Development Notification (Amendment) Order, 2021
Statutory Text (5 Articles)
L.N. 181 of 2021
DEVELOPMENT PLANNING ACT
(CAP. 552)
Development Notification (Amendment) Order, 2021
IN EXERCISE of the powers conferred by article 55 of the
Development Planning Act, the Executive Council, with the approval
of the Minister for the Environment, Climate Change and Planning,
has made the following order:-
The title of this order is the Development Notification Citation.
(Amendment) Order, 2021 and this order shall be read and construed
as one with the Development Notification Order, hereinafter referred S.L. 552. 08.
to as the "principal order".
In this order, unless the contents otherwise requires, words Interpretation.
and expressions defined in the principal order shall have the same
meaning as assigned to them in the principal order.
Insub-article (1) of article 2 of the principal order, in the Amends article
definition "Urban Conservation Area",the words "approved planning 2 principal
policies." shall be substituted by the words "approved planning
policies;" and immediately thereafter there shall be added the
following new definition
" "Urban greening project" means a project which turns an
urbanised and, or spoilt ground to a landscaped area which is
designed, implemented, and maintained to create beneficial
greening spaces within the urban landscape. Urban greening
shall form public landscaped spaces with vegetated areas, which
aim is to provide managed green settings for leisure and
recreation.".
Immediately after Class 23 in Schedule I to the principal Amends
Schedule I to
order, there shall be added the following new Class
the principal
order.
"Class 24 Urban greening projects by Government agencies,
Local Councils and other entities appointed thereby
(i) The formation of greening projects within the
development zones indicated in the respective Local
Plans.
(ii) Installation of playing equipment within
greening projects.
(iii) Vertical structures, which may be accessible,
forming part of the greening project.
(iv) Excavation of underground reservoirs
intended for the irrigation of the proposed vegetation and
other related uses to the greening project.
(v) Formation of green projects including on
schemed roads and public open spaces.
(vi) Taking up of existing surface and resurfacing
with materials such as permeable paving blocks.
(vii) Installation of flooring systems.
(viii) Installation of vertical greening structures,
including against public buildings or government owned
residential blocks, but excluding buildings which are
designated or located within scheduled areas.
(ix) Installation of features and structures for the
purpose of the greening project.
(x) Interventions and planting of trees, including
the related irrigation systems.
(xi) Removal of existing paved or hard-surface
areas and, or existing artificial structures, or their
replacement with soil or soft landscaping.
(xii) Removal
of
redundant
infrastructure
(including poles, brackets, cables, pipework, etc.), and/or
the replacement of such infrastructure with facilities laid
underground within the footprint of existing streets or
pavements
Provided that
(a) Prior approval is obtained from the
Superintendent of Cultural Heritage for sites within
Urban Conservation Area, Scheduled sites and sites
within Scheduled Building Settings;
(b) Prior approval is obtained from Transport
Malta for sites falling within schemed roads;
(c) Prior approval is obtained by the Environment
and Resources Authority for the uprooting, transplanting,
and planting of trees, as necessary.
Development under this class shall be subject to the
notification procedure established in sub-articles (1) and
(3) of article 5.".