Solar Photovoltaic Installations) Regulations, 2013
Table of Provisions (20)
Statutory Text (20 Articles)
L.N. 253 of 2013
MALTA RESOURCES AUTHORITY ACT
(CAP. 423)
Feed-in Tariffs Scheme (Electricity Generated from
Solar Photovoltaic Installations) Regulations, 2013
IN exercise of the powers conferred by article 28(1) of the Malta
Resources Authority Act, the Minister for Energy and the
Conservation of Water, after consultation with the Malta Resources
Authority, has made the following regulations:-
(1)
The title of these regulations is the Feed-in Tariffs
Scheme (Electricity Generated from Solar Photovoltaic Installations)
Regulations, 2013.
(2) The purpose of these regulations is to establish a feed-in
tariff for electricity generated from solar photovoltaic installations
and hence to promote and support the generation of electricity from
renewable energy sources.
(3) These regulations shall be deemed to have entered into
force on the 1st July 2013.
(Regulations 3, 5, 6)
1. In the case of electricity generated exclusively from solar photovoltaic
installations -
(a)
when an application for the FIT scheme, meeting all the
requirements, was submitted and approved by MRA between the 1st of July
2013 and the 30th September 2013; and
(b)
installed on any type of premises in Malta and Gozo in
accordance with regulation 3; and
(c)
exported to the distribution system up to an annual threshold
calculated as kWp multiplied by 1600kWh; and
(d)
roof-mounted and with an installed capacity of less than 1000
kWp; and
(e)
where an application to benefit the solar photovoltaic
installation with a grant has not been made or the solar photovoltaic
installation has not benefited from a grant on the initial capital investment,
the feed-in tariff to be paid by Enemalta to an installation operator for electricity
generated from solar photovoltaic installations and supplied to Enemalta shall
amount to 17 cents per kWh for a period of guaranteed payment of the feed-in
tariff of 20 years
Provided that the total maximum units of electricity allocated for the
payment of the feed in tariff with regard to applications submitted and approved by
MRA between the 1st of July 2013 and the 30th of September 2013 shall not
exceed 6,400,000kWh (4MWp) per annum.
2. In the case of electricity generated exclusively from solar photovoltaic
installations -
(a)
when an application for the FIT scheme, meeting all the
requirements, was submitted and approved by MRA between the 1st of July
2013 and the 30th September 2013; and
(b)
installed on any type of premises in Malta and Gozo in
accordance with regulation 3; and
(c)
exported to the distribution system up to an annual threshold
calculated as kWp multiplied by 1600kWh; and
(d)
ground-mounted and with an installed capacity of less than
1000kWp; and
(e)
where an application to benefit the solar photovoltaic
installation with a grant has not been made or the solar photovoltaic
installation has not benefited from a grant on the initial capital investment,
the feed-in tariff to be paid by Enemalta to an installation operator for electricity
generated from solar photovoltaic installations and supplied to Enemalta shall
amount to 16 cents per kWh for a period of guaranteed payment of the feed-in
tariff of 20 years
Provided that the total maximum units of electricity allocated for the
payment of the feed in tariff with regard to applications submitted and approved by
MRA between the 1st of July 2013 and the 30th of September 2013 shall not
exceed 6,400,000kWh (4MWp) per annum.
3. In the case of electricity generated exclusively by solar photovoltaic
installations -
(a)
when an application for the FIT scheme, meeting all the
requirements, was submitted and approved by MRA between the 1st of July
2013 and the 30th September 2013; and
(b)
installed on any type of premises in Malta and Gozo in
accordance with regulation 3; and
(c)
exported to the distribution system up to an annual threshold
calculated as kWp multiplied by 1600kWh; and
(d)
roof-mounted and with an installed capacity of 1000 kWp or
more; and
(e)
where an application to benefit the solar photovoltaic
installation with a grant has not been made or the solar photovoltaic
installation has not benefited from a grant on the initial capital investment,
the feed-in tariff to be paid by Enemalta to an installation operator for electricity
generated from solar photovoltaic installations and supplied to Enemalta shall
amount to 16 cents per kWh for a period of guaranteed payment of the feed-in
tariff of 20 years
Provided that the total maximum units of electricity allocated for the
payment of the feed in tariff with regard to applications submitted and approved by
MRA between the 1st of July 2013 and the 30th of September 2013 shall not
exceed 6,400,000kWh (4MWp) per annum.
4. In the case of electricity generated exclusively by solar photovoltaic
installations -
(a)
when an application for the FIT scheme, meeting all the
requirements, was submitted and approved by MRA between the 1st of July
2013 and the 30th of September 2013; and
(b)
installed on any type of premises in Malta and Gozo in
accordance with regulation 3; and
(c)
exported to the distribution system up to an annual threshold
calculated as kWp multiplied by 1600kWh; and
(d)
ground-mounted and with an installed capacity of 1000 kWp or
more; and
(e)
where an application to benefit the solar photovoltaic
installation with a grant has not been made or the solar photovoltaic
installation has not benefited from a grant on the initial capital investment,
the feed-in tariff to be paid by Enemalta to an installation operator for electricity
generated from solar photovoltaic installations and supplied to Enemalta shall
amount to 15.5 cents per kWh for a period of guaranteed payment of the feed-in
tariff of 20 years
Provided that the total maximum units of electricity allocated for the
payment of the feed in tariff with regard to applications submitted and approved by
MRA between the 1st of July 2013 and the 30th of September 2013 shall not
exceed 6,400,000kWh (4MWp) per annum.
5. For the purposes of the First Schedule and this Schedule, "kWp" shall
mean the total DC peak power of an array or arrays of photovoltaic modules as
specified in the notification or authorisation application submitted to the Authority
for its approval under the Electricity Market Regulations (S.L. 423.22).
6. Electricity sold to Enemalta and measured in kVAh shall be paid at the
applicable feed-in tariff as that applied for electricity sold to Enemalta and
measured in kWh.
7. In the case of electricity generated exclusively by solar photovoltaic
installations -
(a)
approved for the FIT scheme for the year 2013; and
(b)
installed on residential or domestic premises in accordance with
regulation 3; and
(c)
exported to the distribution system up to an annual threshold
calculated as kWp multiplied by 1600kWh; and
(d)
where the installation operator benefits from a grant of not more
than 50% of the initial capital investment with regard to the solar
photovoltaic installation,
the feed-in tariff to be paid by Enemalta to an installation operator for electricity
generated from solar photovoltaic installations approved for the FIT scheme for
the year 2013 and installed on residential or domestic premises shall amount to
twenty-two cents per kWh for a period of guaranteed payment of the feed-in tariff
of six years for electricity generated from solar photovoltaic installations located
in Malta and Gozo.
(1)
Unless otherwise stated in these regulations, the
definitions in the Act shall apply.
(2) In these regulations, unless the context otherwise requires
"the Act" means the Malta Resources Authority Act;
"annual threshold" means the cap in kWh or kVAh for the
payment of the feed-in tariff for the period of time commencing on
the 1st January and ending on the 31st December of each year;
"the Authority" means the Malta Resources Authority as
established by the Act;
"change of use of premises" means the change in the
classification of a premises in terms of these regulations whether
domestic or residential or non-residential or institutional household;
"commissioned" means the first time a solar photovoltaic
installation is put into operation, following the establishment of
operational readiness;
"DC" means direct current;
"distribution" means the transport of electricity on high voltage,
medium voltage and low voltage distribution systems with a view to
its delivery to consumers, but not including supply;
"distribution system" means all the interconnected technical
facilities used for conveying electricity to final customers;
"domestic premises" means premises which include private
dwellings with no persons registered with Enemalta as residing in
them such as second homes, or private garages and common areas
including roofs, stairs, terraces, gardens to buildings which are used
solely for private dwellings;
"Enemalta" or "the Corporation” means the Enemalta
Corporation established by the Enemalta Corporation Act;
"FIT" means feed-in tariff;
"FIT scheme" means the annual scheme whereby a specific
amount of electricity generated by eligible solar photovoltaic
installations and exported to the distribution system are paid a feed-
in tariff as established in terms of these regulations;
"generation" means the production of electricity;
"ground-mounted" means installed on a supporting structure
directly above ground, or integrated or fixed to a structure, such as a
tent, greenhouse, glasshouse, canopy or other similar structure but
does not include any structure installed on the roof of a building;
"installation operator"
means
the
owner
of
the
solar
photovoltaic installation;
"institutional households" shall include the following premises
(a)
healthcare institutions such as premises used as a
hospital, nursing home or as any institution providing medical
or nursing care;
(b)
institutions for retired, elderly or disabled persons,
including premises used as a home for the retired or elderly
persons or persons with any disability;
(c)
educational institutions including premises used as
a boarding school or for similar purposes;
(d)
care institutions including premises used as
orphanages, shelter homes, open centres for refugees or for
similar purposes;
(e)
religious institutions including premises used as
convents, retreat houses, or for similar purposes;
(f)
military institutions such as military barracks;
(g)
other institutions including premises used as
boarding houses, penal or correctional facilities or for similar
purposes;
"kVAh" means kilo Volt Ampere hour; "kW" means kilo Watt;
"kWh" means kilo Watt hours;
"marginal cost per unit" means the additional cost of producing
one more unit as prescribed in the Fourth Schedule;
"metering equipment" means the electricity meters provided by
Enemalta including smart meters, any voltage and current
transformers and any other associated equipment and wiring required
to measure the quantity of electricity supplied or exported;
"the Minister" means the Minister responsible for resources;
"net metering arrangement" means the arrangement in place
prior to the entry into force of these regulations where the units
exported to the grid are deducted from the units imported from the
distribution system for the calculation of the electricity bill;
"non-residential premises" means a building or plot of land
which is used wholly or mainly for the purpose of conducting an
economic activity, but does not include any building such as private
garages or common areas to buildings which are used solely as
private dwellings;
"operational readiness" means the capability to function in
accordance with design and specifications;
"period of guaranteed payment of the feed-in tariff" means the
period of time over which the feed-in tariff for all electricity
generated from a solar photovoltaic installation is guaranteed;
"renewable energy sources" means renewable non-fossil energy
sources, that is, wind, solar, geothermal, wave, tidal, hydropower,
biomass, landfill gas, sewage treatment plant gas and biogases;
"residential premises" means any premises used solely and
regularly as a private dwelling where at least one person resides but
does not include institutional households;
"roof-mounted" means installed on the roof of a building and for
the purposes of this definition "roof" shall also include a supporting
structure permanently installed or attached to the roof of a building,
but which shall exclude any supporting structure integrated or fixed
to a structure, such as tent, canopies or other similar structures when
installed ground-mounted;
"scheduled" means in accordance with the scheduled program of
ARMS Limited for the taking of periodic electricity meter readings;
"smart meters" shall have the same meaning as in the Electricity S.L.423.01
Supply Regulations;
"spill-off tariff" means the tariff to be paid for every unit
generated by the installation operator in excess of own consumption
and exported to the distribution system from a solar photovoltaic
installation when the billing is done on a net metering arrangement;
"solar photovoltaic installation" means a solar photovoltaic
system that generates electricity exclusively from solar radiation and
consisting of all accessories including
(a)
an array or arrays of photovoltaic modules that
collect and absorb sunlight for conversion into electricity;
(b)
an inverter or inverters;
(c)
associated balance of system components,
including wiring, conduits, switchgear, protection equipment,
ancillary equipment and any other part of the installation
necessary for the production and conveyance of electricity up to
the metering equipment supplied by Enemalta, after the said
solar photovoltaic installation has been approved by the
Authority as meeting the applicable criteria specified in the First
Schedule;
"submission date" means, in the case of a solar photovoltaic
installation mentioned in regulation 4(1), the date on which the
request to participate in the FIT scheme is received by the Authority
and, in the case of a solar photovoltaic installation mentioned in
regulation 4(2), the date when a notification or an application for an
authorisation to construct a solar photovoltaic installation, as the case
may be, is received by the Authority together with the request to
participate in the FIT scheme.
(Regulation 7)
Total maximum electricity that may be generated and sold to Enemalta from
solar photovoltaic installations approved to benefit from the FIT scheme in the
specific year shall be
12,000,000kWh
24,000,000 kWh plus any unallocated units remaining from 2010
any unallocated units remaining from 2011
56,000,000 plus any unallocated units remaining from 2012
56,000,000 plus any unallocated units remaining from 2013
These regulations shall apply to any solar photovoltaic
installation which generates electricity exclusively using solar
photovoltaic panels and insofar as such solar photovoltaic installation
is installed either in a residential or domestic premises or non-
residential or institutional household and is connected to the
distribution system either directly or indirectly with the appropriate
protection and metering equipment
Provided that these regulations shall not apply to
installation operators who are proposed to benefit from a project
specific feed-in tariff agreement, or have benefitted from any other
arrangement approved by the Authority.
(Regulations 6, 9)
Electricity rate per kWh applicable for electricity generated by the solar
photovoltaic installation and exported to the distribution system after the expiry of
the period of guaranteed payment of the feed in tariff or where the thresholds for
the eligibility of the FIT are exceeded.
The electricity rate per kWh referred to in regulations 6 and 9 that shall be
paid by Enemalta to the installation operator for any electricity generated by the
solar photovoltaic installation and exported to the distribution system for each year
after period of guaranteed payment of the feed-in tariff referred to in the Second
Schedule or at any time when in excess of the thresholds defined in the Second
Schedule shall amount to the marginal cost per unit of electricity incurred by
Enemalta for the particular year as approved by the Authority.
The Authority may define which cost items may be considered in the
determination of the marginal cost per unit of electricity incurred by Enemalta.
The marginal cost per unit for the year 2013 shall be of eleven cents (€0.11)
per kWh.
€1.71
(1)
In the case of a solar photovoltaic installation
commissioned and connected to the distribution system on a net
metering arrangement by means of the appropriate metering
equipment provided by Enemalta prior to the entry into force of these
regulations, the installation operator may opt either to
(a)
retain existing net metering arrangements with
Enemalta and be paid the spill-off tariff for any electricity
generated from the solar photovoltaic installation and exported
to the distribution system paid prior to the entry into force of
these regulations
Provided that the installation operator may not
avail himself of this option when an undertaking with Enemalta
existing prior to the entry into force of these regulations requires
him to switch over from existing net metering arrangements to a
feed-in tariff arrangement once this is established; or
(b)
request the Authority
(i) either to sell all electricity generated by the
solar photovoltaic installation to Enemalta in accordance
with regulation 6, or
(ii) to generate electricity primarily for own
consumption in the premises where the photovoltaic
installation is located and to be paid the feed-in tariff in
accordance with regulation 6 for any excess electricity
generated and exported to the distribution system.
(2) In the case of any solar photovoltaic installation
commissioned after the entry into force of these regulations and
satisfying the eligibility criteria established in the First Schedule, the
installation operator may
(a)
either sell all electricity generated by the solar
photovoltaic installation to Enemalta in accordance with
regulation 6; or
(b)
or generate electricity primarily for own
consumption in the premises where the solar photovoltaic
installation is located and be paid the feed-in tariff in
accordance with regulation 6 for any excess electricity
generated and exported to the distribution system.
(3) Where an installation operator referred to in sub-regulation
(1) opts for either of the options in sub-regulation (1)(b), such
installation operator will not be permitted to revert to the net metering
arrangements provided in sub-regulation (1)(a).
(4) Any expenses incurred by the installation operator for the
reversion from the existing net metering arrangements to the
arrangements in sub-regulation (1)(b) shall be borne by the
installation operator.
(5) Notwithstanding the provisions of sub-regulation (1)(a), an
installation operator whose solar photovoltaic installation has been
installed prior to the entry into force of these regulations, may not
retain existing net metering arrangements if the capacity of the solar
photovoltaic installation is increased after the entry into force of these
regulations.
(6) The installation operator shall not be eligible for the feed-
in tariff unless the solar photovoltaic installation is compliant with the
eligibility criteria established by the First Schedule and he obtains the
necessary authorisations, licences or permits from the relevant
competent authorities and Enemalta.
(7) In the case where the installation operator opts to utilise
the electricity generated by the solar photovoltaic installation,
Enemalta shall install metering equipment to measure all the
electricity generated by the solar photovoltaic installation in addition
to the import/export metering equipment.
(8) The electricity generated from different installations
within the same premises shall be separately metered when those
installations generate such electricity from different renewable energy
sources.
(9) For the purposes of these regulations, the installation
operator generating electricity from renewable energy sources in the
same premises may opt either to export all the electricity generated at
the applicable feed in tariff as the case may be for each type of
renewable energy source as separately metered, or to generate
electricity primarily for own use and to export the surplus at the
lowest of the applicable feed-in tariffs payable for the electricity
generated and exported to the distribution system from renewable
energy sources.
(Regolamenti 6, 9)
Ir-rata tal-elettriku għal kull kWh applikabbli għall-elettriku ġenerat mill-
istallazzjoni fotovoltajka tax-xemx u esportat lejn is-sistema tad-distribuzzjoni
wara li jiskadi l-perjodu tal-ħlas garantit tat-tariffa feed-in jew meta jinqabżu l-
limiti bażiċi permessi għall-eliġibbiltà taħt l-iskema FIT.
Ir-rata tal-elettriku għal kull kWh imsemmija fir-regolamenti 6 u 9 li għandha
titħallas mill-Enemalta lill-operatur ta’ stallazzjoni għal kull elettriku ġenerat mill-
istallazzjoni fotovoltajka tax-xemx u esportat lejn is-sistema tad-distribuzzjoni
għal kull sena wara l-perjodu tal-ħlas garantit tat-tariffa feed-in imsemmija fit-
Tieni Skeda jew f’kull waqt meta jinqabżu l-limiti bażiċi massimi mniżżla fit-Tieni
Skeda għandha tammonta għall-ispiża marġinali għal kull unità ta’ elettriku li
għandha ġġorr l-Enemalta għas-sena partikolari kif approvat mill-Awtorità.
L-Awtorità tista’ tiddefinixxi liema spejjeż għandhom jitqiesu biex tiġi
stabbilita l-ispiża marġinali għal kull unità ta’ elettriku li tagħmel tajjeb għaliha l-
Enemalta.
L-ispiża marġinali għal kull unità għas-sena 2013 tkun ta’ ħdax-il ċenteżmu
(€0.11) għal kull kWh.
(1)
The feed-in tariffs shall be due from the time when
the solar photovoltaic installation is first connected to the distribution
system as provided in regulation 3 and produces electricity
exclusively from the solar photovoltaic installation and, or for those
solar photovoltaic installations commissioned prior to the entry into
force of these regulations and where the installation operator has
opted for either of the arrangements in accordance with regulation
4(1)(b), from the date of the necessary modifications to the
installation connection effected by Enemalta which would permit the
arrangements in regulation 4(1)(b).
(2) The feed-in tariffs shall be paid for the period of
guaranteed payment of the feed-in tariff referred to in the Second
Schedule depending upon the applicable solar photovoltaic
installation’s location and the type of premises wherein it is installed.
(3) In the case of solar photovoltaic installations
commissioned prior to the entry into force of these regulations and
where the installation operator opts to sell all electricity generated
from the solar photovoltaic installation to Enemalta in accordance
with the provisions of regulation 4(1)(b), the period of guaranteed
payment of the feed in tariff referred to in the Second Schedule shall
include the period of time during which the installation operator has
already benefited from net metering and spill off tariff arrangements
prior to the entry into force of these regulations
Provided that in the case where the installation operator
expands the existing capacity of the solar photovoltaic installation,
the period of guaranteed payment of the feed-in tariff applicable for
the entire installation after such expansion shall be considered as
commencing from the date of installation of the metering equipment
by Enemalta to enable the net metering arrangement for the original
installation.
(4) Where any person replaces or increases the capacity of the
solar photovoltaic installation in whole or in part, the installation
operator shall not be entitled to the re-commencement or extension of
the period of guaranteed payment of the feed-in tariff
Provided that the same terms and conditions applicable for
that period of guaranteed payment of the feed-in tariff shall subsist.
(5) The feed-in tariff shall only be applicable up to the extent
of and for the total amount of electricity exported to the distribution
system by the solar photovoltaic installation as approved by the
Authority and as measured by the Enemalta metering equipment.
The feed-in tariff to be paid by Enemalta to installation Feed-in tariff.
operators for electricity generated by solar photovoltaic installations
in accordance with regulation 3 shall be as established in the Second
Schedule. The feed-in tariffs shall be deemed to be inclusive of any
compensation for loss of revenue arising from any planned and
unplanned interruption which impedes the export of electricity from
the solar photovoltaic installation to the distribution system
Provided that any electricity generated by the solar
photovoltaic installations and exported to the distribution system in
excess of the thresholds established in the Second Schedule shall be
paid at the applicable electricity rate as established in the Fourth
Schedule
Provided further that in the case where the installation
operator benefits or has benefited from a grant of more than 50% of
the initial capital investment with regard to the solar photovoltaic
installation, the feed-in tariff that shall be paid by Enemalta shall
decrease by €0.002 per kWh for every 1% exceeding the
aforementioned 50% of the initial capital investment received as part
of the grant
Provided also that the feed in tariff shall not be less than
the marginal cost per unit incurred by Enemalta as established in the
Fourth Schedule.
(1)
The total maximum electricity generated by solar Maximum
photovoltaic installations and exported to the distribution system electricity
exported in FIT
which shall be eligible to be paid the feed-in tariff for each annual scheme.
FIT scheme and after the entry into force of these regulations shall be
that established in the Third Schedule.
(2) The maximum electricity generated by solar photovoltaic
installations and exported to the distribution system established in the
Third Schedule shall be composed of electricity generated and
exported to the distribution system by
(a)
solar photovoltaic installations approved by the
Authority during the year for which the thresholds for electricity
generated and exported to the distribution has been established;
and
(b
solar photovoltaic installations approved by the
Authority, commissioned prior to the entry into force of these
regulations, and where the installation operators during the year
in which the thresholds for electricity generated and exported to
the distribution has been established have opted for either of the
options in regulation 4(1)(b).
(1)
Enemalta may set off amounts due by an
installation operator for the supply of electricity against amounts due
to the installation operator for the exporting of electricity under these
regulations
Provided that such setting off shall only be permissible
where the claims are undisputed or are certain, liquidated and due
Provided further that in the case of solar photovoltaic
installations with an installed capacity of more than 100kWp, such
set-off shall only apply by agreement of both Enemalta and the
installation operator.
(2) Where a set-off arrangement between the installation
operator and Enemalta is in place and the amounts due to the
installation operator for the exporting of electricity referred to in sub-
regulation (1) are in excess of the amounts due by an installation
operator for the supply of electricity by Enemalta, the Corporation
shall credit the installation operator the balance due by means of a
credit note
Provided that the installation operator may request to be
paid the balance due by means of such credit note after four
consecutive scheduled billing periods for the supply of electricity by
Enemalta to the installation operator have elapsed.
(3) Where the installation capacity is larger than 100kWp and
no set-off agreement exists between the installation operator and
Enemalta and the amounts due to the installation operator for the
exporting of electricity are in excess of the amounts due by an
installation operator for the supply of electricity by Enemalta, the
Corporation shall credit the installation operator the balance due,
which shall be paid to the installation operator within sixty days from
the scheduled reading of the metering equipment
Provided that Enemalta shall carry out the reading of the
metering equipment within intervals of at least two months, to be
reckoned as from the date of the first reading of the metering
equipment.
(1)
Following the expiry of the period of guaranteed Sale of
payment of the feed-in tariff, the installation operator may opt and by electricity
the expiry of the
written notice to Enemalta request the Corporation to effect the period
guaranteed
necessary modification to the solar photovoltaic installation payment of the
connection to the distribution system to enable the installation feed-in tariff.
operator to utilise the electricity generated from the solar photovoltaic
installation for his own use within his premises and to be
compensated for any exported electricity at the applicable rate for
such electricity at the time as provided in the Fourth Schedule and
subject to regulation 4(7)
Provided that Enemalta shall accede to the installation
operator’s request after effecting the necessary modifications to the
solar photovoltaic installation connection to the distribution system.
(2) Any installation operator who opts for such arrangements
as established in sub-regulation (1) shall bear the costs of any
modifications necessary including those related to the metering and
connection required by Enemalta.
(3) Where the installation operator does not inform Enemalta
to effect the necessary modification to the solar photovoltaic
installation connection as provided in sub-regulation (1), Enemalta
shall continue to purchase all the electricity generated by the solar
photovoltaic installation and exported to the distribution system, and
shall reimburse the installation operator for such electricity at the rate
established in the Fourth Schedule.
Installation operators shall
Obligations of
installation
operators.
(a)
submit such information as the Authority may
reasonably require;
(b)
inform the Authority and Enemalta, in the form and
manner they may reasonable require, if the solar photovoltaic
installation is disconnected or transferred, sold or in any form
modified in such a way as to degrade its performance during the
period of guaranteed payment of the feed-in tariff established in
terms of these regulations;
(c)
comply at all times with the provisions of the
applicable legislation, notification, authorisation, licence
conditions and Network Code as approved by the Authority;
(d)
make available to Enemalta and to the Authority
data required to be recorded for the purposes of these
regulations.
Where an installation operator is deceased, or by reason of
any other act or event, permanently ceases to be the installation
operator, payment of the feed-in tariffs for electricity generated by
solar photovoltaic installation under these regulations for the
remaining period of guaranteed payment of the feed-in tariff may be
transferable to the new installation owner
Provided that
(a)
the new installation operator informs Enemalta and
the Authority of such change in ownership in such form and
manner as they may establish, together with any documentary
proof and information that they may establish for such
purposes;
(b)
the new installation operator takes over all
obligations held by the previous installation operator;
(c)
such person shall not be considered by Enemalta
and the Authority as a new installation operator if such
installation operator is not in compliance with any other law,
permit or any requirement in relation to the solar photovoltaic
installation.
(1)
In the case of modifications relevant to the solar
photovoltaic installation arising from -
(a)
change of use of the premises where the solar
photovoltaic installation is located;
(b)
change of account holder;
(c)
transfer of solar photovoltaic installation to another
different premises with same use;
(d)
transfer of solar photovoltaic installation to another
different premises with different use;
(e)
change of feed-in tariff option from "sell all
electricity generated" to "generate electricity primarily for own
use" or vice versa;
(f)
change in location of solar photovoltaic installation
from roof-mounted to ground-mounted or vice versa in the case
of solar photovoltaic installations benefitting from the feed-in
tariffs in items 1 to 4 of the Second Schedule,
the feed-in tariff shall change as applicable and in accordance with
the feed-in tariff scheme in force during the year when the solar
photovoltaic installation was first approved a feed-in tariff
Provided that when the change occurs during the period of
guaranteed payment of the feed-in tariff, such period shall include the
time for which the installation operator has already benefited from a
feed in-tariff.
(2) Subject to the satisfaction of the eligibility criteria
established in the First Schedule, in the case where an installation
operator increases the generation capacity of a solar photovoltaic
installation which is connected to the distribution system, the feed-in
tariff to be paid by Enemalta and the period for guaranteed payment
of the feed-in tariff shall be that which is applicable during the year
when such increased capacity is notified to or when an application is
submitted to the Authority for an authorisation to construct such
increased capacity, and such feed-in tariff shall be payable in respect
of the whole solar photovoltaic installation as increased in capacity
Provided that in such cases the period for guaranteed
payment of the feed-in tariff shall include the time for which the
installation operator has already benefited from a feed in-tariff
Provided further that where the installation operator has
benefited from a grant on any part of the solar photovoltaic
installation, the whole solar photovoltaic installation shall be deemed
as benefitting from the grant for the purpose of determining the feed-
in tariff applicable for the whole solar photovoltaic installation.
(3) The changes listed in sub-regulations (1) and (2) shall
become applicable for the payment of the feed-in tariff from the date
of the first meter reading taken after the date of submission of an
application to Enemalta to approve and take the necessary action
Provided that during the first year of applicability for the
payment of the feed-in tariff the change shall be taken into
consideration on a pro rata basis.
Installation operators shall not be entitled to any tradable Tradeable green
green certificate for electricity generated from the solar photovoltaic certificates.
installation and for which the feed-in tariff is paid or for which the
installation operator enjoys a net metering arrangement with a spill-
off tariff or benefits from any of the arrangements provided in
regulation 9.
The provisions dealing with access, inspection,
modification or tampering of meters found in the Electricity Supply
Regulations shall mutatis mutandis apply to solar photovoltaic
installation operators in the same manner as provided for in those
regulations.
(1)
The Feed-in Tariffs (Electricity Generated from
Solar Photovoltaic Installations) Regulations, 2010 (hereinafter
referred to as "the revoked regulations") are hereby revoked without
prejudice to anything done, or omitted to be done thereunder.
(2) On the coming into force of these regulations, any
2010. reference, in any legislation, to the revoked regulations shall be
construed as a reference to these regulations.
2010. FIRST SCHEDULE
(Regulation 4)
Eligibility Criteria to participate in FIT scheme
Eligibility Criteria
The electricity generated by a solar photovoltaic installation and exported to
the distribution system is eligible to be paid at the established feed-in tariff rate
determined by these regulations subject to the following criteria being satisfied
1. The electricity is exclusively generated using solar radiation from solar
photovoltaic installations which are approved by the Authority.
2. The electricity generated by the solar photovoltaic installation and
exported to the distribution system is within the thresholds specified in the Second
Schedule.
3. The solar photovoltaic installation has been approved by the Authority
for participation in the FIT scheme during the year for which the applicable feed-in
tariff is established. In the case of a solar photovoltaic installation mentioned in
regulation 4(1), the submission date of a request to participate in the FIT scheme
shall be considered in the determination of eligibility for the FIT scheme. In the
case of a solar photovoltaic installation mentioned in regulation 4(2), the
submission date of the notification or application for authorisation (as applicable)
together with the request to participate in the FIT scheme, shall be considered in
the determination of eligibility for the FIT scheme.
4. A solar photovoltaic installation shall be considered as eligible for
participation in the FIT scheme if the amount proposed for export to the
distribution system may be accommodated within the total maximum of electricity
generated by solar photovoltaic installations eligible to benefit from the FIT
scheme for the applicable year as determined in regulation 7 and in the Third
Schedule. Participation to the FIT scheme shall be determined on a first-come
first-served basis and each kWp installed shall be attributed a generation of
1600kWh.
5. The solar photovoltaic installation is notified to or authorised by the
Authority in accordance with any applicable legislation.
6. The solar photovoltaic installation is commissioned at least within 12
months from the date of -
a.
notification to the Authority of the solar photovoltaic
installation, or
b.
authorisation granted by the Authority to construct the solar
photovoltaic installation.
7. The installation operator complies at all times with the obligations
established in these regulations, the Network Code and all other applicable
legislation.