COMPETITIVE BIDDING RULES FOR RENEWABLE SOURCES OF ENERGY INSTALLATIONS (CAPACITY FROM 40KW UP TO LESS THAN 1000KW)
Table of Provisions (19)
Statutory Text (19 Articles)
SOURCES OF ENERGY INSTALLATIONS (CAPACITY
FROM 40KW UP TO LESS THAN 1000KW)
SUBSIDIARY LEGISLATION 545.32
COMPETITIVE BIDDING RULES FOR RENEWABLE
SOURCES OF ENERGY INSTALLATIONS (CAPACITY
FROM 40KW UP TO LESS THAN 1000KW)
REGULATIONS
1st January, 2020
LEGAL NOTICE 93 of 2020, as amended by Legal Notice 212 of 2021.
The title of these regulations is the Competitive Bidding
Rules for Renewable Sources of Energy Installations (Capacity from
40kW up to less than 1000kW) Regulations.
(1)
Unless otherwise stated in these regulations, the
definitions in the Public Finance Management Act shall apply.
(2)
In these regulations, unless the context otherwise
requires
"annual threshold" means the cap in kWh for the
payment of the awarded bid price per kWh for the period of
time commencing on the 1 st January and ending on the 31 st
December of each year;
"approved renewable energy installation" means a new
renewable energy installation with a capacity from 40kWp up to
less than 1000kWp and granted financial support pursuant to a
competitive bidding process;
"awarded bid price per kWh" means the bid price per
kWh offered by a successful bidder whose offer is selected
pursuant to a competitive bidding process;
"bid price per kWh" means price per kWh offered by a
bidder in a competitive bidding process;
"commissioned" means the first time a renewable energy
installation is put into operation, following the establishment of
operational readiness by the warranted electrical engineer
certifying the installation;
"competitive bidding process" means a non-
discriminatory bidding process that provides for the
participation of a sufficient number of undertakings and where
the support is granted on the basis of the bid submitted by the
bidder. In addition, the volume related to the bidding process is
a binding constraint leading to a situation where not all bidders
can receive support;
SOURCES OF ENERGY INSTALLATIONS (CAPACITY
FROM 40KW UP TO LESS THAN 1000KW)
"Contracting Authority" means the entity issuing and
administering the competitive bidding process;
"DC" means direct current;
"distribution" means the transport of electricity on high
voltage, medium voltage and low voltage distribution systems
with a view to its delivery to consumers, but not including
supply;
"distribution system" means all the interconnected
technical facilities used for conveying electricity to final
customers;
"distribution system operator" shall have the same
meaning as under the Electricity Market Regulations;
"electricity from renewable energy sources" means
electricity produced by plants using only renewable energy
sources, as well as the share in terms of calorific value of
energy produced from renewable energy sources in hybrid
plants which also use conventional energy sources. It includes
renewable electricity used for filling storage systems, but
excludes electricity produced as a result of storage systems;
"eligible renewable energy installation" means a new
renewable energy installation with a capacity from 40kW up to
less than 1000kW applying to be granted financial support
pursuant to a competitive bidding process;
"force majeure" means acts of God, strikes, lock-outs or
other industrial disturbances, acts of the public enemy, wars,
whether declared or not, blockades, insurrection, riots,
epidemics, landslides, earthquakes, storms, direct lighting
strikes, floods, washouts, civil disorder, explosions and other
similar unforeseeable events, which by the exercise of due
diligence cannot be overcome and which, in the view of the
Contracting Authority prevent a successful bidder from
adhering to obligations due to causes beyond his reasonable
control;
"full load hours" means the equivalent number of hours
in a calendar year during which the renewable energy
installation produces at its full nominal or kW capacity;
"generation" means the production of electricity;
"guaranteed period" means the period of time indicated
in the relevant competitive bidding process during which the
SOURCES OF ENERGY INSTALLATIONS (CAPACITY
FROM 40KW UP TO LESS THAN 1000KW)
awarded bid price per kWh for the electricity generated and
sold to the distribution system operator from a qualifying
renewable energy installation is guaranteed;
"kW" means kilo Watt and in the context of these
regulations shall be taken to refer to the nominal capacity of the
renewable energy installation, which in the case of a solar
photovoltaic installation is equal to the total DC peak power at
standard test conditions of the installation;
"kWh" means kilo Watt hour(s);
"metering equipment" means the electricity meters
provided by the distribution system operator including smart
meters, any voltage and current transformers and any other
associated equipment and wiring required to measure the
quantity of electricity supplied or exported;
"Minister" means the Minister responsible for energy;
"new renewable energy installation" means a renewable
energy installation which has never been used for the
generation of electricity in whole or in part and which is
installed by a successful bidder after the conclusion of a
competitive bidding process;
"performance bond" means the performance bond to be
provided by a successful bidder to the Contracting Authority
pursuant to regulation 10;
"premium" means the difference between the awarded
bid price per kWh and the proxy for the market price per kWh
and is payable only when the awarded bid price per kWh is
higher than the proxy for the market price per kWh and the
proxy for the market price per kWh is not negative;
"proxy for the market price" means the average of the
estimated variable cost of meeting the demand forecast for a
given year from locally generated conventional and imported
electricity, with the demand assumption excluding that portion
of the forecast demand which is not expected to be met by
conventional and imported electricity;
"renewable energy sources" means renewable non-fossil
energy sources, that is, wind, solar (solar thermal and solar
photovoltaic), and geothermal energy, ambient energy, tide,
wave and other ocean energy, hydropower, biomass, landfill
gas, sewage treatment plant gas and biogas;
SOURCES OF ENERGY INSTALLATIONS (CAPACITY
FROM 40KW UP TO LESS THAN 1000KW)
"smart meters" shall have the same meaning as in the
Electricity Supply Regulations;
"solar photovoltaic installation" means a solar
photovoltaic system that generates electricity exclusively from
solar radiation and consisting of all accessories including
(a)
an array or arrays of photovoltaic modules
that collect and absorb sunlight for conversion into
electricity;
(b)
an inverter or inverters;
(c)
associated balance of system components,
including wiring, conduits, switchgear, protection
equipment, ancillary equipment and any other part of the
installation necessary for the production and conveyance
of electricity up to the metering equipment supplied by
the distribution system operator;
"successful bidder" means a bidder whose offer is
selected pursuant to a competitive bidding process;
"supply" means the sale or retail, including resale, of
electricity to customers;
"wind energy installation" means an installation that
converts wind energy into electricity and shall include the tower
on which the wind turbine is mounted, a rotor and the nacelle
which houses the equipment, including the generator, that
converts the mechanical energy in the spinning rotor into
electricity and any other ancillary equipment necessary to
connect to the grid.
(1)
The purpose of these regulations is to introduce
the competitive bidding process as the method to determine the fixed
distribution system operator from approved renewable energy
installations with a capacity between 40kW and less than 1000kW and
hence to promote and support the generation of electricity from
renewable energy sources.
(2)
These regulations shall apply only to renewable energy
produced from renewable energy installations installed in Malta, Gozo
and other islands of the Maltese Archipelago, including the territorial
waters thereof.
(3)
These regulations shall not apply to undertakings in
difficulty as defined in Commission Regulation (EU) No 651/2014 of
SOURCES OF ENERGY INSTALLATIONS (CAPACITY
FROM 40KW UP TO LESS THAN 1000KW)
17 June 2014 declaring certain categories of aid compatible with the
internal market in application of Articles 107 and 108 of the Treaty, as
amended by Commission Regulation (EU) No 2017/1084 of 14 June
2017 amending Regulation (EU) No 651/2014 as regards aid for port
and airport infrastructure, notification thresholds for aid for culture
and heritage conservation and for aid for sport and multifunctional
recreational infrastructures, and regional operating aid schemes for
outermost regions and amending Regulation (EU) No 702/2014 as
regards the calculation of eligible costs, and by Commission
Regulation (EU) 2020/972 of 2 July 2020 amending Regulation (EU)
No 1407/2013 as regards its prolongation and amending Regulation
(EU) No 651/2014 as regards its prolongation and relevant
adjustments, and as may be subsequently amended.
(4)
Any investment aid previously received towards the same
renewable energy installation must be deducted from the premium
awarded under this measure.
The price per kWh to be paid for electricity generated
and sold to the distribution system operator from eligible renewable
energy installations shall be determined through a competitive bidding
process
Provided that the payment of any price per kWh to an
undertaking that has benefited from earlier unlawful aid granted by
Malta and declared incompatible by a Decision of the European
Commission shall be suspended until such time as that undertaking has
reimbursed the total amount of unlawful and incompatible aid and the
corresponding recovery interest.
(1)
The awarded bid price per kWh resulting pursuant
to a competitive bidding process shall be paid in each calendar year up
to a capped amount of units of electricity generated and sold to the
distribution system operator and payable for the guaranteed period.
(2)
The awarded bid price per kWh shall be determined by
"pay-as-bid" such that the successful bidders shall be paid, for the
electricity generated and sold to the distribution system operator from
an approved renewable energy installation, the awarded bid price per
kWh based on their actual bid.
(3)
The bidder shall submit the bid price per kWh for each
eligible renewable energy installation as required in the competitive
bidding process.
(4)
The awarded bid price per kWh shall only be applicable
to a successful bidder and only in respect of the renewable energy
installation as described in the bid including the capacity offered in the
bid (in kW), as part of the competitive bidding process. The capacity
SOURCES OF ENERGY INSTALLATIONS (CAPACITY
FROM 40KW UP TO LESS THAN 1000KW)
associated with the bid price shall be deemed to be equal to
Offered kW x Full Load Hours
(5)
Without prejudice to sub-regulation (4), the ownership of
an approved renewable energy installation selected pursuant to a
competitive bidding process may be transferred to a third party and
subject to the third party obtaining the necessary permits, authorisation
and licences, as may be applicable.
(6)
The awarded bid price per kWh with respect to an
approved renewable energy installation shall be payable for the actual
number of units of electricity generated by such installation and sold to
the distribution system operator, up to the annual threshold calculated
as offered kW x Full Load Hours
Provided that the number of assumed full load hours in
the case of a solar photovoltaic installation shall be equal to 1600
hours
Provided further that in the case of other types of
renewable energy installations, such as wind energy, the number of full
load hours which shall determine the annual threshold for the payment
of the awarded price per kWh, shall be specified in the terms and
conditions applicable in the relevant competitive bidding process.
(7)
Any units generated above the amount calculated in sub-
regulation (6) of this regulation in any calendar year shall be
purchased by the distribution system operator and paid at the proxy for
the market price per kWh only, without the payment of the premium.
(8)
The successful bidders shall not be entitled to tradeable
guarantees of origin or other tradeable certificates for the electricity
sold to the distribution system operator.
(9)
Without prejudice to sub-regulations (4) and (5), an
approved renewable energy installation may be relocated to an
alternative site subject to obtaining the necessary permits,
authorisations and licenses as may be applicable, and subject to the
conditions laid down in the competitive bidding procedure.
The competitive bidding process shall include an
administratively established cap on the maximum bid price per kWh
that bidders may offer. The cap may consist of one maximum bid price
per kWh applicable to all offers or different caps for different
categories as may be defined by the Contracting Authority in the
competitive bidding process.
SOURCES OF ENERGY INSTALLATIONS (CAPACITY
FROM 40KW UP TO LESS THAN 1000KW)
(1)
An approved renewable energy installation shall be
fully commissioned as described in the bid, including the capacity
offered in the bid, and an application to connect the installation to the
distribution system shall be submitted to the distribution system
operator within eighteen (18) months to be reckoned as from the date
of the letter of award issued by the Contracting Authority to the
successful bidder to secure the eligibility of the awarded bid price per
kWh.
(2)
If the successful bidder fails to comply with sub-
regulation (1), the time to commission and apply to connect said fully
commissioned approved renewable energy installation to the
distribution system as indicated in sub-regulation (1) may be
extended once only by six(6) months by means of a request in writing
to the Contracting Authority, which request shall be made in the
format required by the Contracting Authority
Provided that if an extension is availed of, the price
payable to the successful bidder for electricity generated and sold to
the distribution system operator for the particular approved
renewable energy installation shall be equivalent to the awarded bid
to the distribution system operator up to the amount indicated in
regulation 5(6), for the guaranteed period.
(3)
The request in writing for an extension indicated in sub-
regulation (2) shall reach the Contracting Authority no later than one
(1) month before the lapse of the eighteen (18) month deadline
indicated in sub-regulation (1)
Provided that should an extension be requested but not
availed of, the reduction in the bid price established in the proviso to
sub-regulation (2) shall not be applicable.
(4)
The time necessary for the successful bidders to obtain the
necessary authorisations, licences and permits as applicable, shall not
suspend the running of the time periods established in sub-
regulations (1) and (2), being the maximum time within which an
approved renewable energy installation shall be fully commissioned
and an application to connect the installation to the distribution
system shall be submitted to the distribution system operator, for the
award pursuant to the competitive bidding process to remain valid.
Failure to comply with sub-regulations (1) (2), when a request for an
extension has been made, shall lead to the automatic withdrawal of
the award and the forfeiture of the performance bond
Provided that a verified event of force majeure may be
invoked by a successful bidder, in line with the provisions related
thereto included in the invitation for bids of the relevant competitive
SOURCES OF ENERGY INSTALLATIONS (CAPACITY
FROM 40KW UP TO LESS THAN 1000KW)
bidding process, to request a suspension of the time periods
established in sub-regulations (1) and (2), which request may be
granted at the Contracting Authority’s discretion..
The launch of each competitive bidding process, as well
as the maximum capacity in kW as determined by the Minister for
each competitive bidding process, shall be made public by means of a
Government Notice published in the Gazette.
(1)
The process shall be carried out through a
competitive bidding process which shall be open to all generators
producing electricity from renewable energy sources on a non-
discriminatory basis
Provided that the competitive bidding process shall be
compliant with the fundamental rules and principles of the Treaty on
the Functioning of the European Union regarding equality,
transparency, proportionality and prohibiting discrimination on
grounds of nationality and with Commission Regulation (EU) No 651/
2014 of 17 June 2014 declaring certain categories of aid compatible
with the internal market in application of Articles 107 and 108 of the
Treaty, as amended by Commission Regulation (EU) No 2017/1084 of
14 June 2017 amending Regulation (EU) No 651/2014 as regards aid
for port and airport infrastructure, notification thresholds for aid for
culture and heritage conservation and for aid for sport and
multifunctional recreational infrastructures, and regional operating aid
schemes for outermost regions and amending Regulation (EU) No 702/
2014 as regards the calculation of eligible costs, and by Commission
Regulation (EU) 2020/972 of 2 July 2020 amending Regulation (EU)
No 1407/2013 as regards its prolongation and amending Regulation
(EU) No 651/2014 as regards its prolongation and relevant
adjustments, and as may be subsequently amended.
(2)
The invitation for bids shall also include terms and
conditions which shall constitute an integral part of the contract with
the successful bidder. The form of contract to be entered into shall also
be specified in the invitation for bids.
(1)
The successful bidder shall be required to provide
a performance bond to the Contracting Authority. The value of the
performance bond and the deadline for its submission shall be included
in the invitation for bids of the relevant competitive bidding process.
(2)
Without prejudice to the terms and conditions applicable
to the relevant competitive bidding process, the performance bond
shall be forfeited by a bidder, inter alia, if the bidder fails to satisfy the
conditions in regulation 7.
SOURCES OF ENERGY INSTALLATIONS (CAPACITY
FROM 40KW UP TO LESS THAN 1000KW)
(3)
Where the capacity of an approved renewable energy
installation as installed and connected to the grid is lower than the
capacity allocated during the bidding process, the forfeiture of the
performance bond shall be in accordance with the terms and conditions
established for such purpose by the relevant competitive bidding
process.
Bids which are deemed as being administratively
compliant shall be ranked according to the bid price per kWh with the
lowest bid price per kWh being given the first preference. The bid
installation kW capacity shall be selected pursuant to the competitive
bidding process, starting from the lowest bid offered, and provided that
the kW available for allocation in the particular competitive bidding
process is not exceeded.
The letter of award to the successful bidder shall include,
but not be limited to, the following
(a)
details of the bidder;
(b)
awarded bid price per kWh;
(c)
capacity in kW and threshold on the units of
electricity for which the bid price per kWh may be paid in each
calendar year for the guaranteed period.
The Contracting Authority shall publish on its website
the results of each competitive bidding process, including the awarded
bid price per kWh for each successful bidder for each approved
renewable energy installation and the corresponding capacity in kW, as
established in the competitive bidding process.
The successful bidder shall bear the costs of connection
of the approved renewable energy installation to the nearest suitable
point of connection to the distribution system. The costs for
connection to the distribution system shall be determined by the
distribution system operator in accordance with the Electricity Supply
Regulations.
(1)
The letter of award issued to a successful bidder
pursuant to a competitive bidding process shall only grant to that
successful bidder the right to be paid the price per kWh and shall not
be, nor shall it be deemed to grant or constitute, an automatic
authorisation to construct an approved renewable energy installation or
give any right for the issue of any authorisation, licence or permit
which may be required. Excepting any permits which may be required
by the provisions of the invitation for bids of the relevant competitive
bidding process, to have already been issued at the time of bidding, the
successful bidder shall be responsible to obtain any relevant permits,
SOURCES OF ENERGY INSTALLATIONS (CAPACITY
FROM 40KW UP TO LESS THAN 1000KW)
authorisations and licences within the time-frames established in
regulation 7. The successful bidder shall submit applications for
permits, authorisations and licences in accordance with the applicable
laws and procedures with a view to obtaining such permits,
authorisations and licences. Any cost related to obtaining the required
permits, authorisations, license shall be borne by the successful bidder.
(2)
The issue of the letter of award shall not grant the
successful bidder any right to damages or compensation if any of the
permits, authorisations and licences required are not issued for any
reason whatsoever. The performance bond shall be forfeited in favour
of the Contracting Authority in any such cases.
(1)
The awarded bid price per kWh shall become
applicable as from the date of installation of the metering equipment
by the distribution system operator and shall continue to be applicable
for the duration of the guaranteed period.
(2)
Payment of the awarded bid price per kWh shall be based
on actual meter readings obtained from the metering equipment
referred to in sub-regulation (1) and capped to a maximum kW and
units of electricity according to the letter of award.
A competitive bidding process for the award of support
for eligible renewable energy installations with a capacity from
40kWp up to less than 1000kWp may be launched as may be decided
by the Minister, and for such capacity as stated in the relevant
competitive bidding process.
(1)
The Public Contracts Review Board established
by regulation 80 of the Public Procurement Regulations shall have
jurisdiction to hear and determine complaints submitted by any person
having or having had an interest in competitive bidding process made
under these regulations and in accordance with the procedures laid
down in those regulations.
(2)
The rules for determining the amount of the deposit
necessary for submitting a complaint as provided for in sub-regulation
(1) shall be stipulated in the rules applicable to the invitation for bids
of the relevant competitive bidding process.