Zone (Amendment) Regulations, 2012
Statutory Text (3 Articles)
L.N. 147 of 2012
MALTA RESOURCES AUTHORITY ACT
(CAP. 423)
Borehole Drilling and Excavation Works within the Saturated
Zone (Amendment) Regulations, 2012
IN exercise of the powers conferred by article 28(1) of the Malta
Resources Authority Act, the Minister for Resources and Rural
Affairs, after consultation with the Malta Resources Authority, has
made the following regulations:-
The title of these regulations is the Borehole Drilling and Citation.
Excavation Works within the Saturated Zone (Amendment)
Regulations, 2012 and these regulations shall be read and construed S.L. 423.32
as one with the Borehole Drilling and Excavation Works within the
Saturated Zone Regulations, hereinafter referred to as "the principal
regulations".
Sub-regulation (2) of regulation 6 of the principal Amends
regulation 6 of
regulations shall be amended as follows
the principal
regulations.
(a)
paragraph (d) thereof shall be substituted by the
following new paragraph
"any seawell; and"; and
(b) immediately after paragraph (d) thereof, there shall
be added the following new paragraph
"(e) any borehole to be drilled in
replacement of an irretrievably collapsed
borehole which was duly notified or
registered with the Authority as a
groundwater source used for agricultural
purposes under the Registration of
L.N. 120 of 1997.
Groundwater Sources Regulations, 1997,
or under the Notification of Groundwater
Sources Regulations.
Such replacement borehole is to be
drilled within the same "reference parcel"
(as defined under the Single Payment
Scheme Regulations) as the irretrievably
collapsed borehole
LN
Provided that such borehole shall be
certified to be "irretrievably collapsed" by
means of a signed declaration of a Perit
and be declared to be so "irretrievably
collapsed" by means of a declaration under
oath of the user of the irretrievably
collapsed groundwater source.".
€0.18
LN