CONTROL OF LEGIONELLA REGULATIONS
Table of Provisions (26)
Statutory Text (26 Articles)
SUBSIDIARY LEGISLATION 465.03
CONTROL OF LEGIONELLA REGULATIONS
10th January, 2006
LEGAL NOTICE 5 of 2006, as amended by Legal Notice 262 of 2006.
The title of these regulations is the Control of Legionella
Regulations.
RECOMMENDED INSPECTION FREQUENCIES FOR RISK SYSTEMS
CHECKLIST 1: COOLING WATER INSTALLATIONS
SYSTEM/SERVICES
TASK
FREQUENCY
C o o l i n g t o w e r s a n d Monitor water quality, water use and 6 monthly
evaporative
biocide/chemical use to assess and ensure
condensers
effectiveness of water treatment regime,
including
key
chemical
and
microbiological parameters and
observations of internal condition of
pond, pack and water
Central control function, conductivity M o n t h l y t o 3
sensor calibration, blow down function, m o n t h l y,
u n i f o r m i t y o f w a t e r d i s t r i b u t i o n , according to risk
condition of sprays/troughs, eliminators,
pack, pond, immersion heater, fan and
sound attenuators
C l e a n a n d d i s i n f e c t c o o l i n g t o w e r s / 6 monthly
evaporative condensers, make up tanks
and associated systems, including all
wetted surfaces, descaling as necessary.
Packs should be removed and cleaned
where practicable.
CHECKLIST 2: HOT AND COLD WATER SERVICES
SERVICES
TASK
FREQUENCY
Warm water services
Arrange for samples to be taken from hot 6 monthly
water heaters, in order to note condition
of drain water
Check temperatures in flow and return at Daily
calorifiers
Check temperature up to 1 minute to see Weekly
if it has reached 50ºC in the sentinel taps
Visual check on internal surfaces of Annually
water heaters for scale and sludge
C h e c k r e p r e s e n t a t i v e t a p s f o r Monthly
temperature as above on a rotational
basis
Cold water services
Check tank water temperature remote 6 monthly
from ball valve and mains temperature at
ball valve. Note maximum temperatures
recorded by fixed max/min thermometers
where fitted
CONTROL OF LEGIONELLA
SERVICES
TASK
FREQUENCY
Note: This temperature Check that temperature is below 20ºC Weekly
may not be reached after running the water for up to 2
d u r i n g t h e s u m m e r minutes in sentinel taps
months in Malta
Visually inspect cold water storage tanks 6 monthly
and carry out remedial work where
necessary
C h e c k r e p r e s e n t a t i v e t a p s f o r Monthly
temperature as above on a rotational
basis
Shower heads
Dismantle, clean and descale shower Quarterly, or as
heads and hoses
n e c e s s a r y,
whichever
comes first
Little used outlets
Flush through and purge to drain
Weekly
CHECKLIST 3: OTHER RISK SYSTEMS
SYSTEM/SERVICES
TASK
FREQUENCY
Spray humidifiers, air Clean and disinfect spray humidifiers/air 6 monthly
w a s h e r s a n d w e t washers and make up tanks including all
scrubbers
wetted surfaces, descaling as necessary
Confirm the operation of non chemical Weekly
water treatment (if present)
Water softeners
Clean and disinfect resin and brine tank - A s
check with manufacturer what chemicals recommended by
can be used to disinfect resin bed
manufacturer
E m e r g e n c y s h o w e r s Flush through and purge to drain
6 monthly or
and eye wash sprays
more frequently
if recommended
by manufacturer
Sprinkler and hose reel When witnessing tests of sprinkler blow Quarterly
systems
down and hose reels ensure that there is
minimal risk of exposure to aerosols
Lathe and machine tool C l e a n a n d d i s i n f e c t s t o r a g e a n d 6 monthly
coolant systems
distribution system
Spa baths
Check filters - sand filters should be Daily
backwashed daily
Check water treatment - pools should be 3 times daily
continuously treated with oxidising
biocide
Clean and disinfect entire system
Weekly
Horticultural misting Clean and disinfect distribution pipe Annually
systems
work, spray heads and make-up tanks,
including all wetted surfaces, descaling
as necessary
CONTROL OF LEGIONELLA
SYSTEM/SERVICES
TASK
FREQUENCY
F o u n t a i n s a n d w a t e r Clean and disinfect ponds, spray heads Weekly
features (particularly and make-up tanks, including all wetted
indoors)
surfaces, descaling as necessary
In these regulations, unless the context otherwise requires
"accreditation" means third-party attestation by the Maltese
National Accreditation Body or by any other accreditation body as
recognised by the Maltese National Accreditation Body, in
accordance with the Establishment of the Accreditation Directorate
Order, of a laboratory, conveying formal demonstration of its
competence to carry out specific test;
"accredited laboratory" means a laboratory to which
accreditation has been granted according to the requirements of
MSA ISO/IEC EN 17025;
"the Act" means the Public Health Act;
"authorised officer" means any duly qualified person authorised
by the Superintendent to carry out any functions under these
regulations and includes any nominated officer;
"biocide" means a physical or chemical agent capable of killing
micro-organisms, including Legionella;
"clean" means to render free from visible sludge, foam, slime
(including algae and fungi), rust, scale, dirt, and any deposit or
accumulation of impurities or other foreign material;
"cold water system" means an installation of plant, pipes and
fittings in which cold water is stored, distributed and subsequently
discharged;
"cooling tower systems" includes
(a) a cooling tower, or a number of interconnected cooling
towers that use the same recirculating water; and
(b) any machinery that is used to operate any such tower;
and
(c) any associated tanks, pipes, valves, pumps or controls;
"cooling tower" means a device whose main purpose is to cool
water by direct contact between that water and a stream of air;
"designated area" means any premises or part thereof to which
the public or a section of the public has access, whether on payment
or otherwise;
"disinfect" means to carry out a process which is intended to kill
or remove pathogenic micro-organisms;
"drift" means the water aerosol which emerges from the airflow
outlet of a cooling system;
"evaporative condenser" means a device whose main purpose is
to cool a fluid by passing that fluid through a heat exchanger which
is itself cooled by the contact of water passing through a stream of
air;
"guidelines" means the European Guidelines for Control and
Prevention of Travel Associated Legionnaires’ Disease produced
b y t h e E u r o p e a n Wo r k i n g G r o u p f o r L e g i o n e l l a I n f e c t i o n s
(EWGLI) and endorsed by the Committee for the Epidemiological
Surveillance and Control of Communicable Diseases in the
Community, instituted by Decision 2119/98/EC of the European
Parliament and the Council;
"heat exchanger" means a device for transferring heat between
fluids which are not in direct contact with one another;
"heterotrophic colony count" means an estimate of the number of
viable units of bacteria per millilitre of water made using the pour
plate, spread plate or membrane filter test (also known as the total
bacterial count, total plate count or viable bacterial count test)
method;
"legionella" means bacteria belonging to the genus Legionella;
"premises" includes all non-domestic premises used for or in
connection with the carrying on of a trade or business (whether for
profit or not) and should include any healthcare facility and
schools;
"responsible person" includes the person who owns, manages or
controls the cooling tower systems, or evaporative condensers, or
hot and cold water systems, or water fountains or a number of these
systems in the same premises;
"sentinel taps", in relation to a hot water system, means the first
and last taps on a recirculating system. For cold water systems (or
non-recirculating hot water systems), the nearest and furthest taps
from the storage tank. The choice of sentinel taps may also include
taps which are considered to represent a particular risk;
"spa pool" includes a bath or a small pool where warm water is
constantly recirculated, through high velocity jets or with the
injection of air to agitate the water;
"the Superintendent" means the Superintendent of Public Health;
"warm water system" means a piped water supply, including any
thermostatic mixing valve, which is designed to supply water at a
temperature of between 30ºC and 60ºC;
"water" means water supplied through the main water
distribution system or water supplied by an authorised private
water supplier or through a water supply approved by the
Superintendent or by the relevant competent authorities;
"water fountain" means any water feature located in a designated
area.
ACTION LEVELS FOLLOWING MICROBIOLOGICAL MONITORING
FORCOOLING TOWER SYSTEMS AND EVAPORATIVE CONDENSERS
HETERO-
TROPHIC
COLONY
LEGIONELLA
COUNT 1 CFU/
ACTION REQUIRED ON
NOTIFICATION TO
ML AT 30ºC BACTERIACF
SYSTEM
SUPERINTENDENT
U/LITRE 2
(Minimum 48
hours
incubation)
<10,000
<1000
System under control
None
>10,000 and
>1000 and
Review programme operation - Following resampling and similar
up to 100,000
up to 10,000
The count should be confirmed by c o u n t s a r e c o n f i r m e d , t h e
immediate re-sampling. If similar Superintendent is to be informed in
count is found again, a review of writing within 24 hours of receiving
t h e c on t ro l m e a s u r e s a n d r i s k the laboratory report and should
assessment should be carried out include copies of laboratory results
to identify any remedial actions. together with the control measures
being taken by the responsible
person to remedy the situation.
>100,000
>10,000
Implement corrective action -
Once microbiological results
The system should immediately indicate these levels of bacterial
be re-sampled. It should then be c o u n t s , t h e r e s p o n s i b l e p e r s o n
‘shot dosed’ with an appropriate within 24 hours of receiving the
biocide, as a precaution. The risk laboratory report shall inform the
assessment and control measures Superintendent by phone and in
should be reviewed to identify w r i t i n g w i t h i n 4 8 h o u r s w h i c h
remedial actions.
report should include copies of the
laboratory results together with the
control measures being taken to
remedy the situation.
Colony count determined by pour plate method according to ISO 6222(20) or by spread plate
method on yeast extract agar 2 Determined in accordance with ISO 11731(19)
(1) Cooling tower systems and evaporative condensers are
prohibited to be newly installed on healthcare facilities and
schools.
(2) Installation of new cooling tower system or evaporative
condenser on any other premises should be restricted to those cases
only where no other suitable dry cooling facility is possible as an
alternative.
TEMPERATURE CONTROL FOR HOT AND COLD WATER SYSTEMS
STANDARD TO MEET
FREQUENCY
CHECK
NOTES
COLD WATER
HOT WATER
Weekly
Sentinel taps
The
water The
w a t e r This check makes sure that
temperature
temperature should t h e s u p p l y a n d r e t u r n
s h o u l d b e b e l o w b e a t l e a s t 5 0 º C temperatures on each loop
20ºC or less after within a minute of are unchanged i.e. the loop
running the water running the water is functioning as required
for up to two
minutes
Monthly
If fitted, input to
The water supply to One way of measuring this
thermostatic
the
TMV is to use a surface
mixer
valves
temperature should temperature probe
(TMV) on a
be at least 50ºC
sentinel basis
within a minute of
running water
Water leaving and
O u t g o i n g w a t e r If fitted, the thermometer
returning to the
should be at least pocket at the top of the hot
water heater
60ºC, return at least water storage heater and on
50ºC
th e retu r n le g are use fu l
points for accurate
temperature measurement.
If
installed,these
measurements could be
carried out and logged by a
building management
system
Six monthly
I n c o m i n g c o l d The water should
The most convenient place
water inlet (at preferably be
to measure is usually at the
least once in the below 20ºC at all
ball valve outlet to the cold
winter and once in times
water storage tank
summer)
Six monthly
Representative The
water The
w a t e r This check makes sure that
temperature should t h e w h o l e s y s t e m i s
number of taps on t e m p e r a t u r e
a rotational basis should be 20ºC or b e a t l e a s t 5 0 º C working properly
less after running within a minute of
the water for two running the water.
minutes
The difference
between the highest
and
lowest
temperature
recorded at the taps
after one minute
should not be
greater that 10ºC
CONTROL OF LEGIONELLA
(1) At the stage of installation of cooling tower system or
an evaporative condenser, inspection shall be carried out by
competent persons so that the cooling tower and evaporative
condenser pose minimal health risk to occupants of the premises
and members of the public.
(2) Cooling systems shall be designed and constructed so as to
minimise the release of drift and to aid safe operation, regular
cleaning and disinfection.
ACTION LEVELS FOLLOWING MICROBIOLOGICAL MONITORING
FOR HOT AND COLD WATER SYSTEMS
NOTIFICATION TO
ACTION REQUIRED ON SYSTEM
SUPERINTENDENT
System under control
None
Either
Following resampling and similar
(i) If only one or two samples c o u n t s a r e c o n f i r m e d , t h e
are positive, systems should Superintendent is to be informed in
be re sampled. If a similar writing within 24 hours of receiving
count is found, then review of the laboratory report, and should
the control measures and risk include copies of laboratory results
assessment should be carried together with the control measures
out to identify any remedial b e i n g t a k e n b y t h e r e s p o n s i b l e
person to remedy the situation
actions;
(ii) If the majority of samples are
positive, the system may be
colonised, albeit at a low
level, with Legionella.
Disinfection of the system
should be considered but an
immediate review of control
measures and risk assessment
should be carried out to
identify any other remedial
action required.
The system should be re-sampled O n c e m i c r o b i o l o g i c a l r e s u l t s
a n d a n i m me d i a t e r e v i ew o f t h e indicate these levels of bacterial
c o n t r o l m e a s u r e s a n d r i s k counts, the responsible person within
assessment carried out to identify 24 hours of receiving the laboratory
a n d r e m e d i a l ac t i o n s , i n c l u d i n g r e p o r t
shall
inform
the
possible disinfection of the system S u p e r i n t e n d e n t b y p h o n e a n d i n
writing within 48 hours which report
should include copies of the
laboratory results together with the
c o n t r o l m e a s u r e s be i n g t a k en t o
remedy the situation
Determined in accordance with ISO 11731(19)
CONTROL OF LEGIONELLA
The cooling tower or evaporative condenser shall be
located at least five metres away from air circulating and
ventilating inlets, open windows and occupied areas, pedestrian
thorough fares, traffic areas, areas of public access, exhaust
discharge from kitchens, air handling systems or other areas where
nutrients conveyed from these systems could assist in the growth of
legionella.
CONFIRMATION DECLARATION OF FEES
DUE TO THE SUPERINTENDENT OF PUBLIC HEALTH
The Superintendent of Public Health
Health Division
I, the undersigned, in my capacity of ................................................. (position) of
.............................................. (premises name) hereby declare that I will pay, within
one month’s time of receipt of invoice, all the expenses that the Health Division will
incur in the sampling, transportation, preparation and analysis of ........... (number) of
samples, which have been taken from ................................................(premises
name and address) on the .................... (date of sampling) as part of the investigation
of a case or suspected case of Legionnaire’s disease.
(Sgd)
Name and Surname
o.b.o.
I.D. No.
Date of Birth
Place of Birth
Parent’s Name and Surname
Residential Address
Billing Address
VAT No.
Date
Make-up water shall be supplied either through the main
distribution system or by an authorised water supplier or through a
water supply approved by the Superintendent.
HEALTH AUTHORITY
ENFORCEMENT NOTICE
(As per regulation 18(2) of the Control of Legionella Regulations)
Date: ...........................................
1. Following investigations carried out by the Superintendent of Public Health,
it was found that the risk of infection from Legionnaire’s Diseases is significant at
2. The risk of infection from Legionnaire’s Diseases relates to: ........................
3. Without prejudice to the Superintendent’s right to take action in accordance
with the provisions of the Control of Legionella Regulations, you are hereby
requested to IMMEDIATELY close down the ............................................................
until further notice.
Superintendent of Public Health
(1) Effluent water from cooling towers and evaporative
condensers shall be discharged into the public sewers as approved
by the respective competent authorities.
(2) The concentration of chemicals in the effluent shall be
within the limits established by the respective competent
authorities.
(1) Cooling towers and evaporative condensers shall be
commissioned, approved and certified by a competent warranted
engineer in terms of the Inġiniera Act before use to ensure that they
operate correctly and safely.
(2) The entire air-conditioning system shall be clear of any
construction debris and dirt, and cleaned before operation starts.
(3) Precautions shall be taken to control the risks during
commissioning, start up and during the normal operation of the
system as per guidelines.
It shall be the duty of the responsible person to ensure that
(a) any cooling tower system or evaporative condenser in
use is maintained and tested in accordance with the
guidelines;
(b) the water of the cooling tower system or evaporative
condenser is maintained in a clean condition;
(c) the water of the cooling tower system or evaporative
condenser is continuously treated with
(i)
one or more biocides to effectively control the
growth
of
micro-organisms,
including
Legionella; and
(ii) chemicals or other agents to minimise scale
formation, corrosion and fouling;
(d) a chlorine-compatible bio-dispersant is added to the
recirculating water of the cooling tower system or
evaporative condenser, and that the system is then
disinfected, cleaned and re-disinfected
(i)
immediately prior to initial start up following
commissioning, or any shut down period of
greater than one month; and
(ii) at intervals not exceeding six months;
(e) the cooling tower system or the evaporative condenser
are inspected in accordance with the guidelines and
Schedule 1;
(f)
at least once every month take a sample of the
recirculating water of the cooling tower system and the
evaporative condenser to an accredited laboratory for
testing for heterotrophic colony count and once every
six months for legionella;
(g) a water sample shall be taken before the dosing of
biocide and in accordance with the guidelines.
(1) The responsible person must ensure that the actions
following microbiological monitoring of cooling towers and
evaporative condensers is in accordance with the procedures laid
down in Schedule 2.
(2) The responsible person shall immediately inform the
Superintended of any situation provided for in Schedule 2.
(3) The responsible person shall carry out any further
monitoring and remedial actions as m ay be directed by the
Superintendent.
(4) The Superintendent may require the systems or part thereof
to be shutdown until all necessary remedial actions have been taken
by the responsible person and until microbiological sampling
results of any system would have returned within the recommended
acceptable levels as indicated in Schedule 2.
The responsible person shall ensure that
(a) unless the system is shut down or drained of water or
is otherwise not in use, any hot and cold water system
that the responsible person owns, manages or controls
is maintained and tested in the manner set out in these
regulations and according to the guidelines;
(b) the hot and cold water system is disinfected by heat or
chlorination and cleaned immediately prior to initial
start up following commissioning, or any shut down
period of greater than one month;
(c) the hot and cold water system is disinfected by one or
more of the following methods
(i)
at least once each month by heat or chlorination;
or
(ii) continuously by means of automatic low level
chlorination; or
(iii) continuously by means of ultra-violet light
treatment; or
(iv) a method approved in the guidelines;
(d) the hot and cold water system is inspected and that the
hot and cold water systems are maintained at all times
in accordance with the guidelines and Schedule 1 and
3;
(e) when biocides are used to treat water systems, they are
meticulously controlled and checked at least weekly or
as otherwise indicated to ensure that it is operating
correctly;
(f)
at least once every six months a sample of the water
from the hot and cold water system is taken and
delivered to an accredited laboratory for testing and
reporting on Legionella.
(1) The responsible person must ensure that the actions
following microbiological monitoring of hot and cold water
systems are in accordance with the procedures laid down in
Schedule 4.
(2) The responsible person shall immediately inform the
Superintended of the situation provided for in Schedule 4.
(3) The responsible person shall carry out any further
monitoring and rem edial actions as may be directed by the
Superintendent.
(4) The Superintendent may require the systems or part thereof
to be shut down until all necessary remedial actions have been
taken by the responsible person and until microbiological sampling
results have returned within the recommended acceptable levels in
Schedule 4.
(1) It shall be the duty of the responsible person to ensure
that
(a) any water fountain under his responsibility is
maintained and tested in accordance with the
guidelines and Schedule 1;
(b) water in a water fountain is sampled
(i)
at least once a month for the purpose of
determining the heterotrophic colony counts;
and
(ii) at least once every six months for the purpose of
detecting legionella bacteria.
(2) The responsible person shall immediately inform the
Superintendent of the situation provided for in Schedule 2.
(3) The Superintendent may require the responsible person to
carry out tests and maintenance of water fountains as he may deem
necessary.
(1) It shall be the duty of the responsible person to ensure
that any spa pool and any other type of water system under his
responsibility is maintained and tested in accordance with the
guidelines and Schedule 1.
(2) Spa pools on display in retail outlets or exhibitions shall be
treated in the same manner as if they were being used.
(1) The responsible person shall
(a) carry out a risk assessment to identify and assess the
risk of exposure to legionella bacteria from work
activities and the water systems on the premises under
his control as identified in the guidelines; and
(b) identify any necessary precautionary measures which
may need to be adopted; and
(c) review the assessment either annually or when the
situation changes or when the original assessment may
no longer be valid; and
(d) keep a fully documented record of the risk assessment.
(2) When the risk assessment reveals that there is a foreseeable
risk which cannot be eliminated, the responsible person shall adopt
a scheme specifying the measures to be taken to minimise the risk
of exposure.
(3) The risk assessment and operation of the control measures
shall be audited by an independent competent person at least every
two years.
(4) All maintenance and risk assessment records shall be
retained for at least five years.
(1) The
responsible
person
shall
inform
the
Superintendent of an outbreak of legionnaire’s disease or if it is
suspected to have occurred.
(2) In the event or on the suspicion of an outbreak of
legionnaires’ disease, the responsible person shall implement all
instructions which may be issued by the Superintendent.
(1) It shall be the duty of the Superintendent to investigate
any case or suspected case of Legionnaires’ disease at any premises
and to cause the sampling and analysis of any samples required to
investigate such case or suspected case.
(2) The expenses incurred for the elevation, transportation,
preparation and analysis of samples in case of initial investigation
of a case or suspected case of legionnaire’ disease shall be
encumbered by the Superintendent.
(3) If the results of the initial samples indicate the presence of
Legionella species, or if the investigation is within twenty-four
months of the first notified case or suspected case, the expenses of
follow-up samples or initial samples, as the case may be, shall be
encumbered by the responsible person
Provided that the responsible person of the premises shall
sign a priori the declaration attached as Schedule 5 to these
regulations confirming his acceptance to pay any fees due to the
Superintendent.
(4) Any person who fails to comply with sub-regulation (3)
shall be guilty of an offence and the court, besides awarding
punishment, shall oblige the accused to pay the due fees.
(1) In the event that the responsible person fails to follow
the instructions referred to in the preceding regulations, or the
Superintendent considers that the risk of infection with legionella
from that particular premises is significant, he may order that the
premises, part of the premises or any water related system, be
immediately closed until the risk of infection is controlled.
(2) The Superintendent shall issue an enforcement notice to the
responsible person and shall be in the form specified in Schedule 6,
or in any other modified form as the Superintendent may deem
appropriate in the particular circumstances.
(3) Once the premises, part of the premises or any water related
system has been closed by an enforcement notice issued by the
Superintendent, the same enforcement notice may be lifted only
after it is confirmed by the Superintendent that the risk of infection
has been controlled.
(4) Any person who fails to comply with the enforcement
notice issued under sub-regulation (2) shall be guilty of an offence
under the Act.
Any person who contravenes any of the provisions of these
regulations shall be guilty of an offence under the Act.
CONTROL OF LEGIONELLA