Scheme for Aviation Regulations, 2012
Table of Provisions (26)
Statutory Text (26 Articles)
L.N. 403 of 2012
ENVIRONMENT AND DEVELOPMENT PLANNING ACT
(CAP. 504)
MALTA RESOURCES AUTHORITY ACT
(CAP. 423)
European Union Greenhouse Gas Emissions Trading
Scheme for Aviation Regulations, 2012
IN exercise of the powers conferred by article 61 of the
Environment and Development Planning Act and by article 28 of the
Malta Resources Authority Act, the Minister for Tourism, Culture and
Environment and the Minister for Resources and Rural Affairs, after
consultation with the Malta Resources Authority and the Malta
Environment and Planning Authority, have made the following
regulations
(1) The title of these regulations is the European Union Title and scope.
Greenhouse Gas Emissions Trading Scheme for Aviation
Regulations, 2012.
(2) These regulations provide for the implementation in Malta
of the European Union scheme for greenhouse gas emissions
allowance trading for the aviation activities listed in Schedule 1.
These regulations transpose Directive 2008/101/EC amending
Directive 2003/87/EC, and Directive 2009/29/EC amending Directive
2003/87/EC in so far as it relates to aircraft operators.
For the purposes of these regulations and unless the Interpretation.
context otherwise requires, the following definitions shall apply
"account holder" means a natural or legal person that holds an
account in the Union registry;
"aerodrome" means a defined area on land or water, including
buildings, installations and equipment, intended to be used either
wholly or in part for the arrival, departure and surface movement of
aircraft;
"aircraft operator" means the person who operates an aircraft at
the time it performs an aviation activity listed in Schedule 1 or, where
that person is not known or is not identified by the owner of the
aircraft, the owner of the aircraft;
"air service" means a flight or a series of flights carrying
passengers, cargo and, or, mail for remuneration and, or, hire as
defined in Article 2(4) of Regulation (EC) No. 1008/2008;
"allowance" means an allowance to emit one tonne of carbon
dioxide equivalent during a specified period, which shall be valid
only for the purposes of meeting the requirements of these regulations
and shall be transferable in accordance with the provisions of these
regulations;
"auctioneer" means the Debt Management Office within the
Treasury Department appointed by the Government to auction
allowances on its behalf;
"authorised representatives" means the representatives,
nominated by an account holder in respect of an account in the Union
registry, to have access to that account and undertake processes
relating to that account on behalf of the account holder;
"the Authority" means the Malta Resources Authority
established by article 3 of the Malta Resources Authority Act;
"aviation emissions" or "emissions" means the release of
greenhouse gases into the atmosphere from an aircraft performing an
aviation activity listed in Schedule 1, as specified in respect of that
activity;
"base year" means, for the purposes of regulation 3(b), in
relation to an aircraft operator which started operating in the Union
after 1 st January 2006, the first calendar year of operation, and in all
other cases, the calendar year starting on 1 st January 2006;
"cancellation" means the definitive disposal of an allowance by
its holder or by the national registry administrator as may be
applicable;
"certified emission reduction" or "CER" means a unit issued
pursuant to Article 12 of the Kyoto Protocol and the decisions
adopted pursuant to the UNFCCC or the Kyoto Protocol;
"Chapter II allowance" means an allowance allocated and issued
in respect of aviation activities listed in Annex I to Directive 2003/87/
EC, in accordance with Chapter II of Directive 2003/87/EC;
"Chapter III allowance" means an allowance allocated and
issued in respect of activities listed in Annex I to Directive 2003/87/
EC other than aviation activities, in accordance with Chapter III of
Directive 2003/87/EC;
"commercial air transport operator" means an operator that, for
remuneration, provides scheduled or non-scheduled air transport
services to the public for the carriage of passengers, freight or mail;
"the Commission" means the European Commission;
"confidential information" means any non-public information
deemed to be sensitive by the operator and, or any privileged
information falling within the scope of regulation 16, shared only for
promoting and elaborating certain purposes. It shall include inter
alia
(a)
trade secrets;
(b) any other information having a commercial value
that would be, or could reasonably be expected to be, destroyed
or diminished if the information were disclosed; or
(c)
information other than trade secrets or information
under paragraph (b) concerning a person, organisation or
undertaking in respect of their business, professional,
commercial or financial affairs;
"deviation" means, in respect of monitoring of tonne-kilometre
data and annual emissions, the use of a monitoring approach that is
different, in full or in part, from the approved monitoring and
reporting plan, which use is of a temporary nature;
"Directive 2003/87/EC" means Directive 2003/87/EC of the
European Parliament and of the Council of 13 October 2003
establishing a scheme for greenhouse gas emission allowance trading
within the Community and amending Council Directive 96/61/EC;
"Directive 2008/101/EC" means Directive 2008/101/EC of the
European Parliament and of the Council of 19 November 2008
amending Directive 2003/87/EC so as to include aviation activities in
the scheme for greenhouse gas emission allowance trading within the
Community;
"Directive 2009/29/EC" means Directive 2009/29/EC of the
European Parliament and of the Council of 23 April 2009 amending
Directive 2003/87/EC so as to improve and extend the greenhouse gas
emission allowance trading scheme of the Community;
"emissions reduction unit" or "ERU" means a unit issued
pursuant to Article 6 of the Kyoto Protocol and the decisions adopted
pursuant to the UNFCCC or the Kyoto Protocol;
"flight" means one flight sector that is a flight or one of a series
of flights which commences at a parking place of the aircraft and
terminates at a parking place of the aircraft;
"greenhouse gases" means the gases listed in Schedule 2;
"Joint Implementation project activity" or "JI project activity"
means a project activity undertaken in accordance with Article 12 of
the Kyoto Protocol and decisions adopted pursuant to the UNFCCC
or the Kyoto Protocol;
"Kyoto Protocol" means the Kyoto Protocol to the UNFCCC;
"Least Developed Countries" means those countries included in
the list of Least Developed Countries as defined by the Committee for
Development Policy and endorsed by the Economic and Social
Council of the United Nations;
"Member State" means a state which is a member of the
European Union and shall also include Iceland, Liechtenstein and
Norway;
"the Minister" means the Minister responsible for climate
change policy;
"modification" means, in respect of monitoring of tonne-
kilometre data and annual emissions, a permanent change in an
approved monitoring plan, in full or in part, and, where deemed to be
of a significant nature, shall require the approval of the Authority
before it shall become valid;
"National Accreditation Board (Malta)" means the National
Accreditation Board (Malta) established by the National
Accreditation Board (Malta) (Establishment) Regulations;
"national registry administrator" means the entity, designated in
accordance with relevant decisions and regulations adopted by the
Commission pursuant to Directive 2003/87/EC, being responsible for
the management, on behalf of the Government, of aircraft operator
holding accounts under the jurisdiction of the Government in the
Union registry;
"operating license" means an authorization granted by a relevant
competent licencing authority to an undertaking, permitting it to
provide air services as stated in the operating licence;
"other accounting units" means units other than allowances, and
including CERs and ERUs, which may be used by aircraft operators
for the purpose of meeting obligations under these regulations in
accordance with these regulations and relevant decisions and
regulations adopted by the Commission pursuant to Directive 2003/
87/EC;
"person" means any natural or legal person;
"the public" means one or more persons and associations,
organisations or groups of persons;
"Regulation (EC) No. 765/2008" means Regulation (EC) No.
765/2008 of the European Parliament and of the Council of 9 July
2008 setting out the requirements for accreditation and market
surveillance relating to the marketing of products and repealing
Regulation (EEC) No. 339/93;
"Regulation (EC) No. 1008/2008" means Regulation (EC) No.
1008/2008 of the European Parliament and of the Council of 24
September 2008 on common rules for the operation of air services in
the Community (Recast);
"Regulation (EC) No. 748/2009" means Commission
Regulation (EC) No 748/2009 of 5 August 2009 on the list of aircraft
operators which performed an aviation activity listed in Annex I to
Directive 2003/87/EC on or after 1 January 2006 specifying the
administering Member State for each aircraft operator;
"surrender" means the accounting of an allowance by an aircraft
operator against verified emissions;
"Union" and "European Union" shall have the same meaning of
"the European Union" as in the European Union Act;
"Union registry" means the registry established and maintained
in accordance with Article 19 of Directive 2003/87/EC for the
execution of processes pertaining to the maintenance of holding
accounts and the allocation, surrender and cancellation of allowances;
"UNFCCC" means the United Nations Framework Convention
on Climate Change which entered into force on 21 st March, 1994;
"verifier" means a legal person or another legal entity carrying
out verification activities pursuant to these regulations and accredited
by a national accreditation body pursuant to Regulation (EC) No 765/
2008 and relevant decisions and regulations adopted by the
Commission pursuant to Directive 2003/87/EC, or natural person
otherwise authorised, without prejudice to Article 5(2) of Regulation
(EC) 765/2008, at the time a verification report is issued.
These regulations shall apply to aircraft operators
performing aviation activities listed in Schedule 1, resulting in
emissions of greenhouse gases specified in respect of those activities,
and
(a)
who have a valid operating licence granted by Malta
in accordance with the provisions of Regulation (EC) No. 1008/
2008; or
(b) for whom Malta, being the Member State with the
greatest estimated attributed aviation emissions from aviation
activities as listed in Schedule 1 performed in the base year by
those aircraft operators, has been designated as the
administering Member State either in Regulation (EC) No 748/
2009, or by means of any measure taken by the Commission
pursuant to Directive 2003/87/EC or by the Authority in terms
of these regulations.
For the period from 1 st January, 2012 to 31 st
(1)
December, 2012, for the eight-year period beginning 1 st January,
2013, and for each subsequent period thereafter, an aircraft operator
may apply for an allocation of Chapter II allowances that are to be
allocated free of charge.
(2) An application made by an aircraft operator pursuant to
sub-regulation (1) may be made by submitting to the Authority
verified tonne-kilometre data for the aviation activities listed in
Schedule 1 performed by that aircraft operator for the monitoring
year. For the purposes of this regulation
the monitoring year for the period from 1 st January,
(a)
2012 to 31 st December, 2012 shall be 2010;
(b) the monitoring year for the period beginning 1 st
January, 2013 shall be 2010; and
(c)
the monitoring year for subsequent periods shall be
the calendar year ending twewnty-four months before the start
of the period to which the application relates.
(3) An application made in terms of sub-regulation (1) shall be
submitted to the Authority
in relation to the period from 1 st January, 2012 to
(a)
31 December, 2012, by the 31 st March, 2011;
st
(b) in relation to the period beginning 1 st January, 2013,
by 31 st March, 2011;
(c)
in relation to subsequent periods, by at least twenty-
one months before the start of the period to which the
application relates.
(4) The Authority shall submit to the Commission any
application received pursuant to sub-regulation (1), if it is satisfied
that the application is in accordance with the provisions of this
regulation and that the aircraft operator who submitted the application
has complied with regulations 6 and 7.
(5) The Authority shall submit to the Commission any
application pursuant to sub-regulation (4)
in relation to the period from 1 st January 2012 to the
(a)
31 st December, 2012, by 30 th June, 2011;
(b) in relation to the period beginning 1 st January, 2013,
by 30 th June, 2011;
(c)
in relation to subsequent periods, by at least
eighteen months before the start of the period to which the
application relates.
(6) Pursuant to a decision adopted by the Commission
pursuant to Directive 2003/87/EC setting out the benchmark for a
period to be used to allocate Chapter II allowances free of charge to
aircraft operators for the period to which such a decision relates, the
Authority shall, within three months of such a decision, calculate and
publish
(a)
the total allocation of Chapter II allowances for such
period, to each aircraft operator whose application it has
submitted to the Commission, in accordance with sub-
regulation (4), calculated by multiplying the tonne-kilometre
data included in the application by the benchmark set out in the
Commission decision; and
(b) the allocation of Chapter II allowances to each
aircraft operator for each year, which shall be determined by
dividing its total allocation of allowances for the period
calculated under paragraph (a) by the number of years in the
period for which that aircraft operator is performing an aviation
activity listed in Schedule 1.
(1) For the period beginning 1 st January, 2013 or a Allocation of
subsequent period, an aircraft operator may apply for a free allocation free
from special
of Chapter II allowances from the special reserve set aside pursuant to reserve
aircraft
Article 3(f) of Directive 2003/87/EC as amended by Directive 2008/ operators.
101/EC. An application for a free allocation from the special reserve
may be made by an aircraft operator
(a)
who starts performing an aviation activity falling
within Schedule 1 after the monitoring year for which tonne-
kilometre data had to be submitted in respect of the period
beginning 1 st January, 2013 or a subsequent period, where such
activity is not, in whole or in part, a continuation of an aviation
activity previously performed by another aircraft operator; or
(b) whose tonne-kilometre data increases by an average
of more than 18% annually between the monitoring year for
which tonne-kilometre data was submitted under regulation 4 in
respect of the period beginning 1 st January, 2013 or a
subsequent period and the second calendar year of that period,
where such an increase in tonne-kilometre data is not, in whole
or in part, the result of a continuation of an aviation activity
previously performed by another aircraft operator.
(2) An aircraft operator who is eligible under sub-regulation
(1) may apply for a free allocation of Chapter II allowances from the
special reserve by submitting an application to the Authority, and
such an application shall be made by the 30 th June of the third year of
the period to which the application relates.
(3) An application under sub-regulation (2) shall
(a)
include verified tonne-kilometre data for the
aviation activities listed in Schedule 1 performed by the aircraft
operator in the second calendar year of the period to which the
application relates;
(b) provide evidence that the criteria for eligibility
under sub-regulation (1) are fulfilled; and
(c)
in the case of an aircraft operator falling within sub-
regulation (1)(b), state
(i) the percentage increase in tonne-kilometres
performed by that aircraft operator between the monitoring
year for which tonne-kilometre data was submitted under
regulation 4 in respect of the period beginning 1 st January,
2013 or a subsequent period and the second calendar year
of that period;
(ii) the absolute growth in tonne-kilometres
performed by that aircraft operator between the monitoring
year for which tonne-kilometre data was submitted under
regulation 4 in respect of the period beginning 1 st January,
2013 or a subsequent period and the second calendar year
of that period; and
(iii) the absolute growth in tonne-kilometres
performed by that aircraft operator between the monitoring
year for which tonne-kilometre data was submitted under
regulation 4 in respect of the period beginning 1 st January,
2013 or a subsequent period and the second calendar year
of that period which exceeds the percentage specified in
sub-regulation (1)(b).
(4) The Authority shall submit to the Commission any
application received pursuant to sub-regulation (2), if it is satisfied
that the application is in accordance with this regulation and that the
aircraft operator who submitted the application has complied with
regulations 6 and 7. The Authority shall submit any such application
by not later than the 31 st December of the third year of the period to
which the application relates.
(5) Pursuant to a decision adopted by the Commission setting
out the benchmark for a period to be used to allocate Chapter II
allowances free of charge from the special reserve to aircraft
operators for the period to which such a decision relates, the
Authority shall, within three months of such a decision, calculate and
publish
(a)
the allocation of Chapter II allowances from the
special reserve to each aircraft operator whose application it has
submitted to the Commission in accordance with sub-regulation
(4); and
(b) the allocation of Chapter II allowances from the
special reserve to each aircraft operator for each year, which
shall be determined by dividing the allocation as determined
under paragraph (a) by the number of calendar years remaining
in the period to which the allocation relates.
(6) The allocation of Chapter II allowances from the special
reserve to each aircraft operator in sub-regulation (5)(a) shall be
calculated by multiplying the benchmark set out in the Commission
decision referred to in sub-regulation (5) in the case of
(a)
an aircraft operator falling within sub-regulation
(1)(a) whose application was submitted to the Commission
pursuant to sub-regulation (4), by the tonne-kilometre data
included in the application submitted to the Commission;
(b) an aircraft operator falling within sub-regulation
(1)(b), whose application was submitted to the Commission
pursuant to sub-regulation (4), by the absolute growth in tonne-
kilometres exceeding the percentage specified in sub-regulation
(1)(b) included in the application submitted to the Commission.
(7) An allocation to an aircraft operator eligible for an
allocation of Chapter II allowances under sub-regulation (1)(b) shall
not exceed one million Chapter II allowances.
(1)
An aircraft operator who intends to submit an
application for free Chapter II allowances pursuant to regulations 4 or
5 shall submit, to the Authority, a monitoring plan setting out
measures to monitor and report tonne-kilometre data from aviation
activities listed in Schedule 1. The plan shall be submitted by not later
than one hundred and twenty days before the start of the monitoring
year to which the monitoring plan relates, or by such date as may be
determined by the Authority.
(2) The monitoring plan shall be in accordance with
(a)
the principles set out in Schedule 3; and
(b) relevant decisions and regulations adopted by the
Commission pursuant to Directive 2003/87/EC; and
(c)
any other requirements made by the Authority in
respect of monitoring and reporting of tonne-kilometre data for
aviation activities.
(3) The monitoring plan submitted by an aircraft operator
pursuant to sub-regulation (1) shall be approved by the Authority, if it
is satisfied that the plan is in accordance with the requirements of this
regulation. The Authority may request from the aircraft operator any
additional information it deems appropriate for the approval of the
plan.
(4) An aircraft operator shall notify the Authority of any
deviations from the monitoring plan that may occur at any time after
the approval of the plan
Provided that the Authority shall be notified of any
deviation from the plan
(a)
as early as possible before the deviation occurs, if
the deviation is known by the operator or is made known to the
operator prior to its occurrence; or
(b) immediately after the deviation occurs if the
occurrence of the deviation is not known to the operator or is
not made known to the operator before or at the time of its
occurrence.
An aircraft operator shall maintain a documented record, which
shall include information in accordance with requirements that may
be established by the Authority, of any deviations that occur during a
monitoring year and shall submit such record to the Authority
together with the verified tonne-kilometre data submitted in respect
of that monitoring year pursuant to regulations 4 or 5.
(5) An aircraft operator may at any time after the approval of
the monitoring plan submit to the Authority proposed modifications
that have to be made to the plan, in accordance with the relevant
decisions and regulations adopted by the Commission pursuant to
Directive 2003/87/EC. The aircraft operator shall maintain a
documented record of all modifications to the monitoring plan. No
proposed significant modifications to an approved plan shall be valid
without the approval of the Authority.
(6) Where it deems appropriate, the Authority may request the
submission of a revised plan.
(7) Without prejudice to sub-regulation (4), an aircraft
operator shall monitor tonne-kilometre data in accordance with the
monitoring plan approved by the Authority in accordance with this
regulation.
(1) The tonne-kilometre data submitted by an aircraft Verification of
operator pursuant to regulations 4 or 5 shall be verified by a verifier tonne-kilometre
data for aviation
in accordance with
activities.
(a)
the principles set out in Schedule 4; and
(b) relevant decisions and regulations adopted by the
Commission pursuant to Directive 2003/87/EC; and
(c)
any other requirements made by the Authority in
respect of verification of tonne-kilometre data for aviation
activities.
(2) A verification report shall be submitted by the aircraft
operator to the Authority with a tonne-kilometre data report
submitted for the purposes of an application under regulations 4 or 5.
(3) A verifier performing verification of tonne-kilometre data
of an aircraft operator shall notify the Authority and the National
Accreditation Board (Malta) of the planned time and place of the
verification and the identity of the aircraft operator whose tonne-
kilometre data are subject to its verification by not later than thirty
days prior to the date when the verification is to be performed.
(1) The Authority may perform any checks it deems
necessary to ensure that a tonne-kilometre data report submitted by an
aircraft operator is in accordance with regulations 6 and 7.
(2) The Authority shall, on the basis of the information
included in the submitted tonne-kilometre report, the verification
report submitted in accordance with regulation 7 and its own checks,
and by not later than thirty days after the date of submission of the
report, determine whether it can accept the submitted report. The
Authority shall not accept a report of tonne-kilometre data for which
a verification report has not been submitted. The Authority shall
inform the aircraft operator, in writing or by other documented
means, of its decision.
(3) Where it deems necessary, the Authority may require the
submission of a revised tonne-kilometre report. The revised tonne-
kilometre report shall be verified in accordance with regulation 7
except where otherwise decided by the Authority.
(1) The quantity of Chapter II allowances that are not
allocated free of charge, as determined for Malta in accordance with
Directive 2003/87/EC, shall be auctioned by the auctioneer in
accordance with the relevant decisions and regulations adopted by the
Commission pursuant to Directive 2003/87/EC.
(2) The auctioneer shall act in accordance with the relevant
decisions and regulations adopted by the Commission pursuant to
Directive 2003/87/EC.
(1) Chapter II allowances issued to aircraft operators in
terms of these regulations shall be held in the Union registry. An
aircraft operator shall have an aircraft operator holding account in the
Union registry.
(2) The Authority shall act as national registry administrator in
respect of aircraft operator holding accounts of aircraft operators to
which these regulations apply. The national registry administrator
shall perform its functions in accordance with relevant decisions and
regulations adopted by the Commission pursuant to Directive 2003/
87/EC. The national registry administrator shall ensure that there is
no conflict of interest between itself and holders of aircraft operator
holding accounts.
(3) A request to open an aircraft operator holding account
shall be made by the Authority or the aircraft operator to the national
registry administrator.
(4) A request for the opening of an aircraft operator holding
account shall include all information required by the national registry
administrator in accordance with the relevant decisions and
regulations adopted by the Commission pursuant to Directive 2003/
87/EC and any requirements and terms and conditions made by the
national registry administrator.
(5) The national registry administrator shall open and
administer an aircraft operator holding account for an aircraft
operator in accordance with the relevant decisions and regulations
adopted by the Commission pursuant to Directive 2003/87/EC and
any terms and conditions it may make. The national registry
administrator shall not open an account unless it is satisfied that the
request is in accordance with the requirements of this regulation.
(6) An account holder of an aircraft operator holding account
and its nominated authorised representatives shall act in accordance
with the relevant decisions and regulations adopted by the
Commission pursuant to Directive 2003/87/EC and any terms and
conditions made by the national registry administrator.
(7) Where an aircraft operator fails to comply with any
requirements of decisions and regulations adopted by the
Commission in respect of registries or terms and conditions made by
the national registry administrator in respect of registries, the national
registry administrator may prevent the transfer of allowances or other
accounting units into and out of the aircraft operator holding account
held by that aircraft operator until non-compliance is rectified
Provided that the national registry administrator shall not
prevent surrender or cancellation of allowances in accordance with
regulation 16.
(1) The Authority shall, by the 28 th February of each Issuing of
year subsequent to the 28 th February, 2012, issue to each aircraft allowances
allocated to
operator the number of Chapter II allowances allocated to that aircraft aircraft
operators and
operator for that year as determined under regulation 4(6)(b) or validity of
regulation 5(5)(b). Issuance of allowances shall be carried out in allowances.
accordance with the relevant decisions and regulations adopted by the
Commission pursuant to Directive 2003/87/EC.
(2) Each aircraft operator shall be issued Chapter II
allowances in accordance with sub-regulation (1) in the aircraft
operator’s holding account held in the Union registry.
(3) Chapter II allowances issued in accordance with sub-
regulation (1) in respect of the period from 1 st January, 2012 to 31 st
December, 2012, the period beginning 1 st January, 2013 and
subsequent periods shall be valid for emissions during the period for
which they are issued.
(4) Four months after the beginning of the period commencing
on the 1 st January, 2013 and subsequent periods the Authority shall
cancel allowances that are no longer valid for that period and have not
been surrendered and cancelled in accordance with regulation 16.
(5) For each period referred to in sub-regulation (4), the
Authority shall issue allowances to aircraft operators for the current
period to replace any allowances held by them which are cancelled in
accordance with sub-regulation (4).
(6) Where Chapter II allowances are issued to an aircraft
operator in respect of a year pursuant to sub-regulation (1), and, in
accordance with relevant decisions and regulations adopted by the
Commission pursuant to Article 25a of Directive 2003/87/EC or
pursuant to a decision taken by the Authority in consequence of these
decisions and regulations, the quantity of Chapter II allowances
allocated to that aircraft operator for that year, as determined in
regulation (4)(6)(b) or regulation 5(5)(b), is to be decreased, the
aircraft operator shall restitute a quantity of allowances equivalent to
the amount by which the allocation is to be decreased.
(1) An aircraft operator shall submit to the Authority a
monitoring plan setting out measures to monitor and report emissions
of greenhouse gases specified in respect of aviation activities in
Schedule 1. A monitoring plan shall be submitted by an aircraft
operator to the Authority at the latest one hundred and twenty days
before the aircraft operator commences aviation activities listed in
Schedule 1
Provided that, where an aircraft operator performs an
aviation activity listed in Schedule 1 for the first time that could not
be foreseen before one hundred and twenty days of the activity taking
place, a monitoring plan shall be submitted to the Authority by not
later than six weeks after the performance of that activity
Provided further that, where an aircraft operator for whom
Malta is designated as the administering Member State pursuant to
regulation 3, after it performs an aviation activity listed in Schedule 1
for the first time, a monitoring plan shall be submitted to the
Authority without undue delay after Malta is designated as the
administering Member State for that aircraft operator or within a
timeframe as may be agreed upon between the aircraft operator and
the Authority.
(2) The monitoring plan shall be in accordance with
(a)
the principles set out in Schedule 3; and
(b) relevant decisions and regulations adopted by the
Commission pursuant to Directive 2003/87/EC; and
(c)
any other requirements made by the Authority in
respect of monitoring and reporting of emissions of greenhouse
gases from aviation activities.
(3) The monitoring plan submitted by an aircraft operator
pursuant to sub-regulation (1) shall be approved by the Authority, if it
is satisfied that the plan is in accordance with the requirements set out
under this regulation. The Authority may request from the aircraft
operator any additional information it deems appropriate for the
approval of the plan.
(4) An aircraft operator shall notify the Authority of any
deviations from the monitoring plan that may occur at any time after
the approval of the plan by the Authority
Provided that the Authority shall be notified of any
deviation from the plan
(a)
as early as possible before the deviation occurs, if
the deviation is known to the operator or is made known to the
operator prior to its occurrence; or,
(b) immediately after the deviation occurs if the
occurrence of the deviation is not known to the operator or is
not made known to the operator before or at the time of its
occurrence.
An aircraft operator shall maintain a documented record, which
shall include information in accordance with requirements that may
be established by the Authority, of any deviations that occur during a
monitoring year and shall submit such record to the Authority
together with the annual emissions report submitted pursuant to this
regulation.
(5) An aircraft operator may at any time after the approval of
the monitoring plan submit to the Authority proposed modifications
that have to be made to the plan, in accordance with the relevant
decisions and regulations adopted by the Commission pursuant to
Directive 2003/87/EC. The aircraft operator shall maintain a
documented record of all modifications to the monitoring plan. No
proposed significant modifications to an approved plan shall be valid
without the approval of the Authority.
(6) Where it deems appropriate, the Authority may request the
submission of a revised plan.
(7) An aircraft operator shall review the monitoring plan
before the start of the period beginning from 1 st January, 2013 and
each subsequent period and submit a revised monitoring plan as
appropriate.
(8) An aircraft operator shall
from the monitoring year 1 st January, 2010 to 31 st
(a)
December, 2010 in the case of an aircraft operator for whom
Malta is identified as the administering Member State before the
start of that monitoring year; or
(b)
from the first monitoring year applicable to it in the
case of an aircraft operator for whom Malta is identified as the
administering Member State after the beginning of the
monitoring year 1 st January, 2010 to 31 st December, 2010,
monitor emissions from aircraft which it operates that perform
aviation activities listed in Schedule 1, during each monitoring year.
(9) Without prejudice to sub-regulation (4), an aircraft
operator shall monitor annual emissions in accordance with the
monitoring plan approved by the Authority in accordance with this
regulation. The Authority may take any action it deems necessary
under these regulations to ensure that an aircraft operator is
monitoring and reporting annual emissions in accordance with the
approved monitoring plan.
(1) An aircraft operator shall report emissions,
monitored in accordance with regulation 12, for each monitoring year
in accordance with
(a)
the principles set out in Schedule 3; and
(b) relevant decisions and regulations adopted by the
Commission pursuant to Directive 2003/87/EC; and
(c)
any other requirements made by the Authority in
respect of reporting of emissions of greenhouse gases from
aviation activities.
(2) A report on emissions for each monitoring year shall be
submitted to the Authority by not later than 31 st March of the
subsequent year.
(3) The report submitted by an aircraft operator pursuant to
sub-regulation (2) shall be verified by a verifier in accordance with
(a)
the principles set out in Schedule 4; and
(b) relevant decisions and regulations adopted by the
Commission pursuant to Directive 2003/87/EC; and
(c)
any other requirements made by the Authority in
respect of verification of reports of emissions of greenhouse
gases from aviation activities.
(4) A verification report shall be submitted by the aircraft
operator to the Authority with each emission report submitted.
(5) Where an aircraft operator fails to submit an annual
emissions report for a monitoring year that has been verified as
satisfactory by 31 st March of the year subsequent to that monitoring
year, the national registry administrator shall not allow the transfer of
allowances or any other accounting units out of the aircraft operator
holding account of that aircraft operator until a report from that
aircraft operator for that monitoring year has been verified as
satisfactory
Provided that the national registry administrator shall not
prevent the surrender or cancellation of allowances in accordance
with regulation 16, or the issuance of allowances in exchange for
CERs or ERUs in accordance with regulations 17 or 18.
(6) A verifier performing verification of an annual emission
report of an aircraft operator shall notify the Authority and the
National Accreditation Board (Malta) of the planned time and place
of the verification and the identity of the aircraft operator whose
annual emissions report is subject to its verification by not later than
thirty days prior to the date when the verification is to be performed.
(1) The Authority may perform any checks it deems
necessary to ensure that a report submitted by an aircraft operator is
in accordance with regulation 13.
(2) The Authority shall, on the basis of the information
included in the submitted report, the verification report submitted in
accordance with regulation 13 and its own checks, and by not later
than thirty days after the date of submission of the report, determine
whether it can accept the submitted report. The Authority shall not
accept a report of annual emissions for which a verification report has
not been submitted. The Authority shall inform the aircraft operator,
in writing or other documented means, of its decision. Where it deems
necessary, the Authority may require the submission of a revised
annual emissions report. The revised annual emissions report shall be
verified in accordance with regulation 13.
(3) Where, in respect of any monitoring year, an aircraft
operator does not submit a verified emissions report in accordance
with regulation 13 or where it is deemed that the aircraft operator has
not submitted an emissions report which is in accordance with the
requirements set out in regulation 13, the Authority may, unless there
is a written agreement between the Authority and the aircraft operator
providing otherwise, itself determine the emissions for aviation
activities performed by the aircraft operator for such year for which
the verified report was not submitted. The Authority shall use best
available data and ensure that a conservative estimate is made that
does not under-estimate emissions. When annual emissions are
determined under this sub-regulation, the Authority shall consider the
requirements set in Schedules 3 and 4
Provided that the Authority shall notify the aircraft
operator of the emissions as determined and the methodology used to
determine such emissions.
(1) An aircraft operator who fails to submit a
monitoring plan in accordance with regulation 12 in respect of the
years 2010 and 2011, shall be liable to the imposition of an
administrative fine of five thousand euro (€5,000) and, or, one
hundred euro (€100) for each day of non-compliance, from the date of
a notice given by the Authority to the operator.
(2) An aircraft operator who fails to monitor annual emissions
in accordance with regulation 12 or fails to submit an annual
emissions report in accordance with regulation 13 in respect of the
years 2010 and 2011, shall be liable to the imposition of an
administrative fine of five thousand euro (€5,000) and, or, one
hundred euro (€100) for each day of non-compliance, from the date of
a notice given by the Authority to the operator.
(3) An aircraft operator who fails to submit a monitoring and
reporting plan in accordance with regulation 12 in respect of the
period from 1 st January, 2012 to 31 st December, 2012, the period
beginning 1 st January, 2013 or a subsequent period, shall be liable to
the imposition
(a)
for an aircraft operator whose emissions for the first
calendar year of the period for which the plan relates or for the
first year of performing an activity covered by these regulations
during the period for which the plan relates are less than ten
thousand (10,000) tonnes carbon dioxide equivalents, of an
administrative fine of one thousand euro (€1,000) and, or, fifty
euro (€50) for each day of non-compliance, from the date of a
notice given by the Authority to the operator;
(b) for an aircraft operator whose emissions for the first
calendar year of the period for which the plan relates or for the
first year of performing an activity covered by these regulations
during the period for which the plan relates are equal to or
greater than ten thousand (10,000) tonnes carbon dioxide
equivalents and equal to or less than fifty thousand (50,000)
tonnes carbon dioxide equivalents, of an administrative fine of
five thousand euro (€5,000) and, or, one hundred euro (€100)
for each day of non-compliance, from the date of a notice given
by the Authority to the operator;
(c)
for an aircraft operator whose emissions for the first
calendar year of the period for which the plan relates or for the
first year of performing an activity covered by these regulations
during the period for which the plan relates are more than fifty
thousand (50,000) tonnes of carbon dioxide equivalents and
equal to or less than five hundred thousand (500,000) tonnes
carbon dioxide equivalents, of an administrative fine of ten
thousand euro (€10,000) and, or, three hundred euro (€300) for
each day of non-compliance, from the date of a notice given by
the Authority to the operator;
(d) for an aircraft operator whose emissions for the first
calendar year of the period for which the plan relates or for the
first year of performing an activity covered by these regulations
during the period for which the plan relates are more than five
hundred thousand (500,000) tonnes of carbon dioxide
equivalents, of an administrative fine of fifty thousand euro
(€50,000) and, or, six hundred euro (€600) for each day of non-
compliance, from the date of a notice given by the Authority to
the operator.
(4) An aircraft operator who fails to monitor annual emissions
during a year in accordance with regulation 12 or fails to submit a
verified annual emissions report in respect of a year in accordance
with regulation 13 in respect of the period from 1 st January, 2012 to
31 st December, 2012, the period beginning 1 st January, 2013 or a
subsequent period, shall be liable to the imposition
(a)
for an aircraft operator whose emissions for that
year are less than ten thousand (10,000) tonnes carbon dioxide
equivalents, of an administrative fine of one thousand euro
(€1,000) and, or, fifty euro (€50) for each day of non-
compliance, from the date of a notice given by the Authority to
the operator;
(b) for an aircraft operator whose emissions for that
year are equal to or greater than ten thousand (10,000) tonnes
carbon dioxide equivalents and equal to or less than fifty
thousand (50,000) tonnes carbon dioxide equivalents, of an
administrative fine of five thousand euro (€5,000) and, or, one
hundred euro (€100) for each day of non-compliance, from the
date of a notice given by the Authority to the operator;
(c)
for an aircraft operator whose emissions for that
year are more than fifty thousand (50,000) tonnes of carbon
dioxide equivalents and equal to or less than fifty hundred
thousand (500,000) tonnes carbon dioxide equivalents, of an
administrative fine of ten thousand euro (€10,000) and, or, three
hundred euro (€300) for each day of non-compliance, from the
date of a notice given by the Authority to the operator;
(d) for an aircraft operator whose emissions for that
year are more than five hundred thousand (500,000) tonnes of
carbon dioxide equivalents, of an administrative fine of fifty
thousand euro (€50,000) and, or, six hundred euro (€600) for
each day of non-compliance, from the date of a notice given by
the Authority to the operator.
(5) For the purposes of determining the administrative fine
under this regulation, where the emissions of the aircraft operator are
not known or are not reported or where the Authority is satisfied that
there is no reasonable possibility that a verified quantity of emissions
will be reported by the aircraft operator, the Authority may itself
determine the emissions from the activities performed by the aircraft
operator. The Authority shall use best available data and ensure that a
conservative estimate is made that does not underestimate emissions.
The aircraft operator shall be liable to the imposition of an
administrative fine equal to the amounts established in sub-
regulations (3) and (4) in respect of the quantity of emissions
estimated in terms of this sub-regulation.
(1) Each aircraft operator shall, as from the year 2013 Surrender and
and by not later than the 30 th April of that year and of each cancellation
allowances.
subsequent year thereafter, surrender a number of allowances equal to
the total verified emissions during the preceding calendar year from
aviation activities listed in Schedule 1 as reported in accordance with
regulation 13.
(2) An aircraft operator may surrender Chapter II and Chapter
III allowances. Allowances issued by a competent authority of
another Member State shall be recognized by the Authority for the
purpose of meeting an aircraft operator’s obligations under sub-
regulation (1).
(3) The national registry administrator shall cancel allowances
surrendered in accordance with sub-regulation (1).
(4) The national registry administrator shall cancel allowances
at any time at the request of an aircraft operator holding those
allowances.
(5) Surrender and cancellation of allowances shall be carried
out in accordance with the relevant decisions and regulations adopted
by the Commission pursuant to Directive 2003/87/EC.
(6) The Authority shall publish the name of any aircraft
operator who is in breach of the requirement to surrender sufficient
allowances under sub-regulation (1).
(7) Any aircraft operator who does not surrender sufficient
allowances by the 30 th April of each year as required by sub-
regulation (1) to cover its emissions during the preceding year shall
be liable to the imposition of an administrative fine of one hundred
euro (€100) for each tonne of carbon dioxide equivalent emitted, for
which the aircraft operator has not surrendered allowances. From 1 st
January 2013, where, for the year in respect of which an aircraft
operator does not surrender sufficient allowances to cover emissions
during that year in accordance with sub-regulation (1), the annual
average Harmonized European Index of Consumer Prices published
shows a percentage increase as compared to the Harmonized
European Index of Consumer Prices published for the previous year,
the administrative fine shall be increased by the same percentage. The
administrative fine as revised pursuant to this sub-regulation shall
apply to subsequent years unless further increased in accordance with
the Harmonized European Index of Consumer Prices. For the
purposes of this sub-regulation, each allowance not surrendered by
the aircraft operator for a tonne of carbon dioxide equivalent emitted,
shall be considered as a separate contravention.
(8) The imposition of an administrative fine as prescribed in
sub-regulation (6) shall not release the aircraft operator from the
obligation to surrender an amount of allowances equal to those excess
emissions in respect of which the administrative fine is paid when
surrendering allowances in relation to the following calendar year.
(9) Where an aircraft operator fails to surrender allowances in
accordance with sub-regulation (1), the national registry
administrator shall not allow the transfer of allowances or any other
accounting units out of the aircraft operator holding account of that
aircraft operator until the aircraft operator complies with the
requirement to surrender allowances
Provided that the national registry administrator shall not
prevent the surrender of allowances in accordance with sub-
regulation (1) or the cancellation of allowances in accordance with
sub-regulation (4), or the issuance of allowances in exchange for
CERs or ERUs in accordance with regulations 17 or 18.
(1) During the period from 1 st January, 2012 to 31 st
December, 2012 an aircraft operator may use CERs and ERUs up to a
quantity equivalent to 15% of the total emissions, in tonnes of carbon
dioxide equivalents, in respect of which allowances are required to be
surrendered pursuant to regulation 16.
(2) The use of CERs or ERUs by an aircraft operator pursuant
2012. to sub-regulation (1) shall take place through the issue and immediate
surrender of one allowance by the Authority in exchange for one CER
or ERU to be surrendered held by that aircraft operator in the Union
registry. CERs and ERUs used in accordance with this regulation by
an aircraft operator to meet obligations under regulation 16 shall be
subsequently cancelled.
(3) CERs and ERUs that are issued and may be used in
accordance with the UNFCCC and the Kyoto Protocol and
subsequent decisions adopted thereunder, may be used by an aircraft
operator in accordance with sub-regulation (1)
Provided that CERs and ERUs from land use, land use
change and forestry activities, and CERs and ERUs generated from
nuclear facilities, may not be so used.
(1) To the extent that the levels of CER and ERU use, Use of CERs
allowed to an aircraft operator for the period from 1 st January 2012 to and
project activities
31 st December 2012 have not been used up, or where an entitlement in
emissions
to use credits is granted under sub-regulation (5), the aircraft operator trading scheme
for the period 1 st
may request to be issued allowances to him valid from 2013 onwards January
in exchange for CERs and ERUs issued in respect of emission 31 st December
reductions up to 2012 from project types which were eligible for use 2020.
in the Union scheme during the period from 1 st January 2008 to 31 st
December 2012. Until 31 st March 2015, the Authority shall make
such an exchange on request.
(2) To the extent that the levels of CER and ERU use, allowed
to an aircraft operator for the period 1 st January 2012 to 31 st
December 2012 have not been used up, or where an entitlement to use
credits is granted under sub-regulation (5), the aircraft operator may
exchange CERs and ERUs issued in respect of emission reductions
from 2013 onwards from project types that were registered before
2013 and which were eligible for use in the Union scheme during the
period 1 st January 2008 to 31 st December 2012, for allowances valid
from 2013 onwards.
(3) To the extent that the levels of CER and ERU use, allowed
to an aircraft operator for the period 1 st January 2012 to 31 st
December 2012, have not been used up, or where an entitlement to
use credits is granted under sub-regulation (5), the aircraft operator
may exchange CERs issued in respect of emission reductions from
2013 onwards from project types started from 2013 onwards in Least
Developed Countries and which were eligible for use in the Union
scheme during the period from 1 st January 2008 to 31 st December
2012, for allowances valid from 2013 onwards. This sub-regulation
shall apply until such countries have ratified a relevant agreement
with the Union or until 2020, whichever is the earlier.
(4) To the extent that the levels of CER and ERU use, allowed
to an aircraft operator for the period 1 st January 2012 to 31 st
December 2012 have not been used up, or where an entitlement to use
credits is granted under sub-regulation (5), the aircraft operator may
use credits from projects or other emission reducing activities in
accordance with any agreements that may be concluded by the Union
with third countries, up to levels of use as specified in such
agreements, to comply with obligations under these regulations.
(5) For the period 1 st January 2013 to 31 st December 2020 an
aircraft operator shall be entitled to use an additional quantity of
CERs and ERUs up to an amount corresponding to a percentage of its
verified emissions during the period from 1 st January 2013 to 31 st
December 2020, as may be established by the Commission pursuant
to Directive 2003/87/EC.
(6) For the purposes of this regulation, aircraft operators shall
not use CERs or ERUs for which restrictions on use apply in
accordance with relevant decisions and regulations adopted by the
Commission pursuant to Directive 2003/87/EC.
No CERs or ERUs shall be issued for reductions or
limitations of greenhouse gas emissions with respect to aviation
activities falling within the scope of these regulations.
(1) Where an aircraft operator fails to comply with the
requirements of these regulations and where enforcement measures
fail to ensure compliance, the Authority may, after consultation with
the regulatory authority responsible for aviation, ask the Minister to
request the Commission to decide on the imposition of an operating
ban on that aircraft operator. Such a request shall be made in
accordance, where applicable, with decisions and regulations adopted
by the Commission pursuant to Directive 2003/87/EC.
(2) The Minister, before requesting the Commission to decide
on the imposition of an operating ban on an aircraft operator, shall
serve a notice to the aircraft operator which shall include
(a)
evidence that the aircraft operator has not complied
with its obligations under these regulations and any decisions
and regulations adopted by the Commission pursuant to
Directive 2003/87/EC; and
(b) information on enforcement action which has been
taken in respect of the aircraft operator; and
(c)
a draft of the request that the Minister intends to
submit to the European Commission under sub-regulation (1).
The aircraft operator shall be given an opportunity to make
submissions to the Minister, within a period of time indicated in the
notice, which shall be of not more than twenty days, before the
Minister submits a request for an operating ban to the Commission.
(3) The request made by the Minister to the Commission
pursuant to sub-regulation (1) shall include
(a)
evidence that the aircraft operator has not complied
with its obligations under these regulations and any decisions
and regulations adopted by the Commission pursuant to
Directive 2003/87/EC; and
(b) information on enforcement action which has been
taken in respect of the aircraft operator; and
(c)
a justification for the imposition of an operating ban
at Union level; and
(d) a recommendation for the scope of the operating ban
and any conditions that should be applied.
Decisions related to the allocation of allowances to aircraft Access to
operators and reports of emissions submitted in accordance with information,
disclosure of
regulation 10 shall be made available to the public in accordance with information
professional
the Freedom of Access to Information on the Environment secrecy.
Regulations
Provided that any access to personal data shall be made in
accordance with the Data Protection Act and that information covered Cap. 440.
by professional secrecy may not be disclosed to any other person or
authority except by virtue of the applicable laws, regulations,
administrative provisions and, or, the provisions of the Professional Cap. 377.
Secrecy Act
Provided also that, without prejudice to this regulation and
to the obligation which may be imposed on the Authority to disclose
any information, the Authority shall not disclose any confidential
information or any parts thereof or any other information provided in
connection with the report which should be treated as commercially
confidential
Provided further that any information which shall be
treated as commercially confidential shall be made known at all times
to the Authority.
The Authority may require that submissions of Submission of
applications, monitoring and reporting plans and reports under these applications,
monitoring and
regulations are made in the form and manner and by means of the reporting
and reports.
medium as specified by it.
The revenue from the auctioning of allowances, after Revenue
deducting the audited costs to administer the scheme agreed to accruing
the auctioning
between the Minister responsible for finance and the Authority, shall of allowances.
accrue to the Consolidated Fund.
The Administrative Review Tribunal shall have Administrative
jurisdiction to hear and determine appeals from decisions of the Review
Tribunal.
Authority made under these regulations.
The European Union Greenhouse Gas Emissions Trading
Scheme for Aviation Regulations, 2012 are hereby being revoked,
without prejudice to anything done or omitted to be done thereunder.
Schedule 1
Regulations 1(2), 3, 4(2), 4(6)(b), 5(1)(a), 5(3)(a), 6(1), 12(1), 12(9) and 16(1)
Categories of Activities to which these Regulations apply
Activities
Aviation
Flights which depart from or arrive in an aerodrome situated in
the territory of a Member State
This activity shall not include
(a)
flights performed exclusively for the
transport, on official mission, of a reigning Monarch and
his immediate family, Heads of State, Heads of
Government and Government Ministers, of a country
other than a Member State, where this is substantiated by
an appropriate status indicator in the flight plan;
(b) military flights performed by military aircraft
and customs and police flights;
(c)
flights related to search and rescue, fire
fighting flights, humanitarian flights and emergency
medical service flights authorised by the appropriate
authority;
(d) any flights performed exclusively under
visual flight rules as defined in Annex 2 to the Chicago
Convention;
(e)
flights terminating at the aerodrome from
which the aircraft has taken off and during which no
intermediate landing has been made;
(f)
training flights performed exclusively for the
purpose of obtaining a licence, or a rating in the case of
cockpit flight crew where this is substantiated by an
appropriate remark in the flight plan provided that the
flight does not serve for the transport of passengers and/
or cargo or for the positioning or ferrying of the aircraft;
(g) flights performed exclusively for the purpose
of scientific research or for the purpose of checking,
testing or certifying aircraft or equipment whether
airborne or ground-based;
(h) flights performed by aircraft with a certified
maximum take-off mass of less than 5 700kg;
(i)
flights performed in the framework of public
service obligations imposed in accordance with
Regulation (EEC) No 2408/92 on routes within the
outermost regions, as specified in Article 299(2) of the
Treaty establishing the European Community, or on
routes where the capacity offered does not exceed 30 000
seats per year;
(j)
flights which, but for this exclusion, would
fall within the definition of aviation activity as listed
here, performed by a commercial air transport operator
operating either
-
fewer than 243 flights per period for
three consecutive four-month periods; or
-
flights with total annual emissions
lower than 10,000 tonnes per year.
Flights performed exclusively for the transport, on
official missions, of a reigning Monarch and his
immediate family, Heads of State, Heads of Government
and Government, of a Member State may not be excluded
under this paragraph.
Schedule 2
Regulation 2
Greenhouse gases
Carbon dioxide (CO 2 )
Methane (CH 4 )
Nitrous Oxide (N 2 O)
Hydrofluorocarbons (HFCs)
Perfluorocarbons (PFCs)
Sulphur Hexafluoride (SF 6 )
Schedule 3
Regulations 6(2)(a), 12(3)(a), 13(1)(a) and 14(3)
Principles for Monitoring and Reporting of Emissions and Tonne-kilometre
Data from Aviation Activities
Monitoring of carbon dioxide emissions from aviation activities
Emissions shall be monitored by calculation. Emissions shall be calculated
using the formula
Fuel consumption × emission factor
Fuel consumption shall include fuel consumed by the auxiliary power unit.
Actual fuel consumption for each flight shall be used wherever possible and shall
be calculated using the formula
Amount of fuel contained in aircraft tanks once fuel uplift for the flight is
complete – amount of fuel contained in aircraft tanks once fuel uplift for
subsequent flight is complete together with fuel uplift for that subsequent
flight.
If actual fuel consumption data are not available, a standardised tiered
method shall be used to estimate fuel consumption data based on best available
information.
Default IPCC emission factors, taken from the 2006 IPCC Inventory
Guidelines or subsequent updates of these Guidelines, shall be used unless
activity-specific emission factors identified by independent accredited laboratories
using accepted analytical methods are more accurate. The emission factor for
biomass shall be zero.
A separate calculation shall be made for each flight and for each fuel.
Reporting of emissions
Each aircraft operator shall include the following information in its report in
regulation 13(2)
A.
Data identifying the aircraft operator, including
(i)
name of the aircraft operator,
(ii)
its administering Member State,
(iii) its address, including postcode and country and, where different,
its contact address in the administering Member State,
(iv) the aircraft registration numbers and types of aircraft used in the
period covered by the report to perform the aviation activities listed in
Schedule 1,
(v) the number and issuing authority of the air operator certificate
and operating licence under which the aviation activities listed in Schedule 1
were performed,
(vi)
address, telephone, fax and e-mail details for a contact person,
and
(vii) name of the aircraft owner.
For each type of fuel for which emissions are calculated
(i)
fuel consumption,
(ii)
emission factor,
(iii) total aggregated emissions from all flights performed during the
period covered by the report which fall within the aviation activities listed in
Schedule 1 to these regulations, for which the operator in question is
considered to be the aircraft operator,
(iv)
aggregated emissions from
-
all flights performed during the period covered by the
report which fall within the aviation activities listed in Schedule 1, for
which the operator in question is considered to be the aircraft operator
and which departed from an aerodrome situated in the territory of a
Member State and arrived at an aerodrome situated in the territory of the
same Member State,
-
all other flights performed during the period covered by
the report which fall within the aviation activities listed in Schedule 1,
for which the operator in question is considered to be the aircraft
operator
(v) aggregated emissions from all flights performed during the period
covered by the report which fall within the aviation activities listed in
Schedule 1, for which the operator in question is considered to be the aircraft
operator and which
-
departed from each Member State, and
-
arrived in each Member State from a third country,
(vi)
uncertainty.
Monitoring of tonne-kilometre data
For the purpose of applying for an allocation of allowances in accordance
with regulation 4 or regulation 5, the amount of aviation activity shall be
calculated in tonne-kilometres using the following formula
tonne-kilometres = distance × payload
where
‘distance’ means the great circle distance between the aerodrome of
departure and the aerodrome of arrival plus an additional fixed factor of 95 km;
‘payload’ means the total mass of freight, mail and passengers carried.
For the purposes of calculating the payload
(a)
the number of passengers shall be the number of persons on-
board excluding crew members;
(b) an aircraft operator may choose to apply either the actual or
standard mass for passengers and checked baggage contained in its mass and
balance documentation for the relevant flights or a default value of 100 kg
for each passenger and his checked baggage.
Reporting of tonne-kilometre data
Each aircraft operator shall include the following information in its
application under regulation 4 or regulation 5
A.
Data identifying the aircraft operator, including
(i)
name of the aircraft operator;
(ii)
its administering Member State;
(iii) its address, including postcode and country and, where different,
its contact address in the administering Member State;
(iv) the aircraft registration numbers and types of aircraft used during
the year covered by the application to perform the aviation activities listed in
Schedule 1;
(v) the number and issuing authority of the air operator certificate
and operating licence under which the aviation activities listed in Schedule 1
were performed;
(vi)
address, telephone, fax and e-mail details for a contact person,
(vii) name of the aircraft owner.
Tonne-kilometre data
(i)
number of flights by aerodrome pair;
(ii)
number of passenger-kilometres by aerodrome pair;
(iii)
number of tonne-kilometres by aerodrome pair;
(iv) chosen method for calculation of mass for passengers and
checked baggage;
(v) total number of tonne-kilometres for all flights performed during
the year to which the report relates falling within the aviation activities listed
in Schedule 1.
Schedule 4
Regulations 7(1)(a), 13(3)(a) and 14(3)
Criteria for Verification
General Principles
1. Emissions from flights falling within aviation activities listed in
Schedule 1 shall be subject to verification.
2. The verification process shall include consideration of the report
pursuant to regulation 13(2) and of monitoring during the preceding year. It shall
address the reliability, credibility and accuracy of monitoring systems and the
reported data and information relating to emissions, in particular
(a)
the reported activity data and related measurements and
calculations;
(b)
the choice and the employment of emission factors;
(c)
the calculations leading to the determination of the overall
emissions; and
(d) if measurement is used, the appropriateness of the choice and the
employment of measuring methods.
3. Reported emissions may only be validated if reliable and credible data
and information allow the emissions to be determined with a high degree of
certainty. A high degree of certainty requires the aircraft operator to show that
(a)
the reported data is free of inconsistencies;
(b) the collection of the data has been carried out in accordance with
the applicable scientific standards; and
(c)
the relevant records of the aircraft used to perform the aviation
activities covered by the report are complete and consistent.
4. The verifier shall be given access to all sites and information in relation
to the subject of the verification.
5. The verifier shall take into account whether the aircraft operator is
registered under the European Community eco-management and audit scheme
(EMAS).
Methodology
Strategic analysis
6. The verification shall be based on a strategic analysis of all the aviation
activities covered by the report carried out by the aircraft operator. This requires
the verifier to have an overview of all the activities and their significance for
emissions.
Process analysis
7. The verification of the information submitted shall, where appropriate,
be carried out at the sites used by the aircraft operator to perform the aviation
activities covered by the report. The verifier shall use spot-checks to determine the
reliability of the reported data and information.
Risk analysis
8. The verifier shall submit all the aircraft for which the aircraft operator is
responsible to an evaluation with regard to the reliability of the data of each source
contributing to the overall emissions of the aircraft operator.
9. On the basis of this analysis the verifier shall explicitly identify those
sources with a high risk of error and other aspects of the monitoring and reporting
procedure which are likely to contribute to errors in the determination of the
overall emissions. This especially involves the choice of the emission factors and
the calculations necessary to determine the level of the emissions from individual
sources. Particular attention shall be given to those sources with a high risk of
error and the abovementioned aspects of the monitoring procedure.
10. The verifier shall take into consideration any effective risk control
methods applied by the aircraft operator with a view to minimising the degree of
uncertainty.
Report
11. The verifier shall prepare a report on the validation process stating
whether the report pursuant to regulation 13(2) is satisfactory. This report shall
specify all issues relevant to the work carried out. A statement that the report
pursuant to regulation 13(2) is satisfactory may be made if, in the opinion of the
verifier, the total emissions are not materially misstated.
Minimum competency requirements for the verifier
12. The verifier shall be independent of the aircraft operator, carry out his
activities in a sound and objective professional manner, and understand
(a)
the provisions of these regulations, as well as relevant standards
and guidance adopted by the Commission pursuant to Directive 2003/87/EC
and any requirements made by the Authority;
(b) the legislative, regulatory, and administrative requirements
relevant to the activities being verified; and
(c)
the generation of all information related to each aircraft for which
the aircraft operator is responsible, in particular, relating to the collection,
measurement, calculation and reporting of data.
Additional provisions for the verification of aviation emission reports
13. The verifier shall in particular ascertain that
(a)
all flights falling within an aviation activity listed in Schedule 1
to these regulations have been taken into account. In this task the verifier
shall be assisted by timetable data and other data on the aircraft operator’s
traffic including data from Eurocontrol requested by that aircraft operator;
(b) there is overall consistency between aggregated fuel consumption
data and data on fuel purchased or otherwise supplied to the aircraft
performing the aviation activity.
Additional provisions for the verification of tonne-kilometre data
submitted for the purposes of regulations 4 and 5
14. The general principles and methodology for verifying emissions reports
as set out in this Schedule shall, where applicable, also apply correspondingly to
the verification of aviation tonne-kilometre data submitted under regulations 4(2)
and 5(2).
15. The verifier shall in particular ascertain that only flights actually
performed and falling within an aviation activity listed in Schedule 1 for which the
aircraft operator is responsible have been taken into account in that operator’s
application under regulations 4 and 5. In this task the verifier shall be assisted by
data on the aircraft operator’s traffic including data from Eurocontrol requested by
that operator. In addition, the verifier shall ascertain that the payload reported by
the aircraft operator corresponds to records on payloads kept by that operator for
safety purposes.
€3.24