Promotion of Energy from Renewable Sources
Table of Provisions (15)
Statutory Text (15 Articles)
L.N. 210 of 2012
MALTA RESOURCES AUTHORITY ACT
(CAP. 423)
BUILDING REGULATION ACT
(CAP. 513)
ENVIRONMENT AND DEVELOPMENT PLANNING ACT
(CAP. 504)
Promotion of Energy from Renewable Sources
(Amendment) Regulations, 2012
IN exercise of the powers conferred by article 28 of the Malta
Resources Authority Act and in exercise of the powers conferred by
articles 6 and 11 of the Building Regulation Act and in exercise of the
powers conferred by article 61 of the Environment and Development
Planning Act, the Minister for Resources and Rural Affairs and the
Minister for Tourism, Culture and the Environment, after consultation
with the Malta Resources Authority, the Building Regulation Board
and the Malta Environment and Planning Authority have made the
following regulations:-
(1) The title of these regulations is the Promotion of
Energy from Renewable Sources (Amendment) Regulations, 2012,
and these regulations shall be read and construed as one with the
Promotion of Energy from Renewable Sources Regulations,
hereinafter referred to as "the principal regulations".
(2) The scope of these regulations is to transpose Articles 3(2),
4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14 and 21(2) of Directive 2009/28/EC
on the promotion of the use of energy from renewable sources and
amending and subsequently repealing Directives 2001/77/EC and
2003/30/EC.
Regulation 2 of the principal regulations shall be amended
as follows
(a)
immediately after the definition "biomass" there
shall be added the following new definitions
" "Building Regulation Board"
means the Board established under article
3 of the Building Regulation Act;
"Building Regulation Office" means
the Building Regulation Office established
under the Building Regulation Act;";
LN
(b) immediately after the definition "hydrothermal
energy" there shall be added the following new definitions
" "Malta Environment and Planning
Authority"
means
the
Authority
established by article 6 of the Environment
and Development Planning Act;
"Member State" means a state which
is a member of the European Union;
"Member State or country of origin"
means a state from which electricity
produced from renewable energy sources
is transferred or exported to another
Member State or a third country;
"Member State or country of
destination" means a state which receives
or to which electricity produced from
renewable energy sources is transferred or
exported from the country of origin;";
(c)
in the definition "the Minister", for the words
"responsible for resources;" there shall be substituted the words
"responsible for energy or any person delegated by him to act on
his behalf;";
(d) in the definition "support scheme", for the words
"and premium payments." there shall be substituted the words
"and premium payments;"; and
(e)
immediately after the definition "support scheme"
there shall be added the following new definition
" "third country" means a country which is not a
member of the European Union and which receives or to
which electricity produced from renewable energy sources
is transferred or exported from the country of origin.".
Immediately after sub-regulation (9) of regulation 5 of the Amends
principal regulations, there shall be added the following new sub- regulation
the principal
regulation
regulations.
"(10) For the purposes of demonstrating compliance with
renewable energy obligations placed on operators and the target
for the use of energy from renewable sources in all forms of
transport referred to in regulation 4, the contribution made by
biofuels produced from wastes, residues, non-food cellulosic
material, and ligno-cellulosic material shall be considered to be
LN
twice that made by other biofuels.".
Immediately after regulation 8 of the principal regulations
there shall be added the following new regulations
" Introduction
The Minister shall introduce
measures effectively designed to ensure that
of measures.
the share of energy from renewable sources
equals or exceeds that shown in the
indicative trajectory set out in the Fourth
Schedule.
(1) The
Authority
may
Statistical
transfers
recommend to the Minister to make
between
Member States.
arrangements for the statistical transfer of a
specified amount of energy from renewable
sources from Malta to another Member State.
The transferred quantity shall be
(a) deducted from the amount
of energy from renewable sources that
is taken into account in measuring
compliance with the requirements of
regulations 3 and 9; and
(b) added to the amount of
energy from renewable sources that is
taken into account in measuring
compliance by the Member State
accepting the transfer with the
requirements of regulations 3 and 9.
(2) A statistical transfer shall not
affect the achievement of the national target
of Malta. The arrangements referred to in
sub-regulation (1) may have a duration of one
or more years. They shall be notified to the
Commission no later than three months after
the end of each year in which they have
effect. The information sent to the
Commission shall include the quantity and
(3) Transfers shall become effective
only after all Member States involved in the
transfer have notified the transfer to the
Commission.
LN
(1) The Minister may designate
Joint projects
between
an authority or entity to cooperate with one
Member States.
or more authorities from other Member
States on all types of joint projects relating to
the production of electricity, heating or
cooling from renewable energy sources. That
cooperation may involve private operators.
(2) The Authority shall notify the
Commission of the proportion or amount of
electricity, heating or cooling from renewable
energy sources produced by any joint project,
that became operational after 25 June 2009,
or by the increased capacity of an installation
that was refurbished after that date, which is
to be regarded as counting towards the
national overall target of another Member
State for the purposes of measuring
compliance with the requirements of these
regulations.
(3) The notification referred to in sub-
regulation (2) shall
(a) describe
the
proposed
installation or identify the refurbished
installation;
(b) specify the proportion or
amount of electricity or heating or
cooling produced from the installation
which is to be regarded as counting
towards the national overall target of
another Member State;
(c) identify the Member State
in whose favour the notification is
being made; and
(d) specify the period, in whole
calendar years, during which the
electricity or heating or cooling
produced by the installation from
renewable energy sources is to be
regarded as counting towards the
national overall target of the other
Member State.
(4) The period specified under sub-
regulation (3)(d) shall not extend beyond
2020. The duration of a joint project may
extend beyond 2020.
LN
(5) A notification made under this
regulation shall not be varied or withdrawn
without the joint agreement between Malta
and the Member State in whose favour the
notification is being made.
(1) Within three months of the
Effects of joint
projects
end of each year falling within the period
between
specified under regulation 11(3)(d), the
Member States.
Authority shall issue a letter of notification
stating
(a) the
total
amount
of
electricity or heating or cooling
produced during the year from
renewable energy sources by the
installation which was the subject of the
notification under regulation 11; and
(b) the amount of electricity or
heating or cooling produced during the
year from renewable energy sources by
that installation which is to count
towards the national overall target of
another Member State in accordance
with the terms of the notification.
(2) The Authority shall send the letter
of notification to the Member State in whose
favour the notification was made and to the
Commission.
(3) For the purposes of measuring
target compliance with the requirements of
these regulations concerning national overall
targets mentioned in regulation 3, the amount
of electricity or heating or cooling from
renewable energy sources notified in
accordance with sub-regulation (1)(b) shall
be
(a) deducted from the amount
of electricity or heating or cooling from
renewable energy sources, that is taken
into account in measuring compliance
by the Authority under sub-regulation
(1); and
LN
(b) added to the amount of
electricity or heating or cooling from
renewable energy sources, that is taken
into account in measuring compliance
by the Member State receiving the letter
of notification in accordance with sub-
regulation (2).
(1) The Minister may designate
Joint projects
between
an authority or entity to cooperate with one
Member States
and third
or more third countries, in collaboration with
countries.
other authorities from other Member States
on all types of joint projects regarding the
production of electricity from renewable
energy sources. Such cooperation may
involve private operators.
(2) Electricity from renewable energy
sources produced in a third country shall be
taken into account only for the purposes of
measuring compliance with the requirements
of these regulations concerning national
overall targets mentioned in regulation 3 if
the following conditions are met
(a) the electricity is consumed
in Member States, a requirement that is
deemed to be met where
(i) an equivalent amount
of electricity to the electricity
accounted for has been firmly
nominated to the allocated
interconnection capacity by all
responsible transmission system
operators in the country of origin,
the country of destination and, if
relevant, each third country;
(ii) an equivalent amount
of electricity to the electricity
accounted for has been firmly
registered in the schedule of
balance of an interconnector by
the
responsible
transmission
system operator on the part of the
Member States; and
LN
(iii) the
nominated
capacity and the production of
electricity from renewable energy
sources by the installation referred
to in sub-regulation (2)(b) refer to
the same period of time;
(b) the electricity is produced
by a newly constructed installation that
became operational after 25 June 2009,
or by the increased capacity of an
installation that was refurbished after
that date, under a joint project as
referred to in sub-regulation (1); and
(c) the amount of electricity
produced and exported has not received
support from a support scheme of a
third country other than investment aid
granted to the installation.
(3) The Authority may apply to the
Commission, for the purposes of regulation
5, for account to be taken of electricity from
renewable energy sources produced and
consumed in a third country, in the context of
the construction of an interconnector with a
very long lead-time between a Member State
and a third country if the following
conditions are met
(a) construction
of
the
interconnector started by 31 December
2016;
(b) it is not possible for the
interconnector to become operational
by 31 December 2020;
(c) it is possible for the
interconnector to become operational
by 31 December 2022;
(d) after it becomes operational,
the interconnector will be used for the
export to other Member States, in
accordance with sub-regulation (2), of
electricity generated from renewable
energy sources;
LN
(e) the application relates to a
joint project that fulfils the criteria in
sub-regulation (2)(b) and (c) and that
will use the interconnector after it
becomes operational, and to a quantity
of electricity that is no greater than the
quantity that will be exported to other
Member States after the interconnector
becomes operational.
(4) The proportion or amount of
electricity produced by any installation in the
territory of a third country, which is to be
regarded as counting towards the national
overall target of one or more Member States
for the purposes of measuring compliance
with regulations 3 and 9 shall be notified to
the Commission. When more than one
Member State is concerned, the distribution
between Member States of this proportion or
amount shall be notified to the Commission.
(5) The proportion or amount
mentioned in sub-regulation (4) shall not
exceed the proportion or amount actually
exported to, and consumed in other Member
States, corresponding to the amount referred
to in sub-regulation (2)(a)(i) and (ii), and
meeting the conditions as set out in sub-
regulation (2)(a). The notification shall be
made by the Authority when the proportion
or amount of electricity is to count towards
Malta’s overall national target.
(6) The notification referred to in sub-
regulation (4) shall
(a) describe
the
proposed
installation or identify the refurbished
installation;
(b) specify the proportion or
amount of electricity produced from the
installation which is to be regarded as
counting towards the national target as
well as, subject to confidentiality
requirements,
the
corresponding
financial arrangements;
LN
(c) specify the period, in whole
calendar years, during which the
electricity is to be regarded as counting
towards the national overall target of
Malta; and
(d) include
a
written
acknowledgement of paragraphs (b)
and (c) by the third country in whose
territory the installation is to become
operational and the proportion or
amount of electricity produced by the
installation which will be used
domestically by that third country.
(7) The period specified under sub-
regulation (6)(c) shall not extend beyond
2020. The duration of a joint project may
extend beyond 2020.
(8) A notification made under this
regulation may not be varied or withdrawn
without the joint agreement between Malta
and the third country that has acknowledged
the joint project in accordance with sub-
regulation (6)(d).
(1) Within three months of the
Effects of joint
projects
end of each year falling within the period
between
Member States
specified under regulation 13(6)(c), the
and third
Authority shall issue a letter of notification
countries.
stating
(a) the
total
amount
of
electricity produced during that year
from renewable energy sources by the
installation which was the subject of the
notification under regulation 13;
(b) the amount of electricity
produced during the year from
renewable energy sources by that
installation which is to count towards
the national overall target in accordance
with the terms of the notification under
regulation 13; and
(c) proof of compliance with
the conditions set out in regulation
13(2).
LN
(2) The Authority shall send the letter
of notification to the third country which has
acknowledged the project in accordance with
regulation 13(6)(d) and to the Commission.
(3) For the purposes of measuring
target compliance with the requirements of
these regulations concerning national overall
targets mentioned in regulation 3, the amount
of electricity produced from renewable
energy sources notified in accordance with
sub-regulation (1)(b) shall be added to the
amount of energy from renewable sources,
that is taken into account in measuring
compliance with these regulations.
(1) Without prejudice to the
Joint support
schemes.
obligations under regulations 3 and 9, the
Minister may designate an authority or entity
to join or partly coordinate national support
schemes on a voluntary basis with other
authorities from other Member States. In
such cases, a certain amount of energy from
renewable sources produced in the territory
of one participating Member State may count
towards the national overall target of another
participating Member State if the Member
States concerned
(a) make a statistical transfer of
specified amounts of energy from
renewable sources from one Member
State to another Member State in
accordance with regulation 10; or
(b) set up a distribution rule
agreed by participating Member States
that allocates amounts of energy from
renewable sources between the
participating Member States. Such a
rule shall be notified by the Authority
to the Commission no later than three
months after the end of the first year in
which it takes effect.
LN
(2) Within three months of the end of
each year, the Authority having made a
notification under sub-regulation (1)(b) shall
issue a letter of notification stating the total
amount of electricity or heating or cooling
from renewable energy sources produced
during the year which is to be the subject of
the distribution rule.
(3) For the purposes of measuring
compliance with the requirements of these
regulations concerning national overall
targets mentioned in regulation 3, the amount
of electricity or heating or cooling from
renewable energy sources notified in
accordance with sub-regulation (2) shall be
reallocated between the concerned Member
States in accordance with the notified
distribution rule.
For the purpose of regulations
Capacity
increases.
11(2) and 13(2)(b), units of energy from
renewable sources imputable to an increase
in the capacity of an installation shall be
treated as if they were produced by a separate
installation becoming operational at the
moment at which the increase of capacity
occurred.
(1) The Authority shall ensure
Administrative
procedures,
that the authorisation, certification and
regulations and
codes.
licensing procedures that are applied to
plants and associated transmission and
distribution network infrastructures for the
production of electricity, heating or cooling
from renewable energy sources, and to the
process of transformation of biomass into
biofuels or other energy products, are
proportionate and necessary.
(2) The Authority and the Malta
Environment and Planning Authority shall, in
particular, take the appropriate steps to
ensure that
LN
(a) the
authorisation,
certification and licensing procedures
including spatial planning are clearly
coordinated
and
defined,
with
transparent timetables for determining
planning and building applications;
(b) comprehensive information
on the processing of authorisation,
certification and licensing applications
for renewable energy installations and
on available assistance to applicants are
made available at the appropriate level;
(c) administrative procedures
are streamlined and expedited at the
appropriate administrative level;
(d) rules
governing
authorisation,
certification
and
licensing are objective, transparent,
proportionate, do not discriminate
between applicants and take fully into
account the particularities of individual
renewable energy technologies;
(e) administrative charges paid
by
consumers,
planners,
periti,
warranted engineers, builders and
equipment and system installers and
suppliers are transparent and cost-
related; and
(f)
simplified
and
less
burdensome authorisation procedures,
including through simple notification if
allowed by the applicable regulatory
framework, are established for smaller
projects and for decentralised devices
for producing energy from renewable
sources, where appropriate.
LN
(3) The Authority shall clearly define
any technical specifications which must be
met by renewable energy equipment and
systems in order to benefit from support
schemes. Where European standards exist,
including eco-labels, energy labels and other
technical reference systems established by
the European standardisation bodies, such
technical specifications shall be expressed in
terms of those standards. Such technical
specifications shall not prescribe where the
equipment and systems are to be certified and
should not impede the operation of the
internal market.
(4) The Authority shall recommend to
all actors, in particular local and regional
administrative bodies to ensure that
equipment and systems are installed for the
use of electricity, heating and cooling from
renewable energy sources and for district
heating and cooling when planning,
designing, building and renovating industrial
or residential areas. Local and regional
administrative bodies shall in particular
include heating and cooling from renewable
energy sources in the planning of city
infrastructure, where appropriate.
(5) The
Authority
shall,
in
collaboration with the Building Regulation
Board, ensure that there shall be introduced
in building regulations and building codes
appropriate measures in order to increase the
share of all kinds of energy from renewable
sources in the building sector. In establishing
such measures or in regional support
schemes, the Building Regulation Board may
take into account national measures relating
to substantial increases in energy efficiency
and relating to cogeneration and to passive,
low or zero-energy buildings
LN
Provided that, by the 31st December
2014, provisions for the use of minimum
levels of energy from renewable sources are
introduced in new building regulations or
building codes for the construction of new
buildings and in existing buildings that
undergo major renovation. The regulations or
building codes of practice shall permit those
minimum levels to be fulfilled, inter alia,
through district heating and cooling produced
using a significant proportion of renewable
energy sources
Provided also that, the requirement of
appropriate measures in order to increase the
share of all kinds of energy from renewable
sources in the building sector shall apply to
the armed forces, only to the extent that its
application does not cause any conflict with
the nature and primary aim of the activities of
the armed forces and with the exception of
material used exclusively for military
purposes.
(6) The
Authority
shall,
in
collaboration with the Building Regulation
Board, ensure that new public buildings, and
existing public buildings that are subject to
major renovation at national, regional and
local level fulfil an exemplary role in the
context of these regulations from the 1st
January 2012 onwards
Provided that, the obligation may be
fulfilled by complying with standards for
zero energy housing, or by providing that the
roofs or other appropriate open spaces of
public or mixed private-public buildings are
used by third parties for installations that
produce energy from renewable sources.
LN
(7) With
respect
to
building
regulations and building codes, the Building
Regulation Board shall promote the use of
renewable energy for heating and cooling
systems and equipment that achieve a
significant reduction of energy consumption.
New Building Regulations shall ensure that
energy or eco-labels or other appropriate
certificates or standards developed at
national or Community level, where these
exist, are used as the basis for encouraging
such systems and equipment.
(8) In the case of biomass, the
Authority
shall
promote
conversion
technologies that achieve a conversion
efficiency of at least 85% for residential and
commercial applications and at least 70% for
industrial applications. In the case of heat
pumps, the Authority shall promote those
that fulfil the minimum requirements of eco-
labelling
established
in
Commission
Decision 2007/742/EC of 9 November 2007
establishing the ecological criteria for the
award of the Community eco-label to
electrically driven, gas driven or gas
absorption heat pumps.
(9) In the case of solar thermal energy,
the Authority shall promote certified
equipment and systems based on European
standards where these exist, including eco-
labels, energy labels and other technical
reference systems established by the
European standardisation bodies
Provided that, in assessing the
conversion efficiency and input or output
ratio of systems and equipment for the
purposes of this sub-regulation, the Authority
shall use Community or, in their absence,
international procedures if such procedures
exist.
LN
(1) The Authority, the Building
Information
Regulation Office or the Building Regulation
and training.
Board as appropriate, shall make available
information on support measures to all
relevant actors, such as consumers, builders,
installers, periti, engineers and suppliers of
heating, cooling and electricity equipment
and systems and of vehicles compatible with
the use of energy from renewable sources.
(2) The supplier of equipment and
systems for the use of heating, cooling and
electricity from renewable energy sources
shall make available information on the net
benefits, cost and energy efficiency of such
equipment and systems.
(3) The Authority shall ensure that
certification
schemes
or
equivalent
qualification schemes become or are
available by the 31st December 2012 for
installers of small-scale biomass boilers and
stoves, solar photovoltaic and solar thermal
systems, shallow geothermal systems and
heat pumps. Those schemes may take into
account existing schemes and structures as
appropriate, and shall be based on the criteria
laid down in the Fifth Schedule. The
Authority shall recognise certification
awarded by other Member States in
accordance with those criteria.
(4) The
Authority
shall
make
available to the public information on
certification
schemes
or
equivalent
qualification schemes as referred to in sub-
regulation (3). The Authority may also make
available the list of installers who are
qualified or certified in accordance with the
provisions referred to in sub-regulation (3).
LN
(5) The
Authority
shall,
in
collaboration with the Building Regulation
Office, develop and make available suitable
guidance to all relevant actors, notably
planners, periti and engineers so that they are
able to properly consider the optimal
combination of renewable energy sources, of
high-efficiency technologies and of district
heating and cooling when planning,
designing, building and renovating industrial
or residential areas.
(6) The
Authority,
with
the
participation of local and regional authorities,
shall
develop
suitable
information,
awareness-raising, guidance or training
programmes in order to inform citizens of the
benefits and practicalities of developing and
using energy from renewable sources.".
5. Immediately after the Fourth Schedule to the principal
regulations there shall be added the following new Schedule
"FIFTH SCHEDULE
Regulation 18
Certification of installers
The certification schemes or equivalent qualification schemes
referred to in regulation 18(3) of these regulations shall be based on
the following criteria
1. The certification or qualification process shall be
transparent and clearly defined by the Authority.
2. Biomass, heat pump, shallow geothermal and solar
photovoltaic and solar thermal installers shall be certified by an
accredited training programme or training provider.
3. The accreditation of the training programme or provider
shall be effected by the Minister or by an administrative body
appointed for this purpose. The Authority shall ensure that the
training programme offered by the training provider has continuity
and regional or national coverage. The training provider shall have
adequate technical facilities to provide practical training, including
some laboratory equipment or corresponding facilities to provide
practical training. The training provider shall also offer in addition to
LN
the basic training, shorter refresher courses on topical issues,
including on new technologies, to enable life-long learning in
installations. The training provider may be the manufacturer of the
equipment or system, institutes or associations.
4. The training leading to installer certification or
qualification shall include both theoretical and practical parts. At the
end of the training, the installer must have the skills required to install
the relevant equipment and systems to meet the performance and
reliability needs of the customer, incorporate quality craftsmanship,
and comply with all applicable codes and standards, including energy
and eco-labelling.
5. The training course shall end with an examination leading
to a certificate or qualification. The examination shall include a
practical assessment of successfully installing biomass boilers or
stoves, heat pumps, shallow geothermal installations, solar
photovoltaic or solar thermal installations.
6. The certification schemes or equivalent qualification
schemes referred to in regulation 18(3) of these regulations shall take
due account of the following guidelines
(a)
Accredited training programmes should be offered
to installers with work experience, who have undergone, or are
undergoing, the following types of training
(i) in the case of biomass boiler and stove
installers: training as a plumber, pipe fitter, heating
engineer or technician of sanitary and heating or cooling
equipment as a prerequisite;
(ii) in the case of heat pump installers: training as
a plumber or refrigeration engineer and have basic
electrical and plumbing skills (cutting pipe, soldering pipe
joints, gluing pipe joints, lagging, sealing fittings, testing
for leaks and installation of heating or cooling systems) as
a prerequisite;
(iii) in the case of a solar photovoltaic or solar
thermal installer: training as a plumber or electrician and
have plumbing, electrical and roofing skills, including
knowledge of soldering pipe joints, gluing pipe joints,
sealing fittings, testing for plumbing leaks, ability to
connect wiring, familiar with basic roof materials, flashing
and sealing methods as a prerequisite; or
LN
(iv) a vocational training scheme to provide an
installer with adequate skills corresponding to a three years
education in the skills referred to in paragraphs (a), (b) or
(c) including both classroom and workplace learning.
(b) The theoretical part of the biomass stove and boiler
installer training should give an overview of the market
situation of biomass and cover ecological aspects, biomass
fuels, logistics, fire protection, related subsidies, combustion
techniques, firing systems, optimal hydraulic solutions, cost and
profitability comparison as well as the design, installation, and
maintenance of biomass boilers and stoves. The training should
also provide good knowledge of any European standards for
technology and biomass fuels, such as pellets, and biomass
related national and Community law.
(c)
The theoretical part of the heat pump installer
training should give an overview of the market situation for heat
pumps and cover geothermal resources and ground source
temperatures of different regions, soil and rock identification for
thermal conductivity, regulations on using geothermal
resources, feasibility of using heat pumps in buildings and
determining the most suitable heat pump system, and
knowledge about their technical requirements, safety, air
filtering, connection with the heat source and system layout.
The training should also provide good knowledge of any
European standards for heat pumps, and of relevant national and
Community law. The installer should demonstrate the following
key competences
(i) a basic understanding of the physical and
operation principles of a heat pump, including
characteristics of the heat pump circle: context between
low temperatures of the heat sink, high temperatures of the
heat source, and the efficiency of the system,
determination of the coefficient of performance (COP) and
seasonal performance factor (SPF);
(ii) an understanding of the components and their
function within a heat pump circle, including the
compressor, expansion valve, evaporator, condenser,
fixtures and fittings, lubricating oil, refrigerant,
superheating and sub-cooling and cooling possibilities
with heat pumps; and
(iii) the ability to choose and size the components
in typical installation situations, including determining the
LN
typical values of the heat load of different buildings and
for hot water production based on energy consumption,
determining the capacity of the heat pump on the heat load
for hot water production, on the storage mass of the
building and on interruptible current supply; determine
buffer tank component and its volume and integration of a
second heating system.
(d) The theoretical part of the solar photovoltaic and
solar thermal installer training should give an overview of the
market situation of solar products and cost and profitability
comparisons, and cover ecological aspects, components,
characteristics and dimensioning of solar systems, selection of
accurate systems and dimensioning of components,
determination of the heat demand, fire protection, related
subsidies, as well as the design, installation, and maintenance of
solar photovoltaic and solar thermal installations. The training
should also provide good knowledge of any European standards
for technology, and certification such as Solar Keymark, and
related national and Community law. The installer should
demonstrate the following key competences
(i) the ability to work safely using the required
tools and equipment and implementing safety codes and
standards and identify plumbing, electrical and other
hazards associated with solar installations;
(ii) the ability to identify systems and their
components specific to active and passive systems,
including the mechanical design, and determine the
components’ location and system layout and configuration;
(iii) the ability to determine the required
installation area, orientation and tilt for the solar
photovoltaic and solar water heater, taking account of
shading, solar access, structural integrity, the
appropriateness of the installation for the building or the
climate and identify different installation methods suitable
for roof types and the balance of system equipment
required for the installation; and
(iv) for solar photovoltaic systems in particular,
the ability to adapt the electrical design, including
determining design currents, selecting appropriate
conductor types and ratings for each electrical circuit,
determining appropriate size, ratings and locations for all
associated equipment and subsystems and selecting an
LN
appropriate interconnection point.
(e) The installer certification should be time restricted,
so that a refresher seminar or event would be necessary for
continued certification.".
€1.89
LN