228 tal-2016 - Regolamenti dwar il-Kontroll ta’ Emissjonijiet ta’ Komposti Organiċi Volatili - KOV (Ħażna u Distribuzzjoni ta’ Petrol mit-Terminals lejn Stazzjonijiet ta’ Servizz)
Table of Provisions (18)
Statutory Text (18 Articles)
L.N. 228 of 2016
ENVIRONMENT PROTECTION ACT
(CAP. 549)
Control of Volatile Organic Compound-VOC Emissions
(Storage and Distribution of Petrol from Terminals
to Service Stations) Regulations, 2016
BY VIRTUE of the powers conferred by articles 54 and 55 of
the Environment Protection Act, the Minister for Sustainable
Development, the Environment and Climate Change, after
consultation with the Environment and Resources Authority, has
made the following regulations:-
The title of these regulations is the Control of Volatile
Organic Compound-VOC Emissions (Storage and Distribution of
Petrol from Terminals to Service Stations) Regulations, 2016.
CALCULATION OF THE LOSS OF PETROL
A. Annual fugitive emissions from the storage of petrol at
terminals and from the loading and unloading of mobile containers at
terminals
The operator shall communicate to the competent authority the
estimates of
(a)
the mass of petrol lost from the storage
installations at terminals;
(b)
the mass of petrol lost from the loading and
unloading of mobile containers at terminals; and
(c)
the throughput of the terminal.
In addition
1. These estimates shall be certified by an approved auditor.
2. The procedure used for the estimation of losses mentioned
in paragraphs (a) and (b) above shall be that outlined in Schedule II,
part B.
3. Estimates of the throughput shall be backed up by the
invoices for the purchasing of petrol during the three preceding years.
B. Annual fugitive emissions from the loading of petrol into
storage installations at service stations.
The operator shall communicate to the competent authority the
estimates of
(a)
the mass of petrol lost from loading into storage
installations at service stations; and
(b)
the throughput of the service stations.
In addition
1. These estimates shall be certified by an approved auditor.
2. The procedure used for the estimation of losses mentioned
in paragraph (a) above shall be that outlined in Schedule II, part A.
3. Estimates of the throughput shall be backed up by the
invoices for the purchasing of petrol during the three preceding years.
(1)
For the purpose of these regulations and unless the
context otherwise requires
"approved auditor" means an auditor which has been approved
by the authority competent in approving such persons, who holds a
warrant to practice the profession of an engineer under the
Engineering Profession Act or the equivalent professional
qualification as provided under the Mutual Recognition of
Qualifications Act, who has suitable training, sufficient knowledge
and experience and capability as approved by the competent
authorities to certify that terminals, service stations and road tankers
are compliant with the standards set by the relevant technical
Schedules of these regulations, and who is duly registered with the
joint competent authorities;
"the competent authority" means the Environment and
Resources Authority;
"existing service stations" means service stations granted
development planning consent before the 01 January 2012;
"gantry" means any structure at a terminal at which petrol can
be loaded on to a single road tanker at any one time;
"intermediate storage of vapours" means the intermediate
storage of vapours in a fixed roof tank at a terminal for later transfer
to and recovery at another terminal. The transfer of vapours from one
storage installation to another at a terminal shall not be considered as
intermediate storage of vapour within the meaning of these
regulations;
"loading installation" means any facility at a terminal at which
petrol can be loaded onto mobile containers. Loading installations for
road tankers shall comprise one or more ‘gantries’;
"major refurbishment" means a significant alteration or renewal
of the station infrastructure, particularly tanks and pipes.
"mobile container" means any tank transported by road, rail or
waterways used for the transfer of petrol from one terminal to another
or from terminal to a service station;
"new service stations" means service stations
granted
development planning consent after the 01 January 2012;
"petrol" means any petroleum derivative, with or without
additives, having a Reid Vapour Pressure (RVP) of 27.6 kilopascals or
more, which is intended for use as a fuel for motor vehicles with the
exception of liquefied petroleum gas (LPG);
"petrol vapour capture efficiency" means the amount of petrol
vapour captured by the Stage II petrol vapour recovery system
compared to the amount of petrol vapour that would otherwise be
emitted to the atmosphere in the absence of such a system and
expressed as a percentage;
"Stage II petrol vapour recovery system" means equipment
aimed at recovering the petrol vapour displaced from the fuel tank of
a motor vehicle during refilling at a service station and which
transfers petrol to a storage tank at the service or back to the petrol
dispenser for resale;
"storage installation" means any stationary tank at a terminal
used for the storage of petrol;
"target reference value" means the guideline given for the
overall assessment of the adequacy of technical measures in the
Schedules and is not a limit value against which the performance of
individual installations, terminals and service stations will be
measured;
"terminal" means any facility which is used for the storage and
loading of petrol onto road tankers, rail tankers, or vessels, including
all storage installations on the site of the facility;
"throughput" means the largest total annual quantity of petrol
loaded from a storage installation at a terminal or from a mobile
containers into a service station during the three preceding years;
"vapour recovery unit" means equipment for the recovery of
petrol from vapours including any buffer systems at a terminal;
"vapour" means any gaseous compound which evaporates from
petrol;
"vapour/petrol ratio" means the ratio between the volume at
atmospheric pressure of petrol vapour passing through the Stage II
petrol vapour recovery system and the volume of petrol dispensed;
"vessel" means an inland waterway vessel as defined in Chapter
1 of Directive of the European Parliament and of the Council 2006/
87/EC of the 12th December 2006 laying down technical
requirements for inland waterway vessels and repealing Council
Directive 82/714/EEC;
(2) These regulations transpose European Parliament and
Council Directive 94/63/EC of 20 December 1994 on the control of
volatile organic compound (VOC) emissions resulting from the
storage of petrol and its distribution from terminals to service
stations, Directive 2009/126/EC of the European Parliament and of
the Council of the 21 October 2009 on Stage II petrol vapour recovery
during refuelling of motor vehicles and service stations and
Commission Directive 2014/99/EU of 21 October 2014 amending, for
the purposes of its adaptation to technical progress, Directive 2009/
126/EC on Stage II petrol vapour recovery during refuelling of motor
vehicles and service stations.
(3) These regulations apply to the operations, installations,
vehicles and vessels used for storage, loading and transport of petrol
from one terminal to another or from a terminal to a service station
and to the dispensing of petrol to motor vehicle fuel tanks at service
station.
PROCEDURE TO CALCULATE PETROL LOSSES
A. Calculation of the Mass of petrol lost from the loading of
petrol into the storage installations at service stations.
Mass of petrol lost (kg) =EF Fill x VOL Load x TVP
Where
EF Fill = Emission Factor from table 1, depending on filling
mode.
VOL Load = Volume of product loaded annually (in m 3 )
TVP = True Vapour Pressure of product at loading temperature
(in kPa). If unknown this value can be taken to be equal to 19°C (the
annual average temperature for the Maltese Islands).
Table 1 NMVOC Emission Factors for Loading Mobile
Containers
Filling Mode
Emission Factor
EF Fill
0.0244 x 10 -2
stage 1b in operation
without vapour balancing
0.0011 x 10 -3
stage 1b in operation
with vapour balancing
B. Calculation of the Mass of petrol lost from loading
operations at terminals.
1. Uncontrolled Emissions
Mass emitted (kg) =EF Load x VOL Load x TVP
Where
EF Load =Emission Factor from Table 2, depending on loading
mode.
VOL Load = Volume of product loaded annually (in m 3 )
TVP = True Vapour Pressure of product at loading temperature
(in kPa). If unknown this value can be taken to be equal to 19°C (the
annual average temperature for the Maltese Islands).
Table 2 NMVOC Emission Factors for Loading Mobile
Containers
Loading Mode
Emission Factor
EF Load
8.60 x 10 -3
Road Tanker, Bottom Loading
No Vapour Balancing during Previous Off-
Loading
9.40 x 10 -3
Road Tanker, Top Loading
No Vapour Balancing during Previous Off-
Loading
2.28 x 10 -2
Road Tanker, Bottom or Top Loading
Vapour Balancing during Previous Off-Loading
1.08 x 10 -2
Rail Tanker
6.10 x 10 -3
Marine tanker - typical cargo tank condition
1.17 x 10 -2
Barge - typical cargo tank condition
Emissions Controlled with a Vapour Recovery Unit (VRU)
(a)
VRU Fitted with a continuous emissions monitor
Mass emitted (kg) = 1.00 x 10 3 x MEAS CONC x VOL LOAD x
(1 - 0.01TVP)
Where
MEAS CONC = Measured VRU vent concentration (in g/m 3 )
VOL Load = Volume of product loaded annually (in m 3 )
TVP = True Vapour Pressure of product at loading temperature
(in kPa). If unknown this value can be taken to be equal to 19°C (the
annual average temperature for the Maltese Islands).
(b) VRU of known efficiency
Mass emitted (kg) = Uncontrolled emissions x [1 - (EFF x
Time ON x 1 x 10 -4 )
Where
Uncontrolled emissions is calculated as shown in B part 1.
EFF = Average percentage efficiency of the VRU over the
reporting period.
Time ON = Percentage of the time that the emissions reduction
equipment is operational when required during the reporting period.
C. Calculation of the Mass of petrol lost from storage
installations at terminals. Mass Emitted (kg) = Standing Loss +
Working Loss
1. Standing Loss and Working Loss from a fixed roof storage
tank
Standing Loss (kg) = 48.5 x D 1.73 x H 0.51 x C
Where
D = the diameter of the tank in metres.
H = vertical height of the tank in metres.
C = a coefficient which depends on the colour, according to
Table 3 below.
Tank Colour
Coefficient
C
White
1.00
Aluminium
1.20
Black
1.83
Other
1.6
Working loss (kg) = 0.878 x VOL
Where
VOL = volume of petrol dispensed annually in metres cubed
(m 3 )
2. Standing Loss and Working Loss from a floating roof
storage tank
Standing Loss (kg) = 9.35 x C J x V n x D
Where
C J = a coefficient for the floating roof tank depending on the
nature of the seal, according to Table 3 below.
v = annual average wind speed at the site in km/h. If unknown
this value can be taken to be equal to 17 km/h (the annual average
wind speed for the Maltese Islands).
n = wind coefficient related to the type of seal, according to
Table 4 below.
D = tank diameter in metres.
Table 4 Coefficient for the different floating tank seals (see
Schedule II)
Type of Seal
C J
n
Mechanical-shoe primary seals
primary only
0.52
1.53
With shoe mounted secondary seal
0.48
1.17
With rim-mounted secondary seal
0.13
0.97
Liquid-mounted resilient filled seal
primary only
0.55
1.03
With weather shield
0.45
0.93
With rim-mounted secondary seal
0.51
0.43
Vapour-mounted resilient filled seal
primary only
0.42
2.10
With weather shield
0.37
2.00
With rim-mounted secondary seal
0.09
2.23
Working Loss (kg) = 5.13 x VOL x (MxD -1 )
Where
VOL = volume of petrol dispensed annually in metres cubed
(m 3 )
M = clingage coefficient
M = 0.0015 for light rust;
M = 0.0075 for dense rust;
M = 0.15 for gunite lining;
D = tank diameter in metres.
3. Standing Loss and Working Loss for a tank fitted with an
internal floating deck.
Standing Loss (kg) = 2.85 x [(O.518S + 2.15P)D 2 + (3.28F +
4.57A)D + 134 B]
Where
D = diameter of the reservoir in metres.
F = a coefficient for the seal of the floating deck
F = 6.3 for a vapour-mounted resilient seal;
F = 2.9 for a liquid-mounted resilient seal;
F = 2.4 for a vapour-mounted resilient seal with a rim-
mounted secondary seal;
F = 1.5 for a liquid-mounted resilient seal with a rim-
mounted secondary seal;
S = a coefficient related to the structure of the internal deck,
according to table 4 below;
P = internal deck penneation coefficient, according to Table 4
below;
A and B = coefficients related to the configuration of the tank,
according to Table 5 below.
Table 5 Tank and Deck coefficients
Type of Tank and Deck
S
A
B
P
Tank with pipe columns
Deck welded or bolted in its
0.800
1.000
1.000
0.000
entirety
other type of deck
1.000
1.000
1.000
0.240
Tank without pipe columns
Deck welded or bolted in its
0.274
0.567
0.784
0.000
entirety
other type of deck
0.474
0.587
0.784
0.340
Working Loss (kg) = 5.13 x R x VOL x (M x D -1 )
Where
R = coefficient related to the tank configuration.
R = 1 for a tank without pipe columns;
R = 1 if the tank has pipe columns and D < 40m;
R = 1.1 if the tank has pipe columns and 40m < D < 70m;
R = 1.2 if the tank has pipe columns and D > 70m;
VOL = volume of petrol dispensed annually in metres cubed
(m3)
M = clingage coefficient
M = 0.0015 for light rust;
M =0.0075 for dense rust;
M = 0.15 for gunite lining;
D = tank diameter in metres.
Wherever required the TVP for petrol can be calculated from
TVP = RVP x 10 EXP {[(7.047 x 10 -6 x RVP) + 1.32 x 10 -2 ] x T
+ [(2.311 x 10 -4 x RVP) - 5.236 x 10 -1 ]}
Where
RVP = Reid Vapour Pressure (in kPa)
T = product loading temperature (in degrees Centigrade)
(1)
The operator shall communicate to the competent
authority the information listed in Part A of Schedule I.
(2) Terminals shall not be allowed to store, load and unload
petrol in Malta, unless they are in possession of a permit from the
competent authority.
(3) The competent authority shall not grant a permit to store,
load and unload petrol unless an approved auditor certifies that
(a)
the storage installations at these terminals operate
in accordance with the technical provisions of Schedule IV, in
order to reduce the total annual loss of petrol from the storage
installations of the terminal to below the target reference value
of 0.01% mass by mass (m/ m) of the throughput;
(b)
loading and unloading equipment at terminals is
designed and operated according to the technical provisions of
Schedule V, in order to reduce the total annual loss of petrol
resulting from loading and unloading of mobile containers at
terminals to below the target reference value of 0.005% mass by
mass (m/ m) of the throughput;
(c)
all road tanker loading gantries at the terminal meet
the technical provisions of Schedule VIII.
(4) In order to calculate the mass of petrol lost from the
storage installation at the terminal the procedure outlined by Schedule
II part C shall be used shall be used and wherever relevant reference
shall be made to Schedule III.
(5) In order to calculate the mass of petrol lost from the
loading and unloading of mobile containers at the terminal the
procedure outlined by the relevant parts of Schedule II part B.
(6) Sub-regulation (3)(b) and (c) is not applicable to existing
terminals with a throughput less than 10,000 tons per year.
(7) Mobile containers shall not be loaded with petrol at any
terminal unless the containers have been registered with the
competent authority.
(8) The operator is required to monitor the mean concentration
of vapours in the exhaust from the vapour recovery unit according to
a method which has been approved by the competent authority. The
competent authority will establish whether continuous or
discontinuous measurements will be required. If discontinuous
measurements are employed, at least four measurements per hour
must be made.
(9) The concentration of vapours (corrected for dilution during
treatment) in the exhaust from the vapour recovery unit shall not
exceed the hourly average of 35 g/Nm 3 .
REQUIREMENTS FOR STORAGE INSTALLATIONS AT
TERMINALS
1. The external wall and roof of tanks above ground shall be
painted in a colour with a total radiant heat reflectance of 70% or
more. These operations may be programmed so as to be carried out as
part of the usual maintenance cycles of the tanks within a period of
three years. The competent authority may grant a derogation from this
provision where required for the protection of special landscape areas
which have been designated by national authority. This provision
shall not apply to tanks linked to a vapour recovery unit which
conforms to the requirements set out in Schedule V, point 2.
2. Tanks with external floating roofs shall be equipped with a
primary seal to cover the annular space between the tank wall and the
outer periphery of the floating roof and with a secondary seal fitted
above the primary seal. The seals should be designed to achieve an
overall containment of vapours of 95% or more as compared to a
comparable fixed-roof tank with no vapour-containment controls
(that is a fixed-roof tank with only vacuum/pressure relief valve).
3. All new storage installations at terminals, where vapour
recovery is required according to regulation 3 (see Schedule V) shall
be either
(a)
fixed-roof tanks connected to the vapour recovery
unit in conformity with the requirements of Schedule V; or
(b)
designed with a floating roof, either external or
internal, equipped with primary and secondary seals to meet the
performance requirements set down in point 2.
4. Existing fixed-rooftanks shall either
(a)
be connected to a vapour recovery unit in
conformity with the requirements of Schedule V; or
(b)
have an internal floating roof with a primary seal
which should be designed to achieve an overall containment of
vapours of 90% or more in relation to a comparable fixed-roof
tank with no vapour controls.
5. The requirements for vapour-containment controls
mentioned under points 3 and 4 do not apply to fixed-roof tanks at
terminals, where intermediate storage of vapours is permitted
according to Schedule V, point 1.
(1)
All the mobile containers handling petrol, Requirements
including those retrofitted for bottom loading in accordance with for
containers.
Schedule VIII, shall be registered with the competent authority.
(2) The competent authority shall refuse to register mobile
containers unless an approved auditor certifies that the mobile
(a)
compliant
with
the
technical
provisions
of
Schedule VII; and
(b)
vapour tight and that the mobile container’s
vacuum or pressure valves are vapour tight.
(3) If after unloading of petrol the mobile container is
subsequently used for products other than petrol, in so far as vapour
recovery or intermediate storage of vapours is not possible,
ventilation may, after consultation with and permission from the
Environment and Resources Authority, be allowed in a geographical
area where emissions are unlikely to contribute significantly to
environmental or health problems.
(4) The provisions of sub-regulation (1) shall not apply to
losses of vapours resulting from measuring options using dipsticks in
(a)
existing mobile containers; and
(b)
new mobile containers which came into operation
from 31 December 1995 to the 31 December 1999.
The operator shall communicate to the competent
authority the information listed in Schedule I, part B and the status of
compliance with the provisions of Schedule VI.
(2) The competent authority shall refuse to issue a permit with
(a)
any service station unless an approved auditor
(i) that loading and storage equipment at the
service station is designed and operated in accordance with
the technical provisions of Schedule VI, part A; and
(ii) that this loading and storage equipment is
designed to reduce the total annual loss of petrol resulting
from loading into storage installations at service stations to
below the target reference value of 0.01% of the
throughput mass by mass (m/m);
(b)
all service stations unless an approved auditor
certifies that the service station is compliant with the technical
provisions of Schedule VI part B.
(3) Service stations shall not load petrol into their storage
installations and dispense petrol to a motor vehicle fuel tank unless
they are in possession of a permit from the competent authority.
(4) The provisions of sub-regulation (2)(b) shall apply to
(a)
‘new’ service stations if their actual or intended
throughput exceeds 500 m 3 per annum;
(b)
‘new’ service stations irrespective of their actual or
intended throughput if they are situated under living quarters or
in working areas;
(c)
‘existing’ service stations if they undergo a major
refurbishment and if their actual or intended throughput
exceeds 500 m 3 per annum; or
(i)
(ii) exceeds 100 m 3 per annum if it is situated
under permanent living quarters or working areas;
(d)
‘existing’ service stations having a throughput
exceeding 3000 m 3 per annum by the 31 December 2018.
(5) In order to calculate the mass of petrol lost from the
storage installation at the service station the procedure outlined by
Schedule II, Part A shall be used.
(6) Mobile containers shall not be allowed to unload petrol
into the storage installations at any service station unless they have
been registered with the competent authority.
(7) The provisions of sub-regulations (1), (3) and (5) are not
applicable to service stations with a throughput less than 100m 3 / year.
REQUIREMENTS FOR LOADING AND UNLOADING
INSTALLATIONS AT TERMINALS
1. Displacement vapours from the mobile container being
loaded shall be returned through a vapour-tight connection line to a
vapour recovery unit for regeneration at the terminal.
This provision does not apply to top-loading tankers as long as
that loading system is permitted.
At terminals which load petrol onto vessels, a vapour
incineration unit may be substituted for a vapour recovery unit if
vapour recovery is unsafe or technically impossible because of the
volume of return vapour. The requirements concerning atmospheric
emissions from the vapour recovery unit shall also apply to the
vapour incineration unit. At terminals with a throughput of less than
25000 tonnes/year, intermediate storage of vapours may be
substituted for immediate vapour recovery at the terminal.
2. Measurements of the mean concentration of vapours in the
exhaust from the vapour recovery unit (whether continuous or
discontious as per regulation 3(7)) shall be made over the course of
one full working day (seven hours minimum) of normal throughput.
The overall measurement error due to the equipment used, the
calibration gas and the procedure used shall not exceed 10% of the
measured value. The equipment used shall be capable of measuring
concentrations at least as low as 3g/Nm 3 . The precision shall be at
least 95 of the measured value.
3. The competent authority shall ensure that the connection
lines and pipe installations are checked regularly for leaks.
4. The competent authority shall ensure that loading
operations are shut down at the gantry in the case of a leak of vapour.
Equipment for such shutdown operations shall be installed at the
gantry.
5. Where top-loading of mobile containers is permissible, the
outlet of the loading arm shall be kept near the bottom of the mobile
container, in order to avoid splash loading.
A. REQUIREMENTS FOR LOADING AND STORAGE
INSTALLATIONS AT SERVICE STATIONS AND TERMINALS
WHERE THE INTERMEDIATE STORAGE OF VAPOURS IS
CARRIED OUT
Vapours displaced by the delivery of petrol into storage
installations at service stations and in fixed-roof tanks used for the
intermediate storage of vapours shall be returned through a vapour-
tight connection line to the mobile container delivering the petrol.
Loading operations may not take place unless the arrangements are in
place and properly functioning.
B. ADDITIONAL REQUIREMENTS FOR SERVICE STATIONS
1. Service Stations shall be equipped with a Stage II Petrol
Vapour Recovery system.
2. The efficiency of the Stage II petrol vapour recovery
system shall be equal or greater than 85% as certified by the
manufacturer in accordance with Standard EN16321-1:2013.
3. For petrol vapour recovery systems where the petrol
vapour is transferred to an underground storage tank at the service
station, the vapour/petrol ratio shall be equal to or greater than
(>)0.95 but less or equal to (<) 1.05.
4. The operator shall ensure that the in-service petrol vapour
capture efficiency of the Stage II petrol vapour recovery systems is
tested at least once a year in accordance with Standard EN 16321-
2:2013.
5. If the operator opts to install an automated monitoring
system, the operator shall make sure that the petrol vapour capture
efficiency of the Stage II Petrol Vapour Recovery system is tested at
least once every three years by an approved auditor.
6. The automated monitoring system in paragraph 5 above
shall
(a)
automatically detect faults; in the proper
functioning of the Stage II petrol vapour recovery system and in
the automatic monitoring system itself; and
(b)
indicate faults to the service station operator and
(c)
automatically stop the flow of petrol from the
faulty dispenser if the fault is not rectified within 7 days.
7. When a service station has installed a Stage II petrol
vapour recovery system, the operator shall ensure that a sign, sticker
or other notification informing consumers of this fact is displayed on,
or in the vicinity of the petrol dispenser.
The Environment and Resources Authority or other Responsibility
designated authority responsible for the environment shall be for enforcement.
responsible for the enforcement of these regulations.
REQUIREMENTS FOR MOBILE CONTAINERS
1. The mobile container shall be designed and operated to
retain residual vapours after the petrol is unloaded.
2. The mobile container shall be capable of accepting and
retaining the return vapours when supplying petrol to service stations
and terminals.
3. Excluding releases through pressure valves, the vapours
mentioned in paragraphs 1 and 2 should be retained in the mobile
container until reloading takes place at a terminal.
Any person shall be guilty of an offence under these Offences under
these
regulations if
regulations.
(a)
he fails to comply with any order lawfully given in
terms of any provision of these regulations; or
(b)
he contravenes any restriction, prohibition or
requirement imposed by or under these regulations; or
(c)
he conspires, attempts, aids, or abets, any other
person by whatever means, including advertising, counselling or
procurement to contravene the provisions of these regulations or
to fail to comply with any such provisions, including any order
lawfully given in terms of any of the provision of these
regulations, or to contravene any restriction, prohibition or
requirement imposed by or under the said regulations.
SPECIFICATIONS FOR BOTTOM- LOADING VAPOUR
COLLECTORS AND OVERFILL PROTECTION OF EUROPEAN
ROAD TANKERS
1. Couplings
1.1. The liquid coupler on the loading arm shall be a female
coupler which shall mate with a 4-inch API (101.6 mm) male adapter
located on the vehicle as defined by
-
API Recommended Practice 1004 Seventh Edition,
November 1988.
Bottom loading and vapour recovery for MC-306 tank motor
vehicles (Section 2.1.1.1 - Type of adapter used for bottom loading)
1.2. The vapour-collection coupler on the loading-gantry
vapour-collection hose shall be a cam-and-groove female coupler
which shall mate with a 4-inch (101.6 mm) cam-and-groove male
adapter located on the vehicle as defined by
-
- API Recommended Practice 1004 Seventh Edition
November 1988.
Bottom loading and vapour recovery for MC-306 tank motor
vehicles (Section 4.1.1.2 - Vapour recovery adapter)
2. Loading conditions
2.1. The normal liquid-loading rate shall be 2,300 litres per
minute (maximum 2500 litres per minute) per loading arm.
2.2. When the terminal is operating at peak demand, its loading
gantry vapour collection system, including the vapour recovery unit,
is allowed to generate a maximum counter pressure of 55 millibar on
the vehicle side of the vapour-collection adapter.
2.3. All approved bottom-loading vehicles will carry an
identification plate which specified the maximum permitted number
of loading arms which may be operated simultaneously whilst
ensuring that no vapours are released via the compartment P and V
valves, when the maximum plant back pressure is 55 millibar as
specified in 2.2.
3. Connection of vehicle earth/overfill detection
The loading gantry shall be equipped with an overfill-detection
control unit which, when connected to the vehicle, shall provide a
fail-safe permission signal to enable loading, providing no
compartment overfill sensors detect a high level.
3.1. The vehicle shall be connected to the control unit on the
gantry via a 10-pin industry-standard electrical connector. The male
connector shall be mounted on the vehicle and the female connector
shall be attached to a flying lead connected to the gantry-mounted
control unit.
3.2. The high-level detectors on the vehicle shall either 2-wire
thermistor sensors, 2-wire optical sensors, 5-wire optical sensors or a
compatible equivalent, provided the system is fail-safe. (NB
thermistors shall have a negative temperature coefficient.)
3.3. The gantry control unit shall be suitable for both 2-wire
and 5-wire vehicle systems.
3.4. The vehicle shall be bonded to the gantry via the common
return wire of the overfill sensors, which shall be connected to pin 10
on the male connector via the vehicle chassis. Pin 10 on the female
connector shall connected to the control-unit enclosure which shall
connected to the gantry earth.
3.5. All approved bottom-loading vehicles shall carry an
identification plate (see 2.3) which specifies the type of overfill-
detection sensors installed (i.e. 2-wire or 5-wire).
4. Location of the connections
4.1. The design of the liquid-loading and vapour collection
facilities on the loading gantry shall be based on the following
vehicle-connection envelope.
4.1.1. The height of the centre line of the liquid adapters shall
be: maximum 1.4 metres (unladen); minimum 0.5 metre (laden), the
preferred height being 0.7 to 1.0 metres).
4.1.2. The horizontal spacing of the adapters shall be not less
than 0.25 metres (preferred minimum spacing is 0.3 metres).
4.1.3. All liquid adapters shall be located within an envelope not
exceeding 2.5 metres in length.
4.1.4. The vapour-collection adapter should be located
preferably to the right of the liquid adapters and at a height not
exceeding 1.5 metres (unladen) and not less than 0.5 metres (laden).
4.2. The earth/overfill connector shall be located to the right of
the liquid and vapour-collection adapters and at a height not
exceeding 1.5 metres (unladen) and not less than 0.5 metre (laden).
4.3. The above connections shall be located on one side of the
vehicle only.
5. Safety interlocks
5.1. Earth/Overfill detection Loading shall not be permitted
unless a permissive signal is provided by the combined earth/overfill
control unit.
In the event of an overfill condition or a loss of vehicle earth,
the control unit on the gantry shall close the gantry-loading control
valve.
5.2. Vapour-collection detection Loading shall not be permitted
unless the vapour -collection hose has been connected to the vehicle
and there is a free passage for the displaced vapours to flow from the
vehicle into the plant vapour-collection system.
€1.98
Any person who commits an offence against these
regulations shall, on conviction, be liable
(a)
on a first conviction to a fine (multa) of not less
than one thousand two hundred euro (€1,200) but not exceeding
two thousand three hundred euro (€2,300);
(b)
on a second or subsequent convictions, to a fine
(multa) of not less than two thousand three hundred euro
(€2,300), but not exceeding eleven thousand six hundred euro
(€11,600) or to imprisonment for a term not exceeding two
years, or to both such fine and imprisonment
Provided that whenever any person is found guilty of
committing an offence under these regulations by means of a vehicle,
the owner of the said vehicle, where applicable, shall be held liable in
the same manner and degree
Provided further that the court shall order any person who
has been found guilty of committing an offence against these
regulations to pay for the expenses incurred by the public entities and,
or other persons acting on their behalf involved in the implementation
of these regulations and restitution of the environment as a result of
the said offence, the revocation of any permit issued by the competent
authority and the confiscation of the corpus delicti.
(1)
The provisions of articles 23 and 30(1) of the
Criminal Code shall, mutatis mutandis, apply to proceedings in
respect of offences against these regulations, so however that the
disqualification from holding or obtain a licence, permit or authority
shall in no case be for less than one year.
(2) Notwithstanding the provisions of article 370 of the
Criminal Code, proceedings for an offence against these regulations
shall be taken before the Court of Magistrates (Malta) or the Court of
Magistrates (Gozo), as the case may be, and shall be in accordance
with the provisions of the Criminal Code regulating the procedure
before the said courts as courts of criminal judicature.
(3) Notwithstanding the provisions of the Criminal Code, the
Attorney General shall always have a right of appeal to the Court of
Criminal Appeal from any judgement given by the Court of
Magistrates (Malta) or the Court of Magistrates (Gozo) in respect of
proceedings for any offence against these regulations.
The Control of Volatile Organic Compound-VOC Revocation.
Emissions (Storage and Distribution of Petrol from Terminals to L.N. 54 of 2009.
Service Stations) Regulations, 2009, are hereby revoked without
prejudice to anything done or omitted to be done thereunder.
6 kilopascal jew aktar, li huwa intiż biex jintuża bħala fuel
għall-vetturi bil-mutur, bl-eċċezzjoni tal-gass tal-petroleum
likwefatt (GPL);
"proporzjon ta’ fwar/petrol" tfisser il-proporzjon bejn il-
volum ta’ fwar tal-petrol taħt pressjoni atmosferika li jgħaddi mis-
sistema għall-irkupru tal-fwar tal-petrol tat-tip Fażi II mqassam;
"sistema għall-irkupru tal-fwar tal-petrol tat-tip Fażi II"
tfisser tagħmir immirat għall-irkupru tal-fwar tal-petrol li
jiċċaqlaq mit-tank tal-petrol ta’ vettura waqt li tkun qed timtela
bil-petrol fi stazzjon ta’ servizz u li jittrasferixxi dan il-petrol f’xi
tank tal-ħżin jew inkella lura fil-pompa tal-petrol sabiex jerġa’
jinbiegħ;
"stazzjon ta’ servizz eżisteni" tfisser kull stazzjon ta’ servizz
li ingħata permess tal-ippjanar qabel l-1 ta’ Jannar 2012;
"stazzjon ta’ servizz ġdid" tfisser kull stazzjon ta’ servizz li
ingħata permess tal-ippjanar qabel l-1 ta’ Jannar 2012;
"terminal" tfisser kull faċilità li tintuża għall-ħażna u t-
tagħbija tal-petrol fit-tankers tat-triq, tankers tal-ferrovija, jew
bastimenti, inklużi kull maħżen li jinsab fis-sit tal-faċilità;
"tagħmir għall-irkupru tal-fwar" tfisser tagħmir li jiġbor il-
petrol mill-fwar inklużi kull sistemi ta’ ġibjuni ta’ riserva
f’terminal;
"tagħmir ta’ tagħbija" tfisser kull faċilità f’terminal li
jintuża sabiex il-petrol jitg ħ abba fil- containers mobbli.
Tagħ mir ta’ tagħbija għat-tankers tat-triq jinkludi ukoll wieħed
jew aktar minn gantry wieħed;
"valur ta’ riferenza prospettiv" tfisser linja gwida li tintuża
għall-valutazzjoni ġenerali tal-adegwatezza tal-miżuri tekniċi li
jinsabu fl-Iskedi u m’għandux jitqies bħala valur ta’ limitu li
jintuża sabiex
titkejjel il-prestazzjoni tal-istallazjonijiet
individwali, terminals u stazzjonijiet ta’ servizz;
"volum totali" tfisser l-ogħla ammont totali fis-sena ta’ petrol
li jitgħabba mill-imħażen ġewwa t-terminal jew mill-containers
mobbli għall-imħażen ġewwa l-istazzjoni tal-petrol waqt it-tliet
snin preċedenti.
"xogħol ta’ rinnovament estensiv" tfisser alterazzjoni jew
tiġdid sinifikanti fl-infrastruttura tal-istazzjon tas-servizz, b’mod
partikolari tat-tankijiet u tal-pajpijiet.
(2) Dawn ir-regolamenti jittrasponu d-Direttiva tal-
Parlament Ewropew u tal-Kunsill 94/63/KE tal-20 ta’ Diċembru
1994 dwar il-kontroll ta’ komposti organiċi volatili li jirriżultaw
mill-ħażna tal-petrol u d-distribuzzjoni tiegħu minn terminals
għall-istazzjonijet tas-servizz, id-Direttiva 2009/126/KE tal-
Parlament Ewropew u tal-Kunsill tal-21 ta’ Ottubru 2009 dwar il-
Fażi II tal-irkupru tal-fwar tal-petrol waqt ir-riforniment bil-
karburant tal-vetturi bil-mutur fl-istazzjonijiet ta’ servizz u d-
Direttiva tal-Kummissjoni 2014/99/UE tal-21 ta’ Ottubru 2014 li
temenda, minħabba l-addattament għall-progress tekniku, id-
Direttiva 2009/126/KE dwar il-Fażi II tal-irkupru tal-fwar tal-
petrol waqt ir-riforniment bil-karburant tal-vetturi bil-mutur fl-
istazzjonijiet ta’ servizz.
(3) Dawn ir-regolamenti japplikaw għal operazzjonijiet,
istallazjonijiet, vetturi u bastimenti li jintużaw għat-tagħbija u
trasport tal-petrol minn terminal għall-ieħor jew minn terminal
għall-istazzjonijiet ta’ servizz u għar-riforniment ta’ petrol lil
vetturi bil-mutur fl-istazzjonijiet ta’ servizz.
3. (1)
L-operatur għandu jikkomunika lill-awtorità Rekwiżiti għat-
terminals.
kompetenti l-informazzjoni mniżżla fil-Parti A tal-Iskeda I.
(2) It-terminals mhux ser jitħallew jaħżnu, jgħabbu u jħottu
l-petrol sakemm ma jkollomx permess mill-awtorità kompetenti.
(3) L-awtorità kompetenti mhux ser toħroġ permess għall-
ħażna, tagħbija, u ħatt ta’ petrol fit-terminals sakemm ma jkunux
ċertifikati minn awditur approvat li
(a)
l-imħażen f’dawn it-terminals joperaw skont id-
disposizzjonijiet tekniċi mniżżla fl-Iskeda IV, sabiex it-telf
ta’ petrol minn dawn l-istallazzjonijiet ikun anqas mill-valur
ta’ riferenza prospettiv ta’ 0.01% m/ m tal-volum totali;
(b)
it-tagħmir għat-tagħbija u l-ħatt tal-petrol f’dawn
l-istallazzjonijiet għandu jkun iddisinjat u mħaddem skont id-
disposizzjonijiet tekniċi mniżżla fl-Iskeda V, sabiex it-telf ta’
petrol li jirriżulta mit-tagħbija u l-ħatt tal-petrol ikun anqas
mill-valur ta’ riferenza prospettiv ta’ 0.005% m/m tal-volum
totali;
(ċ)
il-gantries li jgħabbu l-petrol fit-tankers tat-triq
għandhom ikunu konformi mad-disposizzjonijiet tekniċi
mniżżla fl-Iskeda VIII.
(4) Sabiex jiġi kalkolat l-ammont ta’ petrol li jintilef mill-
im ħ a ż en fit- terminals g ħ andha tintu ż a l-pro ċ edura mni żż la
fl- Iskeda II, Parti Ċ u fejn ikun rilevanti għandha ssir riferenza
għall-Iskeda III.
(5) Sabiex jiġi kalkolat l-ammont ta’ petrol li jintilef mit-
tagħbija u mill-ħatt tal-containers fit-terminals għandha tintuża l-
proċedura mniżż la fl-Iskeda II, Parti B.
(6) Is-subregolament (3)(b) u (ċ) ma japplikax għat-
terminals eżistenti b’volum totali ta’ anqas minn 10,000 tunnellata
fis-sena.
(7) Il-containers mobbli ma jistgħux jitgħabbew bil-petrol
minn ebda terminal sa ke m m il - containers m a j k u n u x
irreġistrati mal-awtorità kompetenti.
(8) L-operatur huwa meħtieġ li jissorvelja kontinwament il-
konċentrazzjoni medja ta’ fwar fl-exhaust tat-tagħmir għall-irkupru
tal-fwar skont xi metodu li jkun ġie approvat mill-awtorità
kompetenti. L-awtorità kompetenti tistabbilixxi jekk hemmx bżonn
ta’ kejl kontinwu jew mhux kontinwu. Jekk jintuża kejl mhux
kontinwu, għandhom isiru mill-inqas erba’ kejl fis-siegħa.
(9) Il-konċentrazzjoni ta’ fwar (korretta għad-dilwiment li
jirriżulta mit-trattament) fl-exhaust tal-vapour recovery unit ma
tistax taqbeż il-valur ta’ 35 g/Nm 3 bħala medja għal kull siegħa.
4. (1)
Il-containers mobbli kollha, inklużi dawk li ġew Rekwiżiti għall-
irran ġ ati sabiex ikunu jistg ħ u jitg ħ abbew minn ta ħ t skont id- containers
mobbli.
disposizzjonijiet tekniċi mniżżla fl-Iskeda VIII, għandhom jiġu
rreġistrati mal-awtorità kompetenti.
(2) L-awtorità kompetenti għandha tirrifjuta li tirreġistra l-
containers mobbli sakemm awditur approvat ma jiċċertifikax li l-
container mobbli hu
(a)
skont id-disposizzjonijiet tekniċi tal-Iskeda VII;
u
(b)
vapour tight u li l-vacuum jew il-pressure
valves tal-container mobbli huma ukoll vapour tight.
(3) Jekk wara li jinħatt il-petrol, il-container mobbli
sussegwentement jintuża għall-ġarr ta’ prodotti oħra apparti għall-
petrol, ladarba l-irkupru jew il-ħażna temporanja tal-fwar ma tkunx
possibbli, il-fwar tal-petrol li jkun in ġ emg ħ a f i h j i s t a ’ , wara
konsultazzjoni mal-Awtorità għall-Ambjent u r-Riżorsi u bil-
permess tagħha, jitħalla jagħmel il-ventilazzjoni tat- tankjiet tiegħu
f’żona ġeografika fejn l-emissjonijiet ma jkunux ta’ ħsara għall-
ambjent kif ukoll għas-saħħa tal-bniedem.
(4) Id-disposizzjonijiet
tas-subregolament
(1)
m’għandhomx japplikaw għal xi telf ta’ fwar li jirriżulta waqt li
jkun qed isir xi kejl bid-dipsticks fuq
(a)
containers mobbli eżistenti;
(b)
containers mobbli ġodda li jkunu bdew
jintużaw bejn il-31 ta’ Diċembru 1995 u il-31 ta’ Diċembru
1999.
5. (1)
L-operatur għandu jikkomunika lill-awtorità Rekwiżiti għall-
kompetenti l-informazzjoni mniżżla fl-Iskeda I, Parti B u l-istatus istazzjonijiet
petrol.
ta’ konformità mad-dispożizzjonijiet tal-Iskeda VI.
(2) L-awtorità kompetenti għandha tirrifjuta milli tagħti
permess fir-rigward ta’
(a)
l-istazzjonijiet tal-petrol kollha sakemm awditur
approvat ma jiċċertifikax -
(i) li t-tagħmir ta’ tagħbija u ta’ ħżin bħal dawk
l-istazzjonijiet tal-petrol ikunu ddisinjati u jaħdmu skont
id-disposizzjonijiet tekniċi tat-Taqsima A fl-Iskeda VI;
(ii) li t-tagħmir ta’ tagħbija u ta’ ħżin sar sabiex
jitnaqqas it-telf annwali u totali ta’ petrol li jirriżulta
mit-tagħbija għal stallazzjonijiet ta’ ħażna fl-
istazzjonijiet ta’ servizz taħt il-valur ta’ riferenza
prospettiv ta’ 0.01% tal-volum totali b’massa (m/m);
(b)
l-istazzjonijiet tal-petrol kollha sakemm awditur
approvat ma jiċċertifikax li l-pompa tal-petrol tkun konformi
mad-disposizzjonijiet tekniċi tal-Iskeda VI, Parti B.
(3) L-istazzjonijiet ta’ servizz ma jistgħux jgħabbu l-petrol fl-
imħażen tagħhom jekk ma jkunux irreġistrati mal-awtorità
kompetenti.
(4) Id-disposizzjonijiet tas-subregolament (2)(b) għandhom
japplikaw għal
(a)
l-istazzjonijiet ta’ servizz ‘ġodda’ jekk il-volum
totali attwali jew intenzjonat tagħhom jaqbeż il-500 m 3 fis-
sena;
(b)
l-istazzjonijiet
ta’
servizz
‘ġodda’
irrispettivament mill-volum totali, attwali jew intenzjonat
tagħhom jekk kemm-il darba dawn ikunu jinstabu taħt
kwartieri residenzjali jew f’żoni tax-xogħol;
(ċ)
l-istazzjonijiet ‘eżistenti’ jekk ikun ser isir xi
xogħol ta’ rinnovament estensiv fuqhom u jekk il-volum
totali, attwali jew intenzjonat tagħhom ikun
ogħla minn 500 m 3 fis-sena, jew;
(i)
(ii) ogħla minn 100 m 3 fis-sena, jekk tkun
tinstab taħt kwartieri residenzjali jew f’żoni tax-xogħol;
(d)
l-istazzjonijiet tal-petrol ‘eżistenti’ li jkollhom il-
volum totali li jkun ogħla minn 3000 m 3 sal-31 ta’ Diċembru
2018. (5) Sabiex jiġi kalkolat l-ammont ta’ petrol li jintilef mill-
imħażen fl-istazzjonijiet ta’ servizz għandha tintuża l-
proċedura mniżżla fl-Iskeda II, Parti A.
(6) Il-containers mobbli mhux irreġistrati mal-awtorità
kompetenti m’għandhomx jitħallew iħottu l-petrol fl-imħażen tal-
istazzjonijiet ta’ servizz.
(7) Id-disposizzjonijiet tas-subregolamenti (1), (3) u (5) ma
japplikawx għall-istazzjonijiet ta’ servizz li jkollhom volum
totali ta’ anqas minn 100 m 3 fis-sena.
6. L-Awtorità għall-Ambjent u r-Riżorsi jew awtorità Responsabbiltà
nominata oħra għandha tkun responsabbli għall-infurzar ta’ għall-infurzar.
dawn ir-regolamenti.
7. Persuna tinsab ħatja ta’ reat taħt dawn ir-regolamenti Reati taħt dawn
ir- regolamenti.
jekk
(a)
tonqos milli tħares xi ordni leġittimament
mogħtija skont xi disposizzjoni ta’ dawn ir-regolamenti; jew
(b)
tikser xi restrizzjoni, projbizzjoni jew ħtieġa
imposta minn jew taħt dawn ir-regolamenti; jew
(ċ)
tikkonfoffa, tagħmel attentat, tgħin jew tħajjar,
lil xi persuna oħra b’liema mezz ikun, inkluż ir-reklamar, l-
għoti ta’ pariri jew ħlas ta’ flus biex tikser id-
disposizzjonijiet ta’ dawn ir-regolamenti jew biex tonqos
milli tħares xi disposizzjoni bħal dawk, inkluż kull ordni
mogħti leġittimament skont xi disposizzjoni ta’ dawn ir-
regolamenti, jew biex tikser xi restrizzjoni, projbizzjoni jew
ħtieġa imposta minn jew taħt dawn ir- regolamenti.
8. Min jagħmel reat kontra dawn ir-regolamenti jeħel, Pieni.
meta jinsab ħati
(a)
meta jinsab ħati għall-ewwel darba, multa ta’
mhux anqas minn elf u mitejn euro (€1,200) iżda mhux iżjed
minn elfejn u tliet mitt euro (€2,300);
(b)
meta jinsab ħati għat-tieni darba jew aktar drabi,
multa ta’ mhux anqas minn elfejn u tliet mitt euro (€2,300)
iżda mhux iżjed minn ħdax-il elf u sitt mitt euro (€11,600) jew
priġunerija għal żmien mhux iżjed minn sentejn, jew dik il-
multa u priġunerija flimkien
Iżda kull meta persuna tinsab ħatja li tkun wettqet reat
taħt dawn ir-regolamenti permezz ta’ xi vettura, sid dik il-
vettura għandu meta dan ikun japplika, jinżamm responsabbli
bl-istess mod u grad
Iżda wkoll il-qorti għandha tordna lil kull min ikun
insab ħati li wettaq reat kontra dawn ir-regolament li jħallas
dawk l-ispejjeż li jkunu saru mill-entitajiet pubbliċi u, jew minn
persuni oħra li jkunu involuti flokhom fl-implimentazzjoni ta’
dawn ir-regolamenti u fir-riparazzjoni tal-ambjent bħala riżultat ta’
dak ir-reat, ir-revoka ta’ kull permess maħruġ mill-awtorità
kompetenti u l-konfiska tal-corpus delicti.
9. (1)
Id-disposizzjonijiet tal-artikoli 23 u 30(1) tal-
Kodiċi Kriminali għandhom japplikaw, mutatis mutandis, għal
proċeduri dwar reati kontra dawn ir-regolamenti, b’dan illi l-
iskwalifika milli p e r s u n a j k o l l h a j e w t i k s e b l i ċ e n z a , p e r m e s s
j e w awtorità m’għandha f’ebda każ tkun għal anqas minn sena.
(2) Minkejja d-disposizzjonijiet tal-artikolu 370 tal-Kodiċi
Kriminali, il-proċeduri dwar reat kontra dawn i r -
r e g o l a m e n t i għandhom isiru quddiem il-Qorti tal-Maġistrati
(Malta) jew il-Qorti tal-Ma ġ istrati (G ħ awdex), skont ma jista’
jkun il-ka ż , u għandhom ikunu skont id-disposizzjonijiet tal-
Kodiċi Kriminali li jirregolaw il-pro ċ edura quddiem dawk il-
qrati b ħ ala qrati ta’ ġudikatura kriminali.
(3) Minkejja d-disposizzjonijiet tal-Kodiċi Kriminali, l-
Avukat Ġenerali għandu dejjem ikollu dritt ta’ appell quddiem il-
Qorti tal-Appell Kriminali minn kull sentenza mogħtija mill-
Qorti tal-Maġistrati (Malta) jew mill-Qorti tal-Maġistrati
(Għawdex) dwar proċeduri għal xi reat kontra dawn ir-
regolamenti.
10. Ir-Regolamenti
tal-2009
dwar
il-Kontroll
ta’
Emissjonijiet ta’ Komposti Organiċi Volatili - KOV (Ħażna u
2009. Distribuzzjoni ta’ Petrol mit-Terminals lejn Stazzjonijiet ta’
Servizz) huma b’dan revokati, mingħajr preġudizzju għal dak kollu li
sar jew li naqas milli jsir taħthom.