Regulations, 2025
Table of Provisions (14)
Statutory Text (14 Articles)
L.N. 271 of 2025
REGULATOR FOR ENERGY AND WATER SERVICES ACT
(CAP. 545)
Data Centres (Sustainability Reporting Obligations)
Regulations, 2025
IN EXERCISE of the powers conferred by article 37(1) of the
Regulator for Energy and Water Services Act, the Minister responsible
for energy and water services, after consultation with the Regulator for
Energy and Water Services, has made the following regulations:-
(1) The title of these regulations is the Data Centres Citation and
scope.
(Sustainability Reporting Obligations) Regulations, 2025.
(2) The scope of these regulations is to transpose Article 12
and Article 26(6) of Directive (EU) 2023/1791 of the European
Parliament and of the Council of 13 September 2023 on energy
efficiency and amending Regulation (EU) 2023/955 (recast).
(regulation 3)
Part A
Minimum requirements for Monitoring and Publishing the Energy
Performance of Data Centres
The following minimum information shall be monitored and
published with regard to the energy performance of data centres
referred to in regulation 3
(a) the name of the data centre, the name of the owner
and operators of the data centre, the date on which the data
centre started its operations and the locality where the data centre
is based;
(b) the floor area of the data centre, the installed power,
the annual incoming and outgoing data traffic, and the amount of
data stored and processed within the data centre;
(c) the performance, during the last full calendar year, of
the data centre in accordance with key performance indicators
about, inter alia, energy consumption, power utilisation,
temperature set points, waste heat utilisation, water usage and
use of renewable energy.
Part B
Data Centre General Information
Name of the Data
Centre
Data
Centre
Owner(s)
Data
Centre
Operator(s) (if different
from owner(s))
Date on which the
Data Centre commenced
operations
Locality of the Data
Centre
Data Specific to the Reporting Period
Reporting
Period
Start Date
Reporting
Period
End Date
Data Centre floor
area
Installed Power
Annual Data Traffic
- Incoming
Annual Data Traffic
- Outgoing
Amount of Data
Stored within Data Centre
Amount of Data
Processed within Data
Centre
Energy
Consumption
Power Utilisation
Temperature
Set
Points
Waste
Heat
Utilisation
Water Consumption
Renewable
Energy
used
Information which is subject to European Union and Maltese
laws protecting trade and business secrets and confidentiality shall not
be made publicly available by the data centre. This information shall
be marked as confidential in any submissions made in satisfaction of
the obligations in accordance with these regulations.
(1)
In these regulations, unless the context otherwise Interpretation.
requires
"Act" means the Regulator for Energy and Water Services Cap. 545.
Act;
"co-hosting customer" means a physical or legal person
who obtains access to a network or networks, servers, and
storage equipment in a co-hosting data centre on which they
operate their own services and applications;
"co-hosting data centre" means a data centre in which one
(1) or more customers are provided with access to network or
networks, servers, and storage equipment on which they operate
their own services and applications and where both the
information technology equipment and the support infrastructure
of the building are provided as a service by the data centre
operator;
"co-hosting data centre operator" means a physical or legal
person who manages the co-hosting data centre space, security,
network access, power, cooling, network or networks, servers,
and storage equipment, and part of the necessary software to
deliver information technology services to one (1) or more
customers, including information technology outsourcing;
"colocation customer" means a physical or legal person
who owns and manages one (1) or more networks, servers and
storage equipment located in a colocation data centre in which
they purchase managed space, power, and cooling capacity;
"colocation data centre" means a data centre in which one
(1) or more customers install and manage their own network or
networks, servers and storage equipment and services;
"colocation data centre operator" means a physical or legal
person who manages and sells space, security, network access,
power and cooling capacity in the entire colocation data centre to
one (1) or more customers who install and manage their own
network or networks, servers and storage equipment and
services;
"Commission" means the European Commission;
"Commission Delegated Regulation" means the
Commission Delegated Regulation (EU) 2024/1364 of 14 March
2024 on the first phase of the establishment of a common Union
rating scheme for data centres adopted in accordance with
Article 33(3) of the Directive;
"data centre" means a structure or a group of structures
used to house, connect and operate computer systems and, or
servers and associated equipment for data storage, processing
and, or distribution, as well as related activities;
"data centre computer room floor area" means the total
floor area within the data centre that accommodates the data
processing, data storage and telecommunication equipment that
provide the information technology services of the data centre;
"data centre operator" means enterprise data centre
operator, colocation data centre operator or co-hosting data
centre operator;
"data centre total floor area" means the total floor area of all
floors of the structure or group of structures that constitute the
data centre;
"Directive" means Directive (EU) 2023/1791 of the
European Parliament and of the Council of 13 September 2023
on energy efficiency and amending Regulation (EU) 2023/955
(recast);
"enterprise data centre" means a data centre that is operated
by an enterprise, and of which the sole purpose is to deliver and
manage the information technology needs of the enterprise;
"enterprise data centre operator" means a physical or legal
person who manages the entire enterprise data centre, including
the building and the use of the information technology services
delivered;
"European Database on data centres" means the database
established by the European Commission in accordance with
Article 12(3) of the Directive, which is intended for the
collection of information to be communicated by obligated data
centres in conformity with any delegated Act adopted by the
Commission in accordance with Article 33(3) of the Directive;
"installed information technology power demand" means
the sum of the nominal power demand, in kW, of the network or
networks, servers and storage equipment installed in the data
centre computer room floor area;
"Malta" shall have the same meaning as assigned to it in
article 124 of the Constitution of Malta;
"obligated data centres" means all data centres located in
Malta, including co-hosting data centres, colocation data centres
and enterprise data centres, having an installed information
technology power demand of at least five hundred kilowatts
(500kW).
(2) Unless the context otherwise requires, words and
phrases used in these regulations which are not defined in this
regulation shall have the same meaning as assigned to them in S.L. 545.33.
the Energy Efficiency Regulations.
(regulation 6)
Part A
Cost-Benefit Analysis
Cost-benefit analysis shall provide information for the purpose of
the measures referred to in regulation 6 as follows
1. If an installation without heat recovery is planned, a
comparison shall be made between the planned installation or the
planned refurbishment and an equivalent installation producing the
same amount of process heat, but recovering the waste heat and
supplying heat through a district heating and cooling network.
2. Within a defined geographical boundary, the assessment
shall take into account the planned installation and any appropriate
existing or potential heat or cooling demand points that may be
supplied from it, taking into account rational possibilities, for example,
technical feasibility and distance.
3. The system boundary shall be set to include the planned
installation and the heat and cooling loads, such as buildings and
industrial process. Within this system boundary the total cost of
providing heat shall be determined for both cases and compared.
4. Heat or cooling loads shall include existing heat or cooling
loads, such as an industrial installation or an existing district heating or
cooling system and also in urban areas, the heat or cooling load and
costs that would exist if a group of buildings or part of a city were
provided with or connected into a new district heating or cooling
network, or both.
5. Cost-benefit analysis shall be based on a description of the
planned installation and the comparison installations and shall cover
thermal capacity, planned usage and the number of planned operating
hours every year, location and thermal demand.
6. An assessment of waste heat utilisation shall take into
consideration current technologies. The assessment shall take into
consideration the direct use of waste heat or its upgrading to higher
temperature levels, or both. In the case of waste heat recovery on-site,
at least the use of heat exchangers, heat pumps, and heat to power
technologies shall be assessed. In the case of waste heat recovery off-
site, at least industrial installations, agriculture sites and district
heating networks shall be assessed as potential demand points.
7. For the purpose of the comparison, the thermal energy
demand and the types of heating and cooling used by the nearby heat
or cooling demand points shall be taken into account. The comparison
shall cover infrastructure related costs for the planned and comparison
installation.
8. Cost-benefit analysis for the purposes of regulation 6 shall
include an economic analysis covering a financial analysis reflecting
actual cash flow transactions from investing in, and the operating of,
individual installations.
9. Projects with positive cost-benefit outcome are those where
the sum of discounted benefits in the economic and financial analysis
exceeds the sum of discounted costs (cost-benefit surplus).
10. The cost-benefit analysis shall be carried out in line with
any further guiding principles which may be published for this purpose
in relation to the methodology, assumptions and timelines for the
economic analysis.
Part B
Information to be supplied within six (6) months of the completion of
the cost-benefit analysis
1. Data on the amount of available heat supply and heat
parameters.
2. Number of planned operating hours every year.
3. Geographical location of the site.
€0.90
(1) Owners and operators of obligated data centres shall, Data centres
by the 15th May of every year, make publicly available the reporting
obligation.
information set out in the First Schedule.
(2) The reporting obligation referred to in sub-regulation (1)
shall not apply to those data centres used for, or which provide their
services exclusively with the final aim of defence and civil protection.
(3) The obligation referred to in sub-regulation (1) shall be
satisfied through the publishing of the form available in Part B of the
First Schedule.
(1) Operators of obligated data centres shall monitor and
communicate to the European database on data centres any
information and key performance indicators required by the
Commission Delegated Regulation, and any other delegated act
adopted by the Commission in accordance with Article 33(3) of the
Directive.
(2) Operators of obligated data centres shall, by the 15th May
of each year, communicate to the European database with regard to the
obligations of data centres described.
Data centre operators shall put in place any arrangements
which may be necessary for the obtaining of information from
customers or third parties, including with colocation data centre
customers and co-hosting data centre customers, as the case may be,
which are required to ensure timely compliance with the obligations
referred to in regulations 3 and 4.
(1) Data centre operators with a total rated energy input
exceeding one megawatt (1MW) shall, following the 11th October
2025, utilise the waste heat or other waste heat recovery applications,
unless they can demonstrate that it is not technically or economically
feasible in accordance with the assessment referred to in sub-
regulation (2).
(2) Data centres operators shall carry out an installation level
cost-benefit analysis in accordance with Part A of the Second Schedule
in order to assess, at a minimum, technical feasibility, cost-efficiency
and the impact on energy efficiency and local heat demand, including
seasonal variation, of utilising waste heat to satisfy economically
justified demand, and of the connection of such installation to a district
heating network or to an efficient or renewable energy source-based
district cooling system, or other waste heat recovery applications.
(3) The analysis referred to in sub-regulation (2) shall be
carried out whenever a data centre with a total rated energy input
exceeding one megawatt (1MW) is newly planned or substantially
refurbished and shall consider cooling system solutions that allow
removing or capturing the waste heat at useful temperature level with
minimal ancillary energy inputs.
(4) Within six (6) months of the conclusion of a cost-benefit
analysis carried out in accordance with sub-regulation (2), the data
centre operator or the developer, as the case may be, shall
communicate the information listed in Part B of the Second Schedule
to the Regulator.
(5)
Any data centres whose waste heat is used or shall be used
in a district heating network or directly for space heating, domestic hot
water preparation or other uses in the building or group of buildings or
facilities where it is located shall be exempt from the application of
this regulation
Provided that such exemption may be subject to thresholds
set by the Regulator, expressed in terms of the amount of available
useful waste heat.
The obligations arising from regulations 3(1), 4(1) and 5 Obligations
are not intended to replace, and shall be without prejudice to any other without
prejudice to
obligations which may be applicable to data centres as they may arise other
obligations.
out of any other law such as obligations in relation to the
implementation of an energy management system, the drawing up of
an action plan based upon the recommendations emanating from
obligatory energy audits, and the publication thereof in the annual
report of the enterprise having any obligations in accordance with
these obligations.
(1) The Regulator may impose an administrative penalty Administrative
upon any person who breaches any provision of these regulations or penalty.
who fails to comply with any directive or decision given by the
Regulator in ensuring compliance with these regulations.
(2) An administrative penalty imposed in accordance with sub-
regulation (1) shall not exceed five thousand euro (€5,000) for each
breach.
For the purposes of an appeal in respect of a decision of Right of appeal.
the Regulator and an administrative penalty, Part VI of the Act
shall apply mutatis mutandis.
Any person who
Offences and
(a) wilfully or through negligence acts in breach of any penalties.
provision of these regulations;
(b) fails to comply with any lawful order in relation to
these regulations; or
(c) makes a declaration or submits information for any
purpose of these regulations which is false, misleading or
incorrect in any material respect,
shall be guilty of an offence against these regulations and shall
on conviction be liable to a fine (multa) of not more than ten thousand
euro (€10,000).
In the Second Schedule to the Administrative Justice Act,
immediately after the item "Customs Ordinance, Cap. 37, Superior
Competence in Proceedings related to the Seizure of Goods" there
shall be added the item "Regulator for Energy and Water Services Act,
Cap. 545, Superior / Inferior Competence" and immediately after the
item "Electricity Connection and Supply Regulations" there shall be
added the item "Data Centres (Sustainability Reporting Obligations)
Regulations, S.L. 545.42, Superior / Inferior Competence".