Development Notification (Amendment) Order, 2025
Table of Provisions (6)
Statutory Text (6 Articles)
L.N. 85 of 2025
DEVELOPMENT PLANNING ACT
(CAP. 552)
Development Notification (Amendment) Order, 2025
IN EXERCISE of the powers conferred by article 55 of the
Development Planning Act, the Executive Council, with the approval
of the Minister responsible for the Planning Authority, has made the
following order:-
The title of this order is the Development Notification Citation.
(Amendment) Order, 2025 and this order shall be read and construed
as one with the Development Notification Order, hereinafter referred S.L. 552.08.
to as the "principal order".
In article 3(5)(a) of the principal order the words "by Class Amends article
3 and Class 16 of Schedule I" shall be substituted by the words "by 3 principal
Class 3 of Schedule I".
Article 5(5)(a) of the principal order shall be amended as Amends article
5 of the
principal order.
(a)
in sub-paragraph (i) thereof the figure "16," shall be
deleted;
(b)
in sub-paragraph (ii) thereof the figure "16," shall be
deleted.
Schedule I of the principal order shall be amended as
Schedule I to
the principal
order.
(a)
in the Index thereof item Class 16 shall be deleted;
(b)
item Class 16 thereof shall be deleted;
(c) item Class 24 in Schedule I thereof shall be
substituted by the following new item
"Class 24 Greening projects by Government
agencies, Local Councils and other entities appointed by
them
(a) The formation of urban greening projects
within the development zones on land designated for
public recreational use in the respective Local Plans,
including on schemed roads and public open spaces;
(b) The formation of urban greening projects
within the development zone on land designated for
any other use in the respective Local Plans;
(c) The formation of greening projects
located outside development zone on land designated
for public recreational use in the respective Local
Plans
Provided that the greening projects shall
only include the following works
(i) the installation of playground
equipment, fitness, and sports equipment, along
with art installations;
(ii) demountable installations, which
may include CCTV and lighting equipment;
(iii) vertical structures and
shading
devices, which may be accessible;
(iv) excavation
of
underground
reservoirs intended for the irrigation of the
proposed vegetation and other related uses to
greening projects;
(v) taking up of existing land surface
and resurfacing with materials such as
permeable paving blocks;
(vi) installation of flooring systems and
hard landscaping;
(vii) installation of vertical greening
structures, including against public buildings
or government owned residential blocks, but
excluding buildings which are designated or
located within scheduled areas;
(viii) installation
of
features
and
structures for the purpose of the greening
project (seating areas, security and or control
rooms, sanitary facilities, etc.);
(ix) installation of demarcation walls
and gates;
(x) interventions and planting of trees,
including the related irrigation systems;
(xi) removal of existing paved or hard-
surface areas and, or existing artificial
structures, or their replacement with soil or soft
landscaping; and
(xii) removal of redundant infrastructure
(including poles, brackets, cables, pipework,
etc.) and, or the replacement of such
infrastructure with facilities laid underground
within the foot print of existing streets or
pavements
Provided further that
(a) prior approval shall be obtained
from the Superintendent of Cultural Heritage
for sites within Urban Conservation Area,
Scheduled sites and sites within Scheduled
Building Settings;
(b) prior approval shall be obtained
from the Authority for Transport in Malta for
sites falling within the boundaries of schemed
roads;
(c) prior approval shall be obtained by
the Environment and Resources Authority;
(d) for all cases, prior approval shall be
obtained from Project Green
Provided further that for development
under this Class, the relevant provisions of the Rural
Policy and Design Guidance and all other relevant
approved plans and policies under the Act,
exceptions, conditions, restrictions, rules, limitations
and exclusions currently in force, shall not be
applicable
Provided further that development under
this class shall be subject to the notification
procedure established in sub-articles (1) and (3) of
article 5, except for where the greening project is by
Project Green.".
Schedule III of the principal Order shall be deleted.
Deletes
Schedule III of
the principal
order.
€0.36