Photovoltaic Installations) (Amendment No.2) Regulations, 2014
Table of Provisions (7)
Statutory Text (7 Articles)
L.N. 155 of 2014
MALTA RESOURCES AUTHORITY ACT
(CAP. 423)
Feed-in Tariffs Scheme (Electricity Generated from Solar
Photovoltaic Installations) (Amendment No.2) Regulations, 2014
IN exercise of the powers conferred by article 28(1) of the Malta
Resources Authority Act, the Minister for Energy and Health, after
consultation with the Malta Resources Authority, has made the
following regulations:-
(1)
The title of these regulations is the Feed-in Tariffs Citation and
Scheme (Electricity Generated from Solar Photovoltaic Installations) commencement.
(Amendment No.2) Regulations, 2014, and these regulations shall be
read and construed as one with the Feed-in Tariffs Scheme S.L. 423.46
(Electricity Generated from Solar Photovoltaic Installations)
Regulations, hereinafter referred to as "the principal regulations".
(2) These regulations shall be deemed to have entered into
force on the 1st January 2014.
In regulation 2 of the principal regulations, the definition Amends
regulation 2 of
"Enemalta" shall be substituted by the following new definition
the principal
regulations.
" "Enemalta" or "Corporation" means the
Enemalta Corporation as established by the
Enemalta Act, and any reference made to the
Corporation in these regulations shall be read
and construed as being a reference to
Enemalta
Provided that any reference to Enemalta
shall also be construed as being a reference to
any subsidiary or associate company of
Enemalta, or to any other entity, however so
described, duly authorised in writing by
Enemalta to perform any of the functions that
Enemalta may undertake in accordance under
the Enemalta Act and any other law;".
In item 6 to the First Schedule to the principal regulations Amends the
immediately after the word "commissioned" there shall be added the First
to the principal
words "and an application to connect the installation to the regulations.
distribution system has been submitted to Enemalta".
The Second Schedule to the principal regulations, shall be
amended as follows
(a)
items 1 to 4 thereof shall be substituted by the
following new item
"1. In the case of electricity generated
exclusively from solar photovoltaic installations -
(a) when an application for the FIT
scheme, meeting all the requirements, was
submitted and approved by the Authority for the
periods of time referred to in Table A; and
(b) installed on any type of premises in
Malta and Gozo in accordance with regulation 3;
and
(c) exported to the distribution system up
to an annual threshold calculated as kWp
multiplied by 1600kWh; and
(d) for a period of guaranteed payment of
feed-in tariff of twenty years;
(e)
where an application to benefit the
solar photovoltaic installation with a grant has not
been made or the solar photovoltaic installation has
not benefited from a grant on the initial capital
investment, the feed-in tariff to be paid by
Enemalta to an installation operator for electricity
generated from solar photovoltaic installations and
supplied to Enemalta shall be in accordance with
the amounts per kWh, solar photovoltaic
installation’s individual capacity limits and
maximum units allocated per annum for payment
of each feed-in tariff as established in Table A as
follows
Table A: Caps and Feed-in Tariffs applicable for solar photovoltaic installations approved
under the FIT scheme
Capacity of
Feed-in
Maximum
Feed-in Tariffs
Maximum
solar
Tariffs
units allocated
applicable
units allocated
photovoltaic
applicable
per annum for between the 1 st per annum for
installation
between the
FIT payment
FIT payment
of November
to PV systems
to PV systems
st
1 of May
2014 and the
approved
approved
2014 and the
th
30 April 2015
under
this
FIT
under
st
31 of
scheme
October
between the
between the 1 st
of May 2014
November
st
and the 31 of
2014 and the
October 2014
30 th April
6,400,000 kWh
5 cents per
6,400,000 kWh
5 cents
per annum
kWh
per annum
<40kWp
per kWh
(4MWp)
6,400,000kWh
15 cents per
6,400,000kWh
per annum
kWh
per annum
16.0 cents
=>40kWp
per kWh
(4MWp)
The maximum units allocated in Table A for each
FIT scheme do not include units from solar photovoltaic
installations which pursuant to item 6 of the First Schedule
become non-eligible for feed-in tariffs approved under
previous FIT Schemes. Such units instead shall be
transferred and added from the previous allocation of units
to the maximum amount of units allocated to the FIT
schemes under Table A. This is subject to the submission
of a new application by the applicant to benefit from a
feed-in tariff under Table A for the same amount of units as
originally approved and its subsequent approval."; and
(b)
items 5, 6, 7, 8 and 9 thereof shall be renumbered
as items 2, 3, 4, 5 and 6 respectively.
5. The Third Schedule to the principal regulations shall be Substitutes the
Third Schedule
substituted by the following new schedule
to the principal
regulations.
"THIRD SCHEDULE
(Regulation 7)
Total maximum electricity that may be generated and sold to
Enemalta from solar photovoltaic installations approved to benefit
from the FIT scheme for the years 2010 to 2014 shall amount to
148,000,000 kWh.".
6. In the Fourth Schedule to the principal regulations, for the
words "year 2013" there shall be substituted the words "year 2014".
€0.36