NEW ROADS AND ROAD WORKS REGULATIONS
Table of Provisions (61)
Statutory Text (61 Articles)
SUBSIDIARY LEGISLATION 499.57
NEW ROADS AND ROAD WORKS REGULATIONS
4th September, 2018
LEGAL NOTICE 291 of 2018, as amended by Legal Notice 159 of 2022.
The title of these regulations is the New Roads and Road
Works Regulations.
PART I
PRELIMINARY PROVISIONS
(Regulation 31)
The charges payable to the Authority for the grant of a permit shall
be as follows
Permit
Processing Fees
(a) Works, not exceeding 10 metres in
length, to be carried out in local/
residential roads ...........................
€150
(b) Works, exceeding 10 metres in
length, to be carried in local/
residential
roads
RWP1
€250
Major Road
Works Permit
(c) Works to be carried out in distributor
and
arterialroads
€250
(d) Road
construction
works
€500
(a) For each RWP 2 permit issued
€50
(b) For services rendered by the
RWP2
Authority official called on site, per
Emergency
hour
or
part
thereof
Road Works
€60
Permit
(c) Penalty where Authority official is
called
on
false
emergencies
....
€500
(a) Works [excluding those works
referred to in paragraph (b) of the
definition of "minor works" in
regulation 2] in residential roads
€10
RWP3
(b) Works [excluding those works
Minor Road
referred to in paragraph (b) of the
Works,
definition of "minor works" in
Maintenance
regulation 2] in arterial or distributor
and Repairs
roads ...................
€25
Permit
(c) Works on behalf of the Authority and
those referred to in paragraph (b) of
the definition "minor works" in
regulation
Nil
In these regulations, unless the context otherwise
requires, the following expressions have the following meanings
"accident report" means a preliminary report drawn up solely
for purposes of data management which shall, in as far as possible,
include the elements listed in Annex IV to Directive 2008/96/EC;
"arterial and distributor roads" has the same meaning as is
given to it in the Agency for Infrastructure Malta Act;
"the Agency" shall mean the Agency for Infrastructure Malta
as established by and under the Agency for Infrastructure Malta Act;
"the Authority" means the Authority for Transport in Malta
established under the Authority for Transport in Malta Act;
"application" means an application for any road works permit;
"applicant" means the person commissioning the road works,
and includes the Agency for Infrastructure Malta;
"certificate of competence" means a certificate of competence
issued to road safety auditors by the Authority in terms of Regulation
12D;
"Commission" means the European Commission as established
by Article 13 of the Treaty on European Union;
"communications service provider" means an operator who
provides an electronic communications service using, for such
purpose, facilities placed in or under or on a public road;
"competent entity" means the public entity or private
developer that has appointed the road safety auditor for the purposes
of carrying out the road safety audits;
"completion period" means the specified period in which all
works covered by the permit shall be completed;
"contractor" means an undertaking commissioned by an
applicant to undertake road works and which has the professional and
technical means to carry out any road works and which shall annually
provide the Authority with a bank guarantee for the amount of up to
fifteen thousand euro (€15,000);
"Directive 2008/96/EC" means Directive 2008/96/EC of the
European Parliament and of the Council of 19 November 2008 on
road infrastructure safety management as amended by Directive (EU)
2019/1936 of the European Parliament and of the Council of 23
October 2019;
"emergency works" means works which are required to be
executed following failure of underground utility or communications
services or works the carrying out of which is urgently required in
order to prevent or put an end to, or reduce the risk of loss, injury or
damage to persons or property;
"improvement" includes the widening, re-aligning and re-
shaping of roads;
"the European Union" has the same meaning as is given to it in
the European Union Act and includes Norway, Iceland and
Liechtenstein;
"guidelines" means measures adopted by the Authority laying
down the steps to be followed and the elements to be considered in
applying the safety procedures set out in Part II bis;
"infrastructure project" means a project for the construction of
new road infrastructure or a substantial modification to the existing
network which affects the traffic flow;
"inhabited area" means any area in which there is an
aggregation of residential buildings inhabited or capable of being
inhabited by more than one hundred persons, or any other area
designated as such by the Minister in consultation with the Authority;
"Local Council" means a local government council established
in terms of the Local Government Act;
"local plan" has the same meaning as is given to it in the
Development Planning Act;
"local road" has the same meaning as is given to it in the
Agency for Infrastructure Malta Act;
"maintenance" in relation
to
public
roads
includes
improvement and management;
"major works" means any road works which are neither minor
works nor emergency works;
"Planning Authority" means the Planning Authority as
established under the Development Planning Act;
"Member State" means a Member State of the European
Union;
"the Minister"
means
the
Minister
responsible
for
infrastructure;
"minor works" shall include works consisting of -
(a)
the connection of a consumer to a service
provided by, or intended to be provided by, a utility service
provider or a communications service provider and which
includes trenching not exceeding a total area of three square
metres;
(b)
using an access hole for the purpose of ducting,
assessing, repairing or maintaining infrastructure under a road
without effecting traffic flow not requiring excavation;
(c)
the excavation of trial pits to assess or detect
buried infrastructure;
(d)
the placing of any thing in any road that
directly or indirectly causes obstruction to the traffic flow;
(e)
the installation, repair or maintenance of traffic
control items and inhabited road furniture not requiring
excavations;
(f)
routine road maintenance in local roads,
arterial and distributor roads;
"new road" includes the extension of an existing road;
"occupier" means any person who is lawfully in possession of
or exercising control over any land;
"other EU funded road projects" means roads and road
infrastructure projects situated outside urban areas which do not
serve properties bordering on them, and do not serve asaccess roads
to industrial estates or agricultural sites, which are completed using
European Union funding in whole or in part;
"owner", in relation to land or other immovable property,
means any person who owns the land or any person representing the
owner in the administration of the land concerned, or acting on behalf
of the owner or assuming the character of owner, according to
circumstances;
"periodic road safety inspection" means an ordinary periodical
verification of the characteristics and defects that require
maintenance work for reasons of safety;
"permit" means a road works permit required from the
Authority under the provisions of these regulations;
"person" means any natural or legal person;
"primary road" means a road of the highest classification
situated outside urban areas, that connects major cities or regions, as
classified in the Third Schedule to these regulations;"
"project owner" means a person appointed by an applicant for
major road works permit, who shall be completely responsible for the
application and whose position within the applicant entity would
allow him to take decisions on his own in a reasonably short time and
give direction to his team;
"private road" has the same meaning as is given to it in the
Agency for Infrastructure Malta Act;
"public road" means any road not being a private road, which
includes both arterial and distributor roads and local roads;
"residential building" means a structure used for the dwelling
of a person or persons and includes any house, mezzanine, garage,
room, store or other building;
"RISM Road System" means roads which are part of the Trans-
European Road Network and other primary roads illustrated in the
Third Schedule and other EU funded road projects;
"road" has the same meaning as is given to it in the Agency for
Infrastructure Malta Act;
"road safety audit" means an independent detailed systematic
and technical safety check relating to the design characteristics of a
road infrastructure project and covering all stages from planning to
early operation;
"road safety impact assessment" means a strategic comparative
analysis of the impact of a new road or a substantial modification to
the existing network on the safety performance of the road network,
as defined in guidelines published by the Authority;
"road works" means any intervention on existing roads,
including major road maintenance, the breaking up or opening of a
road, trenching works, the construction or reconstruction of footways
or carriageways, alterations in carriageways and footways, traffic
calming measures, the construction or removal of road humps, and
any intervention that alters or seeks to re-instate the surface of an
existing road;
"routine road maintenance" means actions performed on a
regular basis in order to keep a road safe and fit for travel, actions
performed to prevent deterioration where possible, and actions
performed to return the appearance of the road surface to good
condition; it includes, but is not limited to, patching pot holes,
surface patching, crack sealing and filling, cleaning of roads, drains
and culverts; installing traffic signs and signals; replacing damaged
signs and road markings, controlling roadside brush and vegetation;
"targeted road safety inspection" means a targeted
investigation to identify hazardous conditions, defects and problems
that increase the risk of accidents and injuries, based on a site visit of
an existing road or section of road;
"tenement" means any building or land separated from a road
by a wall;
"traffic management schemes" means schemes for the
management of traffic in various events with a combination of
network planning and engineering measures to enhance road safety,
with the aim to alleviate the adverse effects of motorized traffic
including traffic signal controlled junctions, parking regulation,
traffic calming, pedestrian and cycle route improvements and road
signing also for road works and temporary situations;
"trans-European road network" means the road network
identified in Regulation (EU) No 1315/2013 of the European
Parliament and of the Council of 11 December 2013 on Union
guidelines for the development of the trans-European transport
network and repealing Decision No 661/2010/EU, as identified in the
Third Schedule;
"trenching" means the construction of an excavation made
below the surface of the road for the purpose of accessing, installing,
repairing and maintaining of utilities under a road;
"underground utility" means any electric, communications,
water, sewer or drainage service or means of transmission that is
installed beneath the surface of a road;
"undertaking" means any entity, including any person, engaged
in economic activity, regardless of its legal status and the way in
which it is financed;
"utility service provider" means an authority or an enterprise,
the primary business of which is to provide electricity or
communication or gas or water or sewage to the public. The utility
provider may be the Government or may be publicly or privately
owned;
"vulnerable road user" means non-motorised road users,
including, in particular, cyclists and pedestrians, as well as users of
powered two-wheelers.
PART II
CONSTRUCTION AND MAINTENANCE OF ROADS
(Regulations 32, 38)
TRAFFIC MANAGEMENT CLASSIFICATION DURING ROAD WORKS
Fine for
Item
Minimum Requirements
Standard Requirements
breach
TM A - Works on ALL roads not affecting traffic in any way
Works carried out
1. Provide temporary
1. Temporary
Traffic
€50
on footpath
pedestrian access
Management
(Safe route for
Arrangements in line
Works carried out
pedestrians)
with
Safety
at
within the parking
Inhabited Road Works
bay area, not
2. Approval
by
and Road Works - A
affecting traffic
Authority
for
Code of Practice
Transport in Malta
for any obstruction
2. Traffic Signs Manual
to
pedestrian
Chapter 8 Volume
crossing
and
1Traffic
Safety
pedestrian areas
Measures and Signs for
Road
Works
and
Temporary Situations
3. Construction machinery
not
obstructing
carriageway
4. Programme of Works
TM B - Works on traffic carriageway on ALL roads partially obstructing traffic, however,
existing traffic flows retained
Works on traffic
1. Provide temporary
1. Traffic
Management
€100
carriageway
pedestrian access
Plan of works area
(Safe route for
2. Enforcement required
pedestrians)
Works on centre-
Temporary Traffic
strips, side
3. Programme of Works
Management
verges,
Arrangements
in
roundabouts and
4. Construction machinery
line with Code
any other road
not
obstructing
junctions etc.
carriageway
2. Approval
by
Authority
for
Transport in Malta
for any obstruction
to
pedestrian
crossing
and
pedestrian areas
TM C - Works on ALL roads affecting traffic, including partial and full obstruction,
where traffic diversions are required
Works on
1. Provide temporary
1. Traffic
Management
€300
carriageway fully
pedestrian access
Plan of works area
obstructing traffic
(Safe route for
2. Traffic
Management
flow on arterial,
pedestrians)
Plan area-wide
distributor, link
Temporary Traffic
roads and other
Management
3. Enforcement required
roads (as
Arrangements
in
required)
line with Code
4. Programme of Works
2. Approval
by
5. Construction machinery
Authority
for
not
obstructing
Transport in Malta
carriageway
for any obstruction
to
pedestrian
crossing
and
pedestrian areas
TM D - Development Projects (Industrial, Residential, Commercial) which have an
impact on existing adjacent roads
NEW ROADS AND ROAD WORKS
4.1
Works on
1. Provide temporary
1. Impact on change in
€500
development
pedestrian access
traffic volumes, traffic
projects which
(Safe route for
patterns, vehicle mix,
have an impact on
pedestrians)
road environment
the characteristics
Temporary Traffic
2. Traffic
Management
of the existing
Management
Plan of development
adjacent roads
Arrangements
in
works area
line with Code
3. Programme of Works
2. Approval
by
4. Construction machinery
Authority
for
not
obstructing
Transport in Malta
carriageway
for any obstruction
to
pedestrian
crossing
and
pedestrian areas
NEW ROADS AND ROAD WORKS
Whenever, in terms of the exercise of its functions under
article 6 of the Agency for Infrastructure Malta Act, a new road is
being constructed or re-constructed or an existing road is being
widened or deviated by the Agency, the Agency shall cause a notice,
accompanied by a plan showing the proposed new road or the portion
of the road intended to be widened or deviated, and the lands through
which it is to pass, to be published in the Gazette and in any
newspaper.
(Regulation 2)
The RISM Road System
The Authority may prepare and publish a Code of
Practice setting out best principles of good practice with respect to
road works applicable to any person conducting such roads works
and in particular to minimise disruption and inconvenience during
road works.
(1)
The designing, building, or the carrying out of
maintenance or other works on any road shall comply with the
following Design and Construction Standards for Road Works, which
shall be accessible to the public at the offices of the Authority, during
normal office hours or on any online medium
(i)
Volume 1- Specifications for Road Works;
(ii)
Volume 2 - Notes for Guidance on the
Specification for Road Works;
(iii)
Volume 3 - Road Construction Details;
(iv)
Volume 4 - Method of Measurement for Road
Works and Notes for Guidance of Measurement of Road
Works;
(v)
Volume 5 - Design Manual for Roads and
Bridges;
(vi)
Volume 6 - Guidelines for the Standard
Presentation of Design Documents for Road Construction;
(vii)
Volume 7 - Directives for the Standardisation
of Pavements for Traffic Areas
Provided that the geometrical standards for
road design set out in Volume 5 of the Design and
Construction Standards for Road Works specified in regulation
5(1)(v) shall only be complied with so far as it is practicable,
and where such standard cannot be complied with approval is
sought from the Authority following consultation with the
Agency.
(2) Without prejudice to any action that may be exercisable
against any person who designs or builds any road in contravention of
this regulation, nothing in this regulation shall be construed as
granting a right to any person against the Authority or against the
Government or other public authority or Agency or against any
person acting in his or her official capacity as an officer or an
employee of Government or of any such aforesaid authority or
agency in respect of failure of any road to conform to the
performance associated with the Design and Construction Standards
for Road Works stipulated in this regulation.
Repealed by Legal Notice 159 of 2022.
Repealed by Legal Notice 159 of 2022.
Repealed by Legal Notice 159 of 2022.
Repealed by Legal Notice 159 of 2022.
Repealed by Legal Notice 159 of 2022.
Repealed by Legal Notice 159 of 2022.
Repealed by Legal Notice 159 of 2022.
Part II bis
Road Safety Infrastructure Management
(1) This Part establishes the requirements for and sets out
implementation of procedures relating to road safety impact
assessments, road safety audits, road safety inspections and
network-wide road safety assessments. These regulations shall
apply to the RISM Road System, whether they are in the design
stage, under construction or in operation.
(2) This Part shall not apply to roads in tunnels covered by
subsidiary legislation on Safety Requirements for Tunnels in the
Trans-European Road Network Regulations.
(1) A road safety impact assessment shall be undertaken by
the Agency on all infrastructure projects on the RISM Road
System. The road safety impact assessment shall be carried out at
the initial planning stage before the infrastructure project is
approved.
(2) The Agency shall endeavour to meet the elements set out in
Annex I to Directive 2008/96/EC when carrying out the road safety
impact assessment.
(3)
The assessment in sub-regulation (1) shall take into
account the needs of vulnerable road users.
(4) The road safety impact assessment shall indicate the road
safety considerations which contribute to the choice of the
proposed solution. It shall further provide all relevant information
necessary for a cost-benefit analysis of the different options
assessed.
(1) A road safety auditor shall be appointed to carry out
road safety audits on all infrastructure projects on the RISM Road
System.
(2) The appointed road safety auditor shall carry out an audit
of the design characteristics of an infrastructure project and shall
endeavour to meet the criteria set in Annex II to Directive 2008/96/
EC.
(3) Road safety audits shall form an integral part of the design
process of an infrastructure project which shall be carried out at the
following different stages of a project
(a)
the preliminary design phase,
(b)
the detailed design stage and during construction of
the project,
(c)
prior to opening to traffic, and
(d)
approximately a year after opening to traffic.
(4) Road safety audits shall conform to standards produced by
the Authority which shall as much as possible meet the criteria set
out in Annex II to Directive 2008/96/EC.
(5) Road safety audits shall take into account the needs of
vulnerable road users.
(6) The appointed road safety auditor shall set out safety
critical design elements in an audit report for each stage of the
infrastructure project. Where unsafe features are identified in the
course of the audit, but the design is not rectified before the end of
the appropriate stage as referred to in Annex II to Directive 2008/
96/EC, the competent entity shall state the reasons thereof in an
annex to that report.
(7) The audit report referred to in sub-regulation (6) shall
result in relevant recommendations from a safety point of view.
(1) The Authority shall ensure that road safety auditors
carrying out the functions stipulated in regulation 12C undergo
initial training resulting in the awarding of a certificate of
competence.
(2) The holder of a certificate of competence must take part in
further periodic training courses, at a periodicity determined by the
Authority.
(3) The Authority shall recognise certificates of competence
issued to road safety auditors before the 19 December 2010.
(4) The road safety auditors must have relevant experience or
training in road design, road safety engineering and accident
analysis.
(5) The road safety auditors shall not have been or be involved
in the conception or operation of the infrastructure project for
which they have been engaged to carry out the audit.
(6) Where audits are undertaken by teams, at least one member
of the team shall hold a certificate of competence.
(7) For road safety auditors taking their training from the 17th
December 2024, the Authority shall provide training curricula for
road safe ty auditors w hich shall inc lude a spects related to
vulnerable road users and the infrastructure for such users.
(1) Network-wide road safety assessments shall be carried
out by the Authority on the RISM Road System. The first network-
wide road safety assessment shall be carried out by 2024 and shall
thereafter be carried out at least every five years.
(2) Network-wide road safety assessments shall evaluate
accident and impact severity risk, based on
(a)
primarily, a visual examination, either on site or by
electronic means, of the design characteristics of
the road (in-built safety); and
(b)
an analysis of sections of the road network which
have been in operation for more than three years
and upon which a large number of serious accidents
in proportion to the traffic flow have occurred.
(3) The assessment referred to in sub-regulation (1) shall
conform to the standards and guidelines issued by the Authority
which may take into account the indicative elements set out in
Annex III to Directive 2008/96/EC.
(4) Network-wide safety assessments shall take into account
the needs of vulnerable road users.
(5) On the basis of the results of the assessment referred to in
sub-regulation (1), and for the purpose of prioritisation of needs for
further action, the Authority shall classify the RISM Road System
in no fewer than three categories according to their level of safety.
(1) The Authority shall undertake periodic road safety
inspections in respect of the RISM Road System with sufficient
frequenc y to safeguard adequa te safety l evels for the road
infrastructure in question.
(2) Periodic road safety inspections shall take into account the
needs of vulnerable road users.
(3) Joint road safety inspections between the Authority and the
designated entity responsible for tunnel management shall be
carried out on the sections of road network adjoining road tunnels
falling within the scope of the Safety Requirements for Tunnels in the
Trans-European Road Network Regulations, at least every six years.
(4) The Authority shall adopt guidelines on temporary safety
measures applying to road works and shall also implement an
appropriate inspection scheme to ensure that those guidelines are
properly applied.
(1) The Authority shall ensure that the findings of network-
wide road safety assessments carried out in terms of regulation 12E
are followed up either by targeted road safety inspections or by
direct remedial action by the entity responsible.
(2) Targeted road safety inspections may take into account the
indicative elements set out in Annex IIa to Directive 2008/96/EC
and shall take into account the needs of vulnerable road users.
(3) Targeted road safety inspections shall be carried out by
expert teams, with at least one team member possessing relevant
experience or training in road design, road safety engineering and
accident analysis.
(4) The Authority shall follow up on the findings of the
targeted road safety inspection and determine whether remedial
action is necessary by means of a reasoned decision.
(5) The reasoned decision referred to in sub-regulation (4)
shall identify the road sections where road infrastructure safety
improvements are needed and set out prioritised actions needed to
improve the safety of those road sections.
(6) Remedial action shall be primarily targeted at those road
sections with low safety levels which have high potential for safety
development and accident cost savings.
(7) The Authority shall prepare and regularly update a risk-
based prioritised action plan to monitor the implementation of
identified remedial action.
The Authority is responsible for establishing a national
system for voluntary reporting, accessible online to all road users,
to facilitate the collection of details of occurrences transmitted by
road users and vehicles, and of any other safety-related information
which is perceived by the reporter as an actual or potential hazard
to road infrastructure safety.
(1) An accident report shall be drawn up for the purpose of
keeping a record of fatal accidents occurring on the road network
identified in the Third Schedule and other EU funded road projects.
(2) The Authority shall calculate the average social cost of a
fatal accident and the average social cost of a severe accident
occurring on the road network at least every five years.
PART III
ROADS IN INHABITED AREAS
(1)
Every new road in any inhabited area or any
road made with a view that it may form part of an inhabited area
which may hereafter be built up shall be at least eight metres wide
Provided that the Planning Authority, in consultation
with the Agency and the Authority, may require any such road to be
of a stated width exceeding eight metres but not exceeding eighteen
metres.
(2) Where an existing road in an inhabited area is extended,
the minimum width of the road may, with the permission of the
Planning Authority, in consultation with the Agency and the
Authority, be reduced to six metres.
No new road in an inhabited area, nor any road made
with a view that it may form part of an inhabited area which may
hereafter be built up, shall be made without the sanction from the
Planning Authority, in consultation with the Agency and the
Authority, as to its course, direction and position, and as to the
manner in which the adjoining residential buildings are to be sewered
and supplied with water and the surface water is to flow off.
A new road in an inhabited area or an area which may
hereafter be built up may only be opened with the permission of the
Planning Authority, in consultation with the Agency and the
Authority, and the Planning Authority may refuse permission for the
opening of such a new road
Provided that where such permission is refused, the
party aggrieved shall have the right to appeal from such a decision
under the provisions of the Development Planning Act.
No building abutting on a new road in an inhabited area
shall be erected before the road has been levelled to the proper line
fixed by the Planning Authority, in consultation with the Agency and
the Authority. The length of the road to be so levelled shall extend
from any existing inhabited road already opened to the public to the
extreme end of the frontage of the building to be erected.
(1)
(a) Subject to the provisions of regulations 13,
14, 15 and 16, no person may commence the construction of any
building having access to, or having any window or other opening on
to, any road belonging to the Government, before paying to the
Planning Authority, in respect of the formation of the said road, a
contribution equal to the cost, as at the time of payment of the
contribution, of the formation of such road (such cost to include the
value, as at the time of payment of the contribution, of the land
required for the formation of the road) or before paying to the
Planning Authority at least twenty-five per cent of such contribution
and at the same time undertaking in writing to pay the balance within
a period of not more than twelve months by equal monthly
instalments, commencing one month from the date of such payment
and undertaking
Provided that where the land on either side or on both
sides of the road belongs to different owners the total contribution
shall be apportioned among such owners in proportion to the frontage
of the land belonging to each owner on to such road, in such manner
that the whole cost of the road shall be distributed in proportion to
such frontage among the various owners.
(b) Where any monthly instalment referred to in
paragraph (a) is not paid within ten days from the date when the
payment of such instalment falls due, the whole amount of the
outstanding contribution shall become and be immediately due and
owing to the Planning Authority and the person who made the
undertaking referred to in the said paragraph shall be deemed to have
commenced the construction of the building in contravention of this
regulation.
(2) A contribution in respect of the cost of the widening of
any road, at whatever time carried out, may be claimed by the
Planning Authority as in the case of a new road and such contribution
shall only be levied from the owner who has or owners who have
derived a benefit from such widening and shall be apportioned in
proportion to the benefit so derived.
(3) Where any road to which this sub-regulation applies
exceeds eighteen metres in width, the cost of the formation or
widening of the road in excess of such width shall not be taken into
account in fixing the contribution payable to the Planning Authority.
(4) Any contribution payable under the provisions of this
regulation and any apportionment thereof among the owners shall, in
default of agreement, be fixed by the Planning Authority
Provided that any party interested may impugn the
assessment of the Planning Authority by an application before the
competent civil court.
(5) The rates of contributions which may be levied in
respect of any class or type of building and the manner of their
collection shall be those established under regulations made in terms
of article 42 of the Development Planning Act.
(6) The said contributions shall be collected and levied by
the Planning Authority on account of the Government.
(1)
The rates to be charged by the Agency for the
levelling, metalling and asphalting of surface otherwise of roads in an
inhabited area or an area which may hereafter be built up shall be
those as prescribed by regulations under the Authority for Transport
in Malta Act.
(2) Where any person fails to form any road in an inhabited
area or an area which may hereafter be built up in accordance with
the provisions of these regulations, the Agency may itself proceed to
form such a road after giving notice of its intention to do so by means
of a notice in the Gazette, giving such person fifteen days within
which to comply. Such formation shall be at the expense of the
person who would otherwise have been obliged to form such
inhabited road, and the Agency shall have the right to recover any
expense so made from such person.
PART IV
PRIVATE ROADS
The Agency may, at any time, carry out or cause or
allow to be carried out in and under any private road any work
whatsoever which it considers necessary or useful on grounds of
public utility.
Every new private road shall be properly levelled,
metalled and put in a proper state as regards its drainage, by the
person by whom such road shall have been opened, in accordance
with the directives of the Authority to the satisfaction of the Agency.
Every such road shall, moreover, be provided by the said person with
footways with kerb and gutter made of hard stone or other suitable
material to the satisfaction of the Agency.
Every private road shall be kept in a proper state of
repair to the satisfaction of the Agency, by the person by whom such
road shall have been opened.
The owners of any property immediately abutting on any
private road or the persons holding such property on emphyteutical
lease shall, for the purpose of this Part, be deemed to be the persons
who opened such road and the owners thereof
Provided that any person who is bound to carry out any
work in any such road shall be entitled to bring against third parties
any civil action, admissible according to law, for the recovery of any
expenses incurred in the execution of the work
Provided further that no such civil action shall delay the
execution of the work by the person who is bound thereto.
(1)
Without prejudice to any other action available
according to law, the Agency shall be enabled to carry out or, as the
case may be, to continue the carrying out of all or any of the works
specified in regulations 20 and 21 after having given the owner notice
by registered letter of its decision so to do; any such works shall be
carried out at the expense of the person who has opened the road.
(2) Every private road, including the footway thereof, shall,
on notice by registered letter given by the Authority, be asphalted or
surfaced otherwise as indicated by the Authority, by the Agency, at
the owner’s expense.
(3) Each of the notices mentioned in the last two preceding
sub-regulations shall specify the amount payable by the owner as his
share of the expense in connection with the proposed works.
(4) The Agency shall give notice by registered letter of the
date of completion of the works referred to in sub-regulations (1) and
(2) to the owners, who shall effect payment, unless they have already
done so, of the amount due by them without interest, within a month
of the receipt of the notice of completion of the works.
(5) Every notice sent by registered post in terms of this
regulation shall be deemed to have reached the addressee in the
normal course of postal delivery.
(6) Private roads shall, when such roads are included in a
scheme or in a local plan -
(a)
on their asphalting or other surfacing; and
(b)
upon the publication in the Gazette of an Order
by the President to that effect,
become Government property and the owners shall thereafter be
relieved of any further obligation of maintaining the roads.
(7) Notwithstanding any other provision of law to the
contrary, the site of every road or part of a road transferred to the
Government in accordance with sub-regulation (6) shall, on the Order
of the President, be freed absolutely from every privilege and
hypothec theretofore affecting it, without prejudice to the entire
credit secured by that privilege or hypothec continuing to be a charge
on the residue of the property of which that site formed part and on
all other affected properties, if any, of the debtor. Any such liberation
shall not be subject to any requirement of reference or other entry in
the Public Registry.
(8) (a)
If the owner of the road shall fail to pay any
amount due by him under and within the period specified in sub-
regulation (4), he shall thereupon become liable to the payment over
and above the amount so due of interest at eight per centum thereon
as from the date of completion of the works to the date of payment,
and the expense incurred by the Agency together with that interest
thereon shall constitute a privileged claim in favour of the Agency on
that owner’s property immediately abutting on the inhabited road,
and such claim shall be paid in preference to all other claims, whether
privileged or hypothecary on such property, notwithstanding any
other provision of law to the contrary.
(b) Such right of priority may not be enforced unless the
claim is registered in the Public Registry within two months from the
completion of the works aforesaid. In default of evidence to the
contrary the date of the completion of the works shall be deemed to
be that indicated in the note for the registration of the privilege.
For the purpose of the registration and recovery of any
claim under regulation 23, the expense incurred by the Agency shall
be apportioned by the Agency among the owners in proportion to the
frontage of their respective land or buildings along the inhabited
road
Provided that any owner may impugn the assessment
made by the Agency by an application before the competent civil
court in contestation with the said Agency.
PART V
ROAD NAMES
The Agency, the Authority, and to the extent of any
responsibility of a Local Council in terms of the Local Government
Act, a Local Council, in consultation with the Planning Authority,
may cause the name by which any road is to be called, as well as the
name of the town, suburb or village in which the road is situated, and
any other notice or mark which may be considered useful for
directing routes or giving warnings about dangerous corners, or for
any other public purpose, to be painted or affixed and maintained in a
legible state on the walls of any building other than a building
destined for divine worship.
Where a Local Council shall cause the name by which a
private road is to be called, that road shall remain a private road.
No person shall paint, mark, write or affix in any road
open to the public any name as that by which such road is to be
called, or any name of any town, suburb or village, or any notice or
mark similar to that painted or made in accordance with the
provisions of regulation 25 without the approval of the Authority, or
of the Local Council responsible for the locality in which such road is
situated, as the case may be, although such road is a private road.
(1)
It is forbidden to destroy, obliterate or deface
the name of any road, town, suburb or village or add any word or
mark thereto, or damage any slab bearing any such name.
(2) Where a person contravenes the provisions of sub-
regulation (1), such person shall be guilty of a contravention and
shall, on conviction, be liable to a fine (ammenda) of one hundred
euro (€100).
PART VI
ROAD WORKS
(1)
Without prejudice to the obligations relating to
road works under any other laws or regulations in force, no works
shall be executed in, or excavations made under a public road without
a permit from the Authority following consultation with the Agency
or Local Council, as the case may be, which may also impose
conditions as described hereinafter.
(2) The application for a permit shall be made to the
Authority by the applicant on the prescribed form and shall be
accompanied by any information and documents required by the
Authority, and by the appropriate fees as prescribed in the First
Schedule.
(3) The permit shall be valid for the period indicated in it
and all work shall be fully completed within the completion period
specified in the permit.
(4) The Authority may renew any permit the validity of
which has expired upon the submission by the holder thereof of an
application for renewal.
(5) Road works may only be carried out by Local Councils,
the Agency for Infrastructure Malta, utility services providers, and
communications service providers, and all parties involved shall at all
stages follow the Code of Practice
Provided that no works shall commence by utility
service providers, communication service providers or any contractor
thereof, prior to the issuance of the necessary permit by the
Authority, and a licence from the Local Council concerned, as
prescribed in the Local Government Act
Provided further that in the case of emergency works,
the Authority must following the approval and permit for said works
and prior to the commencement thereof immediately notify the Local
Council of the works to be carried out.
(6) Where works in contravention of any of the dispositions
of the provisions of sub-regulation (5) are undertaken, the contractor
or service provider as the case may be shall be liable to an
administrative fine (ammenda) imposed by the Authority of up to one
thousand (€1,000) euro for each contravention, which fine
(ammenda) may also be withdrawn from the bank guarantee.
(1)
There shall be three types of road works
permits as follows
(a)
Major Road Works Permit - RWP 1,
(b)
Emergency Road Works Permit - RWP 2,
(c)
Minor Road Works, Maintenance and Repairs
Permit - RWP 3.
(2) A Major Road Works Permit shall cover major works
which involve any type of road works.
(3) An Emergency Road Works Permit shall cover any
emergency road works and it shall be valid for a period not exceeding
three days.
(4)
A Minor Road Works Permit shall cover minor works.
(1)
An application for the granting or renewal of
any of the permits prescribed by these regulations shall not be
processed by the Authority where the application -
(a)
is not submitted on the prescribed form,
(b)
is not accompanied by the prescribed fee, or
(c)
is not accompanied by the information and, or
documents requested by the Authority, including -
(i)
a copy of an insurance certificate
covering such works,
(ii) a proper site plan (an A4 extract from
the 1988 1.2500 scale survey sheet), endorsed by a
qualified civil engineer showing clearly the location of
the proposed works,
(iii) a written agreement to back fill and
restore the surface of the road to specifications set by the
Authority and in accordance with the conditions
specified in the permit, and
(iv) any other requirements as may be
stipulated by the Authority.
(2) Where an application is made for an Emergency Road
Works Permit, the permit shall be issued once the Authority confirms
the emergency of such works and issues the relative permit
conditions
Provided that the permit holder shall pay those fees for
the services rendered by the Authority official or the penalties as
prescribed in the First Schedule;
(1)
Where the Authority issues a permit under
these regulations, it may attach such conditions to the permit as seem
to it appropriate having regard to all the circumstances of the case.
(2) Without prejudice to the generality of sub-regulation (1),
the types of conditions which the Authority may attach to a permit
under the said sub-regulation include conditions relating but not
limited to -
(a)
days on which works may not be carried out;
(b)
times of day during which works may not be
carried out;
(c)
the prohibition or restriction of traffic;
(d)
traffic management arrangements to be made in
connection with the works as prescribed in the Second
Schedule;
(e)
the manner in which the specified works are to
be carried out;
(f)
consultation and publicity in relation to the
specified works, including the display of information at the
location of those works;
(g)
full compliance with the guidelines and
policies published from time to time by the Authority; and
(h)
performance
and,
or
defects
liability
conditions
Provided that the Authority may impose any other
conditions following consultation with the Agency or Local Council,
as the case may be.
(3) Where a contractor executes works in contravention of
any condition attached to the permit or in contravention to any other
direction which the Authority may give, the Authority, if it considers
it desirable to do so, may revoke or suspend the permit as the case
may be, and the contractor shall be liable to an administrative fine of
fifty euro (€50) for each contravention, which fine may be withdrawn
from the bank guarantee
Provided that where the breach is in contravention of
any of the traffic management conditions, the administrative fine
shall be in accordance with any of those provided in the Second
Schedule.
(1)
Where the Authority refuses to issue a permit,
it shall by notice in writing, within seven days, inform the applicant
of its decision and the reasons therefore.
(2) Where the issue of such a permit is refused, the
applicant may, within twenty-one days starting on the date of such
notice, appeal before the Administrative Review Tribunal provided
for under the Administrative Justice Act.
(1)
The Agency shall have the power to contract
major road works where such works are to be commissioned by a
utility services provider which is Government owned.
(2) Where such works are contracted by the Agency, this
shall be done on behalf and at the expense of the utility service
provider concerned.
(1)
The Authority shall, prior to the granting of a
permit for road works, approve a suitable and safe traffic
management plan prepared by the applicant in respect of those works
and ensure the putting into effect and maintenance of the said plan,
which plan shall include but not limited to lighted barricades,
warning lights, or warnings devices, and signage as needed in order
to prevent damage or injury to persons, vehicles and property and to
minimise the inconvenience and danger to the public by the said road
works.
(2) The said traffic management plan and the required
measures shall be carried out at the expense of the applicant.
(3) The applicant shall ensure that the contractor shall
maintain the traffic management plan throughout all the works
execution period. Failure to do so shall make the applicant and, or the
contractor liable to an administrative fine as provided for in the
Second Schedule, which fine may also be withdrawn from the bank
guarantee, without prejudice to any further action that may be taken
by the Authority, including the withdrawal of the bank guarantee and
suspension of authorization for future road works.
A contractor executing road works shall compensate
third parties in respect of any damages or loss suffered by third
parties as a result of the execution of those road works
Provided that the said liability does not extend to
damage or loss which is attributable to negligence or misconduct on
the part of the person suffering the damage or loss.
(1)
Where trenching works are executed in a road,
the contractor shall be required to reinstate the road in accordance
with the conditions stipulated in the permit.
(2) Where the contractor fails to reinstate the road as
required in sub-regulation (1), the contractor or service provider as
the case may be shall be liable to an administrative fine (ammenda)
imposed by the Authority of up to fifteen thousand (€15,000) euro,
which fine (ammenda) may also be withdrawn from the bank
guarantee.
(1)
A contractor which undertakes road works
shall, upon completion of such works, submit a works compliance
report to the Authority within fifteen days from completion prior to
which the no objection of the contracting authority must be obtained.
(2) The Authority shall then inform the Agency of the
issuance of the compliance certificate.
(3) Major and emergency road works shall, upon
completion, be tested by an independent and accredited laboratory
recognised by the Authority.
(4) In addition to the test carried out as provided for in sub-
regulation (2), and on the basis of the same tests where applicable,
major and emergency road works shall be certified by a warranted
architect and civil engineer (Perit) in terms of compliance with
standards and specifications set by the Authority in respect of all
aspects including but not exclusively, material used, workmanship,
and any performance requirements stipulated in applicable standards.
Only upon such positive certification shall the Authority issue a
certificate confirming that those works had been carried out to its
satisfaction.
(5) Reinstatement works shall be subject to a two-year
guarantee, unless otherwise stated.
(6) Where the Authority is not satisfied with the restoration
and resurfacing of the road, the contractor shall redo the said works to
the satisfaction of the Authority, and where the contractor fails to
comply, the Authority may ask the Agency to carry out the works
itself at the expense of the contractor concerned.
(7) The Authority may exclude from road works, for pre-
established period of times of no less than six consecutive months,
contractors who consistently fail from such compliance.
Contractors shall be required to pay a charge of between
fifty euro (€50) and five hundred euro (€500) for each day, or part
thereof, where the duration of road works carried out by that
contractor exceeds the prescribed completion period without a
justifiable reason. The said charges shall be those prescribed in the
Second Schedule.
(1)
It is an offence for a person to execute, or cause
or suffer to be executed, any unauthorised road works.
(2) In the case of an offence under sub-regulation (1) hereof
the Authority shall, by the issue of a stop notice, direct that person to
stop the works immediately and to take such steps as appear to it
necessary to reinstate, within a period not exceeding twenty-four
hours, the road, failing which the Authority shall carry out the works
itself at the expense of the person concerned.
(3) Any delays in the reinstatement of the works beyond the
time limit imposed under sub-regulation (2) shall bear an
administrative penalty of five hundred euro (€500) per day to be
charged to the person who had executed the unauthorised works and
to the person on whose behalf or at whose request the works have
been carried out.
(4) The Authority shall not entertain any other application
by the same person or persons to undertake any other works until
such time the road is reinstated by the person or persons concerned
or, where the reinstatement works are carried out by the Agency, until
such time as all expenses and penalties have been settled.
(5) The Authority shall not enter into negotiations with the
person or persons concerned until such time as that person or persons
comply with the direction given under sub-regulation (2).
PART VII
OTHER PROVISIONS
The Authority may give orders and take the requisite
steps for closing any road and stopping the thoroughfare thereof
during the construction, alteration, repair or demolition of such road,
or of a conduit, sewer or other public work in such road.
It shall not be lawful, without a permit from the
Authority, the obtaining of the necessary licence from the appropriate
Local Council, to construct any work or make any thing in any road,
which may cause obstruction or create danger or inconvenience to the
public, or, in spite of an intimation by the Police or by a community
officer, to leave any building or work which is ruinous or dangerous
to persons or to the property of others.
Any person intending to take down, construct, alter, or
repair any building in such a manner as will necessitate the deposit of
building materials in the road, or may be a source of injury, danger, or
inconvenience, shall, before beginning the same, cause sufficient
fences to be put up in order to separate the building where the works
are to be carried out from the road with a convenient space for the
thoroughfare, and shall keep such fences and such space in good
condition during such time as the public safety or convenience
requires; and shall, in all cases in which it is necessary in order to
prevent accidents, cause the same to be sufficiently lighted during the
night.
A sufficient light shall also be placed, during the night,
on or near the materials lying in the road, by the person who shall
have laid there such materials on the occasion of any building, repair
or excavation.
It shall not be lawful to leave in any road building
materials or other obstructions longer than necessary; and in any such
case, the proof that the necessary time has not been exceeded shall lie
on the person so causing such materials or other obstructions to be
laid.
(1)
Any opening in the surface or footway of any
road, leading to a vault, cellar, or other place underground, shall be
covered by a door or other proper covering, and such door or
covering shall be kept in repair by the owner.
(2) Nevertheless, where such vault, cellar, or place
underground is intended for habitation, it shall suffice to make on the
edge of the opening a sufficient fence for the safety of the public,
where this is practicable without causing considerable obstruction in
the road.
The occupier of any tenement shall rebuild, without
delay, any wall of such tenement which shall have fallen on the road,
or which, being a party-wall between a tenement and a road, shall
require, in the opinion of the Authority, to be rebuilt.
(1)
A person committing an offence under
regulation 39(1) or regulation 41 is liable to a fine (ammenda) of one
thousand five hundred euro (€1,500).
(2) If on completion of the work for which a permit has
been issued the contractor does not carry out the re-instatement
within forty-eight hours of completion, or within such longer period
as may be allowed in the permit, or the re-instatement is not properly
carried out, the Authority may ask the Agency to carry out the re-
instatement at the expense of the grantee. Such reinstatement expense
may be withdrawn from the bank guarantee.
(3) Where reinstatement is effected or remedied by the
Authority, the contractor is still responsible for such reinstatement.
(4) The applicant shall be liable in solidum with the
contractor which carried out the works to carry out the reinstatement
works.
(5) Throughout the carrying out of works, the Authority
may give further instructions to the contractor pertaining to any of the
conditions in the permit through an addendum to the permit. Failure
to immediately comply with the Authority’s instructions shall make
the contractor liable to an administrative penalty of fifty euro (€50)
per day, without prejudice to any further action that may be taken by
the Authority, including the withdrawal of the bank guarantee and
suspension of authorization for future road works.
(6) Where a person contravenes any other provision under
these regulations he shall be liable to a fine (ammenda) of not less
than twenty euro (€20) but not exceeding one thousand five hundred
euro (€1,500).