FEED-IN TARIFFS SCHEME (ELECTRICITY GENERATED FROM SOLAR PHOTOVOLTAIC INSTALLATIONS) REGULATIONS
Table of Provisions (18)
Statutory Text (18 Articles)
SUBSIDIARY LEGISLATION 545.27
FEED-IN TARIFFS SCHEME (ELECTRICITY
GENERATED FROM SOLAR PHOTOVOLTAIC
INSTALLATIONS) REGULATIONS
1st July, 2013 *
LEGAL NOTICE 253 of 2013, as amended by Legal Notices 271 of 2013,
and 7, 155 and 416 of 2014; Act XXXIV of 2014; Legal Notices 171, 264,
365 and 415 of 2015; Act XXV of 2015; and Legal Notices 31, 237, 346,
369 of 2016, 32, 104, 120, 200, 338,381 of 2017, 149 of 2018, 159 of 2018
160 of 2018 and 2 and 171 of 2019 and 94, 234, 417 of 2020 and 36, 61,
298 of 2021, 69 and 88 of 2022, 43 of 2023, 35 of 2024, 48 of 2025 and 101
of 2026.
(1) The title of these regulations is the Feed-in Tariffs
Scheme (Electricity Generated from Solar Photovoltaic
Installations) Regulations.
(2) The purpose of these regulations is to establish a feed-in
tariff for electricity generated from solar photovoltaic installations
and hence to promote and support the generation of electricity from
renewable energy sources.
Amended by
L.N. 155 of 2014;
(Regulation 4)
XXXIV. 2014.56;
XXV. 2015.41;
L.N. 264 of 2015;
L.N. 415 of 2015;
L.N. 237 of 2016;
L.N. 94 of 2020;
L.N. 234 of 2020;
L.N. 43 of 2023;
L.N. 48 of 2025.
Eligibility Criteria to participate in FIT scheme
Eligibility Criteria
The electricity generated by a solar photovoltaic installation and exported to the
distribution system is eligible to be paid at the established feed-in tariff rate
determined by these regulations subject to the following criteria being satisfied
1. The electricity is exclusively generated using solar radiation from solar
photovoltaic installations which are approved by the Regulator.
2. The electricity generated by the solar photovoltaic installation and exported
to the distribution system is within the thresholds specified in the Second Schedule.
3. The submission date of a request to participate in the FIT scheme shall be
considered in the determination of the applicable FIT scheme and approval of the FIT
under such scheme by the Regulator.
4. A solar photovoltaic installation shall be considered as eligible for
participation in the FIT scheme if the amount proposed for export to the distribution
system may be accommodated within the total maximum of electricity generated by
solar photovoltaic installations eligible to benefit from the FIT scheme for the
a p p l i c a b l e y e a r as d e t e r m i n e d i n r e g u l a t i o n 7 a n d i n t h e T h i r d S c h e d u l e .
Participation to the FIT scheme shall be determined on a first-come first-served basis
and each kWp installed shall be attributed a generation of 1600kWh.
5. The solar photovoltaic installation is notified to or authorised by the
Regulator in accordance with any applicable legislation.
6. The solar photovoltaic installation is commissioned and an application to
connect the installation to the distribution system has been submitted to the
distribution system operator not later than twelve (12) months from the date of
approval of the FIT by the Regulator. In the case that the solar photovoltaic
installation is not commissioned and an application to connect the installation to the
distribution system is not submitted to the distribution system operator within the
aforesaid twelve (12) months, the eligibility for a FIT shall be subject to the
beneficiary of the FIT applying to the Regulator for an extension, which extension
shall not be of more than
(a)
twenty-four (24) months, in the case of feed in tariff applications
approved prior to the 1st January 2023;
(b)
twelve (12) months in the case of feed in tariff applications
approved after the 1st January 2023
Provided that any such extension may be granted only once. The aforesaid
extensions, irrespective of the date of application for the extension, shall be reckoned to
commence as from the first day immediately following the end of the mentioned first
FEED-IN TARIFFS SCHEME (ELECTRICITY GENERATED
FROM SOLAR PHOTOVOLTAIC INSTALLATIONS)
twelve (12) month period allowed for the commissioning and submittal of the
application for connection to the distribution system. The rate of the FIT which would be
then applicable shall be that in force at the time of the submission of the application for
said extension by the beneficiary or, if no such FIT has been established, the FIT
originally allocated to the solar PV installation reduced by euro 0.005 per kWh.
7. The installation operator complies at all times with the obligations
established in these regulations, the Network Code and all other applicable
legislation.
8. Deleted by Legal Notice 48 of 2025.
9. The applicant for a feed-in tariff shall submit an application in such form
a n d m a n n e r a s r e q u i r e d b y t h e R e g u l a t o r, a n d w h i c h s h a l l c o n t a i n , o r b e
accompanied by, such information and documents as may also be required by the
Regulator.
The application for the feed-in tariff shall contain at least the following
information
(a) applicant’s name and size of the undertaking, where applicable;
(b) location of the project;
(c) list of project costs;
(d) kW DC rating of the solar photovoltaic installation;
(e) a comprehensive declaration of the de minimis aid received by the
applicant and as required by the application form.
(1) Unless otherwise stated in these regulations, the
definitions in the Act shall apply.
(2)
In these regulations, unless the context otherwise requires
"the Act" means the Regulator for Energy and Water Services
Act;
"annual threshold" means the cap in kWh or kVAh for the
payment of the feed-in tariff for the period of time commencing on
the 1st January and ending on the 31st December of each year;
"change of use of premises" means the change in the
classification of a premises in terms of these regulations whether
domestic or residential or non-residential or institutional
household;
"co-generation" means the simultaneous generation in one
process of thermal energy and electrical or mechanical energy;
"co-generation unit" means a unit that is able to operate in co-
generation mode;
"commissioned" means the first time a solar photovoltaic
installation is put into operation, following the establishment of
operational readiness;
"DC" means direct current;
" de minimis aid" means aid awarded in accordance with
Commission Regulation (EU) No 1407/2013 of 18 December 2013 on
the application of Articles 107 and 108 of the Treaty on the
Functioning of the European Union to de minimis aid;
*see regulation 1(3) of these Regulations, as originally promulgated.
"distribution" means the transport of electricity on high voltage,
medium voltage and low voltage distribution systems with a view
to its delivery to consumers, but not including supply;
"distribution system" means all the interconnected technical
facilities used for conveying electricity to final customers;
"distribution system operator" shall have the same meaning as
assigned to it in the Electricity Regulations;
"domestic premises" means premises which include private
dwellings with no persons registered with the distribution system
operator as residing in them such as second homes, or private
garages and common areas including roofs, stairs, terraces, gardens
to buildings which are used solely for private dwellings;
"export of electricity" means in the case of a solar photovoltaic
installation where the installation operator sells all electricity
generated to the distribution system operator, the total electricity
generated by the solar photovoltaic installation, and, in the case where
the installation operator generates electricity primarily for own
consumption in the premises where the solar photovoltaic system is
located, the excess electricity generated by the solar photovoltaic
installation but not consumed on site and which is injected into the
distribution system;
"FIT" means feed-in tariff;
"FIT scheme" means the annual scheme whereby a specific
amount of electricity generated by eligible solar photovoltaic
installations and exported to the distribution system are paid a feed-
in tariff as established in terms of these regulations;
"generation" means the production of electricity;
"ground-mounted" means installed on a supporting structure
directly above ground, or integrated or fixed to a structure, such as
a tent, greenhouse, glasshouse, canopy or other similar structure
but does not include any structure installed on the roof of a
building;
"installation operator" means the owner of the solar photovoltaic
installation;
"institutional households" shall include the following premises
(a) healthcare institutions such as premises used as a
hospital, nursing home or as any institution providing
medical or nursing care;
(b) institutions for retired, elderly or disabled persons,
including premises used as a home for the retired or
elderly persons or persons with any disability;
(c) educational institutions including premises used as a
boarding school or for similar purposes;
(d)
care institutions including premises used as
orphanages, shelter homes, open centres for refugees
or for similar purposes;
(e) religious institutions including premises used as
convents, retreat houses, or for similar purposes;
(f)
military institutions such as military barracks;
(g) other institutions including premises used as boarding
houses, penal or correctional facilities or for similar
purposes;
"kVAh" means kilo Volt Ampere hour; "kW" means kilo Watt;
"kWh" means kilo Watt hours;
"metering equipment" means the electricity meters provided by
the distribution system operator including smart meters, any
voltage and current transformers and any other associated
equipment and wiring required to measure the quantity of
electricity supplied or exported;
"the Minister" shall have the same meaning as assigned to it in the
Act;
"net metering arrangement" means the arrangement in place prior
to the entry into force of these regulations where the units exported
to the grid are deducted from the units imported from the
distribution system for the calculation of the electricity bill;
"non-residential premises" means a building or plot of land
which is used wholly or mainly for the purpose of conducting an
economic activity, but does not include any building such as private
garages or common areas to buildings which are used solely as
private dwellings;
"operating aid" means the difference between the feed-in tariffs
under the Second Schedule and the proxy for the market price for
electricity established by the Electricity Regulations;
"operational readiness" means the capability to function in
accordance with design and specifications;
"period of guaranteed payment of the feed-in tariff" means the
period of time over which the feed-in tariff for all electricity
generated from a solar photovoltaic installation is guaranteed;
"prem ises cod e" means a u niq ue num ber assigned by t he
distribution system operator identifying a particular premises with its
individual service address and served with electricity and, or water;
"proxy for the market price" shall have the same meaning as
assigned to it in the Electricity Regulations;
"the Regulator" means the Regulator for Energy and Water
Services as established by the Act;
"renewable energy sources" means renewable non-fossil energy
sources, that is, wind, solar, geothermal, wave, tidal, hydropower,
biomass, landfill gas, sewage treatment plant gas and biogases;
"residential premises" means any premises used solely and
regularly as a private dwelling where at least one person resides but
does not include institutional households;
"roof-mounted" means installed on the roof of a building and for
the purposes of this definition "roof" shall also include a supporting
structure permanently installed or attached to the roof of a building,
but which shall exclude any supporting structure integrated or fixed
to a structure, such as tent, canopies or other similar structures
when installed ground-mounted;
"scheduled" means in accordance with the scheduled program of
A RMS Lim it ed f or t he t akin g of periodic electricity meter
readings;
"smart meters" shall have the same meaning as assigned to it in the
Electricity Supply Regulations;
"spill-off tariff" means the tariff to be paid for every unit
generated by the installation operator in excess of own
consumption and exported to the distribution system from a solar
photovoltaic installation when the billing is done on a net metering
arrangement;
"solar photovoltaic installation" means a solar photovoltaic
system that generates electricity exclusively from solar radiation
and consisting of all accessories including
(a) an array or arrays of photovoltaic modules that collect
and absorb sunlight for conversion into electricity;
(b) an inverter or inverters;
(c) associated balance of system components, including
wiring, conduits, switchgear, protection equipment,
ancillary equipment and any other part of the
installation necessary for the production and
conveyance of electricity up to the metering equipment
supplied by the distribution system operator, after the
said solar photovoltaic installation has been approved
by the Regulator as meeting the applicable criteria
specified in the First Schedule;
"structure integrated solar photovoltaic installation" means a
solar photovoltaic installation whereby the photovoltaic panels
form part of the fabric of a structure which is not primarily
intended for supporting PV panels but which can be so adapted.
These include the following
(a) photovoltaic installations integrated in building
façades only when the panels replace glass, stone,
concrete or other building components in the façade;
(b) bus shelters when the panels form part of the bus
shelter envelope substituting other material necessary
for the structure to function as a bus shelter;
(c) canopies when the panels substitute other materials;
(d) greenhouses when the PV panels substitute other
material;
"submission date" means, in the case of a solar photovoltaic
installation mentioned in regulation 4(1), the date on which the
request to participate in the FIT scheme is received by the
Regulator and, in the case of a solar photovoltaic installation
mentioned in regulation 4(2), the date when a notification or an
application for an authorisation to construct a solar photovoltaic
installation, as the case may be, is received by the Regulator
together with the request to participate in the FIT scheme;
"undertaking" means any entity engaged in an economic activity,
regardless of its legal status and the way in which it is financed.
For the purposes of this definition "entity" includes any natural or
legal person engaged in the provision of a good or service on the
market;
Amended by
L.N. 271 of 2013;
(Regulations 3, 5, 6)
L.N. 7 of 2014;
L.N. 155 of 2014;
XXXIV. 2014.56;
L.N. 416 of 2014;
XXV. 2015.41;
L.N. 264 of 2015;
L.N. 365 of 2015;
L.N. 415 of 2015;
L.N. 237 of 2016;
L.N. 346 of 2016;
L.N. 32 of 2017;
L.N. 104 of 2017;
L.N. 200 tal-2017;
L.N. 338 tal-2017;
L.N. 381 of 2017;
L.N. 149 of 2018;
L.N. 160 of 2018;
L.N. 2 of 2019;
L.N. 94 of 2020;
L.N. 417 of 2020;
L.N. 61 of 2021;
L.N. 69 of 2022;
L.N. 43 of 2023;
L.N. 35 of 2024;
L.N. 48 of 2025;
L.N. 101 of 2026.
1. In the case of electricity generated exclusively from solar photovoltaic
installations -
(a) when an application for the FIT scheme, meeting all the requirements,
was submitted and approved by the Regulator for the periods of time
FEED-IN TARIFFS SCHEME (ELECTRICITY GENERATED
FROM SOLAR PHOTOVOLTAIC INSTALLATIONS)
referred to in Table A; and
(b) with the type of installation as shown in Table A, in Malta and Gozo and
in accordance with regulation 3; and
(c) exported to the distribution system up to an annual threshold calculated
as kWp multiplied by 1600h; and
(d) for a period of guaranteed payment of feed-in tariff of twenty (20) years;
and
(e) where the installation, and, or the photovoltaic panels and, or its inverter
have not previously been used for the generation of electricity;
the feed-in tariff to be paid by the distribution system operator to an installation
operator for electricity generated from solar photovoltaic installations and supplied
to the distribution system operator shall be in accordance with the amounts per kWh,
solar photovoltaic installation’s individual capacity limits and maximum units
allocated per annum for payment of each feed-in tariff as established in Table A
Maximum units allocated
per annum for FIT payment
Capacity of solar photo- Feed-in Tariffs applica-
to PV systems approved
voltaic
ble between 1 st January under this FIT scheme
FIT Scheme
installation installed in 2026 and 30 th Novem-
between the 1 st January
any type of location
ber 2026
2026 and the 30 th Novem-
ber 2026
=>1kWp and <40kWp
15 cents per kWh
12.8 GWh
per
annum
(8MWp)
In line with the first-come-first served principle, the Regulator reserves the
right to stop accepting applications for a feed in tariff if, in its opinion, it has
received sufficient applications which reach the total maximum units allocated for
FIT payment to solar photovoltaic installations in terms of Table A and following
publication of a notice to that effect in the web-site of the Regulator.
The receipt of any application by the Regulator, should not be construed as
an acceptance or approval thereof and does not in any manner whatsoever give rise
to any obligation on the part of the Regulator to allocate a feed-in tariff to the
applicant.
The maximum units allocated in Table A for each FIT scheme do not include
units from solar photovoltaic installations which pursuant to item 6 of the First
Schedule benefit from an extension as provided in that item.
2. For the purposes of the First Schedule and this Schedule, "kWp" shall mean
the total DC peak power of an array or arrays of photovoltaic modules as specified in
the notification or authorisation application submitted to the Regulator for its
approval under the Electricity Regulations (S.L.545.34).
3. Electricity sold to the distribution system operator and measured in kVAh
shall be paid at the applicable feed-in tariff as that applied for electricity sold to the
distribution system operator and measured in kWh.
4. In the case of electricity generated exclusively by solar photovoltaic
installations -
FEED-IN TARIFFS SCHEME (ELECTRICITY GENERATED
FROM SOLAR PHOTOVOLTAIC INSTALLATIONS)
(a) approved for the FIT scheme from the 1 st January 2026 until 30 th
November 2026; and
(b) installed on residential or domestic premises in accordance with
regulation 3; and
(c) exported to the distribution system up to an annual threshold calculated
as kWp multiplied by 1600h; and
(d) where the installation operator benefits from a grant on the initial capital
investment with regard to the solar photovoltaic installation, the feed-in
tariff to be paid by the distribution system operator to an installation
operator for electricity generated from solar photovoltaic installations
and supplied to the distribution system operator shall amount to 10.5
cents per kWh for a period of guaranteed payment of the feed-in tariff of
twenty (20) years for electricity generated from solar photovoltaic
installations located in Malta and Gozo; and;
(e) where the installation and, or the photovoltaic panels and, or its inverter
have not previously been used for the generation of electricity.
These regulations shall apply to solar photovoltaic
installations insofar as such solar photovoltaic installations are
installed either in residential or domestic premises or in non-
residential premises or institutional households, and which are to be
connected to the distribution system, and which are so connected
either directly or indirectly with the distribution system with the
appropriate protective and metering equipment
Provided that a feed-in tariff in accordance with these
regulations may only be awarded to solar photovoltaic capacities of
less than 40kWp.
Substituted by
L.N. 155 of 2014.
(Regulation 7)
Amended by
XXXIV. 2014.56;
L.N. 264 of 2015;
L.N. 415 of 2015;
L.N. 237 of 2016.
Repealed by Legal Notice 43 of 2023.
(1) In the case of a solar photovoltaic installation
commissioned and connected to the distribution system on a net
metering arrangement by means of the appropriate metering
equipment provided by the distribution system operator prior to the
entry into force of these regulations, the installation operator shall
retain existing net metering arrangements with the distribution
system operator and be paid the spill-off tariff for any electricity
generated from the solar photovoltaic installation and exported to
the distribution system paid prior to the entry into force of these
regulations
Provided that the installation operator shall not increase the
capacity of a solar photovoltaic installation commissioned and
connected to the distribution system on a net metering
arrangement.
(2) In the case of any solar photovoltaic installation
commissioned after the entry into force of these regulations and
satisfying the eligibility criteria established in the First Schedule,
the installation operator may
(a) either sell all electricity generated by the solar
photovoltaic installation to the distribution system
operator in accordance with regulation 6; or
(b) or generate electricity primarily for own consumption
in the premises where the solar photovoltaic
installation is located and be paid the feed-in tariff in
accordance with regulation 6 for any excess electricity
generated and exported to the distribution system
Provided that the installation operator may opt to switch
between the two options established in paragraphs (a) and (b) at
any time, subject to the provisions laid down in sub-regulation 4 of
this regulation and regulation 9.
(3) The installation operator shall not be eligible for the feed-in
tariff unless the solar photovoltaic installation is compliant with the
eligibility criteria established by the First Schedule and he obtains
the necessary authorisations, licences or permits from the relevant
competent authorities and the distribution system operator.
(4) In the case where the installation operator opts to utilise the
electricity generated by the solar photovoltaic installation, the
distribution system operator shall install metering equipment to
measure all the electricity generated by the solar photovoltaic
installation in addition to the import/export metering equipment.
Without prejudice to the generality of the foregoing, subject to
the attainment of the consent of the distribution system operator, the
installation operator may install metering equipment to measure all the
electricity generated by the solar photovoltaic installation as an
alternative to the installation of metering equipment by the distribution
system operator for the purpose of measuring all the electricity
generated by the solar photovoltaic installation.
(5)
The electricity generated -
(a) from solar photovoltaic installations approved with a
different feed-in tariff for electricity generated and
sold to the distribution system operator shall be
separately metered and such solar photovoltaic
installations shall be deemed to be separately installed;
(b) from installations producing electricity from
renewable energy sources other than solar energy
connected with the same premises code with solar
photovoltaic installations installed in terms of
paragraph (a) shall also be separately metered;
(c) from cogeneration units connected with the same
premises code as solar photovoltaic installations
installed in terms of paragraph (a) shall also be
separately metered.
(6) In the case of an installation operator who generates
electricity -
(a) from
separately
installed
solar
photovoltaic
installations and connected with the same premises
code and approved with different feed-in tariffs, the
electricity produced from each separately installed
solar photovoltaic installation shall be paid by the
distribution system operator at the applicable feed-in
tariff rate as approved to each separate solar
photovoltaic installation
Provided that any addition to a solar photovoltaic
installation’s capacity during the period of guaranteed
payment of the feed-in tariff, when the installation
operator has chosen the option to generate electricity
primarily for own consumption and with the export of
any excess electricity generated to the distribution
system, shall not be deemed to be a separately
installed solar photovoltaic installation and the
provisions of regulation 12(2) shall apply;
(b) primarily for own consumption and exports any excess
electricity to the distribution system from an
installation producing electricity from renewable
energy sources other than from solar photovoltaic
installations, and connected with the same premises
code as a solar photovoltaic installation installed
primarily for own consumption, the export of any
excess electricity generated to the distribution system,
for any excess electricity generated and exported to the
distribution system, shall be paid by the distribution
system operator at the proxy for the market price
established under the Electricity Regulations;
(c) primarily for own consumption and who exports any
excess electricity to the distribution system from an
installation producing electricity from a cogeneration
unit connected with the same premises code as a solar
photovoltaic installation installed primarily for own
consumption and with the export of any excess electricity
generated to the distribution system, any excess
electricity generated and exported to the distribution
system shall be paid by the distribution system operator
at the proxy for the market price established under the
Electricity Regulations..
In the case of electricity generated exclusively by solar
photovoltaic installations constructed mainly for own consumption
and where the installation operator does not benefit from any feed-
in tariff under these regulations, the rate to be paid for any surplus
electricity generated on site but not consumed and supplied to the
distribution system operator shall be the proxy for the market price
established under the Electricity Regulations
Provided that
(a) the installation operator may not avail himself of the
benefits under regulation 12(1)(e); and
(b) in the case of an extension to the capacity of a solar
photovoltaic installation installed in terms of
regulation 4A, the rate paid for the surplus electricity
generated on site but not consumed and supplied to the
distribution system operator shall be the proxy for the
market price established under the Fourth Schedule;
and
(c) solar photovoltaic installations installed in terms of
this regulation shall not be installed as an extension to
an existing solar photovoltaic installation already
benefiting from a feed-in tariff under these
regulations
(d) in the case of -
(i)
roof mounted solar photovoltaic installations
and, or solar photovoltaic installations
integrated in the exterior walls of a building, the
installed capacity which may be paid the proxy
for the market price established shall be limited
to 5MWp per annum;
(ii) ground mounted solar photovoltaic installations,
the installed capacity which may be paid the
proxy for the market price established shall be
limited to 2MWp per annum.
Any installation operator, who in force of the Feed-In Tariffs
(Electricity Generated From Solar Photovoltaic Installations)
Regulations, or in force of these regulations, is being paid or may
be paid the marginal cost, however so described, shall as from the
entry into force of this regulation, be paid the proxy for the market
Any installation operator who was regulated by the repealed
Feed-In Tariffs (Electricity Generated From Solar Photovoltaic
Installations) Regulations, 2010 (originally promulgated by Legal
Notice 422 of 2010), or as from the 1st July 2013, is being paid the
proxy for the market price, and notwithstanding any other provision of
these regulations, in the case of electricity generated exclusively by
solar photovoltaic installations
(a) approved on a FIT scheme before the 1st January 2020;
and
(b) installed on residential or domestic premises in accordance
with regulation 3; and
(c) exported to the distribution system up to an annual
threshold calculated as kWp multiplied by 1600h,
the installation operator shall be paid a feed-in tariff which amounts to
L.N. 155 of 2014;
(Regulations 4, 4A, 6, 9, 12)
XXXIV. 2014.56;
L.N. 171 of 2015;
XXV. 2015.41;
L.N. 369 of 2016;
L.N. 120 of 2017;
L.N. 159 of 2018;
L.N. 171 of 2019;
L.N. 36 of 2021;
L.N. 298 of 2021;
L.N. 88 of 2022.
Repealed by Legal Notice 43 of 2023.
5 cents per kWh for a period of guaranteed payment of the feed-in
tariff of twenty (20) years less the duration for which a FIT has already
been paid to the installation operator
Provided that this regulation shall only apply in cases where the
original application for a feed-in tariff was approved with regard to a
residential or domestic premises and subject to such premises being
continually categorised for billing purposes as a residential or
domestic premises throughout the duration of the guaranteed period of
payment.
5. (1) The feed-in tariff shall be due from the time when the
solar photovoltaic installation is first connected to the distribution
system as provided in regulation 3 and produces electricity
exclusively from the solar photovoltaic installation.
(2) The feed-in tariffs shall be paid for the period of guaranteed
payment of the feed-in tariff referred to in the Second Schedule
depending upon the applicable solar photovoltaic installation’s
location and the type of premises wherein it is installed.
(3) Where any person replaces or increases the capacity of the
solar photovoltaic installation in whole or in part, the installation
operator shall not be entitled to the re-commencement or extension
of the period of guaranteed payment of the feed-in tariff
Provided that the same terms and conditions applicable for
that period of guaranteed payment of the feed-in tariff shall subsist.
(4) The feed-in tariff shall only be applicable up to the extent
of and for the total amount of electricity exported to the
distribution system by the solar photovoltaic installation as
approved by the Regulator and as measured by the distribution
system operator metering equipment.
6. The feed-in tariff to be paid by the distribution system
operator to installation operators for electricity generated by solar
photovoltaic installations in accordance with regulation 3 shall be
as established in the Second Schedule. The feed-in tariffs shall be
deemed to be inclusive of any compensation for loss of revenue
arising from any planned and unplanned interruption which
impedes the export of electricity from the solar photovoltaic
installation to the distribution system
Provided that any electricity generated by the solar
photovoltaic installations and exported to the distribution system in
excess of the thresholds established in the Second Schedule shall be
paid at the applicable electricity rate as established in the Electricity
Regulations.
7. Repealed by Legal Notice 43 of 2023.
8. (1) The distribution system operator may set off amounts
due by an installation operator for the supply of electricity against
amounts due to the installation operator for the exporting of
electricity under these regulations
Provided that such setting off shall only be permissible
where the claims are undisputed or are certain, liquidated and due
Provided further that in the case of solar photovoltaic
installations with an installed capacity of more than 100kWp, such
set-off shall only apply by agreement of both the distribution
system operator and the installation operator.
(2) Where a set-off arrangement between the installation
operator and the distribution system operator is in place and the
amounts due to the installation operator for the exporting of
electricity referred to in sub-regulation (1) are in excess of the
amounts due by an installation operator for the supply of electricity
by the distribution system operator, the distribution system
operator shall credit the installation operator the balance due by
means of a credit note
Provided that the distribution system operator shall pay the
installation operator the balance due in such credit note for the
supp ly of electri ci ty by th e inst all at ion operator when two
consecutive scheduled bills based on actual meter readings are
shown to be in credit and such payment shall be effected within
sixty days of the date of the second scheduled bill.
(3) Where the installation capacity is larger than 100kWp and
no set-off agreement exists between the installation operator and
the distribution system operator and the amounts due to the
installation operator for the exporting of electricity are in excess of
the amounts due by an installation operator for the supply of
electricity by the distribution system operator, the distribution
system operator shall credit the installation operator the balance
due, which shall be paid to the installation operator within sixty
days from the scheduled reading of the metering equipment
Provided that the distribution system operator shall carry
out the reading of the metering equipment within intervals of at
least two months, to be reckoned as from the date of the first
reading of the metering equipment.
9. (1) The installation operator may opt and by written notice
to the distribution system operator request a change between the
two options established in sub-regulation (2) of regulation 4
Provided that, the distribution system operator may require
the carrying out of any necessary modifications to the solar
photovoltaic installation connection to the distribution system
before accepting such a request
Provided further that, following the expiry of the period of
guaranteed payment of the feed-in tariff, the installation operator shall
be compensated for any exported electricity at the applicable rate for
such electricity as at the time provided in the Electricity Regulations.
(2) Any installation operator who opts for such arrangements
as established in sub-regulation (1) shall bear the costs of any
modifications necessary including those related to the metering and
connection required by the distribution system operator.
(3) Where, at the expiry of the period of guaranteed payment of
the feed-in tariff, the installation operator of a solar photovoltaic
installation does not request the distribution system operator to effect a
change in option as provided in sub-regulation (1), the distribution
system operator shall continue to purchase all the electricity
generated by the solar photovoltaic installation and exported to the
distribution system, and shall reimburse the installation operator
for such electricity at the rate established in the Electricity
Regulations.
(4) A solar photovoltaic installation that has benefited from a
feed-in tariff shall not benefit from any new feed-in tariff after the
expiry of the period of guaranteed payment of such feed-in tariff.
10. Installation operators shall
(a) submit such information as the Regulator may
reasonably require;
(b) request the prior approval of the Regulator and of the
distribution system operator, in the form and manner
they may reasonably require, if the solar photovoltaic
installation is to be disconnected or transferred, sold or
in any form modified in such a way as to degrade its
performance during the period of guaranteed payment
of the feed-in tariff established in terms of these
regulations;
(c) comply at all times with the provisions of the
applicable legislation, notification, authorisation,
licence conditions and Network Code as approved by
the Regulator;
(d) make available to the distribution system operator and
to the Regulator data required to be recorded for the
purposes of these regulations.
Where an installation operator is deceased, or by reason of
any other act or event, permanently ceases to be the installation
operator, payment of the feed-in tariffs for electricity generated by
solar photovoltaic installation under these regulations for the
remaining period of guaranteed payment of the feed-in tariff may
be transferable to the new installation owner, subject to the prior
approval of the Regulator
Provided that
(a) the new installation owner shall not be considered by
the distribution system operator and the Regulator as a
new installation operator if such installation owner is
not in compliance with any other law, permit or any
requirement in relation to the solar photovoltaic
installation;
(b) the new installation owner shall inform the
distribution system operator and request the approval
of the Regulator as aforesaid of such change in
ownership in such form and manner as they may
establish, together with any documentary proof and
information that they may establish for such purposes;
(c) the new installation owner takes over all obligations
held by the previous installation operator.
(1) In the case of modifications relevant to the solar
photovoltaic installation arising from -
(a) change of use of the premises where the solar
photovoltaic installation is located;
(b) change of account holder;
(c) transfer of solar photovoltaic installation from a
premises to another different premises with a different
premises code but with same use;
(d) transfer of solar photovoltaic installation from a
premises to another different premises with a different
premises code and with different use;
(e) change option from "sell all electricity generated" to
"generate electricity primarily for own use" or vice
versa, as provided for in regulation 9
any applicable feed-in tariff shall remain as originally approved by the
Regulator and in accordance with the feed-in tariff scheme in force
during the year when the solar photovoltaic installation was first
approved a feed-in tariff.
(2) In the case where an installation operator increases the
generation capacity of a solar photovoltaic installation which is
connected to the distribution system and which benefits from a FIT,
the feed-in tariff to be paid by the distribution system operator and
the period for guaranteed payment of the feed-in tariff shall remain
the same as that approved by the Regulator and such increased
capacity shall not be eligible for the payment of such feed-in tariff
and any electricity exported above the threshold approved as part of
the feed in tariff shall be paid at the proxy for the market price
established under the Electricity Regulations.
(3) The changes listed in sub-regulation (1) shall become
applicable from the date of the first meter reading taken after the
date of submission of an application to the distribution system
operator to approve and take the necessary action
Provided that, if the distribution system operator requires the
carrying out of any modifications to the solar photovoltaic installation
connection to the distribution system such changes shall become
applicable from the date of the first meter reading taken after such
modifications have been made."; and
(4) The change in location of a solar photovoltaic installation
from roof-mounted to ground-mounted or vice versa, for the
purposes of the scheme shall be prohibited and any such change
shall lead to the withdrawal of the feed in tariff
Provided that this shall apply only when the applicable
f e e d - i n t a r i ff f o r r o o f - m o u n t e d a n d g r o u n d - m o u n t e d s o l a r
photovoltaic installations is not identical.
(5) In the case of a solar photovoltaic installation connected to
the grid in accordance with regulation 3 that has benefited from a
grant and which was approved a feed-in tariff, such feed-in tariff
shall remain applicable even if subject to the grant scheme
conditions and as determined by the administrator of the grant
scheme, the grant given for the solar photovoltaic installation has
to be reimbursed.
Installation operators shall not be entitled to any tradable
green certificate or guarantees of origin certificate for electricity
generated from the solar photovoltaic installation and for which the
feed-in tariff is paid or for which the installation operator enjoys a
net metering arrangement with a spill-off tariff or benefits from any
of the arrangements provided in regulation 9.
The provisions dealing with access, inspection,
modification or tampering of meters found in the Electricity
Connection and Supply Regulations shall apply mutatis mutandis to
solar photovoltaic installation operators in the same manner as
provided for in those regulations.
On the coming into force of these regulations, any
reference, in any legislation, to the Feed-in Tariffs (Electricity
Generated from Solar Photovoltaic Installations) Regulations, 2010
FEED-IN TARIFFS SCHEME (ELECTRICITY GENERATED
FROM SOLAR PHOTOVOLTAIC INSTALLATIONS)
(revoked by these Regulations) shall be construed as a reference to
these regulations.
FEED-IN TARIFFS SCHEME (ELECTRICITY GENERATED
FROM SOLAR PHOTOVOLTAIC INSTALLATIONS)