Photovoltaic Installations) (Amendment No. 4) Regulations, 2017

4 Articles / Provisions · Malta
Open official source Machine-readable Markdown (.md)

Statutory Text (4 Articles)

Malta Government Gazette — Legal Notice 2017 200 · Gazzetta tal-Gvern ta’ Malta Nru. 19,842 – 04.08.2017 — Photovoltaic Installations) (Amendment No. 4) Regulations, 2017

L.N. 200 of 2017

REGULATOR FOR ENERGY AND WATER SERVICES ACT

(CAP. 545)

Feed-in Tariffs Scheme (Electricity Generated from Solar

Photovoltaic Installations) (Amendment No. 4) Regulations, 2017

IN EXERCISE of the powers conferred by article 37(1) of the

Regulator for Energy and Water Services Act, the Minister for Energy

and Water Management, with the concurrence of the Minister for

Finance and after consultation with the Regulator for Energy and

Water Services, has made the following regulations

Malta Government Gazette — Legal Notice 2017 200 · Gazzetta tal-Gvern ta’ Malta Nru. 19,842 – 04.08.2017 — Photovoltaic Installations) (Amendment No. 4) Regulations, 2017

The title of these regulations is the Feed-in Tariffs Scheme Citation.

(Electricity Generated from Solar Photovoltaic Installations)

(Amendment No.4) Regulations, 2017, and these regulations shall be

read and construed as one with the Feed-in Tariffs Scheme S.L. 545.27.

(Electricity Generated from Solar Photovoltaic Installations)

Regulations, hereinafter referred to as "the principal regulations".

Malta Government Gazette — Legal Notice 2017 200 · Gazzetta tal-Gvern ta’ Malta Nru. 19,842 – 04.08.2017 — Photovoltaic Installations) (Amendment No. 4) Regulations, 2017

The Second Schedule to the principal regulations, shall be Amends the

Second

amended as follows

Schedule to the

principal

regulations.

(a) in item 1 thereof, Table A shall be substituted by the

following new Table

“FIT scheme

Capacity of solar

Feed-in Tariffs

Maximum units

photovoltaic instal-

applicable between

allocated per

lation installed in

the 3rd July 2017

annum for FIT

any location

and the 29th

payment to PV

December 2017 in

systems approved

case of (a) and in

under this FIT

case of (b)

scheme between

the 3rd July 2017

and the 29th

December 2017 in

case of (a) and in

case of (b)

=>1kWp and

6. 72GWh per

Malta Government Gazette — Legal Notice 2017 200 · Gazzetta tal-Gvern ta’ Malta Nru. 19,842 – 04.08.2017 — Photovoltaic Installations) (Amendment No. 4) Regulations, 2017

5 cents per kWh

(a)

<40kWp

annum (4.2MWp)

14.5c cents per

=>40kWp and

12.8GWh per

(b)

<1MWp

annum (8MWp)”;

kWh

(b)

in item 4 thereof, paragraph (a) shall be substituted

by the following new paragraph

B

"(a) approved for the FIT scheme from the 3rd

July 2017 and the 29th December 2017; and".

€0.18