PUBLICLY ACCESSIBLE ELECTRIC VEHICLE CHARGING INFRASTRUCTURE REGULATIONS
Table of Provisions (19)
Statutory Text (19 Articles)
CHARGING INFRASTRUCTURE
SUBSIDIARY LEGISLATION 545.38
PUBLICLY ACCESSIBLE ELECTRIC VEHICLE
CHARGING INFRASTRUCTURE REGULATIONS
13th November, 2022
LEGAL NOTICE 226 of 2022.
(1)
The title of these regulations is the Publicly
Accessible Electric Vehicle Charging Infrastructure Regulations.
(2)
These regulations shall apply to publicly accessible
electric vehicle charging infrastructure, excluding
(a)
wireless or induction charging devices;
(b)
battery exchange devices;
(c)
charging infrastructures devoted exclusively to
the recharging of buses and coaches; and
(d) charging points whose maximum charging power
does not exceed 3.7 kW.
(1)
Unless otherwise stated in these regulations, the
definitions in the Regulator for Energy and Water Services Act shall
apply.
(2)
In these regulations, unless the context otherwise
requires
"access to charging" means the procedure which allows a
vehicle to be connected to charging infrastructure and the transfer of
the energy required for charging;
"Act" means the Regulator for Energy and Water Services Act;
"authorised provider" means the holder of an authorisation
issued by the Regulator under these regulations permitting such person
to act as an operator of publicly accessible charging infrastructure;
"charging point" means an interface associated with a parking
space which makes it possible to recharge a single electric vehicle at a
time;
"Charging Point Management System" or "CPMS" means the
management system operated by the charging point operator to
manage and maintain the charging points and back-end and, or
network management system;
"commissioning" means the first time a publicly accessible
CHARGING INFRASTRUCTURE
charging point is put into operation, following the establishment of
operational readiness;
"decommissioning" means
the
permanent
removal
from
operation of a charging point;
"electric vehicle" or ‘EV’ means a motor vehicle equipped with a
powertrain containing at least one non-peripheral electric machine as
energy converter with an electric rechargeable energy storage system
and which can be recharged externally;
In particular, electric vehicles includes cars, as well as
motorcycles, mopeds and electric bicycles of the following categories
(a)
purely electric vehicle" means a vehicle equipped
with a drive system, which includes exclusively electric motors
as energy converters and exclusively electric rechargeable
systems as energy storage systems;
(b)
"hybrid electric vehicle for external charging"
means a category of hybrid electric vehicle that can be charged
from an external source;
(c)
"hybrid fuel cell vehicle" means a fuel cell vehicle
equipped with a power transmission system comprising at least
one fuel storage system and at least one rechargeable electrical
storage system as an electrical storage system;
(d)
"assisted cycling (electric bicycle)" means a
bicycle fitted with an auxiliary electric motor of a maximum
rated power of less than or equal to 250W and whose engine
power stops when the bicycle reaches 25 kilometres per hour;
"electromobility service provider" or "eMSP" or "e-Mobility
Service Provider" means an entity providing access for EV drivers to
the charging services;
"environment" shall have the same meaning as assigned to it in
the Environment Protection Act;
"high-power recharging point" means a recharging point that
allows for a transfer of electricity to an electric vehicle with a power of
more than 22kW;
"interoperability platform" means a software platform by means
of which two or more publicly accessible charging infrastructure
operators contribute to the deployment of roaming charging by
facilitating, securing and optimising data exchanges and payment
services between publicly accessible charging infrastructure operators;
"normal power recharging point’ means a recharging point that
CHARGING INFRASTRUCTURE
allows for a transfer of electricity to an electric vehicle with a power
less than or equal to 22 kW, excluding devices with a power less than
or equal to 3.7 kW, which are installed in private households or the
primary purpose of which is not recharging electric vehicles, and
which are not accessible to the public;
"Open Charge Point Interface" or "OCPI" means an open
protocol used for connections between charging station operators and
service providers and which facilitates automated roaming for EV
drivers across several EV charging networks;
"Open Charge Point Protocol" or "OCPP" means an application
protocol for communication between electric vehicle (EV) charging
stations and a central management system, also known as a charging
station network;
"operational readiness" means the capability to function in
accordance with design and specifications;
"publicly accessible charging infrastructure" means all
equipment, such as electrical supply circuits, charging stations or
charging points, control and management equipment, and devices
allowing in particular the transmission of data, supervision, control
and payment, which are necessary for recharging;
"publicly accessible charging infrastructure operator" or
"operator" means a natural or legal person that provides electric
vehicle charging services to users and who is responsible for the
technical maintenance of the publicly accessible charging
infrastructure, of ensuring the availability and operation of the
recharging points managed by that person, supervising and controlling
it, as well as providing the necessary data to electronic platforms for
the monitoring and control of rechargeable infrastructures when
required to do so;
"publicly accessible charging point" means a charging point,
which provides Union-wide non-discriminatory access to users. Non-
discriminatory access may include different terms of authentication,
use and payment. In particular, the following shall be deemed to be
publicly accessible charging points
(a)
a charging point whose parking space is
physically accessible to the public, including where access to
the parking space is subject to an authorization and, or the
payment of an access fee;
(b)
a charging point attached to a shared car system
and accessible to third parties, including on payment of the
charging service;
The following shall not be considered to be publicly accessible
CHARGING INFRASTRUCTURE
charging points
(a)
a charging point installed in a private residential
building or in an outbuilding of a private residential building
and exclusively reserved for residents;
(b)
a charging point assigned exclusively to charging
vehicles in service within the same entity and installed in an
enclosure dependent on this entity;
(c)
a charging point installed in a maintenance or
repair workshop not accessible to the public;
"roaming charging" means the user’s option when having a
contract with a particular publicly accessible charging infrastructure
operator to use the publicly accessible charging infrastructure of a
different operator without having a contract with that operator and by
having access to charging and payment services through an
interoperability platform;
"user" means the end-user requiring to charge an electric vehicle
through a publicly accessible charging point.
(1)
An authorisation shall be required for a person to
act as an operator of publicly accessible charging infrastructure.
(2)
Authorisations shall be issued by the Regulator in respect
of the execution of the operations, activities and practices referred to in
these regulations and shall include the terms and conditions for the
execution of such operations, activities and practices.
(3)
An authorisation issued by the Regulator shall be in
writing and, unless cancelled, suspended or revoked in accordance with
any condition contained in it or in accordance with these regulations or
with any other law, shall continue to remain in force for such period of
time as may be specified in the authorisation.
(4)
Authorisations unless revoked shall be valid for a period
of twelve (12) years.
(5)
An authorisation issued by the Regulator under these
regulations shall not exempt the authorised provider from the
requirement of obtaining any other authorisation or permit as may be
required under any other law.
(6)
Any person who wishes to act as an operator of publicly
accessible charging infrastructure shall submit an application in writing
to the Regulator in such form and manner as the Regulator may
prescribe. A non-refundable application fee of five hundred (€500)
euro shall be paid to the Regulator with the application for an
authorisation.
CHARGING INFRASTRUCTURE
(7)
The Regulator shall establish its procedure for the
purposes of determining an application for the issue of an
authorisation for a person to act as an operator of publicly accessible
charging infrastructure.
(8)
The Regulator shall communicate to the applicant in
writing within a reasonable time, which shall not be of more than six
(6) months from the date of receipt of a valid application, any decision
taken concerning an application for an authorisation or an application
for the renewal of an authorisation or any valid reason impeding the
Regulator to reach such a decision.
(9)
Upon expiry, an authorisation may be renewed, and an
application for the renewal of an authorisation shall have to be
submitted in writing to the Regulator in such form and manner as the
Regulator may require, six (6) months prior to the date on which the
authorisation expires. A non-refundable renewal application fee of five
hundred euro (€500) shall apply.
(10) The Regulator may modify, amend, replace, add or delete
any authorisation condition in the renewed authorisation and add
specific conditions relevant to each individual authorisation as the
Regulator considers to be reasonably justified in the circumstances.
(11) The first authorisation fee payable under sub-regulation
(12) shall be paid by the authorised provider within thirty (30) days
from the granting of an authorisation and thereafter every three years
on the anniversary of the grant of such authorisation or any other date
as the Regulator may reasonably establish.
(12) The amount of the authorisation fee per charging point
shall be of seventy-five (€75) euro and shall be paid to the Regulator
every three (3) years
Provided that the amount of the authorisation fee per
charging point registered after the date of the granting of the
authorisation shall be calculated pro rata temporis.
(13) If any authorisation fee payable under sub-regulation
(12) is not paid within thirty (30) days as from the date from which the
payment of the authorisation fee is due, the Regulator shall after the
lapse of such time communicate to the authorised provider, whose
authorisation fee has not been so paid informing him about his failure
to pay such fee.
(14) The Regulator shall be deemed to have complied with
sub-regulation (13) if such communication is sent by registered post,
to the usual or last known address of the authorised provider whose
authorisation fee has not been so paid.
(15)
If any authorisation fee mentioned in sub-regulation (14)
CHARGING INFRASTRUCTURE
is not paid within thirty (30) days after the date on which the
communication therein mentioned has been sent by registered post, the
authorisation to which it refers shall cease to be in force, and if the
person to whom it was granted wishes again to act as an operator of
publicly accessible charging infrastructure he shall then be required to
apply for a new authorisation.
(16) In considering any such application, the Regulator may
take into consideration the previous failure of the applicant to pay the
authorisation fee payable under sub-regulation (12) and of any
explanation regarding that failure which the applicant may submit to
the Regulator.
(17) The Regulator shall have the power to include in an
authorisation issued under these regulations any such conditions as the
Regulator considers a requisite or suitable.
(18) The authorisation shall have a minimum set of general
conditions
Provided that special conditions may be attached to any
authorisation issued under these regulations.
(19) The authorised provider shall at all times comply with
these regulations and with the conditions of an authorisation.
(20) The conditions included in an authorisation may contain,
but not necessarily be limited to, provisions regarding
(a)
the grant and term of the authorisation;
(b)
suspension, variation and transfer conditions of the
authorisation;
(c)
compliance requirements to conditions, directions,
management letters, standards, guidelines, codes of practice or
rules given by the Regulator or as may be established at law;
(d)
the obligations of the authorised provider
including but not limited to customer service obligations;
(e)
protection of consumers;
(f)
monitoring and recording of the authorised
operations;
(g)
reporting, auditing and submission of information
to the Regulator;
(h)
inspection, making copies and taking extracts from
books and records held by the authorised provider and the
CHARGING INFRASTRUCTURE
carrying out of measurements and tests in relation to any
authorised facility, assets or plant;
(i)
assessment and auditing of operations, activities
and practices and their compliance to authorisation conditions;
and
(j)
regulation of subsidiary companies and, or
companies executing part of the regulated operations, activities
and practices.
(21) Any person granted an authorisation under these
regulations shall
(a)
comply with any direction given by the Regulator
as to such matters as are specified in the authorisation or are of
a description so specified;
(b)
execute the regulated operations, activities and
practices in accordance with such authorisation conditions;
(c)
act in accordance with any requirements as are
specified in the authorisation or are of a description so
specified; and
(d)
comply with the decisions or directions issued by
the Regulator.
(22) The authorised provider shall inform the Regulator of
any changes relating to his activity which result in the conditions for
his authorisation no longer being met and the creation of subsidiaries
whose activities fall within the scope of the authorisation and, or the
authorisation scheme.
(23) The authorised provider shall register the publicly
accessible charging point with the Regulator within fifteen (15) days
as from the date of the commissioning of such charging point by
means of the procedure established by the Regulator for such
purposes. The authorised provider shall also notify the Regulator
within one (1) day as from the date of decommissioning of such
charging point by means of the procedure established by the Regulator
for such purposes.
(1)
The Regulator shall adopt fair, objective and
transparent conditions relating to the granting of an authorisation in
terms of the principles of natural justice.
(2)
In taking a decision in respect of the grant, issue,
amendment or renewal or any other matter pertaining to an
authorisation issued under these regulations, the Regulator may take
account of the following
CHARGING INFRASTRUCTURE
(a)
compliance by the applicant with all other relevant
permits and authorisations, however so described issued by any
other public regulator;
(b)
the capability of the applicant to ensure safety
conditions, in the context of the authorisation being applied for;
(c)
private and professional integrity of the applicant;
(d)
protection of the health and safety of employees;
(e)
protection of the environment;
(f)
record of compliance with these regulations and
any other relevant laws by the person with regard to whom the
decision shall be made;
(g)
suitability of the facility to be authorised or the
authorised facility as the case may be and, with regard to safety,
health, security, hazardous substances, environment, land use
and planning requirements;
(h)
the need for facilities and services to be provided
for customers at the facility concerned and the extent to which
the interests of customers shall be served;
(i)
the public interest in general.
The Regulator shall have the right to refuse a request for
the issue of an authorisation or, if an authorisation has been issued, a
request for the renewal of an authorisation, on the grounds that
(a)
the Regulator considers that the request does not
meet one or more of the criteria referred to in regulation 4(2); or
(b)
the application does not contain all such
information requested by the Regulator in the application form
or any other additional information that the Regulator may
request from the applicant for the purpose of determining an
application for the authorisation; or
(c)
the application is not accompanied by such
application fee as specified in accordance with these
regulations
Provided that any decision taken by the Regulator,
including refusal or withdrawal of an authorisation, shall be fully
reasoned and shall be open to challenge before the Administrative
Review Tribunal
Provided further that in case of failure by the Regulator to
CHARGING INFRASTRUCTURE
inform the applicant regarding any decision taken concerning access to
a service activity or the exercise thereof, including refusal or
withdrawal of an authorisation, shall not mean in any manner
whatsoever, that the Regulator has tacitly granted such authorisation
and that the applicant has automatically been granted access to a
service activity or the exercise thereof.
The Regulator may, at any time in the course of the
period for which an authorisation is valid, order its suspension,
revocation or cancellation where the Regulator is satisfied that
(a)
the holder of the authorisation has failed or is
failing to comply with any condition of the authorisation or
with these regulations;
(b)
the holder of the authorisation does not possess all
other relevant authorisations and permits however so described
that are required by any other public regulator or Government
department;
(c)
the holder of the authorisation is contravening any
requirement imposed by law;
(d)
the holder of the authorisation fails to comply
with any directive given by the Regulator;
(e)
any information submitted in the application for a
authorisation or the application for renewal of a authorisation
and for which the authorisation has been issued or renewed, as
the case may be, is determined to be false; or
(f)
if the holder of the authorisation does not meet
any criteria in respect of one or more of the criteria referred to
in regulation 4(2)
Provided that in exercising the powers for suspension,
revocation or cancellation of authorisations, the Regulator may take
into account the nature of the failure, or the fact that the holder of the
authorisation is taking the appropriate steps which the Regulator
considers to be necessary in order to comply with the conditions of the
authorisation, these regulations or any other requirement that the
Regulator may deem relevant.
(1)
When the holder of an authorisation issued under
these regulations, decides either to suspend or terminate his
authorisation, such holder shall promptly notify the Regulator in the
form prescribed by the Regulator, to notify such a termination or
suspension.
(2) Upon acknowledgment by the Regulator to the holder of
an authorisation of the notification mentioned in sub-regulation (1),
CHARGING INFRASTRUCTURE
the authorisation shall be considered to have ceased to be in force and
with immediate effect from the date of such acknowledgment such
holder shall be deemed to be unauthorised.
(3)
Notwithstanding any notice for the termination or
suspension of an authorisation, the holder of the authorisation shall
remain liable for the payment of any fee due to the Regulator.
(1) An authorisation issued by the Regulator under these
regulations shall not be validly transferred inter vivos to any other
person unless
(a)
the transferor informs in writing the Regulator in
such form and manner as the Regulator shall prescribe;
(b)
the Regulator is satisfied that at least the same
criteria as listed in regulation 4(2) are complied with;
(c)
the transfer is subject to the conditions prescribed
in the authorisation; and
(d)
the Regulator approves in writing the transfer of
the authorisation.
(2)
An authorisation issued by the Regulator under these
regulations shall not be validly transmitted causa mortis to any other
person unless
(a)
the transferor informs in writing the Regulator in
such form and manner as the Regulator shall prescribe;
(b)
the Regulator is satisfied that at least the same
criteria as listed in regulation 4(2) are complied with;
(c)
the transfer is subject to the conditions prescribed
in the authorisation; and
(d)
the Regulator approves in writing the transfer of
the authorisation
Provided that an authorisation issued in terms of these
regulations shall be an indivisible right
Provided further that in the event that the Regulator
approves the transfer of the authorisation as aforesaid, the transfer shall
have retrospective effect from the date of the death of the decujus.
(3)
Where the authorised provider is a body corporate or any
other body of persons, a change in the control of the ownership or
management of that body shall be deemed to be equivalent to the
transfer of the authorisation and shall be subject to the approval of the
CHARGING INFRASTRUCTURE
Regulator. For the purpose of this sub-regulation, a transfer in the
control of the ownership of a body corporate or other body of persons
shall be deemed to occur in any case where a transfer of the capital,
shares, stocks or other rights held in the body corporate or other body
of persons leads to a change in the person holding the controlling
interest therein.
(1)
An operator of publicly accessible charging
infrastructure shall apply for an electricity connection service as
established in the Electricity Supply Regulations and shall be subject
to the applicable charges and consumption tariffs established therein.
(2)
The electrical wiring installation used to supply
electricity to publicly accessible charging infrastructure shall comply
with the Electrical Installations Regulations and shall be carried out
and certified by an authorised provider holding the appropriate
authorisation in terms of the aforementioned regulations.
(1)
All publicly accessible charging infrastructure
shall have metering and control devices installed to control and
manage charging.
(2)
The metering equipment of the publicly accessible
charging infrastructure shall be compliant with the Measuring
Instruments Regulations.
(1)
Each publicly accessible charging point shall be
registered on a national register of publicly accessible charging
infrastructure for electric vehicles. The Regulator shall assign a unique
identifier to each charging point.
(2)
In addition to the charging point identifier, the
information necessary for access to charging and the operating
methods, as well as a telephone number or a connected call button or
any other equivalent means to reach the operator in cases of
malfunction shall be available in the immediate vicinity of the publicly
accessible charging point.
(3)
Data relating to the geographical location and technical
characteristics of publicly accessible charging points shall be
accessible on an open basis to all users in a non-discriminatory
manner. The operator shall take the appropriate measures to ensure
that this data is constantly updated, made public and shall allow the
free reuse of this data.
(4)
Publicly accessible charging infrastructure shall have a
supervision system that allows data exchange with each charging point
as well as real-time monitoring of the state of charging infrastructure,
and which records the essential parameters of the use of the service,
including those concerning the energy delivered.
CHARGING INFRASTRUCTURE
(5)
The Open Charge Point Protocol shall be used by
operators for communication between the charging points and the
charging point management system.
(6)
The Open Charge Point Interface protocol shall be used
for communication between electromobility service providers and
charging point operators and for communication between
electromobility service providers or charging point operators and
platforms that provide roaming charging services.
The operator shall take the appropriate measures to
guarantee, under non-discriminatory conditions, access to charging
and, where applicable, the related payment, to any user who requests it
without the obligation to enter into a contract with such operator
Provided that this obligation is presumed to be satisfied
by allowing ad hoc charging and related payment without the need for
the user’s registration or authentication in any way and by means of
(a)
a common card-based payment system including
contactless systems or cash payment method in the immediate
vicinity of the charging point; and, or
(b)
a common web-based payment system.
(1)
Without prejudice to regulation 12, an operator
may offer electric vehicle charging services to users on a contractual
basis, including in the name and on behalf of other operators. Operators
offering a charging service on a contractual basis on behalf of other
operators may provide this service through a digital connection of the
publicly accessible charging infrastructure to an interoperability
platform, whether managed by the same operator of publicly accessible
charging infrastructure or by third parties.
(2)
The interoperability platform shall offer a universal
intermediation service between the functions of an operator of publicly
accessible charging infrastructure, ensuring the data exchanges
required for roaming charging and associated services such as finding
and booking charging points, when they are offered by the operators
concerned.
(3)
The interoperability platform shall include the appropriate
measures to make its intermediation service accessible to other
operators of publicly accessible charging infrastructure whose activity
requires interaction with operators of publicly accessible charging
infrastructure or users.
(4)
An interoperability platform shall include the appropriate
measures to establish relationships with other interoperability
platforms in order to allow the subscriber of an operator of publicly
accessible charging infrastructure to be connected to one of these
CHARGING INFRASTRUCTURE
platforms, and to access the publicly accessible charging infrastructure
of operators connected to other platforms.
(5)
An interoperability platform shall not, because of its
organization or its activity, confer or contribute to confer an advantage
on a particular operator of publicly accessible charging infrastructure.
(1)
The price per kWh of electricity delivered from a
publicly accessible charging point shall be as established in the
Electricity Supply Regulations and the operator of publicly accessible
charging infrastructure shall make no profit on the resale of electricity.
(2)
The price to be charged to users of publicly accessible
charging infrastructure for the use of the recharging service (excluding
the electricity component) shall be determined by the operator. The
operator may add a premium per kWh for the charging service to the
regulated tariff as established in the Electricity Supply Regulations.
This premium shall be deemed to cover the cost of investment,
installation, operation, maintenance and management of the charging
point as well as any network management system, while including a
reasonable profit.
(3)
On each publicly accessible charging point, the technical
characteristics and a breakdown of the price components shall be
clearly indicated. The applicable price of electricity per kWh shall be
clearly distinguished and displayed separately from any other price
components.
(1)
A normal charging point which is also a publicly
accessible charging point shall be equipped with at least a Type 2
socket outlet or a type 2 connector, as described in standard EN 62196-
2. (2)
A direct current high-power charging point which is also
a publicly accessible charging point shall be equipped with at least one
Combo2 Type connector as described in standard EN 62196-3.
(3)
An alternating current high-power charging point which
is also a publicly accessible charging point shall be equipped with at
least one Type 2 connector as described in standard EN 62196-2.
(4)
A publicly accessible charging point reserved for L-
Category electric vehicles up to 3.7kVA shall be equipped with at least
one of the following
(a)
socket-outlets or vehicle connectors of Type 3a as
described in standard EN 62196-2 (for Mode 3 charging);
(b)
socket-outlets and connectors compliant with IEC
60884 (for Mode 1 or Mode 2 charging).
CHARGING INFRASTRUCTURE
(5)
Charging socket outlets shall have safety shutters.
The operator shall be responsible for maintaining the
publicly accessible charging infrastructure in a good and safe working
order, and for ensuring that regular maintenance is carried out.
(1)
The Regulator may impose an administrative fine
upon any person who infringes any provision of these regulations or of
an authorisation condition or approval issued thereunder or who fails to
comply with any directive or decision given by the Regulator in
ensuring compliance with these regulations.
(2)
An administrative fine imposed under sub-regulation (1)
shall not exceed one hundred thousand euro (€100,000).
The Administrative Review Tribunal established by
article 5 of the Administrative Justice Act shall be competent to hear
and determine appeals from decisions of the Regulator made under
these regulations. Unless otherwise provided by law, an appeal from a
decision of the Regulator made under these regulations shall lie to the
Administrative Review Tribunal in accordance with article 32 of the
Act.