COMPETITIVE BIDDING RULES FOR RENEWABLE SOURCES OF ENERGY INSTALLATIONS REGULATIONS *
Table of Provisions (20)
Statutory Text (20 Articles)
SOURCES OF ENERGY INSTALLATIONS
SUBSIDIARY LEGISLATION 545.31
COMPETITIVE BIDDING RULES FOR RENEWABLE
SOURCES OF ENERGY INSTALLATIONS
REGULATIONS *
7th March, 2017
LEGAL NOTICE 76 of 2017, as amended by Legal Notices 251 of 2018
169 of 2020 and 282 of 2021.
The title of these regulations is the Competitive Bidding
Rules for Renewable Sources of Energy Installations Regulations.
(1)
Unless otherwise stated in these regulations,
the definitions in the Public Finance Management Act shall apply.
(2)
In these regulations, unless the context otherwise requires
"annual threshold" means the cap in kWh for the payment of
the awarded bid price per kWh for the period of time commencing on
the 1st January and ending on the 31st December of each year;
"approved renewable energy installation" means a new solar
photovoltaic installation or new wind energy installation with a
capacity of 1000kW or more and granted financial support for the
first time pursuant to a competitive bidding process, and excludes
solar photovoltaic installations and new wind energy installations that
benefit or have benefited from any other support including support on
the initial capital investment;
"awarded bid price per kWh" means the bid price per kWh
offered by a successful bidder whose offer is selected pursuant to a
competitive bidding process;
"bid price per kWh" means price per kWh offered by a bidder
in a competitive bidding process;
"commissioned" means the first time a renewable energy
installation is put into operation, following the establishment of
operational readiness by the warranted electrical engineer certifying
the installation;
"competitive bidding process" means a non-discriminatory
bidding process that provides for the participation of a sufficient
number of undertakings and where the support is granted on the basis
of the bid submitted by the bidder. In addition, the volume related to
the bidding process shall be a binding constraint leading to a situation
where not all bidders can receive support;
"Contracting Authority" means the entity issuing and
administering the competitive bidding process;
*Repealed by Legal Notice 22 of 2023.
SOURCES OF ENERGY INSTALLATIONS
"DC" means direct current;
"distribution" means the transport of electricity on high
voltage, medium voltage and low voltage distribution systems with a
view to its delivery to consumers, but not including supply;
"distribution system" means all the interconnected technical
facilities used for conveying electricity to final customers;
"distribution system operator" shall have the same meaning as
under the Electricity Market Regulations;
"electricity from renewable energy sources" means electricity
produced by plants using only renewable energy sources, as well as
the share in terms of calorific value of energy produced from
renewable energy sources in hybrid plants which also use
conventional energy sources. It includes renewable electricity used
for filling storage systems, but excludes electricity produced as a
result of storage systems;
"eligible renewable energy installation" means a new solar
photovoltaic installation or new wind energy installation with a
capacity of 1000kW or more applying to be granted financial support
for the first time pursuant to a competitive bidding process, and
excludes solar photovoltaic installations and new wind energy
installations that benefit or have benefited from any other support
including support on the initial capital investment;
"force majeure" means acts of God, strikes, lock-outs or other
industrial disturbances, acts of the public enemy, wars, whether
declared or not, blockades, insurrection, riots, pandemics, landslides,
earthquakes, storms, direct lighting strikes, floods, washouts, civil
disorder, explosions and other similar unforeseeable events, which by
the exercise of all due diligence cannot be overcome and which, in
the view of the Contracting Authority prevent a successful bidder
from adhering to his obligations due to causes beyond his reasonable
control;
"full load hours" means the equivalent number of hours in a
calendar year during which the renewable energy installation
produces at its full nominal or kW capacity;
"generation" means the production of electricity;
"guaranteed period" means the period of time indicated in the
relevant competitive bidding process during which the awarded bid
system operator from a qualifying renewable energy installation is
guaranteed;
"kW" means kiloWatt and in the context of these regulations
shall be taken to refer to the nominal capacity of the renewable
SOURCES OF ENERGY INSTALLATIONS
energy installation, which in the case of a solar photovoltaic
installation is equal to the total DC peak power of the installation;
"kWh" means kilo Watt hour(s);
"metering equipment" means the electricity meters provided
by the distribution system operator including smart meters, any
voltage and current transformers and any other associated equipment
and wiring required to measure the quantity of electricity supplied or
exported;
"Minister" means the Minister responsible for Energy;
"new solar photovoltaic installation" means a solar
photovoltaic installation which has never been used for the
generation of electricity in whole or in part and which is installed by
a successful bidder after the conclusion of a competitive bidding
process;
"new wind energy installation" means a wind energy
installation which has never been used for the generation of
electricity in whole or in part and which is installed by a successful
bidder after the conclusion of a competitive bidding process;
"performance bond" means the performance bond to be
provided by a successful bidder to the Contracting Authority pursuant
to regulation 10;
"premium" means the difference between the awarded bid
payable only when the awarded bid price per kWh is higher than the
proxy for the market price per kWh and the proxy for the market
"proxy for the market price" means the average of the
estimated variable cost of meeting the demand forecast for a given
year from locally generated conventional and imported electricity,
with the demand assumption excluding that portion of the forecast
demand which is not expected to be met by conventional and
imported electricity;
"renewable energy sources" means renewable non-fossil
energy sources, that is, wind, solar (solar thermal and solar
photovoltaic), and geothermal energy, ambient energy, tide, wave and
other ocean energy, hydropower, biomass, landfill gas, sewage
treatment plant gas and biogas;
"smart meters" shall have the same meaning as in the
Electricity Supply Regulations;
"solar photovoltaic installation" means a solar photovoltaic
system that generates electricity exclusively from solar radiation and
consisting of all accessories including
SOURCES OF ENERGY INSTALLATIONS
(a)
an array or arrays of photovoltaic modules that
collect and absorb sunlight for conversion into electricity;
(b)
an inverter or inverters;
(c)
associated balance of system components,
including wiring, conduits, switchgear, protection equipment,
ancillary equipment and any other part of the installation
necessary for the production and conveyance of electricity up
to the metering equipment supplied by the distribution system
operator;
"successful bidder" means a bidder whose offer is selected
pursuant to a competitive bidding process;
"supply" means the sale or retail, including resale, of
electricity to customers;
"wind energy installation" means an installation that converts
wind energy into electricity and shall include the tower on which the
wind turbine is mounted, a rotor and the nacelle which houses the
equipment, including the generator, that converts the mechanical
energy in the spinning rotor into electricity and any other ancillary
equipment necessary to connect to the grid.
(1)
The purpose of these regulations is to introduce
the competitive bidding process as the method to determine the fixed
distribution system operator from approved renewable energy
installations and hence to promote and support the generation of
electricity from renewable energy sources.
(2) These regulations shall apply only to renewable energy
produced from renewable energy installations installed in Malta,
Gozo and other islands of the Maltese Archipelago, including the
territorial waters thereof.
(3) These regulations shall not apply to undertakings in
difficulty as defined by the Guidelines on State aid for Rescuing and
Restructuring non-financial Undertakings in difficulty (2014/C 249/
01).
The price per kWh to be paid for electricity generated
and sold to the distribution system operator from eligible renewable
energy installations shall be determined through a competitive
bidding process
Provided that the payment of any price per kWh to an
undertaking that has benefited from earlier unlawful aid granted by
Malta and declared incompatible by a Decision of the European
Commission shall be suspended until such time as that undertaking
has reimbursed the total amount of unlawful and incompatible aid
SOURCES OF ENERGY INSTALLATIONS
and the corresponding recovery interest.
(1)
The awarded bid price per kWh resulting
pursuant to a competitive bidding process shall be paid in each
calendar year up to a capped amount of units of electricity generated
and sold to the distribution system operator and payable for the
guaranteed period.
(2) The awarded bid price per kWh shall be determined by
"pay-as-bid" such that the successful bidders shall be paid, for the
electricity generated and sold to the distribution system operator from
an approved renewable energy installation, the awarded bid price per
kWh based on their actual bid.
(3) The bidder shall submit the bid price per kWh for each
eligible renewable energy installation as required in the competitive
bidding process.
(4) The awarded bid price per kWh shall only be applicable
to a successful bidder and only in respect of the renewable energy
installation as described in the bid including the capacity offered in
the bid (in kW), only as part of the competitive bidding process. The
capacity associated with the bid price shall be deemed to be equal to
Offered kW x Full Load Hours
(5) Without prejudice to sub-regulation (4), the ownership
of an approved renewable energy installation selected pursuant to a
competitive bidding process may be transferred to a third party and
subject to the third party obtaining the necessary permits,
authorisation and licences, as may be applicable.
(6) The awarded bid price per kWh with respect to an
approved renewable energy installation shall be payable for the actual
number of units of electricity generated by such installation and sold
to the distribution system operator, up to the annual threshold
calculated as offered kW x Full Load Hours
Provided that the number of assumed full load hours in
the case of a solar photovoltaic installation shall be equal to 1600
hours
Provided further that in the case of other types of
renewable energy installations, such as wind energy, the number of
full load hours which shall determine the annual threshold for the
payment of the awarded price per kWh, shall be specified in the terms
and conditions applicable in the relevant competitive bidding
process.
(7) Any units generated above the amount calculated in sub-
regulation (6) of this regulation in any calendar year shall be
purchased by the distribution system operator and paid at the proxy
SOURCES OF ENERGY INSTALLATIONS
for the market price per kWh only, without the payment of the
premium.
(8) The successful bidders shall not be entitled to tradeable
guarantees of origin or other tradeable certificates for the electricity
sold to the distribution system operator.
(9) Without prejudice to sub-regulations (4) and (5), an
approved renewable energy installation may be relocated to an
alternative site subject to obtaining the necessary permits,
authorisations and licenses as may be applicable, and subject to the
conditions laid down in the competitive bidding procedure
The competitive bidding process shall include an
administratively established cap on the maximum bid price per kWh
that bidders may offer. The cap may consist of one maximum bid
categories.
(1)
An approved renewable energy installation shall
be fully commissioned as described in the bid, including the capacity
offered in the bid, and an application to connect the installation to the
distribution system shall be submitted to the distribution system
operator within eighteen (18) months that shall be reckoned as from
the date of the letter of award issued by the Contracting Authority to
the successful bidder to secure the eligibility of the awarded bid price
per kWh.
(2) If the successful bidder fails to comply with sub-
regulation (1), the time to commission and apply to connect said fully
commissioned approved renewable energy installation to the
distribution system as indicated in sub-regulation (1) may be
extended once only by six (6) months by means of a request in
writing to the Contracting Authority, which request shall be made in
the format required by the Contracting Authority
Provided that, if an extension is availed of, the price
that shall be payable to the successful bidder for electricity generated
and sold to the distribution system operator for the particular
approved renewable energy installation shall be equivalent to the
awarded bid price per kWh, less €0.005/kWh for all electricity
generated and sold to the distribution system operator up to the
amount indicated in regulation 5(6), for the guaranteed period.
(3) The request in writing for an extension to the
Contracting Authority indicated in sub-regulation (2) shall reach the
Contracting Authority no later than one (1) month before the lapse of
the eighteen (18) month deadline indicated in sub-regulation (1)
Provided that, should an extension be requested but not
availed of, the reduction in the bid price established in the proviso to
sub-regulation (2) shall not be applicable.
SOURCES OF ENERGY INSTALLATIONS
(4) The time necessary for the successful bidders to obtain
the necessary authorisations, licences and permits as applicable, shall
not suspend the running of the time periods established in sub-
regulations (1) and (2), being the maximum time within which an
approved renewable energy installation shall be fully commissioned
and an application to connect the installation to the distribution
system shall be submitted to the distribution system operator, for the
award pursuant to the competitive bidding process to remain valid.
Failure to comply with sub-regulations (1) and (2), when a request for
an extension has been made, shall lead to the automatic withdrawal of
the award and the forfeiture of the performance bond
Provided that, a verified event of force majeure may be
invoked by a successful bidder, in line with the provisions related
thereto included in the invitation for bids of the relevant competitive
bidding process, to request a suspension of the time periods
established in sub-regulations (1) and (2), which request may be
granted at the Contracting Authority’s discretion.
The launch of each competitive bidding process, as well
as the maximum capacity in kW as determined by the Minister for
each competitive bidding process, shall be made public by means of a
Government Notice published in the Gazette.
(1)
The process shall be carried out through a
competitive bidding process
Provided that the competitive bidding process shall be
compliant with the fundamental rules and principles of the Treaty on
the Functioning of the European Union regarding equality,
transparency, proportionality and prohibiting discrimination on
grounds of nationality and the European Commission’s Guidelines on
State Aid for environmental protection and energy 2014-2020.
(2) The invitation for bids shall also include terms and
conditions which shall constitute an integral part of the contract with
the successful bidder. The form of contract to be entered into shall
also be specified in the invitation for bids.
(1)
The successful bidder shall be required to
provide a performance bond issued in favour of the Contracting
Authority. The value of the performance bond and the deadline for its
submission shall be included in the invitation for bids of the relevant
competitive bidding process.
(2) Without prejudice to the terms and conditions applicable
to the relevant competitive bidding process, the performance bond
shall be forfeited by a bidder, inter alia, if the bidder fails to satisfy
the conditions in regulation 7.
(3)
In the case when the capacity of an approved renewable
SOURCES OF ENERGY INSTALLATIONS
energy installation as installed and connected to the grid is lower than
the capacity allocated during the bidding process, the forfeiture of the
performance bond shall be in accordance with the terms and
conditions established for such purpose by the relevant competitive
bidding process.
Bids which are deemed as being administratively
compliant shall be ranked according to the bid price per kWh with the
lowest bid price per kWh being given the first preference. The bid
installation kW capacity shall be selected pursuant to the competitive
bidding process, starting from the lowest bid offered, and provided
that the kW available for allocation in the particular competitive
bidding process is not exceeded.
The letter of award to the successful bidder shall
include, but not be limited to, the following
(a)
details of the bidder;
(b)
awarded bid price per kWh;
(c)
capacity in kW and threshold on the units of
electricity for which the bid price per kWh may be paid in each
calendar year for the guaranteed period.
The Contracting Authority shall publish on its website
the results of each competitive bidding process, including the
awarded bid price per kWh for each successful bidder for each
approved renewable energy installation and the corresponding
capacity in kW, as established in the competitive bidding process.
The successful bidder shall bear the costs of connection
of the approved renewable energy installation to the nearest suitable
point of connection to the distribution system. The costs for
connection to the distribution system shall be determined by the
distribution system operator in accordance with the Electricity
Supply Regulations.
(1)
The letter of award issued to a successful bidder
pursuant to a competitive bidding process shall only grant to that
successful bidder the right to be paid the price per kWh and shall not
be, nor shall it be deemed to grant or constitute, an automatic
authorisation to construct an approved renewable energy installation
or give any right for the issue of any authorisation, licence or permit
which may be required. Excepting any permit which may be required
by the provisions of regulation 18, the successful bidder shall be
responsible to obtain any relevant permits, authorisations and
licences within the time-frames established in regulation 7. The
successful bidder shall submit applications for permits, authorisations
and licences in accordance with the applicable laws and procedures
with a view to obtaining such permits, authorisations and licences.
SOURCES OF ENERGY INSTALLATIONS
Any cost related to obtaining the required permits, authorisations,
license shall be borne by the successful bidder.
(2) The issue of the letter of award shall not grant the
successful bidder any right to damages or compensation if any of the
permits, authorisations and licences required are not issued for any
reason whatsoever. The performance bond shall be forfeited in favour
of the Contracting Authority in any such cases.
(1)
The awarded bid price per kWh shall become
applicable as from the date of installation of the metering equipment
by the distribution system operator and shall continue to be
applicable for the duration of the guaranteed period.
(2) Payment of the awarded bid price per kWh shall be
based on actual meter readings obtained from the metering equipment
referred to in sub-regulation (1) and capped to a maximum kW and
units of electricity according to the letter of award.
A competitive bidding process for the award of support
for eligible renewable energy installations with capacity of 1000kW
or more shall be launched as determined by the Minister for such
capacity as indicated in the relevant competitive bidding process.
Without prejudice to the generality of the foregoing, the
terms and conditions of a competitive bidding process made public
and published in the Gazette, and applicable to wind installations
shall require as a pre-requisite in any such competitive bidding
process the issue of the applicable Planning Permit as may be
required by law.
The Public Contracts Review Board established by
regulation 80 of the Public Procurement Regulations shall have
jurisdiction to hear and determine complaints submitted by any
person having or having had an interest in competitive bidding
process made under these regulations and in accordance with the
procedures laid down in those regulations.