48 tal-2011 - Regolamenti tal-2011 li jemendaw ir-Regolamenti dwar Ħlasijiet ta’ l-Ippjanar ta’ l-Iżvilupp
Table of Provisions (7)
Statutory Text (7 Articles)
L.N. 48 of 2011
ENVIRONMENT AND DEVELOPMENT PLANNING ACT
(CAP. 504)
Development Planning (Fees) (Amendment) Regulations, 2011
BY VIRTUE of the powers conferred by articles 60, 61, 79
and 80 of the Environment and Development Planning Act, the
Prime Minister and the Malta Environment and Planning Authority,
with the concurrence of the Minister of Finance, the Economy and
Investment, have made the following regulations:-
(a) The title of these regulations is the Development
Planning (Fees) (Amendment) Regulations, 2011, and they shall
be read and construed as one with the Development Planning
(Fees) Regulations, 2010, hereinafter referred to as “the principal
regulations”.
(b) These regulations shall be deemed to have come
into force on the 16th July, 2010.
Sub-regulation (2) of regulation 1 of the principal
regulations shall be amended as follows
(a) in paragraph (c) thereof, the words “within
30 calendar days from date of issue of the bill” shall be
substituted with the words “by the 28th February 2011”; and
(b) in paragraph (d) thereof, the words “within 30
calendar days from date of the coming into force of these
regulations” shall be substituted with the words “by the 28th
February 2011”.
Regulation 2 of the principal regulations shall be
amended as follows
(a) for the definition “demolition of a building” there
shall be substituted the following
“ “demolition of a building or structure” means
the pulling down or removal of the roof and any wall
forming such building, room within a building, or
structure;”;
(b) immediately after the definition “extension” there
shall be added the following new definition
“ “farmhouse” means a single family dwelling used
for habitation by a registered farmer;”;
(c) for the definition “floor area” there shall be
substituted the following
“ “floor area” means
(a) for residential purposes, the amount
of floor area within a building determined by
the external measurements of the building, that
includes the thickness of the external walls and
half the thickness of dividing or party walls, and
includes: any projecting rooms, staircases, lifts,
shafts, internal yards, verandahs, open terraces,
balconies, within the building footprint at each
level; washrooms; terraces formed at roof level
when these belong to penthouses or to any roof
structure exceeding 36m² (excluding washrooms
serving multiple flats); back yards, back gardens,
front gardens, estate or plot gardens, self-imposed
setbacks, at the lower level; and other structures
within the site boundaries; unless otherwise
specifically set out within these regulations; and
(b) for non residential purposes, the amount
of floor area within the site boundaries determined
by the external measurements of the building, that
includes the thickness of the external walls and
half the thickness of dividing or party walls, and
includes: any projecting rooms, staircases, lifts,
shafts, internal yards, verandahs, open terraces,
within the building footprint at each level; plant
facilities; terraces formed at roof level occupied
by structures exceeding 36m² (excluding plant
facilities); balconies; canopies and other spaces,
including open spaces, used for commercial
purposes
Provided that the void left in an intermediate
level is not to be included in the calculation of floor
area
Provided further that an internal yard shall not
be included in the calculation of floor area at the
upper level, when its size exceeds the area set out
in the following table
No. of floors
Area
8m!
8m!
9. 6m!
11. 2m!
8m!
Additional floors
8 + [(No. of floors – 2) x
1.6];”;
(d) immediately after the definition “special building” there shall be
added the (d)
immediately
after the definition “special building”
following
new definition
there shall be added the following new definition
“'social / cultural / sports / educational/forced relocation category” means
“‘social / cultural / sports / educational/
and is limited to developments concerning
(a) hospitals/nursing homes;
forced relocation category” means and is limited to
(b) residential institutions;
developments
concerning
(c) places in connection
with public
worship or religious instruction or the
social or recreational activities of a religious body;
(a) hospitals/nursing homes;
(d) educational institutions;
(e) museums;
(b) residential institutions;
(f) public libraries;
(g) social clubs / societies premises (not including any Class 6 uses bars,
(c) places in connection with public worship
restaurant);
or religious
instruction
or the social
or recreational
(h) structures housing
sports facilities,
or amenities
thereto,
excluding class
activities
of
a
religious
body;
6 uses, which do not form part of a commercial development, where the
applicant is a local council, the Kunsill Malti ghall-iSport or an entity
(d) Malti
educational
institutions;
duly registered with the Kunsill
ghall-iSport;
or
(i) development which is required to relocate by an order of Government or a
(e) !! museums;
government agency or entitiy;”.
(f)
public libraries;
(g) social clubs / societies premises (not
including any Class 6 uses bars, restaurant);
(h) structures housing sports facilities, or
amenities thereto, excluding class 6 uses, which
do not form part of a commercial development,
where the applicant is a local council, the
B
Kunsill Malti ghall-iSport or an entity duly
registered with the Kunsill Malti ghall-iSport; or
(i) development which is required to relocate
by an order of Government or a government agency
or entitiy;”.
4. In regulation 4 of the principal regulations, instead of the Amends regulation
words “Schedule 2” there shall be substituted the words “Schedule 4 regulations.
of the principal
1”.
5. Schedule 1 of the principal regulations shall be amended Amends Schedule
1 to the principal
as follows
regulations.
(a) in paragraph 1 thereof, the tables of fees shall be
substituted with the following new table of fees
5. Schedule 1 of the principal regulations shall be amended as follows
(a) in paragraph 1 thereof, the tables of fees shall be substituted with the
following new table of fees
Development
DPF
Sewer
Street
Rate (!)
Rate (!)
Rate (!)
Per
Per
Per
Per
Per
Per
m
Unit
m
Unit
m
Unit
Advertisements
-
-
-
-
104.12
Agriculture
-
-
0.96
1.98
0.94
Boathouse For Registered
-
-
Fisherman
2.08
3.29
1.88
Bungalow
-
-
11.90
5.60
2.80
Change Of Use To Non Residential
-
-
-
-
9.07
Commercial Building (including
-
-
extensions)
9.07
5.97
3.22
Disposal of Construction &
-
-
-
-
Demolition Waste
1.42
Engineering Operations
-
-
-
-
0.57
Env. & Dev. Brief / Outline
-
-
-
-
Applications - Normal Buildings
0.42
Film Set
-
-
-
-
2.12
Flat / Terraced House / Maisonette
-
-
1.24
3.08
1.68
Garages ancillary to other uses on
-
-
site
1.24
3.08
1.68
Greenhouse
-
-
-
-
0.69
Land Reclamation for Agriculture
-
-
-
-
0.71
Livestock Farm Building
-
-
-
0.96
0.94
Other garages
-
-
5.95
3.29
1.88
Penthouse
-
-
02
12.69
5.17
Plant and Machinery
-
-
-
-
0.57
Public Car Park
-
-
6.35
5.97
3.22
Quarry (New / Horizontal
-
-
-
Extension)
1.28
0.47
Social / Cultural / Sports /
Educational/Forced Relocation
5.50
-
3.00
-
1.70
(New / Change of use)
Temporary Structure / Use Of Land
-
-
-
-
2.12
Villa (Semi / Fully Detached -2
-
-
dwelling units) / Farmhouse
7.29
5.60
2.80
Waste Disposal
-
-
-
-
1.42
Satellite dishes above 2m diameter
-
-
-
-
or telecommunication antennae
150.00
Other development not otherwise
-
-
-
-
specified
150.00
Vending Machine
-
-
-
-
150.00
Overall Application Capping
(1)
Only where the change of use solely involves the use of land
150.00
Vending Machine
-
-
-
-
150.00
Overall Application Capping
(1)
Only where the change of use solely involves the use of land
Development
DPF
Sewer
Street
Rate (!)
Rate (!)
Rate (!)
Per Application
Per m
Per m
Correction Of Site, CPPS Request
150.00
-
Env. & Dev. Brief / Outline
-
applications - Special Buildings /
212.49
Extensions to dwellings,
-
Alterations, Renewal, Amended
150.00
Applications & Minor Amendments
Quarry - Vertical Extension
1,487.43
-
Special Buildings or Uses
148.74
3.29
1.88
Demolition of Building or
Environment
DPF
Structures
Fee
Rate (!)
Rate (!)
-
-
Up to 30 m
140 flat rate per
400 flat rate
application
From 31 m to 100 m
-
From 101 m to 300 m
1,000 flat rate
-
From 301 m to 600 m
1,500 flat rate
-
From 601 m to 1,000m
1,985 flat rate
1,985 for first
-
1,000m2
Remainder at
0.5 per m2
Rate
!60.00
Compliance Certificates
! 60.00
Dangerous Structure Notifications
Development Notification Orders -
!60.00
Alterations
Development Notification Orders -
!120.00
Extensions / New development
Planning Control Applications per
!235.00
150m2 of site or part thereof
(b) in the proviso to paragraph (1) thereof -
(i) paragraph 6 thereof shall be substituted with the following
“6. For new purely commercial development, or where the development is
solely a mix of commercial and social/cultural/educational/sports, the
floor area shall be charged at the rate per square meter as listed in
Schedule 1 and the Development Permit Fee and Environment Fee for
the site area shall be charged separately at the commercial rate per
B
(b) in the proviso to paragraph (1) thereof -
(i) paragraph 6 thereof shall be substituted with
the following
“6. For new purely commercial
development, or where the development is solely a
mix of commercial and social/cultural/educational/
sports, the floor area shall be charged at the rate
per square meter as listed in Schedule 1 and the
Development Permit Fee and Environment Fee
for the site area shall be charged separately at the
commercial rate per meter square; any site area
being increased in relation to proposed extensions
would also be so charged separately;”;
(ii) paragraph 10 thereof shall be substituted with
the following
“10. (1) The rate regulating the Change of
Use to Non Residential will only be applied
(a) in the case where the permission
covering the development subject of the
application for change of use is still valid,
the development subject of the application
for change of use is covered by a compliance
certificate;
or
(b) in the case where the permission
covering the development subject of the
application for change of use has expired,
the development subject of the application
for change of use is completed in accordance
with the permission on site, or is completed
and the building shows as existing as at 1968.
(2) When a residential development includes
an extension having an area exceeding 20m², where
applicable, the rate for Extensions to Dwellings,
shall be charged to cover 20m² of the area being
extended, and any area in excess of 20m 3 shall be
B
calculated at the applicable rate per square metre
applicable to the type of dwelling being extended.
(3) Where the development consists of an
extension to a commercial development which
does not bring about an increase in the site area
of the original development, the rate regulating
alterations to commercial development shall also
cover extensions up to 15m². Extensions larger
than 15m² are to be calculated at the commercial
rate, over and above the rate for alterations.
(4) When more than 75% of an existing unit
is proposed to be demolished and the construction
of new buildings or structures on site is also
proposed, the resulting development shall not
be considered as an extension to the part of the
building or structure being retained, but shall be
charged at the rate for a new unit applicable to the
type of development being proposed.
(5) Change of use into residential is to
be calculated using the same rate applied for
the construction of the relevant new residential
development.
(6) When the subdivision of an existing
residential unit, relative to which fees were paid
in accordance with the Building Levy Rates,
Regulations, 1996, is proposed, the applicable rate
L.N. 112 of 1996.
for the unit type is to be charged in relation to the
smallest created unit.”;
(iii) in paragraphs 17, 18 and 19 thereof, the word
“department” wherever it may occur, shall be substituted
with the words “entity or regulatory authority”; and
(iv) immediately after paragraph 23 thereof, there
shall be added the following new paragraph
“24. When an application, relative to which
a Development Permit Fee and Environment Fee
in excess of 2,000 euro was required and paid,
is withdrawn prior to it being decided and a new
application is submitted by the same applicant
B
on the same site within 3 months from the date
of submission of the request for withdrawal of
the original application, 40% of the Development
Permit Fee and Environment Fee paid in the
original application shall be deducted from the fees
due in relation to the new application.”.
€0.84
00
Applikazzjoni
Emendata u Emendi Minuri
1,487.43
-
-
120.00
Barriera–Estensjoni Vertikali
Bini Spe%jali jew u#i
148.74
3.29
1.88
15.00
Twaqqieg"
ta’
bini
jew
DPF
"las Ambjentali
Rata (#)
Rata (#)
-
-
Sa 30 m
140 Rata Wa#da
400 Rata Wa#da
Kull applikazzjoni
Minn 31 m sa 100 m
-
Minn 101 m sa 300 m
1,000 Rata Wa#da
-
Minn 301 m sa 600 m
1,500 Rata Wa#da
-
Minn 601 m sa 1,000m
1,985 Rata Wa#da
> 1,000m
1,985 g#all-ewwek 1,000m2
-
il-bilan! bil- 0.5 Kull m2
Rata
)ertifikati ta’ Konformita`
&60.00
ta’
Strutturi
& 60.00
Perikolu"i
Notifika ta’ Ordni ta’
&60.00
'vilupp -
Alterazzjonijiet
Notifika ta’ Ordni ta’
&120.00
'vilupp –
Estensjonijiet/'vilupp (did
Applikazzjonijiet
g"all-
Kontroll ta’ l- Ippjanar kull
&235.00
150m2 tas-sit jew parti
(b) fil-proviso mal-paragrafu (1) tag"ha -
(i) minflok il-paragrafu 6 tieg"u g"andu jid"ol il-paragrafu li $ej
“6. G"al #vilupp purament kummer%jali $did, jew fejn l-i#vilupp unikament
#vilupp
#vilupp
ikun
ta"lita
ta’
kummer%jali
u
so%jali/kulturali/edukattiv/sportiv, l-area ta’ l-art g"andha tit"allas bir-rata
g"al kull metru kwadru kif elenkati f’Skeda 1 u il-"las g"al Permess g"al
B
(b) fil-proviso mal-paragrafu (1) tagħha -
(i) minflok il-paragrafu 6 tiegħu għandu jidħol il-
paragrafu li ġej
“6. Għal żvilupp purament kummerċjali
ġdid, jew fejn l-iżvilupp unikament ikun taħlita ta’
żvilupp kummerċjali u żvilupp soċjali/kulturali/
edukattiv/sportiv, l-area ta’ l-art għandha titħallas
bir-rata għal kull metru kwadru kif elenkati
f’Skeda 1 u il-ħlas għal Permess għal Żvilupp u
l-Ħlas Ambjentali għall-area tas-sit għandha tiġi
kalkulata separatament bir-rata kummerċjali għal
kull metru kwadru; kull area tas-sit li tkun qegħda
tiġi miżjuda minħabba l-estenzjonijiet proposti
għandha wkoll hekk titħallas separatament;”;
(ii) minflok il-paragrafu 10 tiegħu għandu jidħol
dan li ġej
“10. (1) Ir-rata li tirregola il-Bidla ta’ Użu
għal Mhux Residenzjali ser tiġi applikata biss
(a) fil-każ meta l-permess li jkopri
l-iżvilupp li hu s-soġġett ta’ l-applikazzjoni
għall-bdil fl-użu jkun għadu validu, l-iżvilupp
li hu s-soġġett ta’ l-applikazzjoni jkun kopert
minn ċertifikat ta’ konformità;
jew
(b) fil-każ meta l-permess li jkopri
l-iżvilupp li hu s-soġġett ta’ l-applikazzjoni
għall-bdil fl-użu jkun skada, l-iżvilupp li hu
s-soġġett ta’ l-applikazzjoni għall-bdil ta’
l-użu jkun sar skond permess li jkun hemm
fuq is-sit, jew ikun tlesta u l-bini jkun jidher
kif kien fis-sena 1968.
(2) Meta żvilupp residenzjali jinkludi
estenzjoni ta’ area li tkun iżjed minn 20m², fejn
ikun il-każ, ir-rata għall-Estenzjonijiet għal
Residenzi għandha titħallas biex skopri 20m²
ta’ l-area li tkun qegħda tiġi estiża, u kull area li
teċċedi l- 20m² għandha titħallas skond ir-rata ta’
kull metru kwadru li tapplika għat-tip ta’ residenza
li tkun qegħda tiġi estiża.
(3) Meta l-iżvilupp ikun jikkonsisti
f’estenzjoni ta’ żvilupp kummerċjali li ma jkunx
jinvolvi żjieda ta’ l-area tas-sit ta’ l-iżvilupp
oriġinali, ir-rata li titħallas għall-alterazzjonijiet
għal żvilupp kummerċjali għandha tkopri wkoll
estenzjonijiet sa 15m². Estenzjonijiet akbar minn
15m² għandhom jitħallsu bir-rata kummerċjali,
apparti r-rata għal alterazzjonijiet.
(4) Meta l-proposta tkun li jkun hemm
twaqqiegħ ta’ izjed minn 75% ta’ unità eżistenti ,
u l-proposta tkun tinkludi wkoll il-kostruzzjoni ta’
bini jew strutturi ġodda fuq is-sit, dak l-iżvilupp
m’għandux jitqies bħala estenzjoni tal-parti tal-
bini jew struttura li tkun ser tinżamm, iżda għandu
jitħallas bir-rata ta’ unità ġdida skond it-tip ta’
żvilupp li jkun qiegħed jiġi propost.
(5) Il-bdil ta’ użu għal wieħed residenzjali
għandu jitħallas bl-istess rata li tkun tapplika għall-
kostruzzjoni ta’ dak l-iżvilupp residenzjali ġdid.
(6) Meta jkun hemm proposta ta’ qasma
ta’ unità residenzjali eżistenti, u fejn ikunu tħallsu
r-rati skond ir-Regolamenti ta’ l-1996 dwar Rati
ta’ Taxxi dwar Bini, ir-rata li tkun tapplika għat-
tip ta’ unità għandha tinħadem fuq l-iżgħar unità
oriġinata.”;
(iii) fil-paragrafi 17, 18 u 19 tiegħu, minflok
il-kliem “Dipartiment”, “dipartiment” u “dak id-
Dipartiment” kull fejn dawn jinsabu, għandhom jidħlu
l-kliem “Entità jew Awtorità Regolatorja”, “entità
jew awtorità regolatorja” u “dik l-entità jew awtorità
regolatorja” rispettivament; u
(iv) minnufih wara il-paragrafu 23 tiegħu, għandu
jidħol dan il-paragrafu ġdid li ġej
“24. Meta jkun hemm applikazzjoni, li
dwarha l-Ħlas għal-Permess għal Żvilupp u l-Ħlas
Ambjentali li jkun tħallas ikun iżjed minn 2,000
B
euro, tiġi rtirata qabel ma jkun hemm deċiżjoni
dwarha u tkun ġiet ippreżentata applikazzjoni
ġdida mill-istess applikant fuq l-istess sit fi żmien
3 xhur mid-data ta’ meta tkun saret it-talba sabiex
l-applikazzjoni oriġinali tiġi irtirata, 40% mill-Ħlas
għal-Permess għal Żvilupp u l-Ħlas Ambjentali
li jkun tħallas fl-applikazzjoni oriġinali għandu
jitnaqqas mill-ħlasijiet dovuti għall-applikazzjoni
l-ġdida.”.