MEASURING INSTRUMENTS AND METHODS OF METROLOGICAL CONTROL REGULATIONS
Table of Provisions (17)
Statutory Text (17 Articles)
SUBSIDIARY LEGISLATION 454.01
MEASURING INSTRUMENTS AND METHODS
OF METROLOGICAL CONTROL
REGULATIONS
15th September, 2006 *
LEGAL NOTICE 395 of 2002, as amended by Legal Notices 9 and 311 of
2008.
The title of these regulations is the Measuring Instruments
and Methods of Metrological Control Regulations.
For the purposes of these regulations, all the definitions in
the Malta Standards Authority Act shall apply, and in addition, in
these regulations, unless the context otherwise requires
"EEC initial verification" refers to the verification of a
measuring instrument which has not been verified previously as
referred to in regulation 11(1);
"verification of a measuring instrument" is the procedure which
includes the examination and marking and, or issuing of the
verification certificate which ascertains and confirms that the
measuring instrument complies with the statutory requirements.
(1) These regulations apply to goods referred to as
instruments, which include measuring instruments, components of
measuring instruments, additional devices and measurement
equipment.
(2) These regulations also apply to units of measurements, the
harmonization of methods of measurement and metrological
control and, where appropriate, the means required for application
of such methods.
(1) These regulations also apply to the prescription,
methods of measurement, metrological control and marking of
quantities of pre-packaged products.
The same value shall be attached to EEC pattern approval
and EEC initial verification as to the corresponding national
measures.
(2) The separate regulations concerning the subjects referred to
in regulation 3 shall specify in particular, the measurement
procedures and characteristics of, and the technical requirements
for, their design and functioning as regards the products referred to
in regulation 3(1) and (2) and the requirements concerning sub-
regulation (1).
*See regulation 1(2) of these regulations as originally promulgated, and Legal Notice
196 of 2006.
(1) EEC pattern approval of instruments constitutes their
admission to EEC initial verification and, where the latter is not
required, the authorization to place them on the market and, or put
them into service. If the separate regulations applicable to a
category of instruments exempt that category from EEC pattern
approval, the instruments in that category shall be admitted directly
to the EEC initial verification.
(2) If its control equipment so permits, the Authority shall
grant the EEC pattern approval for every instrument which satisfies
the requirements laid down in these regulations and the separate
regulations relating to the category of instruments in question.
(3) An application for the EEC pattern approval may be made
only by the manufacturer or his representative established in Malta.
For one and the same instrument, application may be made in Malta
only.
(4) When the Authority has granted the EEC pattern approval,
it shall take the necessary steps to ensure that it is kept informed of
any modification or addition to the approved pattern.
(5) In case of any such modification or addition to the approved
pattern, the Authority shall inform the other Member States of such
alterations.
(6) Modifications or additions to an approved pattern must
receive additional EEC pattern approval from the Authority, where
such changes influence or might influence measurement results or
the prescribed conditions for use of the instrument.
(7) However, in the case of a modified pattern, the new EEC
pattern approval shall be granted instead of an addition to the
original EEC pattern approval certificate, if the pattern is modified
after the provisions of these regulations or of the relevant special
regulations have been amended or adapted in such a way that the
modified pattern could be approved only pursuant to the new
provisions.
(8) The Authority shall grant the EEC pattern approval in
accordance with the provisions of these regulations and of the
relevant separate regulations.
(1) If its control equipment does not permit the granting of
EEC pattern approval, and in any other case, the Authority shall
recognise pattern approvals issued by other EEC type approval
bodies.
(2) When an instrument has successfully completed the EEC
pattern approval examination laid down in paragraph 2 of Annex 1
and in the separate regulations relating to it, the Authority shall
d r a w u p a ce r t i f i c at e c er t i f y i n g t h e E E C p a t t er n a p p r o v a l ,
hereinafter called "the EEC pattern approval certificate" and
forward it to the applicant. In the cases provided for in regulation
14 or in separate regulations, the applicant must, and in all other
cases he shall be entitled to, affix or cause to be affixed on each
instrument and all ancillary equipment conforming to the approved
pattern the approval sign shown in this certificate.
(1) The EEC pattern approval shall be valid for ten years.
It may be extended for successive periods of ten years and the
number of instruments which may be manufactured in accordance
with the approved pattern shall not be limited.
(2) EEC pattern approval is granted on the basis of the
provisions of these regulations and of separate regulations relating
to it and shall not be extended after the date of the entry into force
of any amendment to, or adaptation of, these provisions, in cases
where such EEC pattern approval could not have been granted on
the basis of these new provisions.
(3) When the EEC pattern approval is not extended, this
approval shall nevertheless continue to apply to instruments which
would have already been approved and are already in service.
(4) If its control equipment so permits, where use is made of
new techniques not provided for in separate regulations, the
Authority may grant EEC pattern approval with limited effect after
consultation with other type approval bodies.
(5)
It may include the following restrictions
(a) limit on the number of instruments which may be
covered by the approval,
(b) obligation to notify the competent authorities of the
place of installation,
(c) restrictions on use,
(d) special restrictions concerning the technique used.
(6) However, the Authority shall refuse to grant the limited
EEC pattern approval unless
(a) the separate regulations for
that
category
of
instruments has come into force,
(b) no derogation has been made from the maximum
permissible errors laid down in the separate
regulations.
The period of validity of such approval shall not exceed two
years. It may be extended by up to three years at most.
(7) In the event thai the Authority has granted the limited EEC
pattern approval referred to in subregulation (4), it shall take all
necessary steps to ensure that adjustment to technical progress is
made to the Annexes, and, where appropriate, to the separate
regulations as soon as it considers that a new technique has proved
to be satisfactory.
When EEC pattern approval is not required for a category
of instruments which meets the requirements of separate
regulations, the manufacturer may, on his own responsibility, affix
to the instruments in this category the special sign described in
paragraph 3.3 of Annex I.
(1) When the EEC pattern approval has been granted, the
Authority may withdraw it
(a) if instruments for which this approval was granted do
not conform to the approved pattern or to the
provisions of the relevant separate regulations;
(b) if the metrological requirements specified in the
certificate of approval or the provisions of regulation
8(4) are not met;
(c) if it ascertains that approval was granted in an
improper manner.
(2) When the EEC pattern approval has been granted, the
A u t h o r i t y m u s t w i t h d r a w i t i f t h e i n st r u m e n t s co n st r u c t e d
according to an approved pattern reveal in service a defect of a
general nature which makes them unsuitable for their intended use.
(3) If the Authority is informed of the occurrence of one of the
cases covered by subregulations (1) and (2), it shall likewise take
the measures provided for in those subregulations.
(4)
(a) If the Authority declares in writing that the case
referred to in subregulation (2) has arisen it may forbid
the placing on the market and putting into service of
the instruments concerned until further notice. The
Authority shall give the reasons underlying its decision
in its declaration. The same procedure shall apply in
the cases mentioned in subregulation (1) with respect
to instruments which have been exempted from EEC
initial verification, if the manufacturer, after due
warning, does not bring the instruments into line with
the approved pattern or with the requirements of the
relevant separate regulations.
(b) If the Authority declares that the case referred to in
subregulation (2) has arisen, it may forbid the placing
on the market and putting into service of the
instruments concerned until further notice. It shall
immediately inform the other interested parties, stating
the reasons on which its decision is based. The same
procedure shall apply in the cases mentioned in
subregulation (1), with respect to instruments which
have been exempted from EEC initial verification, if
the manufacturer, after due warning, does not bring the
instruments into line with the approved pattern or with
the requirements of the relevant separate regulations.
(c) If the body which granted the approval disputes that
the case referred to in subregulation (2) of which it has
been informed has arisen, or disputes that the measures
taken in pursuance of subregulation (4) are justified,
the body concerned and the Authority shall endeavour
to settle the dispute.
(1) EEC initial verification constitutes the examination of
a new or reconditioned instrument and the confirmation of its
conformity to the approved pattern and, or to the requirements of
these regulations and the separate regulations relating to the
instrument in question; it is certified by Authority EEC initial
verification mark.
(2) The EEC initial verification of instruments may be carried
out by a method other than unit checking in the cases specified in
the separate regulations and in accordance with the procedures
adopted.
(1) When an instrument is submitted to the Authority for
EEC initial verification, the Authority shall determine whether
(a) the instrument belongs to a category exempt from EEC
pattern approval and, if so, whether it satisfies the
technical construction and functioning requirements
laid down by the separate regulations relating to that
instrument;
(b) the instrument has received EEC pattern approval and,
if so, whether it conforms to the approved pattern, and
to the separate regulations relating to that instrument.
in force on the date of issue of the EEC pattern
approval,
(c) the examination carried out in the course of EEC
initial verification relates in particular to and in
accordance with the separate regulations
(i) the metrological characteristics;
(ii) the maximum permissible errors
(iii) the construction, in so far as this guarantees that
the measurement characteristics are not likely to
deteriorate to any great extent under normal
conditions of use;
(iv) the presence of prescribed inscriptions and
stamp plates or provisions for Authority
verification marking.
When an instrument has successfully undergone Authority
EEC initial verification, in accordance with the requirements of
these regulations and of the separate regulations, the Authority
partial or final verification marks described in Annex II shall be
affixed to that instrument in accordance with the rules laid down in
that Annex.
When the EEC initial verification is not required for a
category of instruments which meet the requirements of separate
regulations, the manufacturer shall, on his own responsibility, affix
to the instruments in that category the special symbol described in
paragraph 3.4 of Annex I.
The Authority shall take all necessary measures to prevent
the use on instruments of marks or inscriptions liable to be
confused with the Authority signs or marks.
(1) The Authority shall notify all interested parties of the
services, agencies and institutes which are duly authorized to carry
out the examination specified in these regulations and in the
separate regulations, to issue the certificates of EEC pattern
approval and to affix the Authority EEC initial verification marks.
(2) The separate regulations shall specify the control
requirements for instruments in service which bear signs or marks
and in particular the maximum errors permitted in service.
(3) Notwithstanding the provisions of regulation 3(1), an
instrument in service which bears Authority signs or marks but
does not satisfy the requirements of the relevant separate
regulations, in particular with regard to maximum permissible
e r r or s, m a y b e b an n ed f r om se r vi c e i n t h e sam e wa y a s an
instrument bearing national marks.
All decisions taken pursuant to these regulations and of the
separate regulations regarding the instruments in question and
refusing to grant or extend the EEC pattern approval, withdrawing
such approval, refusing to carry out the EEC initial verification or
prohibiting the placing on the market or entry into service shall
state the reasons on which they are based. Such refusal, withdrawal
or prohibition shall be notified to the party concerned, who shall at
the same time be informed of the remedies available to him under
the laws at the time in force in Malta and of the time limits allowed
for the exercise of such remedies.
MEASURING INSTRUMENTS
AND METHODS OF METROLOGICAL CONTROL
ANNEX I
Substituted by
L.N. 9 of 2008.
EEC PATTERN APPROVAL
1. Application for the EEC pattern approval
The application and the correspondence relating to it shall be drawn up
in English. The annexed documents shall be written in English.
The application shall contain the following information
the name and address of the manufacturer or the firm, or of his or its
authorised representative or of the applicant,
the category of instrument,
the intended use,
the measurement characteristics,
the commercial designation, if any, or the type.
The application shall be accompanied by the documents necessary for its
evaluation, in duplicate, and in particular
A description in particular of
i.
the construction and operation of the instrument,
ii.
the protecting arrangements ensuring correct working,
iii.
the devices for regulation and adjustment,
iv.
the intended locations for
a. verification marks
b. seals (where applicable).
General layout drawings and details of important components.
A schematic drawing illustrating the principles of operation and,
if necessary, a photograph.
The application shall be accompanied, where appropriate, by documents
relevant to the national approvals already granted.
Examination for EEC approval
The examination shall comprise
Study of the documents and an examination of the measurement
characteristics of the pattern in the laboratories of the
metrological service, in approved laboratories or at the place of
manufacture, delivery or installation
If the measurement characteristics of the pattern are known in
detail, only an examination of the documents submitted is
required.
The examination shall cover the entire performance of the instruments
under normal conditions of use. Under such conditions, these instruments must
maintain the measurement characteristics required.
The nature and scope of the examination mentioned in paragraph 2.1 may
be specified by separate regulations.
3. The EEC certificate and sign of approval
MEASURING INSTRUMENTS
AND METHODS OF METROLOGICAL CONTROL
3.1.
The certificate shall give results of the examination of the pattern and
shall specify the other requirements which must be complied with, if any. It shall be
accompanied by descriptions, drawings and diagrams necessary to identify the
pattern and to explain its functioning. The sign of approval provided for in
regulation 4 shall be a stylised letter E containing
•
in the upper part, the sign for Malta.
•
in the lower part, a designation to be determined by the
metrological service which granted approval (an identification
number).
An example of this approval sign is shown in paragraph 6.1.
3.2.
In the case of the limited approval, the letter P, having the same
dimensions as the stylised letter E, shall be placed before this letter.
An example of this limited approval sign is shown in paragraph 6.2.
3.3.
The sign mentioned in regulation 6 is the same as the Authority approval
sign, except that the stylised letter E is reversed symmetrically about a vertical axis
and bears no other indication unless the separate regulations stipulate otherwise.
3.4.
The sign mentioned in regulation 11 is the same as the Authority
approval sign is a hexagon.
An example of this sign is shown in paragraph 6.4.
3.5.
The signs mentioned in the previous paragraphs and affixed by the
manufacturer in accordance with the provisions of these regulations must be affixed
at a visible point of each instrument and all ancillary equipment submitted for
verification, and must be legible and indelible. If their affixation presents technical
difficulties, exceptions may be made in separate regulations or accepted after the
Authority considers the individual case.
4. Depositing of a sample instrument
In the cases mentioned by separate regulations, the service which granted the
approval may, if it considers this necessary, request the deposition of the sample
instrument for which approval has been granted. Instead of this sample instrument,
the service may authorise the depositing of parts of the instrument, of scale models
or of drawings, and will mention this on the Authority certificate of approval.
5. Announcement of approval
5.1.
EEC pattern approval and limited EEC pattern approvals shall be
published in a special Annex to the Gazette. The same applies to the Authority
additional EEC pattern approvals.
5.2.
At the same time as the party concerned is notified, copies of the
Authority certificate of approval shall be sent to the Commission and to the other
Member States; the latter can also obtain copies of the reports of the metrological
examinations if they wish.
5.3.
Withdrawal of EEC pattern approval and other communications
concerning the extent and validity of EEC pattern approval shall also be subject to
the announcement procedure mentioned in paragraphs 5.1 and 5.2.
6. Signs relative to EEC pattern approval
6.1.
Sign of the EEC pattern approval
MEASURING INSTRUMENTS
AND METHODS OF METROLOGICAL CONTROL
Example
EEC pattern approval granted by the Metrology Directorate of the Republic of
Malta in 2002 (see paragraph 3.1, first indent)
Identification number of the EEC pattern approval (see paragraph 3.1, second
indent)
6.2.
Sign of limited EEC pattern approval (see paragraph 3.2)
Example
Limited EEC pattern approval granted by the Metrological Service of the Federal
Republic of Germany in 1971.
Identification number of the limited EEC pattern approval.
6.3.
Sign of exemption from the limited EEC pattern approval (see paragraph
3.3)
Example
6.4.
Sign of pattern of approval for instruments exempt from the EEC initial
verification (see paragraph 3.4)
Example
EEC pattern approval granted by the Metrological Service of the Federal Republic
of Germany in 1971.
Identification number of the EEC pattern approval.
ANNEX I
ANNEX II
EEC INITIAL VERIFICATION
1. General points.
The EEC initial verifications may be carried out in one or more stages
Subject to the provisions of the separate regulations
The EEC initial verification shall be carried out in one stage on
instruments that constitute a whole on leaving the factory, that is
to say instruments which, theoretically, can be transferred to
their place of installation without first having to be dismantled.
The EEC initial verification shall be carried out in two or more
stages for instruments whose correct functioning depends on the
conditions in which they are installed or used.
The first stage of the verification procedure must ensure, in
particular, that the instrument conforms to the approved pattern
or, in the case of instruments exempt from EEC pattern
approval, that they conform to the relevant provisions.
2. Place of the EEC initial verification
If the separate regulations do not specify the place where verification is
to be carried out, instruments which have to be verified in only one stage shall be
verified at the place chosen.
Instruments which have to be verified in two or more stages shall be
The last stage of verification shall be carried out at the place of
installation.
The other verification stages of a verification shall be carried
out as laid down in paragraph 2.1.
In particular, when the verification takes place outside the office of
verification of the Authority, it may require the applicant
to make available standards, appropriate means in material and
personnel for the execution of the verification,
to provide a copy of the Authority certificate of approval.
3. Marks of the EEC initial verification
Marks of the description of EEC initial verification.
Subject to the provisions of separate regulations, EEC initial
verifications marks which are affixed in accordance with this
paragraph shall be as follows
3.1.1.1.
The final verification mark shall be composed of two
stamps
(a)
the first consists of a letter 'e' containing
-
in the upper half, the distinguishing capital
MEASURING INSTRUMENTS
AND METHODS OF METROLOGICAL CONTROL
letter of the State where the EEC initial
verification is carried out, together, where
necessary, with one or two numbers
identifying a territorial subdivision;
-
in the lower half, the identification number
of the verifying agent or office;
(b)
the second stamp shall consist of the last two
digits of the year of the verification, in a
hexagon.
3.1.1.2.
The mark of partial verification shall consist solely
of the first stamp. It shall also serve as a seal.
Shape and dimensions of marks
The attached drawings show the shape, dimensions and outline
of the letters and numbers for the EEC initial verification marks
as laid down in paragraph 3.1.
Affixing the marks
The final verification mark shall be affixed at the appointed
location on the instrument when the latter has been completely
verified and is recognised to conform to the EEC requirements.
The partial verification mark of the Authority shall be affixed
3.3.2.1.
When verification is made in several stages on the
instrument or part of an instrument which fulfils the
conditions laid down for operations other than those
at the place of installation, at the place where the
stamp-date is affixed or in any other place specified
in the separate regulations.
3.3.2.2.
In all cases as a seal, in the places specified in the
separate regulations.
MEASURING INSTRUMENTS
AND METHODS OF METROLOGICAL CONTROL
MEASURING INSTRUMENTS
AND METHODS OF METROLOGICAL CONTROL
MEASURING INSTRUMENTS
AND METHODS OF METROLOGICAL CONTROL