Photovoltaic Installations) (Amendment No. 2) Regulations, 2015
Table of Provisions (15)
Statutory Text (15 Articles)
L.N. 264 of 2015
REGULATOR FOR ENERGY AND WATER SERVICES ACT
(CAP. 545)
Feed-in Tariffs Scheme (Electricity Generated from Solar
Photovoltaic Installations) (Amendment No. 2) Regulations, 2015
IN exercise of the powers conferred by article 37(1) of the
Regulator for Energy and Water Services Act, the Minister for Energy
and Health, after consultation with the Regulator for Energy and
Water Services, has made the following regulations:-
(1)
The title of these regulations is the Feed-in Tariffs
Scheme (Electricity Generated from Solar Photovoltaic Installations)
(Amendment No. 2) Regulations, 2015, and these regulations shall be
read and construed as one with the Feed-in Tariffs Scheme
(Electricity Generated from Solar Photovoltaic Installations)
Regulations, hereinafter referred to as "the principal regulations".
(2) Paragraph (b) of regulation 12 which substitutes item 4 of
the Second Schedule to the principal regulations shall be deemed to
have come into force on the 13th July 2015.
Regulation 2 of the principal regulations shall be amended
as follows
(a)
immediately after the definition "solar photovoltaic
installation" there shall be added the following new definition
" "start of works" means the earlier of either the
start of construction works relating to the investment, or
the first legally binding commitment to order equipment or
any other commitment that makes the investment
irreversible. Buying land and preparatory works such as
obtaining permits and conducting feasibility studies are not
considered start of works. For take-overs, "start of works"
means the moment of acquiring the assets directly linked
to the acquired establishment;";
(b)
immediately after the definition "submission date"
there shall be added the following new definition
" "undertaking" means any entity engaged in an
economic activity, regardless of its legal status and the way
in which it is financed. For the purposes of this definition
"entity" includes any natural or legal person engaged in the
provision of a good or service on the market;";
(c)
immediately after the new definition "undertaking"
there shall be added the following new definition
" "undertaking in difficulty" means an undertaking
in respect of which at least one of the following
circumstances occurs
(a)
in the case of a limited liability
company (other than an SME that has been in
existence for less than three years or, for the
purposes of eligibility for risk finance aid, an SME
within seven years from its first commercial sale
that qualifies for risk finance investments following
due diligence by the selected financial
intermediary), where more than half of its
subscribed share capital has disappeared as a result
of accumulated losses. This is the case when
deduction of accumulated losses from reserves (and
all other elements generally considered as part of
the own funds of the company) leads to a negative
cumulative amount that exceeds half of the
subscribed share capital. For the purposes of this
provision, "limited liability company" refers in
particular to the types of company mentioned in
Annex I of Directive 2013/34/EU * and "share
capital" includes, where relevant, any share
premium;
(b)
in the case of a company where at least
some members have unlimited liability for the debt
of the company (other than an SME that has been in
existence for less than three years or, for the
purposes of eligibility for risk finance aid, an SME
within seven years from its first commercial sale
that qualifies for risk finance investments following
due diligence by the selected financial
intermediary), where more than half of its capital as
shown in the company accounts has disappeared as
a result of accumulated losses. For the purposes of
* Directive 2013/34/EU of the European Parliament and of the Council of 26 June 2013 on the
annual financial statements, consolidated financial statements and related reports of certain
types of undertakings, amending Directive 2006/43/EC of the European Parliament and of the
Council and repealing Council Directives 78/660/EEC and 83/349/EEC.
this provision, "a company where at least some
members have unlimited liability for the debt of the
company" refers in particular to the types of
company mentioned in Annex II of Directive 2013/
34/EU;
(c)
where the undertaking is subject to
collective insolvency proceedings or fulfils the
criteria under its domestic law for being placed in
collective insolvency proceedings at the request of
its creditors;
(d)
where the undertaking has received
rescue aid and has not yet reimbursed the loan or
terminated the guarantee, or has received
restructuring aid and is still subject to a
restructuring plan;
(e)
in the case of an undertaking that is not
an SME, where, for the past two years
(i) the undertaking’s book debt to
equity ratio has been greater than 7,5 and
(ii) the
undertaking’s
EBITDA
interest coverage ratio has been below 1,0.".
Regulation 3 of the principal regulations shall be
substituted by the following new regulation
"3. (1) These regulations shall apply to solar
photovoltaic installations with a capacity of less than 1000kWp,
insofar as such solar photovoltaic installation is installed either
in a residential or domestic premises or non-residential or
institutional household and which is to be connected to the
distribution system either directly or indirectly with the
appropriate protection and metering equipment
Provided that for the purpose of determining the total
installed solar photovoltaic capacity, installations with the same
premises code shall be considered to be installations with a
common connection point to the electricity grid and the kWp
capacities of such installations shall be considered
cumulatively.
(2)
These regulations shall not apply to
(a)
undertakings
which
are
subject
to
an
outstanding recovery order following a previous European
Commission decision declaring an aid illegal and
incompatible with the internal market;
(b)
undertakings in difficulty,
and undertakings referred to in paragraphs (a) and (b) shall be
precluded from applying and being paid or benefiting from a
feed in tariff under these regulations.".
Regulation 4 of the principal regulations shall be amended Amends
regulation 4 of
as follows
the principal
regulations.
(a) sub-regulation (1) thereof shall be substituted by
the following new sub-regulation
"(1) In the case of a solar photovoltaic installation
commissioned and connected to the distribution system on
a net metering arrangement by means of the appropriate
metering equipment provided by the distribution system
operator prior to the entry into force of these regulations,
the installation operator shall retain existing net metering
arrangements with the distribution system operator and be
paid the spill-off tariff for any electricity generated from
the solar photovoltaic installation and exported to the
distribution system paid prior to the entry into force of
these regulations
Provided that the installation operator shall
not increase the capacity of a solar photovoltaic
installation commissioned and connected to the
distribution system on a net metering arrangement."; and
(b)
sub-regulations (3), (4) and (5) thereof shall be
deleted and sub-regulations (6), (7), (8) and (9) shall be
renumbered as subregulations (3), (4), (5) and (6) respectively.
Regulation 5 of the principal regulations shall be amended Amends
regulation 5 of
as follows
the principal
regulations.
(a)
sub-regulation (1) thereof shall be substituted by
the following new sub-regulation
"(1) The feed-in tariff shall be due from the time
when the solar photovoltaic installation is first connected
to the distribution system as provided in regulation 3 and
produces electricity exclusively from the solar
photovoltaic installation."; and
(b)
sub-regulation (3) thereof shall be deleted and sub-
regulations (4) and (5) shall be renumbered as sub-regulations
(3) and (4) respectively.
Sub-regulation (2) of regulation 7 of the principal
regulations shall be substituted by the following new sub-regulation
The maximum electricity generated by solar
"(2)
photovoltaic installations and exported to the distribution
system established in the Third Schedule shall be composed of
electricity generated and exported to the distribution system by
solar photovoltaic installations approved by the Regulator for
the payment of the feed in tariff during the years for which the
thresholds for electricity generated and exported to the
distribution system has been established.".
In sub-regulation (1) of regulation 9 of the principal
regulations, for the words "regulation 4(7)" there shall be substituted
the words "regulation 4(4)".
Paragraph (b) of regulation 10 of the principal regulations
shall be substituted by the following new paragraph
request the prior approval of the Regulator and of
"(b)
the distribution system operator, in the form and manner they
may reasonably require, if the solar photovoltaic installation is
to be disconnected or transferred, sold or in any form modified
in such a way as to degrade its performance during the period of
guaranteed payment of the feed-in tariff established in terms of
these regulations;".
Regulation 11 of the principal regulations shall be
amended as follows
(a)
immediately after the words "new installation
owner" there shall be added the words ", subject to the prior
approval of the Regulator"; and
(b)
paragraphs (a), (b) and (c) to the proviso thereof
shall be substituted by the following new paragraphs
"(a) the new installation owner shall not be
considered by the distribution system operator and the
Regulator as a new installation operator if such installation
owner is not in compliance with any other law, permit or
any requirement in relation to the solar photovoltaic
installation;
(b) the new installation owner shall inform the
distribution system operator and request the approval of
the Regulator as aforesaid of such change in ownership in
such form and manner as they may establish, together with
any documentary proof and information that they may
establish for such purposes;
(c) the new installation owner takes over all
obligations held by the previous installation operator.".
Sub-regulations (1), (2) and (3) of regulation 12 of the Amends
principal regulations shall be substituted by the following new sub- regulation
the principal
regulations
regulations.
In the case of modifications relevant to the solar
"(1)
photovoltaic installation arising from -
(a) change of use of the premises where the solar
photovoltaic installation is located;
(b)
change of account holder;
(c) transfer of solar photovoltaic installation
from a premises to another different premises with a
different premises code but with same use;
(d) transfer of solar photovoltaic installation
from a premises to another different premises with a
different premises code and with different use;
(e) change of feed-in tariff option from "sell all
electricity generated" to "generate electricity primarily for
own use" or vice versa,
the feed-in tariff shall remain as originally approved by the
Regulator and in accordance with the feed-in tariff scheme in
force during the year when the solar photovoltaic installation
was first approved as a feed-in tariff.
(2)
In the case where an installation operator increases
the generation capacity of a solar photovoltaic installation
which is connected to the distribution system and which
benefits from a FIT, the feed-in tariff to be paid by the
distribution system operator and the period for guaranteed
payment of the feed-in tariff shall remain the same as that
approved by the Regulator and such increased capacity shall not
be eligible for the payment of such feed-in tariff and any
electricity exported above the threshold approved as part of the
feed in tariff shall be paid at the marginal cost.
(3)
The changes listed in sub-regulation (1) shall
become applicable for the payment of the feed-in tariff from the
date of the first meter reading taken after the date of submission
of an application to the distribution system operator to approve
and take the necessary action.
(4)
The change in location of a solar photovoltaic
installation from roof-mounted to ground-mounted or vice
versa, for the purposes of the scheme shall be prohibited and
any such change shall lead to the withdrawal of the feed in
tariff
Provided that this shall apply only when the
applicable feed-in tariff for roof-mounted and ground-mounted
solar photovoltaic installations is not identical.".
The First Schedule to the principal regulations shall be
amended as follows
(a)
item 3 thereof shall be substituted by the following
new item
"3. The solar photovoltaic installation has been
approved by the Regulator for participation in the FIT
scheme during the year for which the applicable feed-in
tariff is established. The submission date of a request to
participate in the FIT scheme shall be considered in the
determination of eligibility for the FIT scheme.";
(b)
item 6 thereof shall be substituted by the following
new item
"6. The solar photovoltaic installation is
commissioned and an application to connect the
installation to the distribution system has been submitted
to the distribution system operator not later than twelve
months from the date of approval of the FIT by the
Regulator.
In the case that the solar photovoltaic installation is
not commissioned and an application to connect the
installation to the distribution system is not submitted to
the distribution system operator within the aforesaid
twelve months, the eligibility for a FIT shall be subject to
the beneficiary of the FIT applying to the Regulator for an
extension, which extension shall be of not more than
twelve months, and which may be granted only once. The
rate of the FIT which would be then applicable shall be
that in force at the time of the submission of the
application for such extension by the beneficiary. The
application for extension shall be made within thirty days
to be reckoned to commence as from the first day
immediately following the end of the aforesaid twelve
month period allowed for the commissioning and submittal
of the application for connection to the distribution
system."; and
(c)
immediately after item 7 thereof there shall be
added the following new items
"8. Without prejudice to any other requirement
under this scheme or any other law, in no case shall the
start of works of the solar photovoltaic installation
commence prior to the submission of an application for a
feed in tariff and the approval of such feed in tariff by the
Regulator.
9. The applicant for a feed in tariff must submit
a written application to the Regulator and receive
allocation of the FIT from the Regulator before start of
works. The application for the feed in tariff shall contain at
least the following information
(a) undertaking’s/applicant’s name and size;
(b) description of the project, including its
start and end dates;
(c) location of the project;
(d) list of project costs;
(e) type of aid and amount of public funding
needed for the project.".
The Second Schedule to the principal regulations shall be Amends the
Second
amended as follows
Schedule to the
principal
regulations.
(a)
item 1 thereof shall be substituted by the following
new item
"1. In the case of electricity generated
exclusively from solar photovoltaic installations -
(a) when an application for the FIT scheme,
meeting all the requirements, was submitted and
approved by the Regulator for the periods of time
referred to in Table A; and
(b) with the type of installation as shown in
Table A, in Malta and Gozo and in accordance with
regulation 3; and
(c) exported to the distribution system up to
an annual threshold calculated as kWp multiplied
by 1600h; and
(d) for a period of guaranteed payment of
feed-in tariff of twenty (20) years;
(e) where an application to benefit the solar
photovoltaic installation with a grant has not been
made or the solar photovoltaic installation has not
benefited from a grant on the initial capital
investment,
the feed-in tariff to be paid by the distribution system
operator to an installation operator for electricity generated
from solar photovoltaic installations and supplied to the
distribution system operator shall be in accordance with
the amounts per kWh, solar photovoltaic installation’s
individual capacity limits and maximum units allocated per
annum for payment of each feed-in tariff as established in
Table A as follows
Table A: Caps and Feed in Tariffs applicable for solar photovoltaic installations
approved under the FIT scheme
Type of
Capacity of
Feed-in Tariffs
Maximum units
Installation
solar
applicable
allocated per
photovoltaic between the 3rd
annum for FIT
installation August 2015 until payment to PV
the 29th January systems approved
under this FIT
scheme between
the 3rd August
2015 and the 29th
January 2016
=>1kWp and
5 cents per
3.2GWh per
(a)
Any installation
<40kWp
kWh
annum (2MWp)
=>40kWp and
6 GWh per
(b)
Any installation
15 cents per kWh
<1MWp
annum (11MWp)
In line with the first-come-first served principle,
the Regulator reserves the right to stop accepting
applications for a feed in tariff if, in its opinion, it has
received sufficient applications which reach the total
maximum units allocated for FIT payment to solar
photovoltaic installations in terms of Table A and
following publication of a notice to that effect in the web-
site of the Regulator.
The receipt of any application by the Regulator,
should not be construed as an acceptance or approval
thereof and does not in any manner whatsoever give rise to
any obligation on the part of the Regulator to allocate a
feed-in tariff to the applicant.
Applications received under previous schemes are
not eligible under the FIT scheme in Table A. Such
applications have to be re-submitted to the Regulator for
approval, if applicable.
The maximum units allocated in Table A for each
FIT scheme do not include units from solar photovoltaic
installations which pursuant to item 6 of the First Schedule
benefit from an extension as provided in that item.";
(b)
item 4 thereof, shall be substituted by the following
new item
"4. In the case of electricity generated
exclusively by solar photovoltaic installations -
(a) approved for the FIT scheme from the
13th July 2015 to the 30th June 2016; and
(b) installed on residential or domestic
premises in accordance with regulation 3; and
(c) exported to the distribution system up to
an annual threshold calculated as kWp multiplied
by 1600h; and
(d) where the installation operator benefits
from a grant of not more than 50% of the initial
capital investment with regard to the solar
photovoltaic installation,
the feed-in tariff to be paid by the distribution system
operator to an installation operator for electricity generated
from solar photovoltaic installations and supplied to the
distribution system operator shall amount to 16.5 cents per
kWh for a period of guaranteed payment of the feed-in
tariff of six (6) years for electricity generated from solar
photovoltaic installations located in Malta and Gozo."; and
(c)
items 5 and 6 thereof shall be deleted.
13. In the Third Schedule to the principal regulations, for the
words "2014 shall amount to 148,000,000 kWh" there shall be
substituted by words "2016 shall amount to 180,000,000 kWh".