WORK PLACE (MINIMUM HEALTH AND SAFETY REQUIREMENTS FOR WORK AT CONSTRUCTION SITES) REGULATIONS *
Table of Provisions (23)
Statutory Text (23 Articles)
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
SUBSIDIARY LEGISLATION 424.36
WORK PLACE (MINIMUM HEALTH AND SAFETY
REQUIREMENTS FOR WORK AT CONSTRUCTION
SITES) REGULATIONS *
1st August, 2018
LEGAL NOTICE 88 of 2018, as amended by Act XXXIII of 2024.
(1)
The title of these regulations is the Work Place
(Minimum Health and Safety Requirements for Work at Construction
Sites) Regulations.
(2) The scope of these regulations is to lay down minimum
health and safety requirements for work at construction sites.
(3) These regulations shall not apply to drilling and
extraction in the extractive industries including the activities of
prospecting and of extraction in the strict sense of the word as well as
of preparation of extracting materials for sale (crushing, screening,
washing) but they would apply to the processing of such extracted
material.
(4) The provisions of the General Provisions for Health and
Safety at Work Places Regulations, are fully applicable to the whole
scope referred to in sub-regulation (2), without prejudice to more
stringent and, or specific provisions contained in the herein
mentioned regulations.
(Regulation 2)
NON-EXHAUSTIVE LIST OF BUILDING AND CIVIL
ENGINEERING WORKS
1. Excavation
2. Earthworks
3. Construction
4. Assembly and disassembly of prefabricated elements
5. Conversion or fitting-out
6. Alterations
7. Renovation or restoration
8. Repairs
9. Dismantling
10. Demolition
11. Upkeep
12. Maintenance – painting and cleaning work
13. Drainage
In these regulations, unless the context otherwise
requires
"the Act" means the Occupational Health and Safety Authority
Act;
"the Authority" means the Occupational Health and Safety
Authority established by article 8 of the Act;
"client" means any natural or legal person for whom a project
is carried out;
"competent person" means a person possessing adequate
qualifications, suitable training and sufficient knowledge, experience
and skill for the safe performance of the specific task or work
required;
"construction site" means any construction site at which
building or civil engineering works are carried out, a non-exhaustive
list of which is given in Schedule I;
*These regulations have been transferred to Cap. 646. Vide S.L. 646.25 and Act
XXXIII of 2024.
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
"contractor" means a contractor or employer whose workers
undertake, carry out or manage construction work, and who supplies
materials and, or labour to carry out such work;
"domestic client" means a client for whom a project is being
carried out which is not in the course or furtherance of a business of
that client;
"health and safety file" means a file containing relevant health
and safety information to be taken into account during any subsequent
works;
"health and safety plan" means a document establishing the
rules applicable to the construction site and the specific measures
concerning work which falls within one or more categories of
Schedule II;
"project" means any development which includes or is intended
to include construction work;
"project supervisor" means any natural or legal person
responsible for the health and safety supervision of a project,
appointed by a client;
"scaffold or scaffolding" means any temporary structure on or
from which persons may perform work in connection with an activity
to which these regulations apply, and any temporary structure which
enables persons to obtain access to or which enables materials to be
taken to any place at which such work is performed, and includes any
working platform, gangway, run, ladder or step-ladder (other than an
independent ladder or step-ladder which does not form part of such a
structure) together with any guard-rail, toe-board or other safe guards
and all fixings, but does not include a lifting appliance or a structure
used merely to support such an appliance or to support other
machinery or plant;
"self-employed person" means any person, other than a person
in the employment, traineeship or apprenticeship of a contractor,
whose professional activity contributes to the completion of a project.
(Regulations 2, 4 and 5)
NON-EXHAUSTIVE LIST OF WORK INVOLVING
PARTICULAR RISKS TO THE HEALTH AND SAFETY OF
WORKERS
1. Work which puts workers at risk of burial under earth
falls, engulfment in swampland or falling from a height,
where the risk is particularly aggravated by the nature of
the work or processes used or by the environment at the
place of work or site.
2. Work which puts workers at risk from chemical or
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
biological substances constituting a particular danger to
the health and safety of workers or involving a legal
requirement for health monitoring.
3. Work with ionizing radiation requiring the designation of
controlled or supervised areas.
(a)
Controlled area means an area subject to special
rules for the purposes of protection against
ionizing radiation and to which access is
controlled.
(b)
Supervised area means an area subject to
appropriate supervision for the purpose of
protection against ionizing radiation.
4. Work near high voltage power lines.
5. Work exposing workers to the risk of drowning.
6. Work on wells, underground earthworks and tunnels.
7. Work carried out by drivers having a system of air supply.
8. Work carried out by workers in caisson with a
compressed-air atmosphere.
9. Work involving the use of explosives.
10. Work involving the assembly or dismantling of heavy
prefabricated components.
(1)
It shall be the duty of a client to appoint, in
respect of every project, a project supervisor for the design and
execution stage, and any such appointment shall be terminated,
changed or renewed as necessary
Provided that nothing in this regulation, shall prevent the client
from acting as project supervisor for any stage if he is competent to
undertake the duties involved.
(2) It shall be the duty of a client to keep and make available
any health and safety files prepared in accordance with sub-regulation
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
(4) of regulation 5 and any other relevant information regarding
health and safety, for inspection by any person who may need
information in the file for the purpose of compliance with any
statutory obligations.
(3) The client shall ensure that prior to the setting up of a
construction site, a health and safety plan is drawn up in accordance
with sub-regulation (4) of regulation 5.
(4) Where a client disposes of his or her interests in the
project, a client shall deliver the health and safety file in respect of
the project to that person who acquires such interest in the project,
and any obligations arising out of these regulations remaining for the
duration of the project, shall be assumed by this person.
(5) Except where provided in regulation 4, when a client
fails to appoint a project supervisor, the client will ipso facto be
deemed to be the project supervisor for the purpose of these
regulations.
(6) No client may transfer the obligation to appoint a project
supervisor to any other person except as provided for in these
regulations.
(Regulation 5)
CONTENT OF THE PRIOR NOTICE REFERRED TO IN SUB-
REGULATION (3) OF REGULATION 5
1. Date of forwarding.
2. Exact address of the construction site.
3. Client(s) (name(s) and address(es)).
4. Type of project.
5. Project supervisor(s) (name(s) and address(es)).
6. Date planned for start of work on the construction site.
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
7. Planned duration of work on the construction site.
8. Estimated maximum number of workers on the
construction site.
9. Planned number of contractors and self-employed
persons on the construction site.
10. Details of contractors already chosen.
Where the client is a domestic client, regulation 3 shall
not apply if the following conditions are met
(a)
the project does not require a prior notice in
terms of sub-regulation (3) of regulation 5;
(b)
only one contractor for the whole project will
be present; and
(c)
work does not involve particular risks as listed
in Schedule II.
(Regulation 10)
MINIMUM HEALTH AND SAFETY REQUIREMENTS
FOR CONSTRUCTION SITES
Preliminary remarks
The obligations laid down in this Schedule apply
wherever required by the features of the construction
site, the activity, the circumstances or a hazard. For the
purposes of this Schedule, 'rooms' covers, inter alia,
hutted accommodation.
PART A: GENERAL MINIMUM REQUIREMENTS
FOR ON-SITE WORKPLACES
1. Stability and solidity
1.1. Materials, equipment and, more generally, any
component which, when moving in any way, may affect
the health and safety of workers must be stabilized in an
appropriate and safe manner.
1.2. Access to any surface involving insufficiently resistant
materials is not authorized unless appropriate equipment
or means are provided to enable the work to be carried
out safely.
2. Energy distribution installations
2.1. The installations must be designed, constructed and used
so as not to present a fire or explosion hazard; persons
must be adequately protected against the risk of
electrocution caused by direct or indirect contact.
2.2. The design, construction and choice of equipment and
protection devices must take account of the type and
power of the energy distributed, external conditions and
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
the competence of persons with access to parts of the
installation.
3. Emergency routes and exits
3.1. Emergency routes and exits must remain clear and lead as
directly as possible to a safe area.
3.2. In the event of danger, it must be possible for workers to
evacuate all workstations quickly and as safely as
possible.
3.3. The number, distribution and dimensions of emergency
routes and exits depend on the use, equipment and
dimensions of the site and of the rooms and the maximum
number of persons that may be present.
3.4. Specific emergency routes and exits must be indicated by
signs in accordance with regulations in force.
Such signs must be sufficiently resistant and be placed at
appropriate points.
3.5. Emergency routes and exits, and the traffic routes and
doors giving access to them, must be free from
obstruction so that they can be used at any time without
hindrance.
3.6. Emergency routes and exits requiring illumination must
be provided with emergency lighting of adequate
intensity in case the lighting fails.
4. Fire detection and fire fighting
4.1. Depending of the characteristics of the site, the
dimensions and use of the rooms, the on-site equipment,
the physical and chemical properties of the substances
present and the maximum potential number of people
present, an adequate number of appropriate fire-fighting
devices and, where required, fire detectors and alarm
systems must be provided.
4.2. These fire-fighting devices, fire detectors and alarm
systems must be regularly checked and maintained.
Appropriate tests and drills must take place at regular
intervals.
4.3. Non-automatic fire-fighting equipment be easily
accessible and simple to use. The equipment must be
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
indicated by signs in accordance with the regulations
contained in the Work Place, (Provisions of Health and,
or Safety Signs) Regulations, (S.L. 424.16.).
Such signs must be sufficiently resistant and placed at
appropriate points.
5. Ventilation
5.1 Steps shall be taken to ensure that there is sufficient
supply of fresh air, having regard to the working methods
used and the physical demands placed on the workers.
5.2 If a forced ventilation system is used, it must be
maintained in working order and must not expose
workers to draughts which are harmful to health.
5.3 Any breakdown must be indicated by a control system
where this is necessary for workers' health.
6. Exposure to particular risks
6.1
Workers must not be exposed to harmful levels of noise
or to harmful external influences (e.g. gases, vapours,
dust).
6.2 If workers have to enter an area where the atmosphere is
liable to contain a toxic or harmful substance or to have
an insufficient oxygen level or to be inflammable, the
confined atmosphere must be monitored and appropriate
steps taken to prevent any hazards.
6.3 A worker may not in any circumstances be exposed to a
high-risk confined atmosphere. He must at least be
watched at all times from outside and all appropriate
precautions must be taken to ensure that he can be
assisted effectively and immediately.
7. Temperature
During working hours, the temperature must be
appropriate for human beings, having regard to the
working methods used and the physical demands placed
on the workers.
8. Natural and artificial lighting of workstations, rooms and
traffic routes on the site
8.1. Workstations, rooms and traffic routes must as far as
possible have sufficient natural lighting and be provided
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
with appropriate and sufficient artificial lighting at night
and when natural daylight is inadequate; where necessary,
portable light sources that are protected against impact
must be used.
The colour of artificial light used must not alter or affect
the perception of signals or signposts displaying such
signs.
8.2. Lighting installations for rooms, workstations and traffic
routes must be placed in such a way that there is no risk of
accident to workers as a result of the type of lighting
fitted.
8.3. Rooms, workstations and traffic routes where workers are
especially exposed to risks in the event of artificial
lighting, must be provided with emergency lighting of
adequate intensity.
9. Doors and gates
9.1. Sliding doors must be fitted with a safety device to
prevent them from being derailed and falling over.
9.2. Doors and gates opening upwards must be fitted with a
mechanism to secure them against falling back.
9.3. Doors and gates along
escape
routes
must
be
appropriately marked.
9.4. In the immediate vicinity of gates intended primarily for
vehicle traffic, there must be doors for pedestrian traffic
unless it is safe for pedestrians to cross; such doors must
be clearly marked and kept free at all times.
9.5. Mechanical doors and gates must operate without any risk
of accident to workers. They must be fitted with
emergency stop devices which are easily identifiable and
accessible and, unless they open automatically in the
event of a power-cut, it must be possible for them to be
opened manually.
10. Traffic routes - danger areas and safe means of access and
egress
10.1. Traffic routes, including stairs, fixed ladders and loading
bays and ramps, must be calculated, located, laid out and
made negotiable to ensure easy, safe and appropriate
access in such a way as not to endanger workers
employed in the vicinity of these traffic routes.
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
10.2. Routes used for pedestrian traffic and, or goods traffic
including those used for loading and unloading must be
dimensioned in accordance with the number of potential
users and the type of activity concerned.
If means of transport are used on traffic routes, a
sufficient safety clearance or adequate protective devices
must be provided for other site users.
Routes must be clearly marked, regularly checked and
properly maintained.
10.3. Sufficient clearance must be allowed between vehicle
traffic routes and doors, gates, passages for pedestrians,
corridors and staircases.
10.4. If the site includes limited-access areas, these must be
equipped with devices to prevent unauthorized workers
from entering.
Appropriate measures must be taken to protect workers
who are authorized to enter the danger areas.
Danger areas must be clearly signposted.
10.5. Sufficient safe means of access and egress must be
provided and maintained to and from every workplace at
which any person has at any time to perform any work
and every such place must be made and kept safe for any
person working and/or being present there.
11. Loading bays and ramps
11.1. Loading bays and ramps must be suitable for the
dimensions of the loads to be transported.
11.2. Loading bays must have at least one exit point.
11.3. Loading ramps must be sufficiently safe, to prevent
workers from falling off.
12. Freedom of movement at the workstation
The floor area at the workstation must be such as to allow
workers sufficient freedom of movement to perform their
work, taking account of any necessary equipment or
appliances present.
13. First aid
13.1. The contractor must ensure that first aid can be provided,
and that the staff trained to provide it can be called upon,
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
at any time.
Measures must be taken to ensure that workers who have
had an accident or have suddenly been taken ill can be
removed for medical treatment.
13.2. One or more first-aid rooms must be provided where the
scale of the works or the types of activity being carried
out so require.
13.3. First-aid rooms must be fitted with essential first-aid
installations and equipment and be easily accessible to
stretchers.
They must be signposted in accordance with the Work
Place, (Provisions of Health and, or Safety Signs)
Regulations, (S.L. 424.16.).
13.4. In addition, first-aid equipment must be available at all
places where working conditions so require.
This equipment must be suitably marked and easily
accessible.
The address and telephone number of the local emergency
service must be clearly displayed.
14. Sanitary equipment
14.1. Changing rooms and lockers.
14.1.1. Appropriate changing rooms must be provided for
workers if they have to wear special work clothes and if,
for reasons of health or propriety, they cannot be expected
to change in another area.
Changing rooms must be easily accessible, be of
sufficient capacity and be provided with seating.
14.1.2. Changing rooms must be sufficiently large and have
facilities to enable each worker, where necessary, to dry
his working clothes as well as his own clothing and
personal effects and to lock them away.
If circumstances so require (e.g. dangerous substances,
humidity, dirt), facilities must be provided to enable
working clothes to be kept in a place separate from
workers' own clothes and personal effects.
14.1.3. Provisions must be made for separate changing rooms
or separate use of changing rooms for men and women.
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
14.1.4. If changing rooms are not required as referred to in
point 14.1.1, first paragraph, each worker must be
provided with a place in which he can lock away his own
clothes and personal effects.
14.2. Showers and washbasins
14.2.1. Suitable showers in sufficient numbers must be
provided for workers if required by the nature of the
work or for health reasons.
Provisions must be made for separate shower rooms or
separate use of shower rooms for men and women.
14.2.2. The shower rooms must be sufficiently large to permit
each worker to wash without hindrance in conditions of
an appropriate standard of hygiene.
The showers must be equipped with hot and cold running
water.
14.2.3. Where showers are not required as required by the first
paragraph of point 14.2.1, a sufficient number of suitable
washbasins with running water (hot water if necessary)
must be provided in the vicinity of the workstations and
the changing rooms.
Provisions must be made for separate washbasins, or
separate use of washbasins for men and women when so
required for reasons of propriety.
14.2.4. Where the rooms housing, the showers or washbasins
are separate from the changing rooms, there must be easy
communication between the two.
14.3. Lavatories and washbasins
Special facilities with an adequate number of lavatories
and washbasins must be provided for workers in the
vicinity of workstations, rest rooms, changing rooms and
rooms housing showers or washbasins.
Provisions must be made for separate lavatories or
separate use of lavatories for men and women.
15. Rest rooms and, or accommodation areas
15.1. Where the safety or health of workers, in particular
because of the type of activity carried out or the presence
of more than a certain number of employees as well as
the remote nature of the site, so require, workers must be
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
provided with easily accessible rest rooms and, or
accommodation areas.
15.2. Rest rooms and, or accommodation areas must be large
enough and equipped with an adequate number of tables
and seats with supporting backs for the number of
workers concerned.
15.3. If there are no facilities of this kind, other facilities must
be provided in which workers can stay during
interruptions in work.
15.4. Fixed accommodation areas unless used only in
exceptional cases, must have sufficient sanitary
equipment, a rest room and a leisure room.
They must be equipped with beds, cupboards, tables and
seats with backs taking account of the number of workers,
and be allocated taking account, where appropriate, of the
presence of workers of both sexes.
15.5. Appropriate measures should be taken for the protection
of non-smokers against discomfort caused by tobacco
smoke in rest rooms and or accommodation areas.
16. Pregnant women and nursing mothers
Pregnant women and nursing mothers must be able to lie
down to rest in appropriate conditions.
The project supervisor shall
(1) take account of the general principles of prevention
concerning health and safety referred to in the Act and subsidiary
regulations as appropriate, during the various stages of designing and
preparing the project, in particular
(a)
when architectural, technical and, or organizational
aspects are being decided, in order to plan the
various items or stages of work which are to take
place simultaneously or in succession;
(b)
when estimating the period required for completing
such work or work stages.
Account shall also be taken, each time this appears necessary,
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
of all health and safety plans and of files drawn up in accordance with
sub-regulation (4) or adjusted in accordance with paragraph (e) of
sub-regulation (4).
(2) The health and safety plan shall set out the rules
applicable to the construction site concerned, taking into account
where necessary the industrial activities taking place on the site; this
plan shall also include specific measures concerning work which falls
within one or more of the categories of Schedule II.
(3) In the case of construction sites on which work is
scheduled to last longer than 30 working days and on which more than
20 workers are occupied simultaneously, or on which the volume of
work is scheduled to exceed 500 person-days, the project supervisor
shall communicate a prior notice drawn up in accordance with
Schedule III to the Authority at least four calendar weeks before work
starts on the project. Once any work activity on the project
commences, a copy of the prior notice shall be clearly displayed on
the construction site and, if necessary, periodically updated.
(4)
The project supervisor shall also
(a)
co-ordinate the implementation of the
provisions of this regulation, and shall draw up a health and
safety plan prior to the setting up of a construction site;
(b)
prepare a file appropriate to the characteristics
of the project containing relevant health and safety information
to be taken into account during any subsequent works;
(c)
coordinate the implementation of the general
principles of prevention and safety
(i)
when technical and, or organizational
aspects are being decided, in order to plan the various
items or stages of work which are to take place
simultaneously or in succession;
(ii) when estimating the period required for
completing such work or work stages;
(d)
coordinate the implementation of the relevant
provisions of these regulations in order to ensure that
employers and, if necessary for the protection of workers, self-
employed persons
(i)
apply the principles referred to in
regulation 9 in a consistent manner;
(ii) where required, follow the health and
safety plan referred to in sub-regulation (4) of regulation
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
5;
(e)
make, or cause to be made, any adjustments
required to the health and safety plan referred to in sub-
regulation (4) of regulation 5 and the file referred to in sub-
regulation (4) of regulation 5 to take account of the progress of
the work and any changes which have occurred;
(f)
organize cooperation between contractors,
including successive contractors on the same site, coordination
of their activities with a view to protecting workers and
preventing accidents and occupational health hazards and
reciprocal information as provided for in regulation 7 of the
General Provisions for Health and Safety at Work Places
Regulations, ensuring that self-employed persons are brought
into this process where necessary;
(g)
coordinate arrangements to check that the
working procedures are being implemented correctly;
(h)
take the steps necessary to ensure that only
authorized persons are allowed onto the construction site.
The project supervisor shall take all the necessary
measures for the safeguard of occupational health and safety.
No action, or other proceeding for damages shall lie or
be instituted against the project supervisor for an act done in
pursuance of these regulations, unless the project supervisor of the
project acted in a negligent manner.
(1)
Where a client has appointed the project
supervisor to perform the duties referred to in regulation 5, this does
not relieve the client of his responsibilities in that respect.
(2) The implementation of these regulations shall not affect the
principle of employers' responsibility as provided for in the Act or in
subsidiary legislation.
(3) In order to preserve health and safety on the construction
site, the client shall take into account any report given in writing by
the project supervisor, and shall take all reasonable measures to
ensure that duty holders abide by their obligations within the limits of
their respective responsibilities.
(4) In order to preserve health and safety on the construction
site, the client shall take all the necessary measures for the adequate
safeguard of occupational health and safety.
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
When the work is being carried out, the principles set out
in regulations 4 to 8 of the General Provisions for Health and Safety at
Work Places Regulations shall be applied, in particular as regards
(a)
keeping the construction site in good order and
in a satisfactory state of cleanliness;
(b)
choosing the location of workstations, bearing
in mind how access to these workplaces is obtained, and
determining routes or areas for the safe passage and movement
of equipment;
(c)
the conditions under which various materials
are handled;
(d)
technical maintenance, pre-commissioning
checks and regular checks on installations and equipment with
a view to correcting any faults which might affect the health
and safety of workers;
(e)
the demarcation and laying-out of areas for the
storage of various materials, in particular where dangerous
materials or substances are concerned;
(f)
the conditions under which the dangerous
materials used are removed;
(g)
the storage and disposal or removal of waste
and debris;
(h)
the adaptation, based on progress made on the
site, of the actual period to be allocated for the various types of
work or work stages;
(i)
cooperation between contractors and self-
employed persons;
(j)
interaction with industrial activities at the place
within which or in the vicinity of which the construction site is
located.
In order to preserve health and safety on the construction
site, contractors shall
(a)
not commence any work related to the project
before a project supervisor has been appointed by the client in
terms of regulation 3;
(b)
in particular when implementing regulation 9,
take measures that are in line with the minimum requirements
set out in Schedule IV
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
(c)
take into account directions from any project
supervisor on health and safety matters;
(d)
take all the necessary measures for the
adequate safeguard of occupational health and safety.
(1)
In order to preserve health and safety on the
construction site, self-employed persons shall
(a)
comply in particular with the following,
mutatis mutandis
(i)
the requirements of regulations 7 and
15(2) of the General Provisions for Health and Safety at
Work Places Regulations and regulation 8 and Schedule
IV of these regulations;
(ii) the Minimum Requirements for the Use
of Personal Protective Equipment at Work Regulations;
(iii) the Work Equipment (Minimum Safety
and Health Requirements) Regulations;
(b)
take into account directions from the project
supervisor or supervisors on health and safety matters;
(c)
take all the necessary measures for the
safeguard of occupational health and safety;
(d)
not commence any work related to the project
before a project supervisor has been appointed by the client in
terms of regulation 3.
(2) In order to preserve health and safety on the construction
site, where contractors are engaged in work activity on the
construction site, they shall
(a)
comply in particular with the following,
mutatis mutandis
(i)
regulation 15(2) of the General
Provisions for Health and Safety at Work Places
Regulations;
(ii) the Minimum Requirements for the Use
of Personal Protective Equipment at Work Regulations;
(iii) the Work Equipment (Minimum Safety
and Health Requirements) Regulations;
(b)
take account of any directions given by the
project supervisor.
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
(1)
Without prejudice to regulation 12 of the
General Provisions for Health and Safety at Work Places Regulations,
workers and, or their representatives shall be informed of all the
measures to be taken concerning their health and safety on the
construction site.
(2) The information shall be comprehensible to the workers
concerned.
Consultation and participation of workers and, or of their
representatives shall take place in accordance with regulation 13 of
the General Provisions for Health and Safety at Work Places
Regulations on matters covered by regulations 5, 9 and 10, ensuring
whenever necessary proper coordination between workers and, or
workers' representatives in undertakings carrying out their activities at
the workplace, having regard to the degree of risk and the size of the
work site.
(1)
Every person on whom a duty is placed by these
regulations in relation to the design, planning and preparation of a
project shall take account the general principles of prevention referred
to in the Act in the performance of those duties.
(2) Every person on whom a duty is placed by these
regulations in relation to the construction phase of a project shall take
account the general principles of prevention referred to in the Act in
the performance of those duties.
(3) The client shall take reasonable steps to ensure that the
arrangements referred to in sub-regulation (1) are maintained and
reviewed throughout the project.
In any proceedings for an offence under these regulations
consisting of a failure to comply with a duty or requirement to do
something, or to do something so far as is reasonably practicable, it
shall be for the accused to prove, as the case may be, that it was not
practicable or not reasonably practicable to do more than was in fact
done to satisfy the duty or requirement, or that there was no better
practicable means than was in fact used to satisfy the duty or
requirement.
Any person who knowingly or recklessly interferes with
the process of providing a safe and healthy place of work, shall be
guilty of an offence.
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
Disabled workers
Workplaces must be organized to take account of disabled
workers, if necessary.
The provision applies in particular to the doors,
passageways, staircases, showers, washbasins, lavatories
and workstations used or occupied directly by disabled
persons.
Miscellaneous provisions
18.1. The surroundings and the perimeter of the site must be
signposted and laid out so as to be clearly visible and
identifiable.
18.2. Workers must be provided at the site with a sufficient
quantity of drinking water and possibly another suitable
non-alcoholic beverage both in occupied rooms and in the
vicinity of workstations.
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
18.3. Workers must
-
be provided with facilities enabling them to
take their meals in satisfactory conditions,
-
where appropriate, be provided with facilities
enabling them to prepare their meals in
satisfactory conditions.
PART B: SPECIFIC MINIMUM REQUIREMENT FOR
ON-SITE WORKSTATIONS
Preliminary remark
If special situations so dictate, the classification of these
minimum requirements into two sections, as below,
should not be regarded as binding.
Section I: On-site indoor workstations
1. Stability and solidity
Premises must have a structure and stability appropriate
to the nature of their use.
2. Emergency doors
Emergency doors must open outwards.
Emergency doors must not be so locked or fastened that
they cannot be easily and immediately opened by any
person who may require to use them in an emergency.
Sliding or revolving doors are not permitted if intended
as emergency exits.
3. Ventilation
If air-conditioning or mechanical ventilation installations
are used, they must operate in such a way that workers
are not exposed to draughts which cause discomfort. Any
deposit or dirt likely to create an immediate danger to the
health of workers by polluting the atmosphere must be
removed without delay.
4. Temperature
4.1. The temperature in rest areas, rooms for duty staff,
sanitary facilities, canteens and first-aid rooms must be
appropriate to the particular purpose of such areas.
4.2. Windows, skylights and glass partitions should allow
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
excessive effects of sunlight to be avoided, having regard
to the nature of the work and the use of the room.
5. Natural and artificial lighting
Workplaces must as far as possible have sufficient natural
light and be equipped with the means of providing
artificial lighting which is adequate for the purposes of
protecting workers' health and safety.
6. Floors, walls, ceilings and roofs of rooms
6.1. The floors of workplaces must have no dangerous bumps,
holes or slopes and must be fixed, stable and not slippery.
6.2. The surfaces of floors, walls and ceilings in rooms must
be such that they can be cleaned or refurbished to an
appropriate standard of hygiene.
6.3. Transparent or translucent walls, in particular all-glass
partitions, in rooms or in the vicinity of workplaces and
traffic routes must be clearly indicated and made of safety
material or be shielded from such places or traffic routes
to prevent workers from coming into contact with walls or
being injured should the walls shatter.
7. Windows and skylights
7.1. It must be possible for workers to open, close, adjust or
secure windows, skylights and ventilators in a safe
manner.
When open, they must not be positioned so as to
constitute a hazard to workers.
7.2. Windows and skylights must be designed in conjunction
with equipment or otherwise fitted with devices allowing
them to be cleaned without any risk to the workers
carrying out this work or to workers present.
8. Doors and Gates
8.1. The position, number and dimensions of doors and gates,
and the materials used in their construction, are
determined by the nature and use of the rooms or areas.
8.2. Transparent doors must be appropriately marked at a
conspicuous level.
8.3. Swing doors and gates must be transparent or have see-
through panels.
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
8.4. If transparent or translucent surfaces in doors and gates
are not made of safety material and if there is a danger
that workers may be injured if a door or gate should
shatter, the surfaces must be protected against breakage.
9. Traffic routes
Where the use and equipment of rooms so requires for
the protection of workers, traffic routes must be clearly
identified.
10. Specific measures for escalators and travelators
Escalators and travelators must function safely. They
must be equipped with any necessary safety devices.
They must be fitted with easily identifiable and
accessible emergency shut-down devices.
11. Room dimensions and air space in rooms
Workrooms must have sufficient surface area and height
to allow workers to perform their work without risk to
their safety, health or well-being.
Section II: On-site outdoor workstations
1. Stability and solidity.
1.1. High-level or low-level movable or fixed workstations
must be solid and stable, taking account of
-
the number of workers occupying them,
-
the maximum loads they may have to bear and
the weight distribution,
-
the outside influences to which they may be
subject.
-
if the support and the other components of
these workstations are not intrinsically stable,
their stability will have to be ensured by
appropriate and safe methods of fixing to avoid
any untimely or spontaneous movement of the
whole or of parts of the workstations.
1.2. Checking
Stability and solidity must be checked appropriately and
especially after any change in the height or depth of the
workstation.
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
2. Energy distribution installations
2.1. On-site energy distribution installations, especially those
subject to outside influences, must be regularly checked
and maintained in good condition.
2.2. Installations existing before the site began must be
identified, checked and clearly signposted.
2.3. Whenever possible, where overhead electric power lines
exist, either they must be redirected away from the area of
the site or else the current must be cut off.
If this is not possible, there will be barriers or notices to
ensure that vehicles and installations are kept away.
Suitable warnings and suspended protections must be
provided where vehicles have to pass beneath the lines.
3. Atmospheric influences
Workers must be protected against atmospheric influences
which could affect their health and safety.
4. Falling objects
Wherever technically feasible, workers must be protected
by collective methods against falling objects.
Materials and equipment must be laid out or stacked in
such a way as to prevent their collapsing or overturning.
Where necessary, there must be covered passageways on
the side or access to danger areas must be made
impossible.
5. Falls from a height
5.1. Work at height must be properly planned and carried out
on the basis of the requirements of article 6(2) of the Act
and article 10 of the General Provisions for Health and
Safety at Work Places Regulations, (S.L. 424.18.).
5.2. Where work is carried out at height, every employer and/
or self-employed person, must take suitable and sufficient
measures to prevent any person falling a distance liable to
cause personal injury.
5.3. In principle, work at a height must be carried out only
with appropriate equipment or using collective protection
devices such as cradles, platforms or safety nets.
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
Where cradles are used, these must be solid, sufficiently
high and have at least an end-board, a main handrail and
an intermediate handrail or an equivalent alternative.
If the use of such equipment is not possible because of
the nature of the work, suitable means of access must be
provided and safety harnesses or other anchoring safety
methods must be used.
5.4 Protection railings, barriers or other form of protection
must be fitted around stairwells, stairs, shafts, balconies,
edges, openings an in all other areas where any person
may fall a distance liable to cause personal injury, or to
fall into any liquid or material so as to involve risk of
drowning or serious injury.
5.5 Protection railings, barriers or other form of protection
must be of good construction, of suitable and sound
material, of adequate height, and of adequate strength for
the purpose of which are used. Protection railings,
barriers or other form of protection must be placed as to
prevent as far as possible the fall of persons. Where
covering are used, these must be so construed as to
prevent the fall of persons, materials or articles, which
covering must be clearly and boldly marked to show its
purpose, be securely fixed in position, be of good
construction and of adequate strength for the purpose for
which are used.
6. Scaffolding and ladders
6.1. All scaffolding must be properly designed, constructed
and maintained to ensure that it does not collapse or
move accidentally.
6.2. Work platforms, gangways and scaffolding stairways
must be constructed, dimensioned, protected and used in
such a way as to prevent people from falling or being
exposed to falling objects.
6.3. Scaffolding must be inspected and certified as being safe
for use by a competent person
(a)
before being put into service;
(b)
subsequently, at periodic intervals;
(c)
after any modification period without use,
exposure to bad weather or seismic tremors, or
any other circumstance which may have
affected its strength or stability.
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
6.4. Ladders must be sufficiently strong and correctly
maintained. They must be correctly used, in appropriate
places and in accordance with their intended purpose.
6.5. Mobile scaffolding must be secured against spontaneous
movements.
7. Lifting equipment
7.1. All lifting devices and accessories, including their
component parts, attachments, anchorings and supports,
must be
(a)
properly designed and constructed and
sufficiently strong for the use to which they are
put;
(b)
correctly installed and used;
(c)
maintained in good working order;
(d)
checked and subjected to periodic tests and
inspections in accordance with current
legislation;
(e)
operated by qualified workers who have
received appropriate training.
7.2. All lifting devices and accessories must clearly display
their maximum load values.
7.3. Lifting equipment and accessories may not be used for
other than their intended purposes.
8. Excavating
and
materials-handling
vehicles
and
machinery
8.1. All excavating and materials-handling vehicles and
machinery must be
(a)
properly designed and constructed taking
account, as far as possible, of the principles of
ergonomics;
(b)
kept in good working order;
(c)
used correctly.
8.2. Drivers and operators of excavating and materials-
handling vehicles and machinery must be specially
trained.
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
8.3. Preventive measures must be taken to ensure that
excavating and materials-handling vehicles and
machinery do not fall into the excavations or into water.
8.4. Where appropriate, excavating machinery and materials-
handling machinery must be fitted with structures to
protect the driver against being crushed if the machine
overturns, and against falling objects.
9. Installations, machinery, equipment
9.1. Installations, machinery and equipment, including hand
tools whether power-driven or not, must be
(a)
properly designed and constructed taking
accounts, as far as possible, of the principle of
ergonomics;
(b)
kept in good working order;
(c)
used solely for the work for which they were
designed;
(d)
operated by workers who have received
appropriate training.
9.2. Installations and equipment under pressure must be
checked and subjected to regular tests and inspections in
accordance with existing legislation.
10. Excavations, wells, underground works, tunnels and
earthworks
10.1. Suitable precautions must be taken in an excavation,
well, underground, working or tunnel
(a)
using an appropriate support or embankment;
(b)
to prevent hazards entailed in the fall of a
person, materials or objects, or flooding;
(c)
to provide sufficient ventilation at all
workstations so as to ensure a breathable
atmosphere which is not dangerous or harmful
to health;
(d)
to enable workers to reach safety in the event
of fire or inrush for water or materials.
10.2. Before excavation starts, measures must be taken to
identify and reduce to a minimum any hazard due to
underground cables and other distribution systems.
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
10.3. Safe routes into and out of the excavation must be
provided.
10.4. Piles of earth, materials and moving vehicles must be kept
away from the excavation; appropriate barriers must be
built if necessary.
11. Demolition work
Where the demolition of a building or construction may
present a danger
(a)
appropriate
precautions,
methods
and
procedures must be adopted;
(b)
the work must be planned and undertaken only
under the supervision of a competent person.
12. Metal or concrete frameworks, shutterings and heavy
prefabricated components.
12.1. Metal or concrete frameworks and their components,
shutterings, prefabricated components or temporary
support, and buttresses must be erected and dismantled
only under the supervision of a competent person.
12.2. Adequate precautions must be taken to protect workers
against risks arising from the temporary fragility or
instability of a structure.
12.3. Shutterings, temporary supports and buttresses must be
devised and designed, installed and maintained so as to
safely withstand any strains and stresses which may be
placed on them.
13. Cofferdams and caissons
13.1. All cofferdams and caissons must be
(a)
well constructed, of appropriate,
solid
materials of adequate strength;
(b)
appropriately equipped so that workers can
gain shelter in the event of an irruption of
water and materials.
13.2. The construction, installation, transformation or
dismantling of a cofferdam or caisson must take place
only under the supervision of a competent person.
REQUIREMENTS FOR WORK AT CONSTRUCTION SITES)
13.3. All cofferdams and caissons must be inspected by a
competent person at regular intervals.
14. Work on roofs
14.1. Where necessary to avert a risk or where the height or the
slope exceed set values, collective preventive measures
must be taken to prevent workers, and tools or other
objects or materials, from falling.
14.2. Where workers have to work on or near a roof or any
other surface made of fragile materials through which it
is possible to fall, preventive measures must be taken to
ensure that they do not inadvertently walk on the surface
made of fragile materials, or fall to the ground.