from Renewable Energy Sources Regulations, 2023
Table of Provisions (18)
Statutory Text (18 Articles)
L.N. 21 of 2023
REGULATOR FOR ENERGY AND WATER SERVICES ACT
(CAP. 545)
Competitive Bidding Rules for Installations Producing Electricity
from Renewable Energy Sources Regulations, 2023
IN EXERCISE of the powers conferred by article 37 of the
Regulator for Energy and Water Services Act the Minister responsible
for energy and water services, after consultation with the Regulator for
Energy and Water Services, has made the following regulations:-
The title of these regulations is the Competitive Bidding
Rules for Installations Producing Electricity from Renewable Energy
Sources Regulations, 2023.
(1) The scope of these regulations is to govern the
competitive bidding process through which the fixed price per kWh to
be paid for electricity generated and sold directly to the market from
approved renewable energy installations is determined, and hence to
promote and support the generation of electricity from renewable
energy sources.
(2) These regulations shall apply only to renewable energy
produced from renewable energy installations installed in Malta, Gozo
and other islands of the Maltese Archipelago, including the territorial
waters.
(3) These regulations shall apply to renewable energy
installations with a capacity equal to one thousand kilowatts (1000kW)
or greater
Provided that in respect of installations having a capacity
equal to or greater than forty kilowatts (40kW) but less than one
thousand kilowatts (1000kW), they shall be applicable as of the 1 st of
January, 2024.
(1) Unless otherwise stated in these regulations, the
definitions in the Public Finance Management Act shall apply.
(2)
In these regulations, unless the context otherwise requires
"annual cap" means the maximum number of kWh
generated annually for the period of time commencing on the 1st
January and ending on the 31st December of each year and sold
directly to the market, to which the payment of the fixed awarded
bid price per kWh shall apply;
"approved renewable energy installation" means an eligible
renewable energy installation which produces electricity from a
renewable energy source and which is granted financial support
for the first time following a competitive bidding process in
accordance with these regulations and in respect of which a
contract for difference has been entered into between the
Contracting Authority and the successful bidder;
"awarded bid price per kWh" means the bid price per kWh
offered by a successful bidder during a competitive bidding
process;
"balancing" means balancing as defined in point 10 of
Article 2 of Regulation (EU) 2019/943 of the European
Parliament and of the Council of 5 June 2019 on the internal
market for electricity (recast);
"bid price per kWh" means price per kWh submitted by a
bidder in a competitive bidding process;
"commission" means the first time a renewable energy
installation is put into operation, following the establishment of
operational readiness by the warranted electrical engineer
certifying the installation;
"Commission Regulation (EU) No 651/2014" means
Commission Regulation (EU) No 651/2014 of 17 June 2014
declaring certain categories of aid compatible with the internal
market in application of Articles 107 and 108 of the Treaty, as
amended by Commission Regulation (EU) 2017/1084 of 14 June
2017 amending Regulation (EU) No 651/2014 as regards aid for
port and airport infrastructure, notification thresholds for aid for
culture and heritage conservation and for aid for sport and
multifunctional recreational infrastructures, and regional
operating aid schemes for outermost regions and amending
Regulation (EU) No 702/2014 as regards the calculation of
eligible costs, and by Commission Regulation (EU) 2020/972 of
2 July 2020 amending Regulation (EU) No 1407/2013 as regards
its prolongation and amending Regulation (EU) No 651/2014 as
regards its prolongation and relevant adjustments, and by
Commission Regulation (EU) 2021/1237 of 23 July 2021
amending Regulation (EU) No 651/2014 declaring certain
categories of aid compatible with the internal market in
application of Articles 107 and 108 of the Treaty, and as may be
subsequently amended;
"competitive bidding process" means a non-discriminatory
bidding process that provides for the participation of a sufficient
number of undertakings and where the support is granted on the
basis of the bid submitted by the bidder. Moreover, the volume
related to the bidding process shall be a binding constraint
leading to a situation where not all bidders may receive support;
"competitive bidding process administrator" means any
entity delegated with the administration of the competitive
bidding process. The competitive bidding process administrator
for any competitive bidding process shall be named in the
documentation pertaining to that bidding process;
"contract for difference" means the contract entered into
between the Contracting Authority and a successful bidder,
governing the payment of the fixed price per kWh of electricity
up to the annual cap for each year of the guaranteed period, for
electricity generated from renewable energy sources and sold
directly to the market from an approved renewable energy
installation where such guaranteed fixed price shall be the sum
of the market price and the premium;
"contracting authority" means the contracting party
responsible for issuing and administering the competitive
bidding process, provided that any part of the administration of
the competitive bidding process may be delegated to a
competitive bidding process administrator;
"distribution" means the transport of electricity by means
of high voltage, medium voltage and low voltage distribution
systems with a view to its delivery to consumers, but not
including the supply;
"distribution system" means all the interconnected
technical facilities used for conveying electricity to final
customers;
"distribution system operator" means the same as the
meaning assigned to it in regulation 2 of the Electricity
Regulations;
"electricity from renewable energy sources" means
electricity produced by plants using only renewable energy
sources, or, in the case of hybrid plants which also use
conventional energy sources, the share of electricity produced
from renewable energy sources calculated in terms of their
calorific value. It includes renewable electricity used for filling
storage systems connected behind-the-meter, but excludes
electricity produced as a result of storage systems;
"electricity markets" means the same as the meaning
assigned to it in regulation 2 of the Electricity Regulations
Provided that until such time as an electricity market
exists which is open for successful bidders to sell electricity
directly to the market, electricity sold to the distribution system
operator shall be deemed to have been sold directly to the market
for the purposes of these regulations;
"eligible person" means any person, being a natural or legal
person, including any body corporate, company, society or other
association of persons, and any renewable energy community;
"eligible renewable energy installation" means a new
renewable energy installation which produces electricity from a
renewable energy source having a capacity of forty (40) kW or
more, which may be granted financial support for the first time
following a competitive bidding process;
"energy from renewable sources" or "renewable energy"
means energy from renewable non-fossil sources, namely wind,
solar (solar thermal and solar photovoltaic) and geothermal
energy, ambient energy, tide, wave and other ocean energy,
hydropower, biomass, landfill gas, sewage treatment plant gas,
and biogas;
"force majeure" means acts of God, strikes, lock-outs or
other industrial disturbances, acts of the public enemy, wars
whether declared or not, blockades, insurrection, riots,
pandemics, landslides, earthquakes, storms, direct lighting
strikes, floods, washouts, civil disorder, explosions and other
similar events which are unforeseeable, and which at the time of
the signing of any contract between the Contracting Authority
and a successful bidder, which by the exercise of all due
diligence cannot be overcome and which, in the view of the
Contracting Authority, prevent a successful bidder from adhering
to his obligations due to causes beyond his reasonable control;
"full load hours" means the equivalent number of hours in a
calendar year during which the renewable energy installation
produces at its full nominal or kW capacity;
"generation" means the production of electricity;
"guaranteed period" means the period of time indicated in
the applicable competitive bidding process documentation for
which the renewable energy installation which was awarded
financial support under a competitive bidding process shall
remain operational, and for which the fixed awarded bid price
per kWh for the electricity generated and sold directly to the
market from an approved renewable energy installation is
guaranteed;
"kW" means kiloWatt and in the context of these
regulations shall be taken to refer to the nominal capacity of the
renewable energy installation;
"kWh" means one (1) kilo Watt per one (1) hour;
"market price" means the market price for electricity in
Malta which, until such time as a liquid intra-day wholesale
electricity market or an alternative pricing system for electricity
is established in Malta, shall be the proxy for the market price;
"metering equipment" means the electricity meters
provided by the distribution system operator including smart
meters, any voltage and current transformers and any other
associated equipment and wiring required to measure the
quantity of electricity supplied or exported;
"Minister" means the Minister responsible for energy and
water services;
"new renewable energy installation" means a renewable
energy installation which has never, in whole or in part, been
used for the generation of electricity;
"performance bond" means the performance bond which
shall be provided by a successful bidder to the Contracting
Authority in accordance with regulation 11;
"premium" means the difference between the awarded bid
when the awarded bid price per kWh is different from the market
when the market price exceeds the awarded bid price per kWh,
and that the premium shall be zero when the market price per
kWh is negative;
"proxy for the market price" means the same as the meaning
assigned to it in in regulation 2 of the Electricity Regulations;
"renewable energy community" means the same as the
meaning assigned to it in regulation 2 of the Promotion of Energy
from Renewable Sources Regulations;
"renewable energy installation" means a renewable energy
installation which produces electricity from a renewable energy
source.
"smart meter" means the same as the meaning assigned to it
in regulation 2 of the Electricity Supply Regulations;
"successful bidder" means a bidder whose offer is selected
following a competitive bidding process;
"supply" means the same as the meaning assigned to it in
regulation 2 of the Electricity Regulations.";
undertaking in difficulty" means an undertaking in
difficulty as defined in Article 2 of Commission Regulation (EU)
No 651/2014.
(1) The price per kWh which shall be paid for electricity Competitive
generated and sold directly to the market from eligible renewable bidding process.
energy installations shall be determined through a competitive bidding
process.
(2) Any eligible person may participate in the competitive
bidding process
Provided that no participant in the competitive bidding
process, irrespective of whether such participation is individual or
joint as part of a consortium or joint venture, shall be an undertaking in
difficulty.
(3) The competitive bidding process shall be compliant with
the fundamental rules and principles of the Treaty on the Functioning
of the European Union regarding equality, transparency,
proportionality and prohibiting discrimination on grounds of
nationality and with the relative provisions of Commission Regulation
(EU) No 651/2014.
(4) The documentation pertaining to the competitive bidding
process shall also include terms and conditions which shall constitute
an integral part of the contract to be entered into between the
Contracting Authority and each successful bidder. The form of the
contract to be entered into shall be specified in the invitation for bids.
The frequency of competitive bidding processes and the
maximum capacity in kW associated with each one shall be at the
Minister’s discretion, and the launch of competitive bidding processes
shall be made public by means of a notice published in the Gazette.
Bids submitted in the competitive bidding process shall be
subject to an administratively established cap on the maximum bid
per kWh applicable to all offers or different caps for different
categories of installations.
(1) The awarded bid price per kWh resulting from a
competitive bidding process shall be paid in each calendar year up to a
capped amount of units of electricity generated and sold directly to the
market and shall be payable for the guaranteed period
Provided that in the first and last year of the guaranteed
period, the annual cap shall be applied on a pro rata basis for the
payment of the awarded bid price per kWh.
(2) The awarded bid price per kWh shall be determined by
"pay-as-bid" such that each successful bidder shall receive an offer of
award of the bid price per kWh as submitted in said successful bidder’s
actual bid, and shall be paid in line with the provisions of the contract
for difference.
(3) The bidder shall submit a separate bid price per kWh for
each separate eligible renewable energy installation proposed, as
required in the competitive bidding process.
(4) The awarded bid price per kWh shall only be applicable to
a successful bidder and only in respect of the proposed renewable
energy installation as described in the bid, including the capacity in
kW as offered in the bid, only as part of a specific competitive bidding
process call. The capacity associated with the bid price shall be
deemed to be equal to
Offered kW x Full Load Hours
1600. (5) Without prejudice to sub-regulation (4), where an approved
renewable energy installation selected pursuant to a competitive
bidding process is transferred to a third party, the validity of the
awarded bid price for every kWh may remain applicable to the said
approved renewable energy installation through an agreement entered
into between the successful bidder, the third party purchaser and the
Contracting Authority, subject to the third party obtaining any
necessary permits, authorisation and licences, as may be applicable
Provided that the provisions of sub-regulations (2) and (3)
of regulation 4 shall be applicable to such third party purchaser.
(6) The awarded bid price per kWh with respect to an approved
renewable energy installation shall be payable for the actual number of
units of electricity generated by such installation and sold directly to
the market, up to the annual cap calculated as following
Offered kW x Full Load Hours
Provided that the number of full load hours which shall
determine the annual cap for the payment of the awarded price per
kWh shall be dependent on the particular technology or technologies
being supported in the relevant competitive bidding process and
specified in the documentation applicable thereto.
(7) Any units generated by the installation in excess of the
annual cap in any calendar year shall not be subject to the provisions
of the contract for difference.
(8) A successful bidder shall not be entitled to tradeable
guarantees of origin or other tradeable certificates in respect of units of
electricity from renewable sources sold directly to the market for
which the successful bidder has received financial support.
(9) Without prejudice to sub-regulations (4) and (5), an
approved renewable energy installation may be relocated to an
alternative site subject to obtaining the necessary permits,
authorisations and licenses as may be applicable, and subject to the
conditions laid down in the competitive bidding procedure documents.
(1) Bids which are administratively compliant shall be Method of
ranked according to the bid price per kWh where the lowest bid price award of bids.
per kWh is ranked the highest.
(2) Bidders whose bids have been ranked in line with the
provisions of sub-regulation (1) shall be offered an award of financial
support starting from the highest ranking bid and the corresponding
eligible renewable energy installation kW capacity as proposed, and
the order of ranking shall continue to be followed until all ranked bids
which may be fully accommodated in the remaining unallocated
capacity for that competitive bidding process have been offered an
award of financial support.
(3) Where the next ranking offer is for a proposed installation
the capacity of which cannot be fully accommodated in the remaining
unallocated capacity associated with that competitive bidding process,
the Contracting Authority shall not make an offer to award support.
The Contracting Authority, or the bidding process
administrator when acting on its behalf, shall publish the results of
each competitive bidding process on its website, including the
awarded bid price per kWh for each successful bidder for each
approved renewable energy installation and the corresponding
capacity in kW, as established in the competitive bidding process.
(1) A letter of award shall be issued to each successful
and the contract.
bidder and shall include, but not be limited to, the following
(a)
the details of the bidder;
(b)
the awarded bid price per kWh;
(c) the capacity in kW of the approved renewable energy
installation;
(d)
the capping on the units of electricity for which
the bid price per kWh may be paid in each calendar year for the
guaranteed period; and
(e)
the applicable deadlines.
(2) The award offered shall be formalised through a contract
entered into between the Contracting Authority and the successful
bidder, which contract shall be signed within the time limit stipulated
in the invitation for bids of the relevant competitive bidding process.
(3) The letter of award issued to a successful bidder following
a competitive bidding process, or any contract entered into as a result
thereof, shall not be, nor shall it be deemed to grant or constitute, an
automatic authorisation to construct an approved renewable energy
installation, or to give any right for the issue of any authorisation,
licence or permit which may be required, nor shall it be deemed to
grant the successful bidder any right to damages or compensation if
any required permits, authorisations and licences required are not
issued for any reason whatsoever.
(1) A successful bidder shall be required to provide a
performance bond issued in favour of the Contracting Authority. The
value of the performance bond and the deadline for its submission
shall be included in the invitation for bids of the relative competitive
bidding process documentation.
(2)
In the case when the capacity of an approved renewable
energy installation as installed and connected to the grid is lower than
the capacity allocated to a successful bidder on the basis of said
bidder’s proposal during the bidding process, the complete or partial
forfeiture of the performance bond shall apply in accordance with the
terms and conditions established for such purpose in the relative
competitive bidding process documentation.
(1) Each successful bidder in a competitive bidding Validity of bid
process shall be issued with a letter of award as provided for in price per kWh.
regulation 10.
(2) In order to secure the validity of the awarded bid price per
kWh, a successful bidder shall, within the applicable time limit from
the date of the letter of award referred to in sub-regulation (1), comply
with the following obligations
(a) fully commission the approved renewable energy
installation in accordance with the terms of the competitive
bidding process; and
(b) submit an application to the distribution system
operator to connect the installation to the distribution system.
(3) If the successful bidder fails to fulfil the obligations laid
down in sub-regulation (2) within the applicable time limit, a one-time
request for an extension may be submitted in writing to the
Contracting Authority, which request shall reach the Contracting
Authority no later than one (1) month before the lapse of the deadline
arising out of the time limit established in sub-regulation (7).
(4) If an extension requested in terms of sub-regulation (3), is
acceded to by the Contracting Authority, and is availed of in part or in
full, the awarded bid price per kWh shall be reduced by zero point zero
zero five Euro per kWh (€0.005/kWh) for all electricity generated and
sold directly to the market up to the amount indicated in regulation
7(6), for the entire duration of the guaranteed period.
(5) Failure to comply with the obligations established in sub-
regulation (2) within the time limit established in sub-regulation (7) or,
where an extension is requested and granted, within the time limit as
extended, including where such failure results from a failure to obtain
the necessary permits required as described in regulation 13, shall lead
to the automatic withdrawal of the award, the termination of the
contract and the forfeiture of the performance bond.
(6) A verified event of force majeure may be invoked by a
successful bidder, in accordance with the related provisions included
in the invitation for bids of the relative competitive bidding process, to
request a suspension of the time periods established in sub-regulation
(7), which request may be granted at the Contracting Authority’s
discretion.
(7) The applicable time limit and maximum allowable
extension period referred to in sub-regulations (2) and (3) respectively
shall be as follows
(a) for installations having a capacity inferior to one
thousand (1000) kW the applicable time limit shall be eighteen
(18) months from the date of the letter of award, and the
maximum allowable extension shall be of six (6) months;
(b) for installations having a capacity of one thousand
(1000) kW or larger, the applicable time limit shall be twenty-
four (24) months from the date of the letter of award, and the
maximum allowable extension shall be of twelve (12) months.
(1) The successful bidder shall be responsible for
obtaining all necessary applicable or relevant permits, authorisations
and licences and shall bear the costs thereof.
(2) Applications for permits, authorisations and licences shall
be submitted to the relevant entities or authorities in accordance with
the applicable laws and procedures
Provided that where such submissions are made following
the receipt of a letter of award, the time required for their issuing shall
not suspend the running of the time periods established in regulation
12(7).
(3) Renewable energy installations which require a planning
permit shall be covered by an approved planning permit as a pre-
requisite to their being proposed in any competitive bidding process
Provided that an approved planning permit shall not be a
pre-requisite for the proposal of solar photovoltaic installations having
a capacity of one thousand (1000) kW or greater in a competitive
bidding process, subject to the relevant alternative documents as
established in the relative competitive bidding process documentation
being submitted instead.
(1) The successful bidder shall bear the costs of Connection of
connection of the approved renewable energy installation to the the
renewable
nearest suitable point of connection of the distribution system.
energy
installations.
(2) The costs for connection to the distribution system referred
to in sub-regulation (1) shall be determined by the distribution system
operator in accordance with the Electricity Supply Regulations.
(1) The awarded bid price per kWh shall become payable Payment of the
as from the date of the installation of the metering equipment by the awarded
distribution system operator and shall continue to be so for the duration
of the guaranteed period as reckoned from that date.
(2) Payment of the awarded bid price per kWh shall be based
on actual meter readings obtained from the metering equipment
referred to in sub-regulation (1) and capped in accordance with the
provisions of regulation 7(6) as indicated in the letter of award.
(3) The payment of the awarded bid price referred to in sub-
regulation (1) shall be without prejudice to the following
(a) any reduction in bid price resulting from the
applicability of regulation 12(4); and
(b) the exclusion of the payment of aid to any
undertaking which is subject to an outstanding recovery order
following a previous Commission decision declaring an aid
granted by the Maltese authorities to the same undertaking
illegal and incompatible with the internal market, in compliance
with Article 1(4)(a) of Commission Regulation (EU) No 651/
2014; and
(c) where the renewable energy installation has
previously benefited from investment aid, to the deduction from
any premium due under this measure of any said previously
received investment aid, in compliance with Article 42(11) of
Commission Regulation (EU) No 651/2014, until such
investment aid is fully recovered.
Standard balancing responsibilities as established in Article Balancing
5 of Regulation (EU) 2019/943 of the European Parliament and of the responsibility.
Council of 5 June 2019 on the internal market for electricity (recast)
shall apply to the operation of renewable energy installations having an
installed capacity equal to or larger than two hundred (200) kW
Provided that this obligation shall be deemed to be in
abeyance until a liquid intra-day electricity market is developed.
The Public Contracts Review Board established by
regulation 80 of the Public Procurement Regulations shall have
jurisdiction to hear and determine the complaints submitted by any
person having or having had an interest in a competitive bidding
process made under these regulations and in accordance with the
procedures laid down in those regulations.