community or Maltese legislation, in particular those in the
Pollution Caused by Certain Dangerous Substances discharged into
the Aquatic Environment Regulations, the Protection of
Groundwater against Pollution caused by Certain Dangerous
S u b s t a n c e s R e g u l a t i o n s , a n d t h e Wa t e r P o l i c y F r a m e w o r k
Regulations, following closure of an excavation void, whether
created through surface or underground extraction, the operator
shall, inter alia, control the physical and chemical stability of the
excavation void, whether created through surface or underground
extraction, and minimise any negative environmental effect, in
particular with respect to surface and groundwater, by ensuring
that
(a) all the structures pertaining to the excavation void,
whether created through surface or underground
extraction, are monitored and conserved, with control
and measuring apparatus always ready for use; and
(b) where applicable, overflow channels and spillways are
kept clean and free.
PART VIII
DISPOSAL INTO A RECEIVING BODY OF WATER
The disposal of extractive waste, whether in solid, slurry or
liquid form, into any receiving body of water other than one
constructed for the purpose of disposing of extractive waste, shall
be conditional upon compliance by the operator with the relevant
requirements of the Pollution Caused by Certain Dangerous
Substances discharged into the Aquatic Environment Regulations,
the Protection of Groundwater against Pollution caused by Certain
D a n g e r o u s S u b s t a n c e s R e g u l a t i o n s , a n d t h e Wa t e r P o l i c y
Framework Regulations.
PART VIII
ENFORCEMENT
(1) Prior to the commencement of deposit operations and
at regular intervals thereafter, including the after-closure phase, to
be decided by the competent authority, the competent authority
shall inspect any waste facility covered by regulation 9 or 16 or 17
in order to ensure that it complies with the relevant conditions of
the permit
Provided that an affirmative finding shall in no way reduce
the responsibility of the operator under the conditions of the
permit.
(2) The operator shall keep up-to-date records of all waste
management operations and make them available for inspection by
the competent authority.
(3) In the event of a change of operator during the management
of a waste facility, the operator shall ensure that there is an
appropriate transfer of relevant up-to-date information and records
relating to the waste facility.
(1) Prior to the commencement of deposit operations and
at regular intervals thereafter, including the after-closure phase, to
be decided by the competent authority, the competent authority
shall inspect any excavation void, whether created through surface
or underground extraction, covered by regulation 22 in order to
ensure that it complies with the relevant conditions of the permit
Provided that an affirmative finding shall in no way reduce
the responsibility of the operator under the conditions of the
permit.
(2) The operator shall keep up-to-date records of all backfilling
operations and make them available for inspection by the
competent authority.
(3) In the event of a change of operator during the backfilling
into an excavation void, whether created through surface or
underground extraction, the operator shall ensure that there is an
appropriate transfer of relevant up-to-date information and records
relating to the excavation void, whether created through surface or
underground extraction.
Any person shall be guilty of an offence under these
regulations if
(a) he fails to comply with any provisions of these
regulations or fails to comply with permit conditions
or with any order lawfully given in terms of any
provision of these regulations; or
(b) he contravenes any restriction, prohibition or
requirement imposed by or under these regulations; or
(c) he acts in contravention of any of the provisions of
these regulations; or
(d) he conspires or attempts, or aids, or abets, any other
person by whatever means, including advertising,
counselling or procurement to contravene the
provisions of these regulations or to fail to comply
with any such provisions (including any order lawfully
given in terms of any of the provisions of these
regulations) or to contravene any restriction,
prohibition or requirement imposed by or under the
said regulations.
Any person who commits an offence against these
regulations shall, on conviction, be liable
(a) on a first conviction, to a fine (multa) of not less than
one thousand and one hundred and sixty-four euro and
sixty-nine cents (€1,164.69), but not exceeding two
thousand and three hundred and twenty-nine euro and
thirty-seven cents (€2,329.37);
(b) on a second conviction or subsequent convictions, to a
fine (multa) of not less than two thousand and three
hundred and twenty-nine euro and thirty-seven cents
(€2,329.37), but not exceeding four thousand and six
hundred and fifty-eight euro and seventy-five cents
(€4,658.75), or to imprisonment for a term not
exceeding two years, or to both such fine and
imprisonment
Provided that whenever any person is found guilty of
committing an offence under these regulations by means of a
vehicle, the owner of the said vehicle, where applicable, is held
liable in the same manner and degree
Provided further that the court may order any person who
has been found guilty of committing an offence against these
regulations to pay for the expenses incurred by the competent
authority mentioned in these regulations as a result of the said
offence, the revocation of the permit issued by the competent
authority and the confiscation of the corpus delicti, including the
vehicle, if applicable.
(1) The provisions of articles 23 and 30 of the Criminal
Code shall, mutatis mutandis, apply to proceedings in respect of
offences against these regulations, so however that the
disqualification from holding or obtaining a licence, permit or
authority shall in no case be for less than one year.
(2) Notwithstanding the provisions of article 370 of the
Criminal Code, proceedings for an offence against these
regulations shall be held before the Court of Magistrates (Malta) or
the Court of Magistrates (Gozo), as the case may be, and shall be in
accordance with the provisions of the Criminal Code regulating the
procedure before the said courts as courts of criminal judicature.
(3) Notwithstanding the provisions of the Criminal Code, the
Attorney General shall always have a right of appeal to the Court of
Criminal Appeal from any judgement given by the Court of
Magistrates (Malta) or the Court of Magistrates (Gozo) in respect
of proceedings for any offence against these regulations.
WASTE MANAGEMENT (MANAGEMENT OF WASTE FROM
EXTRACTIVE INDUSTRIES AND BACKFILLING)
Schedule 1
(Regulation 8)
Major-accident prevention policy and information to be communicated
to the public concerned
1. Major-accident prevention policy
The operator’s major-accident prevention policy and safety management system
should be proportionate to the major-accident hazards presented by the waste
facility. For the purpose of implementing them, account shall be taken of the
following elements
(1) the major-accident prevention policy should include the operator’s
overall aims and principles of action with respect to the control of
major-accident hazards;
(2) the safety management system should include the part of the general
management system which includes the organisational structure,
responsibilities, practices, procedures, processes and resources for
determining and implementing the major-accident prevention policy;
(3) the following issues shall be addressed by the safety management
system
(a) organisation and personnel - the roles and responsibilities of
personnel involved in the management of major hazards at all
levels in the organisation; identification of training needs of such
personnel and the provision of the training so identified; and
involvement
of
employees
and,
where
appropriate,
subcontractors;
(b) identification and evaluation of major hazards - adoption and
implementation of procedures for systematically identifying
major hazards arising from normal and abnormal operations and
assessment of their likelihood and severity;
(c) operational control - adoption and implementation of procedures
and instructions for safe operation, including maintenance of
plant, processes, equipment and temporary stoppages;
(d) management of change - adoption and implementation of
procedures for planning modifications to, or the design of, new
waste facilities;
(e) planning for emergencies - adoption and implementation of
procedures to identify foreseeable emergencies by systematic
analysis and to prepare, test and review emergency plans to
respond to such emergencies;
(f) monitoring performance - adoption and implementation of
procedures for the ongoing assessment of compliance with the
objectives set by the operator’s major-accident prevention policy
and safety management system, and the mechanisms for
investigation and taking corrective action in case of non-
compliance. The procedures should cover the operator’s system
for reporting major accidents or near misses, particularly those
involving failure of protective measures, and their investigation
and follow-up on the basis of lessons learnt;
(g) audit and review - adoption and implementation of procedures for
periodic systematic assessment of the major-accident prevention
policy and the effectiveness and suitability of the safety
management system; the documented review of performance of
the policy and safety management system and its updating by
senior management.
2. Information to be communicated to the public concerned
1. Name of operator and address of the waste facility.
2. Identification, by position held, of the person providing the information.
3. Confirmation that the waste facility is subject to these regulations and,
when applicable, that the information relevant to the elements referred
to in regulation 8(2) has been submitted to the competent authority.
4. An explanation in clear and simple terms of the activity or activities
undertaken at the site.
5. The common names or the generic names or the general danger
classification of the substances and preparations involved at the waste
facility as well as waste which could give rise to a major accident, with
an indication of their principal dangerous characteristics.
6. General information relating to the nature of the major-accident
hazards, including their potential effects on the surrounding population
and environment.
7. Adequate information on how the surrounding population concerned are
to be warned and kept informed in the event of a major accident.
8. Adequate information on the actions the population concerned should
take, and on the behaviour they should adopt, in the event of a major
accident.
9. Confirmation that the operator is required to make adequate
arrangements on site, in particular liaison with the emergency services,
to deal with major accidents and to minimise their effects.
10. A reference to the external emergency plan drawn up to cope with any
off-site effects from an accident. This should include advice to co-
operate with any instructions or requests from the emergency services at
the time of an accident.
11. Details of where further relevant information can be obtained, subject to
the requirements of confidentiality laid down in Maltese legislation.