Construction Management Site (Amendment) Regulations, 2023
Table of Provisions (6)
Statutory Text (6 Articles)
L.N. 142 of 2023
BUILDING AND CONSTRUCTION AUTHORITY ACT
(CAP. 623)
Construction Management Site (Amendment) Regulations, 2023
IN EXERCISE of the powers conferred by article 17(2) of the
Building and Construction Authority Act, the Minister responsible for
the construction industry after consultation with the Building and
Construction Authority Board, has made the following regulations
(1) The title of these regulations is the Construction Citation and
Management Site (Amendment) Regulations, 2023 and these commencement.
regulations shall be read and construed as one with the Construction S.L. 623.08.
Management Site Regulations, hereinafter referred to as "the principal
regulations".
(2) These regulations shall come into force within two (2)
months from their publication in the Gazette.
In the English version only the words "public way", General
wherever they occur, shall be substituted by the words "public amendment
the principal
passage".
regulations.
The Second Schedule to the principal regulations shall be Amends the
Second
amended as follows
Schedule to the
principal
regulation.
(a) item 6 thereof shall be substituted by the following
new item
" Barricades.
The client shall erect timber or metal
barricades or bricks or similar material barricades,
bound together by cement based mortar when
surrounding an excavated site in such a way to block
the entrance and prevent access to unauthorised
persons and that
(a) the barricades shall be constructed
to withstand any external impact and of a
height of not less than two (2) metres between
the site and the public passage or block
completely the open sides of a construction site
and this to safeguard the public and third party
moveable or immovable property;
(b) the barricades shall have smooth
surfaces on the sides facing the public passage
and shall be without openings, except those
required for authorised access;
(c) access openings through the
barricades shall be kept closed at all times with
gates, and closed and locked with gates when
there is no one on site, and shall be maintained
in place until completion of the works to the
satisfaction of the Authority. Such gates shall
be designed in such a manner that prevents
public access, especially children;
(d) all access gates into the site used by
machinery should have warning lights lit up
during entry and exit of such machinery or
banksmen to warn motorists or the general
public during passage of machinery."; and
(b) item 7 thereof shall be substituted by the following
new item
The client shall ensure a safe passage past
the site. When the works necessitate the obstruction
of the pedestrian pavement, and this is approved by
the Local Council, a temporary pedestrian pavement
shall be provided which shall not be obstructed at any
time
Provided that in the case where a
temporary pedestrian pavement cannot be
constructed, the Authority for Transport in Malta
shall provide direction to the client on how to make a
safe passage past the site.".
4. The Ninth Schedule to the principal regulations shall be Substitutes the
Ninth Schedule
substituted by the following new Schedule
to the principal
regulations.
"NINTH SCHEDULE
(Part IV - Enforcement)
Breaches
Minimum
Maximum
Continued
Administrative Administrative
Breaches
Penalty (€)
Penalty (€)
(€ per day)
Missing Notice Board
or missing or incomplete
information
Cutting of stones and
bricks not as authorised
Transport, deposit and
storing of screed sand not as
authorised
Obstruction
of
pavements and easy flow of
traffic in the vicinity of the
site
Lack of enforcement
officers and, or appropriate
traffic
management
or
warning signs
Cleanliness of the site
and environment
Health hygiene
10,000
Inadequate hoarding
Lack of enclosures or
machinery too close to public
passage
Improperly
covered
ways
Improper
setup
of
barricades
Unauthorised
demolition and excavation
between the fifteenth (15)
June and thirtieth (30)
September
Unauthorised works on
Sundays and Public Holidays
and
works
outside
permissible hours
Use of a mechanical
excavator and, or pneumatic
drill outside the permissible
hours
Improper dust control
measures
Mechanical fair facing
of stone on site
Excessive
and,
or
unnecessary noise
No safe passage past the
site
Any other violation of
5000".
obligations in accordance
with the First, Second, Third
or Fourth Schedule not listed
in this Schedule
€0.36