Development Notification (Amendment) Order, 2024
Table of Provisions (6)
Statutory Text (6 Articles)
L.N. 90 of 2024
DEVELOPMENT PLANNING ACT
(CAP. 552)
Development Notification (Amendment) Order, 2024
IN EXERCISE of the powers conferred by article 55 of the
Development Planning Act, the Executive Council, with the approval
of the Minister responsible for the Planning Authority, has made the
following order:-
The title of this order is the Development Notification
(Amendment) Order, 2024 and this order shall be read and construed
as one with the Development Notification Order, hereinafter referred
to as the "principal order".
Unless the context otherwise requires, words and
expressions defined in this order shall have the same meaning as
assigned to them in the principal order.
Article 2(1) of the principal order shall be amended as
(a) immediately after the definition "development plan"
there shall be added the following new definition
" "distribution system operator" shall have the
same meaning assigned to it in the Electricity
Regulations;";
(b) the definition "public utility services" shall be
amended as follows
(i) the
words
"and
electricity
and
telecommunications undertakings" shall be substituted by
the words ", electricity and telecommunications
undertakings and any other undertakings and structures
related to the electricity infrastructure"; and
(ii) in the Maltese version only, immediately after
the word "telekomunikazzjoni" there shall be added the
words "u kwalunkwe xogħlijiet oħra għall-provvista u
kwalunkwe strutturi relatati mal-infrastruttura tal-
elettriku".
Article 5(5)(a) of the principal order shall be amended as Amends article
5 of the
principal order.
(a) in sub-paragraph (i) thereof, immediately after the
word "Classes" there shall be added the words "5(ix)(a),"; and
(b) in sub-paragraph (ii) thereof, immediately after the
word "Classes" there shall be added the words "5(ix)(a),".
Schedule I to the principal order shall be amended as Amends
Schedule I to
the principal
order.
(a)
the Index to Schedule I thereof shall be amended as
follows
(i) in the Maltese version only, the words "Klassi 5
Żvilupp relatat ma’ servizzi infrastrutturali pubbliċi" shall
be substituted by the words "Klassi 5 Żvilupp relatat ma’
servizzi għall-utilità pubblika";
(ii) immediately after item (viii) "Feeder or service
pillars" of Class 5, there shall be added the following new
item
"(ix) Development related to the electrical
distribution system";
(b)
Class 5 thereof shall be amended as follows
(i) in the Maltese version only, the words
"KLASSI 5 - Żvilupp li għandu x’jaqsam ma’ servizzi
infrastrutturali pubbliċi" shall be substituted by the words
"KLASSI 5 Żvilupp relatat ma’ servizzi għall-utilità
pubblika";
(ii) in item (iv) thereof, immediately after the words
"public" there shall be added the words "water distribution
or sewage";
(iii) immediately after item (viii) thereof, there shall
be added following new item
"(ix) Development required by the electrical
distribution system operator in connection with
(a) the
construction,
alteration,
maintenance or repair of an electric power
distribution centres provided that the building
does not exceed the height of ten (10) meters
above highest road level;
(b) the
construction,
alteration,
maintenance or repair of electricity power sub-
stations provided that the building shall not
exceed the footprint of fifty (50) square metres
and does not exceed the height of four (4)
meters above highest road level;
(c) the temporary installation of any
equipment and any associated structure,
required for emergency generation of electrical
power that is installed as ancillary to existing
infrastructure use provided that the equipment
and the associated structure may be retained for
a period not exceeding five (5) years, subject to
the approval of the Environment and Resources
Authority
Provided that
(a) the site has adequate access from
the road network;
(b) ancillary infrastructure including
but not limited to cabling, pipes and, or channel
services shall be located under existing roads;
(c) aboveground level wiring, poles and
off-street trenching shall be avoided; and
(d) the design shall be in congruence
with the surrounding environment and
landscape.";
(c) in the last paragraph thereof, immediately after the
words "established in article 5(1) and (3)" there shall be added
the words "and developments falling under this class which are
located in ODZ or in protected or scheduled areas for
environmental reasons shall be subject to prior approval by the
Environment and Resources Authority.".
€0.27