WASTE MANAGEMENT (LANDFILL) REGULATIONS (landfill)
Table of Provisions (28)
Statutory Text (28 Articles)
SUBSIDIARY LEGISLATION 549.29
WASTE MANAGEMENT (LANDFILL)
REGULATIONS
8th October, 2002
LEGAL NOTICE 168 of 2002, as amended by Legal Notices 289 of 2002,
and 70, 146, 426 of 2007, 150 of 2013, 7 of 2019, 147 and 453 of 2021.
(1) The title of these regulations is the Waste Management
(Landfill) Regulations.
(2) With a view to supporting the European Union’s transition to
a circular economy and meeting the requirements of Directive 2008/
98/EC of the European Parliament and of the Council * , and in
particular Articles 4 and 12 thereof, the aim of these regulations is to
ensure a progressive reduction of landfilling of waste, in particular of
waste that is suitable for recycling or other recovery, and, by way of
stringent operational and technical requirements on the waste and
landfills, to provide for measures, procedures and guidance to prevent
or reduce as far as possible negative effects on the environment, in
particular the pollution of surface water, groundwater, soil and air, and
on the global environment, including the greenhouse effect, as well as
any resulting risk to human health, from landfilling of waste, during
the whole life-cycle of the landfill.
(3) In respect of the technical characteristics of landfills, these
regulations contain, for those landfills to which the Industrial
Emissions (Integrated Pollution Prevention and Control) Regulations
are applicable, the relevant technical requirements in order to
elaborate in concrete terms the general requirements of those
regulations. The relevant requirements of the Industrial Emissions
(Integrated Pollution Prevention and Control) Regulations shall be
deemed to be fulfilled if the requirements of these regulations are
complied with.
(4) These regulations bring into effect the provisions of Council
Directive 1999/31/EC of 26 April 1999 on the landfill of waste as
amended by Council Directive 2011/97/EU amending Directive 1999/
31/EC as regards specific criteria for the storage of metallic mercury
considered as waste and Directive (EU) 2018/850 of the European
Parliament and of the Council of 30 May 2018 amending Directive
1999/31/EC on the landfill of waste.
Amended by
L.N.150 of 2013;
L.N. 147 of 2021.
GENERAL REQUIREMENTS FOR ALL CLASSES OF LANDFILLS
1. Location
1.1. The location of a landfill must take into consideration requirements relating
to
(a) the distances from the boundary of the site to residential and recreation
areas, waterways, water bodies and other agricultural or urban sites;
(b) the existence of groundwater, coastal water or nature protection zones in
the area;
(c) the geological and hydrogeological conditions in the area;
(d) the risk of flooding, subsidence, landslides or avalanches on the site;
(e) the protection of the nature or cultural patrimony in the area.
1.2. The landfill can be authorised only if the characteristics of the site with
respect to the above mentioned requirements, or the corrective measures to be taken,
indicate that the landfill does not pose a serious environmental risk.
2. Water control and leachate management
Appropriate measures shall be taken, with respect to the characteristics of the
landfill and the meteorological conditions, in order to
-
control water from precipitations entering into the landfill body,
-
prevent surface water and/or groundwater from entering into the
landfilled waste,
-
collect contaminated water and leachate. If an assessment based on
consideration of the location of the landfill and the waste to be accepted
shows that the landfill poses no potential hazard to the environment, the
competent authority may decide that this provision does not apply;
-
treat contaminated water and leachate collected from the landfill to the
appropriate standard required for their discharge.
The above provisions may not apply to landfills for inert waste.
3. Protection of soil and water
3.1. A landfill must be situated and designed so as to meet the necessary
conditions for preventing pollution of the soil, groundwater or surface water and
ensuring efficient collection of leachate as and when required according to Section 2.
Protection of soil, groundwater and surface water is to be achieved by the
combination of a geological barrier and a bottom liner during the operational/active
phase and by the combination of a geological barrier and a bottom liner during the
operational/active phase and by the combination of a geological barrier and a top
liner during the passive phase/post closure.
3.2. The geological barrier is determined by geological and hydrogeological
conditions below and in the vicinity of a landfill site providing sufficient attenuation
capacity to prevent a potential risk to soil and groundwater. The landfill base and
sides shall consist of a mineral layer which satisfies permeability and thickness
requirements with a combined effect in terms of protection of soil, groundwater and
su r f a c e w a t e r a t l e a s t e q u i v a l e n t t o t h e o n e r e s u l t i n g f r o m t h e f o l l o w i n g
requirements
landfill for hazardous waste: K less than or equal to 1.0 x 10 -9 m/s * ;
-
thickness greater than or equal to 5 m,
landfill for non-hazardous waste: K less than or equal to 1.0 x 10 -9 m/s;
-
thickness greater than or equal to 1 m,
landfill for inert waste: K less than or equal to 1.0 x 10 -7 m/s; thickness
-
greater than or equal to 1 m.
Where the geological barrier does not naturally meet the above conditions it can
be completed artificially and reinforced by other means giving equivalent protection.
An artificially established geological barrier should be no less than 0.5 metres thick.
3.3. In addition to the geological barrier described above a leachate collection
and sealing system must be added in accordance with the following principles so as
to ensure that leachate accumulation at the base of the landfill is kept to a minimum
Leachale collection and bottom sealing
Landfill category
Non-hazardous
Hazardous
Artificial sealing liner
Required
Required
Drainage layer greater than
Required
Required
or equal to 0.5m
The competent authority may set general or specific requirements for inert waste
landfills and for the characteristics of the above mentioned technical means.
If the competent authority, after a consideration of the potential hazards to the
environment, finds that the prevention of leachate formation is necessary, a surface
sealing may be prescribed.
Recommendations for the surface sealing are as follows
Landfill category
Non-hazardous
Hazardous
Gas drainage layer
Required
Not required
Artificial sealing liner
Not required
Required
Impermeable mineral layer
Required
Required
Drainage layer greater than 0.5m
Required
Required
Top soil cover greater than 1m
Required
Required
3.4. If, on the basis of an assessment of environmental risks, the competent
authority has decided, in accordance with Section 2 ("Water control and leachate
management"), that collection and treatment of leachate is not necessary or it has
been established that the landfill poses no potential hazard to soil, groundwater or
surface water, the requirements in paragraphs 3.2 and 3.3 above may be reduced
accordingly. In the case of landfills for inert waste these requirements may be
adapted by national legislation.
3.5. The method for the determination of the permeability coefficient for landfills, in
the field and for the whole extension of the site, shall be determined by the Commission
through the adoption of implementing acts in accordance with article 15b of Directive
1999/31/EC.
4. Gas control
*1 m/s: metre/second.
4.1. Appropriate measures shall be taken in order to control the accumulation
and migration of landfill gas (Schedule 3).
4.2. Landfill gas shall be collected from all landfills receiving biodegradable
waste and the landfill gas must be treated and used. If the gas collected cannot be
used to produce energy, it must be flared.
4.3. The collection, treatment and use of landfill gas under paragraph 4.2 shall be
carried on in a manner which minimises damage to or deterioration of the
environment and risk to human health.
5. Nuisances and hazards
Measures shall be taken to minimise nuisances and hazards arising from the
landfill through
emissions of odours and dust,
wind-blown materials,
noise and traffic,
birds, vermin and insects,
formation and aerosols,
fires.
The landfill shall be equipped so that dirt originating from the site is not dispersed
onto public roads and the surrounding land.
6. Stability
The emplacement of waste on the site shall take place in such a way as to ensure
stability of the mass of waste and associated structures, particularly in respect of
avoidance of slippages. Where an artificial barrier is established it must be
ascertained that the geological substratum, considering the morphology of the
landfill, is sufficiently stable to prevent settlement that may cause damage to the
7. Barriers
The landfill shall be secured to prevent free access to the site. The gates shall be
locked outside operating hours. The system of control and access to each facility
should contain a programme of measures to detect and discourage illegal dumping in
the facility.
8. Temporary storage of metallic mercury
For the purposes of temporary storage for more than 1 year of metallic mercury,
the following requirements shall apply
Metallic mercury shall be stored separately from other waste.
Containers shall be stored in collecting basins suitably coated so as to
be free of cracks and gaps and impervious to metallic mercury with a
containment volume adequate for the quantity of mercury stored.
The storage site shall be provided with engineered or natural barriers
that are adequate to protect the environment against mercury emissions
and a containment volume adequate for the total quantity of mercury
stored.
The storage site floors shall be covered with mercury-resistant sealants.
A slope with a collection sump shall be provided.
The storage site shall be equipped with a fire protection system.
Storage shall be arranged in a way to ensure that all containers are
easily retrievable.
In these regulations, unless the context otherwise requires
"applicant" means any person who applies for a landfill operating
permit under these regulations;
"biodegradable waste" means any waste that is capable of
undergoing anaerobic or aerobic decomposition, such as food and
garden waste, and paper and paperboard;
"competent authority" means the Environment and Resources
Authority as prescribed by the Nomination of the Competent
* OJ L 312, 22.11.2008, p. 3.
Authority Order, and such other body or person as the Minister
responsible for the environment may by order in the Gazette
prescribe and different bodies or persons may be designated as the
competent authority for different provisions and different purposes
of these regulations;
"eluate" means the solution obtained by a laboratory leaching
test;
"inert waste" means waste that does not undergo any significant
physical, chemical or biological transformations. Inert waste will not
dissolve, burn or otherwise physically or chemically react, biodegrade
or adversely affect other matter with which it comes into contact in a
way likely to give rise to environmental pollution or harm human
health. The total leachability and pollutant content of the waste and the
ecotoxicity of the leachate must be insignificant, and in particular not
endanger the quality of surface water and, or groundwater;
"landfill" means a waste disposal site for the deposit of the waste
onto or into land (i.e. underground), including
-
internal waste disposal sites i.e. landfill where a
producer of waste is carrying out its own waste
disposal at the place of production, and
-
a permanent site i.e. more than one year, which is used
for temporary storage of waste;
but excluding
-
facilities where waste is unloaded in order to permit its
preparation for further transport for recovery,
treatment or disposal elsewhere, and
-
storage of waste prior to recovery or treatment for a
period less than three years as a general rule, or
-
storage of waste prior to disposal for a period less than
one year;
"landfill gas" means all the gases generated from the landfilled
waste;
"landfill operating permit" or "permit" means a permit to operate
a landfill issued under the Waste Regulations;
"leachate" means any liquid percolating through the deposited
waste and emitted from or contained within a landfill;
"liquid waste" means any waste in liquid form including waste
waters but excluding sludge;
"operator" means the natural or legal person responsible for a
landfill; this person may change from the preparation to the after-
care phase;
"treatment" means the physical, thermal, chemical or biological
processes, including sorting, that change the characteristics of the
waste in order to reduce its volume or hazardous nature, facilitate its
handling or enhance recovery;
"underground storage" means a permanent waste storage facility
in a deep geological cavity such as a salt or potassium mine.
The words "waste", "hazardous waste", "non-hazardous waste",
"municipal waste", "waste producer", "waste holder", "waste
management", "separate collection", "recovery", "preparing for re-
use", "recycling" and "disposal" shall have the same meaning as that
assigned to them in regulation 4 of the Waste Regulations.
Amended by
L.N.150 of 2013;
L.N. 147 of 2021.
WASTE ACCEPTANCE CRITERIA AND PROCEDURES
1. Introduction
This Schedule describes general principles for acceptance of waste at the various
classes of landfills.
2. General principles
The composition, leachability, long-term behaviour and general properties of a
waste to be landfilled must be known as precisely as possible. Waste acceptance at a
landfill can be based either on lists of accepted or refused waste, defined by nature
and origin, and on waste analysis methods and limit values for the properties of the
waste to be accepted.
The competent authority shall set national lists of waste to be accepted or refused
at each class of landfill, or define the criteria required to be on the lists. In order to
be accepted at a particular class of landfill, a type of waste must be on the relevant
national list or fulfil criteria similar to those required to be on the list. These lists or
acceptance criteria should be used to establish site specific lists, i.e: the list of
accepted waste specified in the permit in accordance with regulation 11.
The criteria for acceptance of waste on the reference lists or at a class of landfill
may be based on other legislation and/or on waste properties.
Criteria for acceptance at a specific class of landfill must be derived from
considerations pertaining to
protection of the surrounding environment (in particular groundwater
and surface water),
protection of the environmental protection systems (e.g. liners and
leachate treatment systems),
protection of the desired waste-stabilisation processes within the
landfill, - protection against human-health hazards.
Examples of waste property-based criteria are
requirements on knowledge of total composition,
limitations on the amount of organic matter in the waste,
requirements or limitations on the biodegradability of the organic waste
components,
limitations on the amount of specified, potentially harmful/hazardous
components (in relation to the above mentioned protection criteria),
limitations on the potential and expected leachability of specified,
potentially harmful/hazardous components (in relation to the above
mentioned protection criteria),
ecotoxicological properties of the waste and the resulting leachate.
The property-based criteria for acceptance of waste must generally be most
extensive for inert waste landfills and can be less extensive for non-hazardous waste
landfills and least extensive for hazardous waste landfills owing to the higher
environmental protection level of the latter two.
3. General procedures for testing and acceptance of waste
The general characterisation and testing of waste must be based on the following
three-level hierarchy
Level 1: Basic characterisation. This constitutes a thorough determination,
according to standardised analysis and behaviour-testing methods, of the short and
long-term leaching behaviour and/or characteristic properties of the waste.
Level 2: Compliance testing. This constitutes periodical testing by simpler
standardised analysis and behaviour-testing methods to determine whether a waste
complies with permit conditions and/or specific reference criteria. The tests focus on
key variables and behaviour identified by basic characterisation.
Level 3: On-site verification. This constitutes rapid check methods to confirm that
a waste is the same as that which has been subjected to compliance testing and that
which is described in the accompanying documents. It may merely consist of a visual
inspection of a load of waste before and after unloading at the landfill site.
A particular type of waste must normally be characterised at Level 1 and pass the
appropriate criteria in order to be accepted on a reference list. In order to remain on
a site-specific list, a particular type of waste must a regular intervals (e.g. annually)
be tested at Level 2 and pass the appropriate criteria. Each waste load arriving at the
gate of a landfill must be subjected to Level 3 verification.
Certain waste types may be exempted permanently to temporarily from testing at
Level 1. This may be due to impracticability to testing, to unavailability of
appropriate testing procedures and acceptance criteria or to overriding legislation.
4. Guidelines for preliminary waste acceptance procedures
Only Level 3 testing is mandatory and Level 1 and Level 2 applied to the extent
possible. Waste to be accepted at a particular class of landfill must either be on a
restrictive national or site-specific list for that class of landfill or fulfil criteria
similar to those required to get on the list.
The following general guidelines may be used to set preliminary criteria for
acceptance of waste at the three major classes of landfill or the corresponding lists.
Inert waste landfills: only inert waste can be accepted on the list.
Non-hazardous waste landfills: in order to be accepted on the list a waste type
must not be hazardous waste.
Hazardous waste landfills: a preliminary rough list for hazardous waste landfills
would consist of only those waste which are hazardous. Such waste types should,
however, not be accepted on the list without prior treatment if they exhibit total
contents or leachability of potentially hazardous components that are high enough to
constitute a short-term occupational or environmental risk or to prevent sufficient
waste stabilisation within the projected lifetime of the landfill.
5. Sampling of waste
The Commission shall adopt implementing acts in accordance with article 15c of
Directive 1999/31/EC, to develop a standard for sampling of waste.
Provided that until such implementing acts are adopted, national standards and
procedures shall apply.
6. On site verification
On-site verification ensures that the waste is the same as the waste that was
subject to basic characterisation and compliance testing, and that the waste is
correctly described in the accompanying document.
In this regard the landfill operator is to
check the relevant waste documentation;
visually inspect the waste entering the landfill, unless it is not
practicable to see the waste due to the vehicle or container in which the
waste is delivered;
periodically take samples and the same samples are to be kept for a
period of at least one year;
keep a register of the waste deposited including the location of
hazardous waste.
7. Records
The operator shall keep records of the required information, including test results,
for a period of three years, including basic characterisation and compliance testing
of the waste.
8. Specific requirements for metallic mercury
For the purposes of temporary storage for more than 1 year of metallic mercury,
the following requirements shall apply
Composition of the mercury
Metallic mercury shall comply with the following specifications
mercury content greater than 99,9% per weight;
no impurities capable of corroding carbon or stainless steel (e.g. nitric
acid solution, chloride salts solutions).
Containment
Containers used for the storage of metallic mercury shall be corrosion and shock-
resistant. Welds shall therefore be avoided. The containers shall comply in particular
with the following specifications
container material: carbon steel (ASTM A36 minimum) or stainless
steel (AISI 304, 316L),
containers shall be gas and liquid tight,
the outer side of the container shall be resistant against the storage
conditions,
the design type of the container shall successfully pass the drop test and
the leakproofness tests as described in Chapters 6.1.5.3 and 6.1.5.4 of
the UN Recommendations on the Transport of Dangerous Goods,
Manual of Tests and Criteria.
The maximum filling ratio of the container shall be 80% by volume to ensure that
sufficient ullage is available and neither leakage nor permanent distortion of the
container can occur as a result of an expansion of the liquid due to high temperature.
Acceptance procedures
Only containers with a certificate complying with the requirements set out in this
Section shall be accepted.
Acceptance procedures shall comply with the following
only metallic mercury which fulfils the minimum acceptance criteria set
out above shall be accepted,
containers shall be visually inspected before storage. Damaged, leaking
or corroded containers shall not be accepted,
containers shall bear a durable stamp (made by punching) mentioning
the identification number of the container, the construction material, its
empty weight, the reference of the manufacturer and the date of
construction,
containers shall bear a plate permanently fixed to the container
mentioning the identification number of the certificate.
Certificate
The certificate indicated in subsection C shall include the following elements
name and address of the waste producer,
name and address of the responsible for the filling,
place and date of filling,
quantity of the mercury,
the purity of the mercury and, if relevant, a description of the
impurities, including the analytical report,
confirmation that the containers have been used exclusively for the
transport/storage of mercury,
the identification numbers of the containers,
any specific comments.
Certificates shall be issued by the producer of the waste or, in default, by the
person responsible for its management.
(1) These regulations shall apply to any landfill as defined
in regulation 2.
(2) The following activities shall be excluded from the scope
of these regulations
(a) the spreading of sludges, including sewage sludges,
and sludges resulting from dredging operations, and
similar matter on the soil for the purpose of
fertilisation or improvement,
(b) the use of inert waste which is suitable, in
development restoration and filling-in work, or for
construction purposes, in landfills,
(c) the deposit of non-hazardous dredging sludges
alongside small waterways from where they have been
dredged out and of non-hazardous sludges in surface
water including the bed and its sub-soil.
(3) The management of waste from land-based extractive
industries, that is to say, the waste arising from the prospecting,
extraction, including the pre-production development stage,
treatment and storage of mineral resources and from the working of
quarries, shall be excluded from the scope of these regulations
where it falls within the scope of other European Union legislative
acts.
Amended by
L.N. 150 of
2013;
L.N. 147 of 2021.
CONTROL AND MONITORING PROCEDURES IN OPERATION
AND AFTER-CARE PHASES
1. Introduction
The purpose of this Schedule is to provide the m inim um procedures for
monitoring to be carried out to check
that waste has been accepted to disposal in accordance with the criteria
set for the category of landfill in question,
that the processes within the landfill proceed as desired,
that the environmental protection systems are functioning fully as
intended,
-
that the permit conditions for the landfill are fulfilled.
2. Meteorological data
Should the competent authority decide that water balances are an effective tool for
evaluating whether leachate is building up in the landfill body or whether the site is
leaking, it is recommended that the following data are collected from monitoring at
the landfill or from the nearest meteorological station, as long as required by the
competent authority in accordance with regulation 16(4)
Operation phase
After-care phase
1.1 Volume of precipitation
Daily
Daily, added to
monthly values
1.2 Temperature (min., max., 14.00h CET)
Daily
Monthly average
1.3 Direction and force of prevailing wind
Daily
Not required
1.4 Evaporation (lysemeter)*
Daily
Daily, added to
monthly values
1.5 Atmospheric humidity (14.00h CET)
Daily
Monthly average
* Or through other suitable methods.
3. Emission data: water, leachate and gas control
S a m p l i n g o f l e ac h a t e a n d s u r f a c e w a t e r i f p r e se n t m u s t b e c o l l ec t e d a t
representative points. Sampling and measuring (volume and composition) of
leachate must be performed separately at each point at which leachate is discharged
from the site. Reference: general guidelines on sampling technology, ISO 5667-2
(1991).
Monitoring of surface water if present shall be carried out at not less than two
points, one upstream from the landfill and one downstream.
Gas monitoring must be representative for each section of the landfill. The
frequency of sampling and analysis is listed in the following table. For leachate and
water, a sample, representative of the average composition, shall be taken for
monitoring.
The frequency of sampling could be adapted on the basis of the morphology of the
landfill waste (in tumulus, buried, etc). This shall be specified in the permit.
After-care phase( 2 )
Operation phase
Monthly( 1 )( 2 )
2.1 Leachate volume
Every six months
2.2 Leachate composition( 3 )
Quarterly( 2 )
Every six months
Quarterly( 2 )
2.3 Volume and composition of surface(4)
Every six months
water
Quarterly( 2 )( 6 )
Every six months( 7 )
2.4 Potential gas emissions and atmospheric
pressure( 5 ) (CH 4 , CO 2 , O 2 , H 2 S, H 2 , etc.)
( 1 ) The frequency of sampling could be adapted on the basis of the morphology of the landfill waste in
tumulus, buried, etc. This has to be specified in the permit.
( 2 ) If the evaluation of data indicates that longer intervals are equally effective, they may be adapted.
For leachates, conductivity must always be measured at least once a year.
( 3 ) The parameters to be measured and the substances to be analysed vary according to the
composition of the waste deposited; they must be laid down in the permit document and reflect the
leaching characteristics of the waste.
(4) On the basis of the characteristics of the landfill site, the competent authority may determine that
these measurements are not required.
(5)
These measurements are related mainly to the content of organic material in the waste.
(6) CH 4 , CO 2 , O 2 regularly, other gases as required, according to the composition of the waste
deposited, with a view to reflecting its leaching properties.
(7)
Efficiency of the gas extraction system must be checked regularly.
2.1 and 2.2 apply only where leachate collection takes place.
4. Protection of groundwater
A.
Sampling
The measurements must be such as to provide information on groundwater likely
to be affected by the discharging of waste, with at least one measuring point in the
groundwater inflow region and two in the outflow region. This number can be
increased on the basis of a specific hydrogeological survey and the need for an early
identification of accidental leachate release in the groundwater.
Sampling must be carried out in at least three locations before the filling
operations in order to establish reference values for future sampling. Reference
Sampling Groundwaters, ISO 5667, Part 11, 1993.
B.
Monitoring
The parameters to be analysed in the samples taken must be derived from the
expected composition of the leachate and the groundwater quality in the area. In
selecting the parameters for analysis account should be taken of mobility in the
groundwater zone. Parameters could include indicator parameters in order to ensure
an early recognition of change in water quality. Recommended parameters are: pH,
TOC, phenols, heavy metals, fluoride, AS, oil/hydrocarbons.
Operation phase
After-care phase
Every six months( 1 )
Every six months( 1 )
Level of groundwater
Groundwater composition
Site-specific frequency(2)(3) Site-specific frequency(2)(3)
( 1 )
If there are fluctuating groundwater levels, the frequency must be increased.
( 2 ) The frequency must be based on possibility of remedial actions between samplings if a trigger level
is reached, i.e. the frequency must be determined on the basis of knowledge and the evaluation of the
velocity of groundwater flow.
( 3 ) When a trigger level is reached (see C), verification is necessary by repeating the sampling. When
the level has been confirmed, a contingency plan (laid down in the permit) must be followed.
C.
Trigger levels
Significant adverse environmental effects, as referred to in regulations 15 and 16,
should be considered to have occurred in the case of groundwater, when an analysis
of a groundwater sample shows a significant change in water quality. A trigger level
must be determined taking account of the specific hydrogeological formations in the
location of the landfill and groundwater quality. The trigger level must be laid down
in the permit whenever possible.
The observations must be evaluated by means of control charts with established
control rules and levels for each down gradient well. The control levels must be
determined from local variations in groundwater quality.
5. Topography of the site: data on the landfill body
Operation phase
After-care phase
5.1 Structure and composition
Yearly
of landfill body ( 1 )
5.2 Setting behaviour of the
Yearly
Yearly reading
level of the landfill body
( 1 ) Data for the status plan of the concerned landfill: surface occupied by waste, volume and
composition of waste, methods of depositing, time and duration of depositing, calculation of the
remaining capacity still available at the landfill.
6. Specific requirements for metallic mercury
For the purposes of temporary storage for more than 1 year of metallic mercury,
the following requirements shall apply
A.
Monitoring, inspection and emergency requirements
A continuous mercury vapour monitoring system with a sensitivity of at least 0,02
mg mercury/m 3 shall be installed in the storage site. Sensors shall be positioned at
ground level and head level. This shall include a visual and acoustic alert system.
The system shall be maintained annually.
The storage site and containers shall be visually inspected by an authorised person
at least once a month. Where leaks are detected, the operator shall immediately take
all necessary action to avoid any emission of mercury to the environment and restore
the safety of the storage of the mercury. Any leaks shall be considered to have
significant adverse environmental effects as referred to in regulation 15(2).
Emergency plans and adequate protective equipment suitable for handling metallic
mercury shall be available on site.
B.
Record keeping
All documents containing the information referred to in paragraph 6 of Schedule 2
and in point A of this paragraph, including the certificate accompanying the
container, as well as records concerning the destocking and dispatch of the metallic
mercury after its temporary storage and the destination and intended treatment shall
be kept for at least 3 years after the termination of the storage.
Each landfill shall be classified in one of the following
classes
-
landfill for hazardous waste,
-
landfill for non-hazardous waste, and
-
landfill for inert waste.
Added by
L.N. 453 of 2021.
(Regulation 5)
IMPLEMENTATION PLAN
The implementation plan to be submitted pursuant to sub-regulation (4) of
regulation 5 of shall contain the following
1. Assessment of the past, current and projected rates of recycling, landfilling
and other treatment of municipal waste and the streams of which it is composed.
2. Assessment of the implementation of waste management plans and waste
prevention programmes in place pursuant to regulations 28 and 29 of the Waste
Regulations.
3. Reasons for Malta considers that it might not be able to attain the relevant
target laid down in sub-regulation (3) of regulation 5 within the deadline set therein and
an assessment of the time extension necessary to meet that target.
4. Measures necessary to attain the targets set out in sub-regulation (6) of
regulation 5 of these regulations applicable to Malta during the time extension, including
appropriate economic instruments and other measures to provide incentives for the
application of the waste hierarchy as set out in regulation 4A and Schedule 12 of the
Waste Regulations.
5. A timetable for the implementation of the measures identified in item 4,
determination of the body competent for their implementation and an assessment of their
individual contribution to attaining the targets applicable in the event of a time
extension.
6. Information on funding for waste management in line with the polluter-
pays principle.
7. Measures to improve data quality, as appropriate, with a view to better planning
and monitoring performance in waste management.
(1) The competent authority shall, not later than 15 July
2003, set up a national strategy for the purpose of the reduction of
biodegradable waste going to landfill. This strategy shall include
measures to achieve the targets as set out in sub-regulation (2)
including such measures as recycling, composting, biogas
production or material and energy recovery.
(2)
The strategy shall ensure that by
(a) 15 July 2010 biodegradable waste going to landfill is
reduced to 75% of the total amount by weight of
biodegradable municipal waste produced in 1995;
(b) 15 July 2013 biodegradable waste going to landfill is
reduced to 50% of the total amount by weight of
biodegradable municipal waste produced in 1995; and
(c) 15 July 2020 biodegradable waste going to landfill is
reduced to 35% of the total amount by weight of
biodegradable municipal waste produced in 1995.
(3) By 2035 the amount of municipal waste landfilled is to be
reduced to 10% or less of the total amount of municipal waste
generated (by weight).
(4) By 2030, the Minister may consider postponing the
deadline for attaining the target referred to in sub-regulation (3) by
up to five (5) years provided that
(a) Malta has landfilled more than sixty per cent (60%) of
its municipal waste generated in 2013 as reported
under the Joint Questionnaire of the OECD and
Eurostat; and
(b) at the latest twenty-four (24) months before the
deadline laid down in sub-regulation (3), the Minister
notifies the Commission of its intention to postpone
the deadline and submits an implementation plan in
accordance with Schedule 4. The Minister may
combine that plan with an implementation plan
submitted pursuant to the Waste Regulations.
(5) Within three (3) months of receipt of the implementation
plan submitted pursuant to paragraph (b) of sub-regulation (4), the
Commission may request Malta to revise the plan if the
Commission considers that the plan does not comply with the
requirements of Schedule 4. Malta shall submit a revised plan
within three (3) months of receipt of the Commission’s request.
(6) In the event of postponing the deadline in accordance with
sub-regulation (4), the Minister, in consultation with the authority and
the agency, shall take the necessary measures to reduce by 2035 the
amount of municipal waste landfilled to twenty-five per cent (25%) or
less of the total amount of municipal waste generated (by weight).
(1)
For the purpose of calculating whether the targets
laid down in regulation 5(3) and (4) have been attained
(a)
the weight of the municipal waste generated and
directed to landfilling shall be calculated in a given calendar
year;
(b)
the weight of waste resulting from treatment
operations prior to recycling or other recovery of municipal
waste such as sorting or mechanical biological treatment,
which is subsequently landfilled shall be included in the
weight of municipal waste reported as landfilled;
(c)
the weight of municipal waste that enters
incineration disposal operations and the weight of waste
produced in the stabilization operations of the biodegradable
fraction of municipal waste in order to be subsequently
landfilled shall be reported as landfilled;
(d)
the weight of waste produced during recycling or
other recovery operations of municipal waste which is
subsequently landfilled shall not be included in the weight of
municipal waste reported as landfilled.
(2)
The competent authority shall establish an effective system
of quality control and traceability of the municipal waste landfilled to
ensure that the conditions laid down in sub-regulation (1) are met.
(3) Where municipal waste is shipped to another Member State or
exported from the European Union for the purposes of landfilling, in
accordance with Regulation (EC) No 1013/2006 of the European
Parliament and of the Council ** , it shall be counted towards the
amount of waste landfilled in Malta, in accordance with sub-regulation
(1)
The following wastes shall not be accepted in a
landfill
-
liquid waste;
-
waste which, in the conditions of landfill, is explosive,
corrosive, oxidising, highly flammable or flammable as
defined in Schedule 3 to the Waste Regulations;
-
hospital and other clinical waste arising from medical
or veterinary establishments, which are infectious as defined
by property HP9 of Schedule 3 to the Waste Regulations and
waste chemical substances arising from research and
development or teaching activities which are not identified
and, or are new and whose effects on man and, or the
environment are not known (e.g. laboratory residues, etc.);
-
whole used tyres, excluding tyres used as engineering
material and bicycle tyres and tyres with an outside diameter
above 1,400 mm;
-
shredded used tyres excluding bicycle tyres and tyres
with an outside diameter above 1,400 mm;
-
any other type of waste which does not fulfil the
acceptance criteria determined in accordance with Schedule 2;
-
waste that has been separately collected for preparing
for re-use and recycling pursuant to regulation 10 of the Waste
Regulations, with the exception of waste resulting from
subsequent treatment operations of the separately collected
waste for which landfilling delivers the best environment
outcome in accordance with regulation 4A of the Waste
Regulations;
-
any other type of waste which the competent authority
declares as not acceptable in a landfill.
(2) The competent authority shall endeavour, through, inter
alia, the establishment of guidelines and, or a landfill operating
permit, to ensure that as of 2030, all waste suitable for recycling or
other recovery, in particular municipal waste, shall not be accepted
in a landfill with the exception of waste for which landfilling
delivers the best environmental outcome in accordance with
regulation 4A of the Waste Regulations.
Information on the measures taken pursuant to this sub-
regulation shall be included in the waste management plans
referred to in regulation 28 of the Waste Regulations or in other
strategic documents covering the entire territory of Malta.
The dilution or mixture of waste solely in order to meet the
of waste acceptance criteria is prohibited.
(1) Only waste that has been subject to treatment shall be
landfilled. This provision does not apply to inert waste for which
treatment is not technically feasible, nor to any other waste for
which such treatment does not contribute to the objectives of these
regulations, by reducing the quantity of the waste or the hazards to
human health or the environment.The competent authority shall
ensure that measures taken in accordance with this sub-regulation do
not compromise the achievement of the objectives of the Waste
Regulations, notably on the waste hierarchy and on the increase of
preparing for re-use and recycling as set out in regulation 4A of those
regulations.
(2) Only hazardous waste that fulfils the criteria set out in
accordance with Schedule 2 shall be landfilled in a hazardous waste
landfill.
(3) Only the following types of non-hazardous waste shall be
landfilled at a non-hazardous waste landfill
(a) municipal waste;
(b) non-hazardous waste of any other origin, which fulfils
the criteria for the acceptance of waste at landfill for
non-hazardous waste set out in accordance with
Schedule 2;
(c) stable, non-reactive hazardous waste (e.g. solidified,
vitrified), with leaching behaviour equivalent to those
of the non-hazardous wastes referred to at paragraph
(b) which fulfils the relevant acceptance criteria set
out in accordance with Schedule 2. These hazardous
wastes shall not be deposited in cells destined for
biodegradable non-hazardous waste.
(4)
Inert waste landfill sites shall be used only for inert waste.
Without prejudice to the Waste Regulations, the application
for a landfill operating permit must contain at least the following
particulars
(a) the identity of the applicant and of the operator when
they are different entities;
(b) the description of the types and total quantity of waste
to be deposited;
(c) the proposed capacity of the disposal site;
(d) the description of the site, including
its
hydrogeological and geological characteristics;
(e) the proposed methods for pollution prevention and
abatement;
(f)
the proposed operation, monitoring and control plan;
(g) the proposed plan for the closure and after-care
procedures;
(h) where an impact assessment is required under the
Environment Impact Assessment Regulations, a copy
of the Environment Impact Assessment Report;
(i)
the financial security by the applicant, or any other
equivalent provision under regulation 10(1)(d).
Following a successful application for a permit this
information shall be made available to the competent national
statistical authority when requested for statistical purposes.
(1) Without prejudice to the Waste Regulations, the
competent authority shall not issue a landfill permit unless it is
satisfied that
(a) the landfill project complies with all the relevant
requirements of these regulations;
(b) the management of the landfill site will be in the hands
of a natural person who is technically competent to
manage the site, and that professional and technical
development and training of landfill operators and
staff are provided;
(c) the landfill shall be operated in such a manner that the
necessary measures are taken to prevent accidents and
limit their consequences;
(d) adequate provisions, by way of financial security or
any other equivalent, to the satisfaction of the
competent authority, have been or will be made by the
applicant prior to commencement of disposal
operations to ensure that the obligations (including
after-care provisions) arising under the landfill
operating permit are discharged and that the closure
procedures required under regulation 16 are followed.
This security or its equivalent shall be kept as long as
required by maintenance and after-care operation of
the site in accordance with regulation 16(4).
(2) The landfill project shall be in line with the relevant
national waste management strategy and implementation plan.
(3) Prior to the commencement of the disposal operations, the
competent authority shall inspect the site in order to ensure that it
complies with the relevant conditions of the permit. This will not
reduce in any way the responsibility of the operator under the
conditions of the permit.
Without prejudice to the Waste Regulations and the
Industrial Emissions (Integrated Pollution Prevention and Control)
Regulations, the landfill permit shall state the following
(a) the class of the landfill;
(b) the list of defined types and the total quantity of waste
which are authorised to be deposited in the landfill;
(c) requirements for the landfill preparations, landfilling
operations and monitoring and control procedures,
including contingency plans, as well as provisional
requirements for the closure and after-care operations;
(d) the obligation on the applicant to report at least
annually to the competent authority on the types and
quantities of waste disposed of and on the results of
the monitoring programme as required by regulations
15 and 16 and Schedule 3.
All the costs involved in the setting up and operation of a
landfill site, including as far as possible the cost of the financial
security or its equivalent referred to in regulation 10(1)(d), and the
estimated costs of the closure and after-care of the site for a period
of at least thirty years shall be covered by the price to be charged
by the operator for the disposal of any type of waste in that site.
Collection and use of information related to costs of the
landfill operation shall be carried out in a transparent way and
according to the provisions of the Freedom of Access to
Information on the Environment Regulations.
(1) The established criteria and procedures for the
acceptance of waste at landfills pursuant to Council Decision 2003/
33/EC of 19 December 2002 establishing criteria and procedures
for the acceptance of waste at landfills pursuant to Article 16 of and
Annex II to Directive 1999/31/EC * shall be applied.
(2) Before or at the time of delivery or of the first in a series of
deliveries, provided the type of waste remains unchanged, the
holder or the operator shall show, by means of the appropriate
documentation, that the waste in question can be accepted at that
site according to the conditions set in the permit, and that it fulfils
the acceptance criteria set out in Schedule 2.
(3) Moreover, to ensure that reception procedures are in
accordance with the provisions of these regulations the operator
shall
(a) check the waste documentation, including those
documents required by the Waste Regulations, and
where applicable those required by the Waste
Management (Shipments of Waste) Regulations;
(b) visually inspect the waste at the entrance and at the
point of deposit and, as appropriate, verify conformity
with the description provided in the documentation
submitted by the holder;
*OJ L 11, 16.1.2003, p. 27.
(c) if applicable, take samples and analyse same in
compliance with Schedule 2, point 3 level 3. The
operator shall ensure that quality control of such
sampling and analytical operations shall be carried out
by a competent agency to the satisfaction of the
competent authority and in accordance with Schedule
2. These samples shall be kept for at least one month;
(d) keep a register of the qualities and characteristics of
the waste deposited, indicating origin, date of delivery,
identity of the producer or collector in the case of
municipal waste, and, in the case of hazardous waste,
the precise location on the site, and make this
information available to the competent authority on
request.
(4) The operator of the landfill shall always provide written
acknowledgement of receipt of each delivery accepted on the site.
(5) Without prejudice to the Waste Management (Shipments of
Waste) Regulations, if waste is not accepted at a landfill the
operator shall notify without delay the competent authority of the
non-acceptance of the waste.
(1) The operator of a landfill shall in the operational phase
of a landfill carry out a control and monitoring programme as
specified in Schedule 3.
(2) The operator shall notify the competent authority of any
significant adverse environmental effects revealed by the control
and monitoring procedures and follow the decision of the
competent authority on the nature and timing of the corrective
measures to be taken. These measures shall be undertaken at the
expense of the operator.
The competent authority shall determine the frequency,
which shall at least be a year, whereby the operator shall report, on
the basis of aggregated data, all monitoring results to the competent
authority for the purpose of demonstrating compliance with permit
conditions and increasing the knowledge on waste behaviour in the
landfills.
(3) The operator shall ensure that quality control of analytical
operations related to the control and monitoring procedures are
carried out by a competent laboratory to the satisfaction of the
competent authority.
(1) The operator shall start closure procedures of the
landfill or part of it
(a) when the relevant conditions stated in the permit are
met; or
(b) following authorisation by the competent authority at
the request of the operator; or
(c) following an order to this effect by the competent
authority.
(2)
A landfill or part of it may only be considered as definitely
closed after the competent authority has carried out a final on-site
inspection, has assessed all the reports submitted by the operator
and has communicated to the operator its approval for the closure.
This shall not in any way reduce the responsibility of the operator
under the conditions of the permit.
(3) After a landfill has been definitely closed, the operator
shall be responsible for its maintenance, monitoring and control in
t h e a f t e r- c a r e p h a s e f o r a s l o n g a s m a y b e r e q u i r e d b y t h e
competent authority, taking into account the time during which the
landfill could present hazards.
The operator shall notify the competent authority of any
significant adverse environmental effects revealed by the control
and monitoring procedures and shall follow the decision of the
competent authority on the nature and timing of the corrective
measures to be taken.
(4) The competent authority shall as long as it considers that a
landfill is likely to cause a hazard to the environment and without
prejudice to any liability of the waste holder, oblige the operator of
the site to be responsible for monitoring and analysing landfill gas
and leachate from the site and the ground and surface water regime
in the vicinity of the site in accordance with Schedule 3.
Landfills which are in operation shall not continue to
operate unless the steps outlined below are accomplished as soon as
possible and until 15 July 2009 at the latest
(a) the operator shall, by 15 July 2003, prepare and
present to the competent authority, for its approval, a
conditioning plan for the site including the particulars
listed in regulation 11 and any corrective measures
which the operator considers will be needed in order to
comply with the requirements of these regulations with
the exception of the requirements in Schedule 1 point
1;
(b) following the presentation of the conditioning plan,
the competent authority shall take a definite decision
on whether operations may continue on the basis of the
said conditioning plan and these regulations
Provided that the competent authority shall take
necessary measures to ensure that sites which have not
been granted, in accordance with regulation 10, a
permit to continue to operate, shall be closed down as
soon as possible, in accordance with regulations 9(g)
and 16.
(c) on the basis of the approved conditioning plan, the
competent authority shall authorise the necessary work
and shall lay down a transitional period for the
completion of the plan by 15 July 2009;
(d) in the case of an existing landfill receiving hazardous
waste, regulations 4, 5, 6, 7 and 14 and Schedule 2
shall enter into force on 1 January 2004. Regulation 8
shall enter into force on 15 July 2004.
In order to contribute to the objectives laid down in these
regulations, the Minister shall make use of economic instruments
and other measures to provide incentives for the application of the
waste hierarchy under regulation 4A of the Waste Regulations.
Such instruments may include those indicated in Schedule 12 of the
Waste Regulations or other appropriate instruments and measures.
Any person shall be guilty of an offence under these
regulations if
(a) he fails to comply with any provision of these
regulations or fails to comply with permit conditions
or with any order lawfully given in terms of any
provision of these regulations; or
(b) he contravenes any restriction, prohibition or
requirement imposed by or under these regulations; or
(c) he acts in contravention of any of the provisions of
these regulations; or
(d) he conspires or attempts, or aids, or abets, any other
person by whatever means, including advertising,
counselling or procurement to contravene the
provisions of these regulations or to fail to comply
with any such provisions (including any order lawfully
given in terms of any of the provision of these
regulations) or to contravene any restriction,
prohibition or requirement imposed by or under the
said regulations.
Any person who commits an offence against these
regulations shall, on conviction, be liable
(a) on a first conviction to a fine (multa) of not less than
one thousand and one hundred and sixty-four euro and
sixty-nine cents (€1,164.69) but not exceeding two
thousand and three hundred and twenty-nine euro and
thirty-seven cents (€2,329.37);
(b) on a second or subsequent convictions, to a fine
(multa) of not less than two thousand and three
hundred and twenty-nine euro and thirty-seven cents
(€2,329.37), but not exceeding four thousand and six
hundred and fifty-eight euro and seventy-five cents
(€4,658.75) or to imprisonment for a term not
exceeding two years, or to both such fine and
imprisonment
Provided that whenever any person is found guilty of
committing an offence under these regulations by means of a
vehicle, the owner of the said vehicle, where applicable, is held
liable in the same manner and degree
Provided further that the court shall order any person who
has been found guilty of committing an offence against these
regulations to pay for the expenses incurred by the competent
authority as a result of the said offence, the revocation of the permit
issued by the competent authority and the confiscation of the
corpus delicti, including the vehicle, if applicable.
(1) The provisions of articles 23 and 30 of the Criminal
Code shall, mutatis mutandis, apply to proceedings in respect of
offences against these regulations, so however that the
disqualification from holding or obtaining a licence, permit or
authority shall in no case be for less than one year.
(2) Notwithstanding the provisions of article 370 of the
Criminal Code, proceedings for an offence against these
regulations shall be held before the Court of Magistrates (Malta) or
the Court of Magistrates (Gozo), as the case may be, and shall be in
accordance with the provisions of the Criminal Code regulating the
procedure before the said courts as courts of criminal judicature.
(3) Notwithstanding the provisions of the Criminal Code, the
Attorney General shall always have a right of appeal to the Court of
Criminal Appeal from any judgement given by the Court of
Magistrates (Malta) or the Court of Magistrates (Gozo) in respect
of proceedings for any offence against these regulations.
Schedules 1, 2 and 3 are being published in the English
language with the English text of these regulations.