Photovoltaic Installations) (Amendment) Regulations, 2025
Table of Provisions (6)
Statutory Text (6 Articles)
L.N. 48 of 2025
REGULATOR FOR ENERGY AND WATER SERVICES ACT
(CAP. 545)
Feed-in Tariffs Scheme (Electricity Generated from Solar
Photovoltaic Installations) (Amendment) Regulations, 2025
IN EXERCISE of the powers conferred by article 37 of the
Regulator for Energy and Water Services Act, the Minister responsible
for energy and water services, after consultation with the Regulator for
Energy and Water Services, has made the following regulations:-
(1) The title of these regulations is the Feed-in Tariffs
commencement.
Scheme (Electricity Generated from Solar Photovoltaic Installations)
(Amendment) Regulations, 2025 and these regulations shall be read
and construed as one with the Feed-in Tariffs Scheme (Electricity
Generated from Solar Photovoltaic Installations) Regulations,
hereinafter referred to as the "principal regulations".
(2) These regulations shall be deemed to have come into force
on the 1st January 2025.
In sub-regulation (2) of regulation 2 of the principal
regulations the definition "start of works" shall be deleted.
The First Schedule to the principal regulations shall be
amended as follows
(a) item 3 thereof shall be substituted by the following
new item
"3. The submission date of a request to participate
in the FIT scheme shall be considered in the determination
of the applicable FIT scheme and approval of the FIT under
such scheme by the Regulator.";
(b)
item 8 thereof shall be deleted; and
(c)
item 9 thereof shall be substituted by the following
new item
"9. The applicant for a feed-in tariff shall
submit an application in such form and manner as
required by the Regulator, and which shall contain, or
be accompanied by, such information and documents as
may also be required by the Regulator.
The application for the feed-in tariff shall contain
at least the following information
(a) applicant’s name and size of the
undertaking, where applicable;
(b) location of the project;
(c) list of project costs;
(d) kW DC rating of the solar photovoltaic
installation;
(e) a comprehensive declaration of the de
minimis aid received by the applicant and as
required by the application form.".
The Second Schedule to the principal regulations shall be Amends the
Second
amended as follows
Schedule to the
principal
regulations.
(a) in item 1 thereof Table A shall be substituted by the
following new Table
" Table A: Caps and feed-in tariffs applicable for solar photovoltaic
installations approved under the FIT scheme
Maximum units
allocated per annum for
Capacity of solar
Feed-in Tariffs
FIT payment to
photovoltaic
applicable between
installation
photovoltaic systems
1st January 2025 and
FIT Scheme
installed in any
approved under this FIT
31st December 2025
type of location
scheme between the 1st
January 2025 and the
31st December 2025
8 GWh per
=>1kWp and
15 cents per kWh
a n n u m (8MWp)"; and
<40kWp
(b)
item 4 thereof shall be amended as follows
(i) in paragraph (a) thereof the words "from the 1st
January 2024 until 31st December 2024;" shall be
substituted by the words "from the 1st January 2025 until
31st December 2025;";
(ii) in paragraph (d) thereof the word "Gozo." shall
be substituted by the words "Gozo; and;"; and
(iii) immediately after paragraph (d), as amended,
there shall be added the following new paragraph
"(e) where the installation and, or the
photovoltaic panels and, or its inverter have not
previously been used for the generation of
electricity.".
€0.27