L.N. 93 of 2020
PUBLIC FINANCE MANAGEMENT ACT
(CAP. 601)
REGULATOR FOR ENERGY AND WATER SERVICES ACT
(CAP. 545)
Competitive Bidding Rules for Renewable Sources of Energy
Installations (Capacity between 400kwp and less than 1000kwp)
Regulations, 2020
IN EXERCISE of the powers conferred by article 4 of the Public
Finance Management Act, and in exercise of the powers conferred by
article 37 of the Regulator for Energy and Water Services Act, the
Minister for Finance and Financial Services and the Minister for
Energy and Water Management after consultation with the Regulator
for Energy and Water Services, has made the following regulations: -
(1) The title of these regulations is the Competitive
commencement.
Bidding Rules for Renewable Sources of Energy Installations
(Capacity between 400kWp and less than 1000kWp) Regulations,
2020. These regulations shall come into force on the 1 st January
(2)
2020.
(1) Unless otherwise stated in these regulations, the
definitions in the Public Finance Management Act shall apply.
(2)
In these regulations, unless the context otherwise requires
"annual threshold" means the cap in kWh for the payment
of the awarded bid price per kWh for the period of time
commencing on the 1 st January and ending on the 31 st December
of each year;
"approved renewable energy installation" means a new
renewable energy installation with a capacity between 400kWp
and less than 1000kWp and granted financial support pursuant to
a competitive bidding process;
"awarded bid price per kWh" means the bid price per kWh
offered by a successful bidder whose offer is selected pursuant to
a competitive bidding process;
"bid price per kWh" means price per kWh offered by a
bidder in a competitive bidding process;
"common point of connection to the grid" means the point
on the electricity distribution network where the distribution
system operator and customer/generator assets are connected and
coincides with the location of the meter;
"commissioned" means the first time a renewable energy
installation is put into operation, following the establishment of
operational readiness by the warranted electrical engineer
certifying the installation;
"competitive bidding process" means a non-discriminatory
bidding process that provides for the participation of a sufficient
number of undertakings and where the aid is granted on the basis
of the bid submitted by the bidder. In addition, the volume
related to the bidding process is a binding constraint leading to a
situation where not all bidders can receive aid;
"Contracting Authority" means the entity issuing and
administering the competitive bidding process;
"DC" means direct current;
"distribution" means the transport of electricity on high
voltage, medium voltage and low voltage distribution systems
with a view to its delivery to consumers, but not including
supply;
"distribution system" means all the interconnected
technical facilities used for conveying electricity to final
customers;
"distribution system operator" shall have the same meaning
as under the Electricity Market Regulations;
"electricity from renewable energy sources" means
electricity produced by plants using only renewable energy
sources, as well as the share in terms of calorific value of energy
produced from renewable energy sources in hybrid plants which
also use conventional energy sources. It includes renewable
electricity used for filling storage systems, but excludes
electricity produced as a result of storage systems;
"eligible renewable energy installation" means a new
renewable energy installation with a capacity between 400kWp
and less than 1000kWp applying to be granted financial support
pursuant to a competitive bidding process;
"full load hours" means the equivalent number of hours in a
year during which the renewable energy installation produces at
its full nominal or kWp capacity;
"generation" means the production of electricity;
"guaranteed period" means the period of time indicated in
the relevant competitive bidding process during which the
awarded bid price per kWh for the electricity generated and sold
to the distribution system operator from a qualifying renewable
energy installation is guaranteed;
"kW" means kilo Watt;
"kWh" means kilo Watt hour(s);
"kWp" means the nominal capacity of the renewable
energy installation, which in the case of a solar photovoltaic
installation is equal to the total DC peak power at standard test
conditions of a solar photovoltaic installation;
"metering equipment" means the electricity meters
provided by the distribution system operator including smart
meters, any voltage and current transformers and any other
associated equipment and wiring required to measure the
quantity of electricity supplied or exported;
"Minister" means the Minister responsible for energy;
"new renewable energy installation" means a renewable
energy installation which has never been used for the generation
of electricity in whole or in part and which is installed by a
successful bidder after the conclusion of a competitive bidding
process;
"performance bond" means the performance bond to be
provided by a successful bidder to the Contracting Authority
pursuant to regulation 10;
"premium" means the difference between the awarded bid
payable only when the awarded bid price per kWh is higher than
the proxy for the market price per kWh and the proxy for the
market price per kWh is not negative;
"proxy for the market price" means the average of the
estimated variable cost of meeting the demand forecast for a
given year from locally generated conventional and imported
electricity, with the demand assumption excluding that portion of
the forecast demand which is not expected to be met by
conventional and imported electricity;
"renewable energy sources" means renewable non-fossil
energy sources, that is, wind, solar, geothermal, wave, tidal,
hydropower, biomass, landfill gas, sewage treatment plant gas
and biogases;
"smart meters" shall have the same meaning as in the
Electricity Supply Regulations;
"solar photovoltaic installation" means a solar photovoltaic
system that generates electricity exclusively from solar radiation
and consisting of all accessories including
(a) an array or arrays of photovoltaic modules that
collect and absorb sunlight for conversion into electricity;
(b)
an inverter or inverters;
(c) associated balance of system components,
including wiring, conduits, switchgear, protection
equipment, ancillary equipment and any other part of the
installation necessary for the production and conveyance of
electricity up to the metering equipment supplied by the
distribution system operator;
"successful bidder" means a bidder whose offer is selected
pursuant to a competitive bidding process;
"supply" means the sale or retail, including resale, of
electricity to customers;
"wind energy installation" means an installation that
converts wind energy into electricity and shall include the tower
on which the wind turbine is mounted, a rotor and the nacelle
which houses the equipment, including the generator, that
converts the mechanical energy in the spinning rotor into
electricity and any other ancillary equipment necessary to
connect to the grid.
(1) The purpose of these regulations is to introduce the Scope.
competitive bidding process as the method to determine the fixed price
per kWh to be paid for electricity generated and sold to the distribution
system operator from approved renewable energy installations with a
capacity between 400kWp and less than 1000kWp and hence to
promote and support the generation of electricity from renewable
energy sources. The method and amount of support for renewable
photovoltaic installations with a kWp capacity lower than 400kWp
shall continue to be determined administratively. For the purpose of
calculating the capacity of a renewable energy installation, renewable
energy installations with a common point of connection to the
electricity grid shall be considered as one installation.
(2) These regulations shall apply only to renewable energy
produced from renewable energy installations installed in Malta, Gozo
and other islands of the Maltese Archipelago, including the territorial
waters thereof.
(3) These regulations shall not apply to firms in difficulty as
defined in Commission Regulation (EU) No 651/2014 of 17 June 2014
declaring certain categories of aid compatible with the internal market in
application of Articles 107 and 108 of the Treaty, as amended by
Commission Regulation (EU) No 2017/1084 of 14 June 2017 amending
Regulation (EU) No 651/2014 as regards aid for port and airport
infrastructure, notification thresholds for aid for culture and heritage
conservation and for aid for sport and multifunctional recreational
infrastructures, and regional operating aid schemes for outermost
regions and amending Regulation (EU) No 702/2014 as regards the
calculation of eligible costs, and as may be subsequently amended.
(4) Any investment aid previously received towards the same
renewable energy installation must be deducted from the premium
awarded under this measure.
The price per kWh to be paid for electricity generated and
sold to the distribution system operator from eligible renewable energy
installations shall be determined through a competitive bidding
process
Provided that the payment of any price per kWh to an
undertaking that has benefited from earlier unlawful aid granted by
Malta and declared incompatible by a Decision of the European
Commission shall be suspended until such time as that undertaking has
reimbursed the total amount of unlawful and incompatible aid and the
corresponding recovery interest.
(1) The awarded bid price per kWh resulting pursuant to
a competitive bidding process shall be paid in each calendar year up to
a capped amount of units of electricity generated and sold to the
distribution system operator and payable for the guaranteed period.
(2)
The awarded bid price per kWh shall be determined by
"pay-as-bid" such that the successful bidders shall be paid, for the
electricity generated and sold to the distribution system operator from
an approved renewable energy installation, the awarded bid price per
kWh based on their actual bid.
(3) The bidder shall submit the bid price per kWh for each
eligible renewable energy installation as required in the competitive
bidding process.
(4) The awarded bid price per kWh shall only be applicable to
a successful bidder and only in respect of the renewable energy
installation as described in the bid including the capacity offered in the
bid (in kWp), as part of the competitive bidding process. The capacity
associated with the bid price shall be deemed to be equal to
Offered kWp x Full Load Hours
(5) Without prejudice to sub-regulation (4), the ownership of
an approved renewable energy installation selected pursuant to a
competitive bidding process may be transferred to a third party and
subject to the third party obtaining the necessary permits, authorisation
and licences, as may be applicable.
(6) The awarded bid price per kWh with respect to an approved
renewable energy installation shall be payable for the actual number of
units of electricity generated by such installation and sold to the
distribution system operator, up to the annual threshold calculated as
offered kWp x Full Load Hours
Provided that the number of assumed full load hours in the
case of a solar photovoltaic installation shall be equal to 1600 hours
Provided further that in the case of other types of
renewable energy installations, such as wind energy, the number of full
load hours which shall determine the annual threshold for the payment
of the awarded price per kWh, shall be specified in the terms and
conditions applicable in the relevant competitive bidding process.
(7) Any units generated above the amount calculated in sub-
regulation (6) of this regulation in any calendar year shall be
purchased by the distribution system operator and paid at the proxy for
the market price per kWh only, without the payment of the premium.
(8) The successful bidders shall not be entitled to tradeable
guarantees of origin or other tradeable certificates for the electricity
sold to the distribution system operator.
(9) Without prejudice to sub-regulations (4) and (5), an
approved renewable energy installation may be relocated to an
alternative site subject to obtaining the necessary permits,
authorisations and licenses as may be applicable, and subject to the
conditions laid down in the competitive bidding procedure.
The competitive bidding process shall include an
administratively established cap on the maximum bid price per kWh
that bidders may offer. The cap may consist of one maximum bid price
per kWh applicable to all offers or different caps for different
categories as may be defined by the Contracting Authority in the
competitive bidding process.
(1) An approved renewable energy installation shall be
commissioned and an application to connect the installation to the
distribution system has been submitted to the distribution system
operator within eighteen (18) months to be reckoned as from the date
of the letter of award issued by the Contracting Authority to the
successful bidder to secure the eligibility of the awarded bid price per
kWh.
(2) If the successful bidder fails to comply with sub-regulation
(1), the time to commission and apply to connect the approved
renewable energy installation to the distribution system as indicated in
sub-regulation (1) may be extended once only by six months by means
of a request in writing to the Contracting Authority and made in the
format required by the Contracting Authority
Provided that the price payable to the successful bidder for
electricity generated and sold to the distribution system operator for
the particular approved renewable energy installation shall be
equivalent to the awarded bid price per kWh, less €0.005/kWh for all
electricity generated and sold to the distribution system operator up to
the amount indicated in regulation 5(6), for the guaranteed period.
(3) The time necessary for the successful bidders to obtain the
necessary authorisations, licences and permits as applicable, shall not
suspend the running of the time periods stated in sub-regulations (1)
and (2), being the maximum time within which an approved renewable
energy installation must be commissioned and an application to
connect the installation to the distribution system has been submitted
to the distribution system operator, for the award pursuant to the
competitive bidding process to remain valid. Failure to comply with
sub-regulation (1) and sub-regulation (2) (when an application for an
extension has been made), shall lead to the automatic withdrawal of
the award and the forfeiture of the performance bond.
The launch of each competitive bidding process, as well as Publication of
the maximum capacity in kWp as determined by the Minister for each launch
bidding process
competitive bidding process, shall be made public by means of a and
kWp capacity.
Government Notice published in the Gazette.
(1) The process shall be carried out through a Process.
competitive bidding process which shall be open to all generators
producing electricity from renewable energy sources on a non-
discriminatory basis
Provided that the competitive bidding process shall be
compliant with the fundamental rules and principles of the Treaty on
the Functioning of the European Union regarding equality,
transparency, proportionality and prohibiting discrimination on
grounds of nationality and with Commission Regulation (EU) No 651/
2014 of 17 June 2014 declaring certain categories of aid compatible
with the internal market in application of Articles 107 and 108 of the
Treaty, as amended by Commission Regulation (EU) No 2017/1084 of
14 June 2017 amending Regulation (EU) No 651/2014 as regards aid
for port and airport infrastructure, notification thresholds for aid for
culture and heritage conservation and for aid for sport and
multifunctional recreational infrastructures, and regional operating aid
schemes for outermost regions and amending Regulation (EU) No 702/
2014 as regards the calculation of eligible costs, and as may be
subsequently amended.
(2) The invitation for bids shall also include terms and
conditions which shall constitute an integral part of the contract with
the successful bidder. The form of contract to be entered into shall also
be specified in the invitation for bids.
(1) The successful bidder shall be required to provide a Performance
performance bond to the Contracting Authority within one week from bond.
the date of the Letter of Award. The value of the performance bond
shall be included in the invitation for bids of the relevant competitive
bidding process.
(2) Without prejudice to the terms and conditions applicable to
the relevant competitive bidding process, the performance bond shall
be forfeited by a bidder, inter alia, if the bidder fails to satisfy the
conditions in regulation 7.
(3) Where the capacity of an approved renewable energy
installation as installed and connected to the grid is lower than the
capacity allocated during the bidding process, the forfeiture of the
performance bond shall be in accordance with the terms and conditions
established for such purpose by the relevant competitive bidding
process.
Bids which are deemed as being administratively compliant
shall be ranked according to the bid price per kWh with the lowest bid
and the corresponding eligible renewable energy installation kWp
capacity shall be selected pursuant to the competitive bidding process,
starting from the lowest bid offered, and provided that the kWp
available for allocation in the particular competitive bidding process is
not exceeded.
The letter of award to the successful bidder shall include,
but not be limited to, the following
(a)
details of the bidder;
(b)
awarded bid price per kWh;
(c) capacity in kWp and threshold on the units of
electricity for which the bid price per kWh may be paid in each
calendar year for the guaranteed period.
The Contracting Authority shall publish on its website the
results of each competitive bidding process, including the awarded bid
energy installation and the corresponding capacity in kWp, as
established in the competitive bidding process.
The successful bidder shall bear the costs of connection of
the approved renewable energy installation to the nearest suitable point
of connection to the distribution system. The costs for connection to
the distribution system shall be determined by the distribution system
operator in accordance with the Electricity Supply Regulations.
(1) The letter of award issued to a successful bidder
pursuant to a competitive bidding process shall only grant to that
successful bidder the right to be paid the price per kWh and shall not
be, nor shall it be deemed to grant or constitute, an automatic
authorisation to construct an approved renewable energy installation or
give any right for the issue of any authorisation, licence or permit
which may be required. The successful bidder shall be responsible to
obtain any relevant permits, authorisations and licences within the
time-frames stated in regulation 7. The successful bidder shall submit
applications for permits, authorisations and licences in accordance
with the applicable laws and procedures with a view to obtaining such
permits, authorisations and licences. Any cost related to obtaining the
required permits, authorisations, license shall be borne by the
successful bidder.
(2)
The issue of the letter of award shall not grant the
successful bidder any right to damages or compensation if any of the
permits, authorisations and licences required are not issued for any
reason whatsoever. The performance bond shall be forfeited in favour
of the Contracting Authority in any such cases.
(1) The awarded bid price per kWh shall become Payment of bid
applicable as from the date of installation of the metering equipment price
awarded.
by the distribution system operator and shall continue to be applicable
for the duration of the guaranteed period.
(2) Payment of the awarded bid price per kWh shall be based
on actual meter readings obtained from the metering equipment
referred to in sub-regulation (1) and capped to a maximum kWp and
units of electricity according to the letter of award.
A competitive bidding process for the award of support for Frequency of
eligible renewable energy installations with a capacity between competitive
bidding process.
400kWp and less than 1000kWp may be launched as may be decided
by the Minister, and for such capacity as stated in the relevant
competitive bidding process.
The Public Contracts Review Board established by Appeals.
regulation 80 of the Public Procurement Regulations shall have S.L. 601.03.
jurisdiction to hear and determine complaints submitted by any person
having or having had an interest in competitive bidding process made
under these regulations and in accordance with the procedures laid
down in those regulations.