L.N. 514 of 2010
ENVIRONMENT AND DEVELOPMENT PLANNING ACT
(CAP. 504)
Development Planning (Procedure for Applications and their
Determination) Regulations, 2010
BY VIRTUE of the powers conferred by subarticle (2) of
article 61 of the Environment and Development Planning Act, the
Prime Minister has made the following regulations
(1) The title of these regulations is the Development
Planning (Procedure for Applications and their Determination)
Regulations, 2010.
(2) These regulations shall come into force on the 1st
January, 2011
Provided that the provisions of regulation 5, sub-
regulation (2) of regulation 8, and sub-regulations (1), (2), (3),
and (9) of regulation 9 shall only apply in respect of applications
submitted on or after the 1st January, 2011
Provided further that the provisions of regulation 10
shall only apply in respect of applications the decision notification
of which has been issued on or after the 1st January, 2011.
In these regulations, unless the context otherwise
requires
“the Act” means the Environment and Development
Planning Act;
“application” shall have the meaning assigned to it in
these regulations
Provided that for the purposes of a Stop or Enforcement
Notice issued under the provisions of the Act, a request for
screening shall be construed as an application;
“the Authority” has the same meaning as is assigned to it
in article 2 of the Act;
“consultee” means a person, including any government
agency or authority mentioned in Schedule 3 to these
regulations, which is consulted by the Authority during the
processing of a development application, but does not include
any official of the Authority or a body or entity established
under the Act;
“drawing” means site plans, floor plans, elevations,
sections, block plans and any other method of illustrating a
proposed development;
“electronic system” means the eApplications
infrastructure of the Authority which provides a secure
interface enabling electronic communications throughout the
application process;
“material change” means
(a) a change in site configuration which affects
new land;
(b) an addition in number of floors or basements;
(c) an increase in height of the building which
would exceed the maximum height limitation in metres;
(d) an increase in density (including volume, area
or units) of more than 10%;
(e) a substantial change in the external
appearance or design;
(f) a change in the location of vehicular access
from a different street frontage;
(g) a change in the proposed use;
(h) a change in the official alignment of the
building; or
(i) a change in the position of physical
development within the site that would fall within an
area subject to different constraints;
“report” means the report prepared by the Director of
Development Planning or the Director for Environment
Protection in relation to an application for a development;
“screening” means the process during which the
proposed development is considered by the Authority and the
applicant, at the request of an applicant. The screening request
shall be made by an applicant to the Authority in accordance
with the procedures and format established by the Authority,
and which shall include
(a) an application form duly filled in and signed
by the applicant and a perit as per regulation 4(1)(b)
hereof;
(b) a site plan which is not older than twelve
months from date of submission, dimensioned drawings,
photographs of the site and its environs;
(c)
official alignments and levels as required; and
(d)
a fee as established by the Authority.
(1) No development application may be submitted
unless the applicant has requested the Authority to conduct
screening of the development proposed in the development
application. The Authority shall inform the applicant and the perit
of the date within which the screening process is to be finalised.
(2) The screening process shall be finalised within four
weeks from the submission of a request in full by the applicant
Provided that in the case of a development falling
under Schedule 1 to these regulations, the screening process may
be further extended by a period of three months from the date of
notification (within the four week period) to the applicant that the
proposed development falls under Schedule 1 to these regulations.
(3) The Authority shall notify the applicant with a
screening letter which will include all or any of the following
(a) the classification of the development in accordance
with Schedule 1 and Schedule 2 to these regulations,
or whether the proposed development is regulated by a
development order or falls under the provisions of regulation
12 hereof;
(b) whether the proposed development falls within the
types of development referred to in the Sixth Schedule to the
Act;
(c) a reference to those major issues, policies and
regulations with which the proposed development does
not conform, namely considerations relating to demolition,
land-use zoning, height limitation, constraints, environment,
enforcement, and other issues, policies and regulations
directly relating to the principle of the development;
(d) additional submissions, studies, assessments and
documentation required;
(e) consultations which will be carried out in the
processing of the eventual application;
(f) the fees and contributions which shall be payable to
the Authority before the submission of the application, on the
submission of the application, or during the processing of the
application, in accordance with the provisions of Schedule 5
to these regulations;
(g) a date within which the development application
has to be submitted in accordance with the requirements set
out in the screening letter, which date shall not be more than
three months in the case of a development which falls under
the provisions of Part A of Schedule 2 to these regulations and
not more than six months in the case of a development which
does not fall under the provisions of Schedule 1 or Part A of
Schedule 2 to these regulations.
(4) For the purposes of the provisions of article 41 of
the Act, only the items mentioned in paragraphs (b), (d) and (f) of
sub-regulation (3) hereof shall be construed as a decision of the
Authority and the applicant may lodge an appeal therefrom before
the Tribunal.
(5) The appeal shall be filed in accordance with the
provisions of the Act and the appellant shall give detailed reasons
in the written appeal to the Tribunal. The Tribunal shall appoint the
first sitting within forty-five days from submission of the appeal
and shall determine the appeal within the period established in
article 41(4) of the Act.
(6) In the case of an appeal before the Tribunal,
the terms established in accordance with the provisions of sub-
regulation (3)(g) hereof shall commence to run from the date of the
final determination of the appeal.
(1) The development application shall be submitted
within the terms established by the Authority in the screening letter
and shall consist of any updated or new documentation attached to
the screening request. It shall include
(a) all the documentation, studies, and requirements,
as set out in the screening letter;
(b) the completed application form wherein
(i) all sections of the form shall be filled in
correctly. Moreover, no section or question may be left
blank and where sections or questions are irrelevant,
they should be marked “N/A”. Where a yes or no or
similar answer is required, one of the alternatives shall
be correctly selected;
(ii) the particulars of both applicant and perit
should be fully and clearly indicated, particularly the
name, address and ID number. Contact details, as well
as perit’s or the partnership of periti warrant number, are
obligatory;
(iii) in the case of applications that are submitted
on behalf of a corporate body or by a warranted
partnership of periti, an identifiable person, duly
authorised by the company or partnership represented,
shall take responsibility for the application on behalf of
the company or partnership. Accordingly, the particulars
of the individual person are still required;
(iv) unless a perit is submitting his own personal
application, the applicant’s personal address and
telephone number shall be provided and they may not be
substituted by a repetition of the perit’s contact details.
(v) only one type of application that correctly
corresponds to the proposed development should be
selected, by ticking. Proposals that contain conflicting
details are not acceptable;
(vi) the description of development should be
clear and in detail, avoiding the use of complex and
technical terminology or unexplained acronyms. It
should include
(a) the proposed height of the development
in storeys;
(b) the overall type of development;
(c) the existing and proposed use or uses;
(d) the number and type of units (dwellings,
garages);
(e) for alterations, a concise but complete
summary of proposed works;
(f) for extensions, the location and number
of storeys;
(g) for amended permission, a
comprehensive outline of the differences between
the original and amended proposal;
(vii) the perit’s and applicant’s declarations
should be completed;
(c) a full set of drawings is required for all types of
development, except for renewal applications. Such drawings
should be clear and bold enough to enable printing without
loss of detail. All text entries contained therein should be
clearly legible without the need for magnification. Drawings
should conform to the Submission Requirements Checklist
published as a Circular to Periti;
(d) a site location plan should be submitted and
compiled as set out in the Submission Requirements
Checklist;
(e) at least three good quality colour photographs
faithfully showing the current and latest state of the site are
required as set out in the Submission Requirements Checklist;
(f)
drawings, which shall all be dimensioned, listed
with their title, date of issue and the perit’s unique reference
number. Legends and dimensions on drawings should be clear
and legible;
(g) a copy of the latest relevant permission and relevant
approved drawings for the previously approved development,
indicating the area affected by the proposed development;
(h) mandatory site-related information as set out in the
Submission Requirements Checklist;
(i) additional supplementary information required as
set out in the Submission Requirements Checklist;
(j) any fees and contributions due in relation to the
proposed development
Provided that any fees and contributions due may be
payable to the Authority before the submission of the application,
on the submission of the application, or during the processing of
the application, in accordance with the provisions of Schedule 5 to
these regulations.
(2) Reference is always to be made to the Submission
Requirements Checklist when submitting required documentation.
(3) The application shall only be considered as valid
if it is submitted as stated above, and the Authority shall establish
such date as from when it considers the application to be valid as
the validation date
Provided that if the application as submitted is not
compiled as stated above and in line with the screening letter,
the Authority shall allow a term not exceeding four weeks within
which the applicant shall comply with the above to enable the
Authority to validate the application, failing which, the application
and its accompanying documentation shall be automatically
withdrawn by the Authority.
(1) Changes in the application, drawings or documents
which do not constitute a material change may be made by the
applicant
(a) between the screening letter and the validation date
of the application;
(b) during the processing of the application
(i) in the case of a development mentioned in
Part A of Schedule 2 to these regulations, only within
four weeks from the validation date;
(ii) in the case of a development not mentioned in
Schedule 1 or Part A of Schedule 2 to these regulations,
only within sixteen weeks from the validation date;
Provided that in the opinion of the Authority such
a change does not affect consultations or does not require the
payment of additional fees payable to the Authority.
(2) Changes in the application, drawings or documents
which do not constitute a material change may be made at the
request of the Authority at any time during the processing of the
application within the time frames given by the Authority.
(3) A material change in the application, drawings or
documents is not allowed
(a) between the screening letter and the validation
date of the application, unless such a change is a result of the
screening letter;
(b) during the processing of an application for a
development mentioned in Part A of Schedule 2 to these
regulations; or
(c) after the lapse of eight weeks from the validation
date in the case of any other development
Provided that such a material change may only be
considered as valid if the applicant pays the relative fees payable
to the Authority as a result of such a change, if any, within two
weeks from the date of issue of a revised bill by the Authority as a
result of such a request by the applicant. This shall be done without
prejudice to the proviso to sub-regulation 4(3).
(4) When a material change in the application,
drawings or documents is permitted as aforesaid, the procedures set
out in sub-regulations (1) to (5) of regulation 6 of these regulations
shall apply.
(5) Any change of applicant or of the perit may only be
made through a form established by the Authority.
(1) The Authority shall cause the proposal together
with the name of the applicant to be published in the local press
and also advertised by means of a notice affixed on the site.
(2) The Authority shall be responsible to affix the
notice on site and the applicant shall be responsible to ensure that
the notice remains affixed on site for the period stipulated in the
said notice. The Authority shall also affix a notice of development
applications submitted in a locality on any notice board made
available for such purpose by the local council of such a locality.
(3) The Authority shall inform the applicant and the
perit that the notice has been affixed on site.
(4) In the case of an application for a development
mentioned in Schedule 1 to these regulations, the notice on site
shall be in a format established by the Authority and shall be
placed by the applicant in those areas specified by the Authority.
The applicant may also be requested to place additional adverts
in the local press and to hold consultations in relation to such an
application and the term for any person to declare an interest in the
said application in accordance with the provisions of the Act shall
apply for each advert.
(5) Without prejudice to the aforesaid, a copy of
any application and the relative site plan shall be served by the
Authority on the local council in whose locality the development is
being proposed to be carried out.
(6) Upon the determination of the application, the
Authority shall cause the proposal together with the name of
the applicant and a note as to whether the application has been
approved or refused to be published in the local press.
(1) Any person may declare an interest in a
development application in accordance with the provisions of
article 68(4) of the Act.
(2) Such an interest must be registered with the
Authority within twenty days from the date of publication of the
notice of an application in a local newspaper
Provided that such period may be shortened to six days
in urgent cases as may be indicated in the publication
Provided further that the Authority may extend the
aforesaid period up to thirty days in the case of an application
for a development mentioned in Schedule 1 to these regulations,
and in such case it shall give notice of such extension in the said
publication.
(3) Such an interest must be registered by means of a
written communication, in the Maltese or English language, and
must include a postal address or an electronic address, at which all
communication by the Authority or the Tribunal, as the case may
be, shall be made.
(4) For the purposes of these regulations and of
articles 41 and 68 of the Act, paragraph 11 of the First Schedule of
the Act, and paragraph 11 of the Second Schedule of the Act, any
notification or service of a decision to such an interested third party
shall be made by the Authority or the Tribunal, as the case may
be, through a letter sent by normal post to the postal address or by
means of an electronic communication to the electronic address, if
any, notified in accordance with the provisions of sub-regulation
(3) hereof.
(1) All consultees and the applicant’s perit shall
register with the Authority through the Authority’s electronic
system. All communication between the Authority and the said
consultees and the applicant’s perit, including the submission of
the screening request and the submission of the application, can
only be made through the said electronic system.
(2) The perit shall comply with a request for a change
of the drawings, including a revised development profile form, or
documents as requested by the Authority within twenty-one days
from such a request, or within the term set out by the Authority in
its request, failing which the Authority shall construe such a failure
as a refusal by the perit to comply with such a request.
(3) All consultees listed in Part B of Schedule 3 to
these regulations shall comply with a request for consultation by
the Authority, made in relation to development falling within Part
A of Schedule 2 to these regulations, within seven days from such a
request. All consultees shall comply with a request for consultation
by the Authority, made in relation to development not falling within
Part A of Schedule 2 to these regulations, within thirty days from
such a request. The Authority shall construe any failure to comply
with these timeframes as a no objection by the said consultee to the
request.
(4) The Authority shall cause a copy of the report
compiled by the Authority in relation to the proposed development
to be communicated to the perit and applicant, who shall be
allowed to make submission on the said report within twenty-one
days from the date of communication of the report to the perit.
(5) Any person who has declared an interest in the
said application as aforesaid shall be informed of the date of
completion of the report compiled by the Authority in relation to
the development on which he has made submissions and shall be
allowed to make written submissions on the said report by not later
than ten days prior to the date of the sitting of the Authority or the
Commission.
(6) Any such notification shall also include the date
of the sitting of the Authority or the Commission, as the case
may be, during which the said application shall be discussed and
determined by the Authority or the Commission.
(7) All submissions to the Authority by any person,
including consultees and the perit, shall be made within the
terms established under the Act, these regulations or as specified
in the notice requesting such submissions, and if such a person
fails to make such submissions within such terms, then, without
prejudice to the submissions that such a person may have already
made during the course of the processing of the application, this
shall be construed that such a person has no submission or further
submissions to make on the said application.
(8) Late or incorrect submissions and submissions
with erroneous reference numbers will not be considered by the
Authority or the Commission.
(1) Subject to the provisions of the Act and of these
regulations, the Authority shall appoint the sitting of the Authority
or the Commission during which the application for a development
shall be discussed and determined by the Authority or the
Commission
(a)
within fifty-two weeks from the validation date
in the case of a development which does not fall under the
provisions of Schedules 1 and 2 if such a development is
outside the development boundaries as established in a local
plan or any other plan;
(b) within twenty-six weeks from the validation date
in the case of a development which falls under the provisions
of Part B of Schedule 2 to these regulations and in the case
of any other development which does not fall under the
provisions of Schedule 1 and Schedule 2 to these regulations
if such a development is within the development boundaries
as established in a local plan or any other plan;
(c) within twelve weeks from the validation date in
the case of a development which falls under the provisions of
Part A of Schedule 2.
(2) Unless otherwise provided for in the Act or in these
regulations, the terms established in sub-regulation (1) hereof shall
not be suspended.
(3) If
(a) the Authority is required to cause the proposal
together with the name of the applicant to be republished in
the local press and also re-advertised by means of a notice
affixed on the site due to an error, then the terms established
under paragraphs (a), (b) and (c) of sub-regulation (1) hereof
shall be automatically extended by a period of four weeks;
(b) the applicant makes a material change to the
application, drawings or documents in accordance with the
provisions of sub-regulation (3) of regulation 5, then the terms
established under paragraphs (a) and (b) of sub-regulation (1)
hereof shall be automatically extended by a period of eight
weeks;
(c) within the timeframe set out in regulation 8(4),
the applicant makes a request, based on a valid reason, for
a deferral of the sitting of the Authority or the Commission
as the case may be, then the terms established under
paragraphs (a), (b) and (c) of sub-regulation (1) hereof shall
be automatically extended by a period of two weeks, and the
provisions of paragraph 11 of the First Schedule to the Act
shall apply; and
(d) the applicant contests a decision of a consultee
(under the provisions of a law regulating such a consultee and
informs the Authority in writing) or appeals the computation
of the fees being levied by the Authority before the Tribunal,
then the terms established under paragraphs (a), (b) and (c)
of sub-regulation (1) hereof, or the timeframes established
by the Authority in the screening letter shall be automatically
extended by a period equivalent to the period between the date
when the Authority is notified of such contestation or appeal
and the date when the Authority is notified of the decision of
such body or Tribunal.
(4) If the Authority or the Commission intends to
overturn the recommendation of the Directorate, the Authority or
the Commission, as the case may be, they shall request, in addition
to the requirements of the Act, the Director of Planning to update
the report on the application and to include a list of conditions, and
defer the determination of the application in accordance with the
provisions of paragraph 11 of the First Schedule to the Act, and the
perit shall be informed of the updated report prior to the date of the
deferred sitting.
(5) If the Authority or the Commission imposes the
payment of a fine, planning gain or any other contribution, or
the provision of a financial guarantee or any other requirement,
as a condition to the approval of a development application, the
applicant shall, unless otherwise instructed by the Authority or the
Commission as the case may be, affect such a payment or provide
such an assurance or document within a period of six months from
the date of notification of a notice to this effect, failing which, the
application shall be automatically deemed as dismissed.
(6) The Authority, the Commission or the Director
of Planning, as the case may be, shall be authorised to amend the
proposal of the development so as to better reflect the principle of
the development without the need to comply with the provisions of
regulation 6(1) to 6(5) of these regulations.
(7) The decision of the Authority is to be
communicated to the applicant, the perit and any person who
registered an interest in the application within fifteen days from
the date of the decision, or within fifteen days from the date of
submission by the applicant of any further information requested
by the Authority in furtherance of its decision.
(8) For the purposes of these regulations and of article
41 of the Act
(a) the service of a decision to the applicant shall
be made by the Authority through a letter sent by normal
post to the postal address of the applicant as indicated
in the application form, and by means of an electronic
communication to the perit;
(b) a copy of any approved drawings or documents
shall be served by the Authority to the applicant and the perit
by normal post to the postal address of the applicant and perit
as indicated in the application form;
(c) the service of a decision to the interested third party
shall be made in accordance with the provisions of regulation
7(4) hereof;
and the term mentioned in article 41(2) of the Act
shall commence from the date of publication of the notice
of the decision in a local newspaper in accordance with the
provisions of regulation 6(6) hereof.
(9) When the original or extended period mentioned in
sub-regulation (1) has expired, and the Authority has not appointed
the sitting of the Authority or the Commission during which the
application for a development shall be discussed and determined
by the Authority or the Commission, the applicant may request the
Chairman of the Authority by means of a registered letter that his
application be dealt with as follows
(a) on receipt of the afore-mentioned registered letter,
the Chairman of the Authority shall first establish whether
the original or extended period mentioned in sub-regulation
(1) has expired. If the Chairman of the Authority is of the
opinion that such is not the case, he shall inform the applicant
accordingly giving reasons thereof;
(b) if such period has expired, the Chairman of the
Authority shall order the Director of Planning to process the
application, to draw up the application report and to refer
same to the Chairman of the Authority within seven days
from the date of receipt, by the Chairman of the Authority, of
such a letter;
(c) when the Chairman of the Authority receives the
Director’s report, he shall comply with the provisions of
regulations 8(4), 8(5) and 8(6);
(d) if the application is not brought before the
Authority or the Commission for determination as mentioned
in paragraph (c), or if the Authority or the Commission,
as the case may be, after taking a decision fails to issue
the permission in accordance with the provisions of this
regulation, the application shall be deemed to have been
approved and the Secretary of the Authority shall forthwith
issue the relative development permission subject to such
standard conditions which are normally imposed in a
development permission and also subject to conditions which
are based on the development parameters and environmental
constraints resultant from the local plan or any other plan,
policy or regulation. In such a case the conditions of the
permission shall prevail over the drawings or documents.
(1) A reconsideration from a decision of the Authority
is only possible if
(a) the Authority or the Commission, as the case may
be, has approved an application for a development; and
(b) the request for a reconsideration is made in
relation to a condition of the decision of the Authority or
the Commission approving the said application, and which
condition is not related to the approved height or number of
floors or the use of the development.
(2) No change in the application, drawings or
documents may be allowed at reconsideration stage. The request
for reconsideration can only be made by the same perit and
applicant of the original application, unless the change of perit and
the change of applicant procedures are followed.
(3) The provisions of regulations 7(4), 8(4), 8(5), 8(6),
9(4) and 9(5) of these regulations shall apply mutatis mutandis to
the procedure to be used by the Authority or the Commission in the
processing of the request for a reconsideration.
(4) A report by the Director of Planning or the
Director of Environment Protection, in relation to the request for
reconsideration, shall be finalised within twenty-eight days from
receipt of the request for reconsideration and the Authority or the
Commission, as the case may be, shall be convened to discuss and
determine the said request within twenty-eight days from the date
of notification of the report to the perit.
(5) If an appeal has been lodged with the Tribunal
by any interested third party in accordance with the provisions
of article 41(1)(c) of the Act and the applicant submits a request
for reconsideration in accordance with the provisions of this
regulation, the procedures before the Tribunal shall be suspended
until the request for the reconsideration has been determined and
a copy of the decision has been submitted to the Tribunal by the
applicant, and any time periods established under the provisions
of article 41 of the Act in relation to the procedures before the
Tribunal shall commence from the date of receipt by the Tribunal
of the decision on the reconsideration.
(1) An Environment and Development Brief may be Environment and
made only in relation to any development mentioned in Schedule Development Brief.
1 to these regulations or if so required in a local plan or any other
plan.
(2) An application for an Environment and
Development Brief shall be made in the format established by
the Authority, and the provisions of regulation 3, regulation 4,
sub-regulations (1) to (5) of regulation 6, regulation 7, and sub-
regulations (4) and (5) of regulation 9 hereof shall, as the case
may be, apply to the application for and determination of such an
Environment and Development Brief
Provided that for the purposes of the provisions of article
41 of the Act, and in addition to the provisions of sub-regulation
(4) of regulation 3, the items mentioned in paragraph (a) of sub-
regulation (3) of regulation 3 shall be construed as a decision of the
Authority and the applicant may lodge an appeal therefrom before
the Tribunal
Provided further that, where required in a local plan or
any other plan, the formulation and approval of the Brief shall be
in accordance with the provisions of article 58 of the Act.
(3) An Environment and Development Brief shall be
valid for such a period as established by the Authority, but may, in
no case, be valid for more than two years from date of approval.
(1)
Minor amendment requests can only be
(a) submitted to amend approved drawings and
documents of development permissions; and
(b) made by the same perit and applicant of the
original application, unless the change of perit and the change
of applicant procedures are followed.
(2) Conditions of permissions cannot be amended
through the minor amendment procedure.
(3) An amendment to approved drawings and
documents shall be minor when it relates to
(a) changes which refer to development which is
otherwise permitted through the Development Notification
Order, or similar order; and
(b) amendments which satisfy all of the following
specifications
(i) do not materially alter the character and
external appearance of a site;
(ii) do not result in a development that no longer
accords with the character of the surrounding area;
(iii) do not significantly alter the overall form or
nature of the development;
(iv) do not involve a change of use or change the
scale of the development;
(v) do not affect the substance or overall form of
a landscaping scheme;
(vi) do not require additional car parking on
site, or which would lead to a shortfall in car parking
provision on site; and
(vii) do not increase the number of parking
spaces on site.
(4)
Requests for minor amendments are to be
submitted through the electronic system, provided that
(a) the minor amendment application form is used and
duly filled in;
(b)
the permission has not expired and it is still valid;
and
(c) the development is not listed in the Sixth Schedule
to the Act.
(5) The minor amendment application shall include
(a) amended drawings and documents;
(b)
the correct fee due; and
(c) any revision or update of any approved documents,
where applicable.
(6) Each drawing must indicate clearly all the proposed
changes in conventional colours. The colour coding needs to be
indicated on the same drawing. The same number and format of
drawings (including positioning of floor plans, elevations, sections
on drawings) shall be retained.
(7) Amendments to approved documents may arise
from the proposed minor amendments, such as amendments to
Fire Safety and Ventilation Reports, Accessibility Audit Reports,
Restoration Method Statements, or conditions set out by other
Authorities or Government Departments. In such cases, clearance
should be sought prior to the submission of the minor amendment
application and a copy of such clearance or any updated report,
as necessary, shall be attached to the minor amendment request
together with the proposed drawings endorsed by the competent
persons or authorities accordingly.
(8) Amendments to the approved drawings and
documents could be considered through the minor amendment
procedure provided that the changes
(a) are minor in accordance with the provisions of sub-
regulation (3) hereof;
(b)
can all be shown in conventional colours on the
same drawing;
(c) do not give rise to new material planning
considerations;
(d) do not constitute a material change from the
previously approved drawings;
(e) do not affect the way in which the material
considerations raised by the development had originally been
assessed or addressed;
(f) do not refer to other parts or areas of a building
or site which were previously not affected by development
approved through the permission;
(g)
do not conflict with any current legislation or
policy;
(h) do not include any development which is not
covered by an approved policy;
(i) do not conflict with any condition of the
permission;
(j) do not conflict with a decision taken by the
Authority or Commission, even if this is not a condition of
the permission;
(k) do not result in an increase of non-residential
floorspace as previously approved;
(l) do not require the payment of additional fees;
(m) do not extend beyond the site boundaries as
defined on the approved site plan and drawings; and
(n) do not affect the objections raised during the public
consultation period.
(9) The Development Notification Order (or a similar
order) procedure cannot be used to amend a valid permission. The
minor amendment procedure must be followed in such instances.
(10)
Interested third parties who had complied with
the provisions of regulation 7 of these regulations in the original
application, shall be notified, in accordance with the provisions of
regulation 7, of the submission of a request for minor amendments.
Only such parties shall be allowed to submit further representations
in writing, provided that these representations are received by the
Authority within a period specified by the Authority and, in any
case, not later than fourteen days from the receipt of the minor
amendment request. The minor amendment assessment shall take
into account any valid representations received.
(11) Requests for minor amendments are to be dealt
with as expeditiously as possible and the Authority shall issue a
written decision within twenty-eight days from the receipt of the
request, without any extensions of time. Any requests for minor
amendments which do not conform to any of the above sub-
regulations hereof shall be refused by the Authority, provided
that the Authority clearly specifies the reasons for refusing such
requests. There shall be no refund of the fees paid, whatever the
circumstance.
(12) In approving minor amendments, the Authority
may include additional conditions, provided that these conditions
relate only to the minor amendments being approved and not to
the other development already approved in the original permission,
unless rendered necessary by the implications of the amendments
on the overall development. The conditions of the original
permission always remain valid and the development, as amended,
is still subject to these conditions. The validity of the minor
amendment approval expires with the validity of the permission.
(13) There shall be no right of reconsideration, appeal,
or third party appeal from a decision on a minor amendment
request. Where the request cannot be considered through the
minor amendment procedure or where the proposed changes are
significant, an amended or a full development application should
be submitted.
The terms established in these regulations shall be
suspended only during such period when the Authority’s offices
are closed as specified in Schedule 4 to these regulations. No
submissions will be accepted during this period.
(1) Without prejudice to article 70 and the Sixth
Schedule to the Act, when existing development on a site is
wholly or partly illegal, the Authority shall refuse a development
application relating to new development on that site, unless the
illegal development is included for sanctioning and the illegal
development complies with current policies.
Provided that for the purposes of this regulation, a
development falling under Category B of the Eight Schedule of the
Act shall not be construed as illegal development.
(2) The illegal development may either be regularised
through a specific development application solely for that
purpose or through a development application which includes
the sanctioning of illegal development as well as proposed new
development.
(3) Where sanctioning of illegal development is being
requested in a development application, the proposal description
and the drawings shall clearly indicate the development which is
to be sanctioned so as to ensure that the unauthorised development
forms part of the development application.
(4) The proposal description of a development
application and the drawings submitted shall not propose the
removal of illegal development from the site. The development
application shall include only illegal development which is
proposed to be sanctioned.
(5) Any illegal development which is not indicated for
sanctioning in a development application shall be removed prior to
the submission of the development application or, without prejudice
to regulation 14(4), prior to the issue of a development permission,
provided that where the application is determined by the
Authority, the Commission, or the Tribunal subject to the removal
of the illegal development prior to the issue of the development
permission, the period by which the applicant is required to comply
with this requirement shall not exceed six months, failing which,
the application shall be automatically deemed as dismissed by the
Authority, the Commission or the Tribunal, as the case may be.
The Authority, the Commission and the Tribunal shall not impose
a bank guarantee or a condition requiring the removal of illegal
development subsequent to the issue of a development permission.
(6) Where parts of a site or building are illegal,
permission for new development elsewhere on the site or building
shall not be refused solely because there are illegalities on the site
or building subject to all of the following
a)
the application does not include the illegal parts;
and
b) granting permission for the new development will
not physically prevent, hinder or make difficult enforcement
action, either removal or rectification, against the illegal parts;
and
c) the applicant has no control, whether directly
or indirectly, over the illegal parts or the applicant was not
involved directly or indirectly in the illegal development.
Schedule 1: Types of applications
(a) Projects which require or may require
•
an Environment Impact Assessment
•
an Appropriate Assessment
•
a Traffic Impact Statement, or
•
any specialist environmental or technical assessment or report;
(b) development which is subject of a Development Brief, Action Plan or
Subject Plan, or falling within an area identified in a Local Plan as requiring a brief
or a comprehensive scheme;
(c) development which, in the opinion of the Authority, is a development of
national importance;
(d)
development with a site area larger than 5,000m²;
(e) development which is regulated by a specific policy which allows the
increase in the height limitation established in a local plan;
(f)
residential development with more than 40 residential units;
(g) new hotel or tourist accommodation projects (or extensions) with a site
area larger than 500m²;
(h) new commercial development (or extensions) with a gross floorspace
larger than 750m²;
(i) new sports or entertainment projects (or extensions) with a gross
floorspace larger than 500m²;
(j)
new hospitals (or extensions) with a gross floorspace larger than 500m²;
(k)
new schools (or extensions) with a gross floorspace larger than 500m²;
(l) industrial or warehousing development located within an approved
industrial estate and with a gross floorspace larger than 1,000m²;
(m) industrial or warehousing development not located within an approved
industrial estate and with a gross floorspace larger than 500m²;
(n)
new waste management projects; or
(o)
national infrastructure projects.
B
Schedule 2: Types of applications
A. Development proposed to be carried out within the limits of the
development zone established in a local plan or other plan, subject to both (a) and
(a) All the following apply
(i) development not within an Urban Conservation Area or Design
Priority Area as established in a local plan or any other plan;
(ii) development not on scheduled buildings and not within
scheduled areas or Special Areas of Conservation;
(iii) development not falling within a special constraint area as
established by the Authority, including Civil Aviation Public Safety
Zones, water galleries and major utility infrastructure;
(iv) development not falling within Residential Priority Areas,
including villa and bungalow zones, as established in a local plan or any
other plan;
(v) development not within an industrial zone;
(vi) development which does not qualify as an internal
development;
(vii) development not requiring a specialised assessment as
required by the Authority, or technical assessment, such as a fire safety
and ventilation report, noise report or restoration method statement;
(viii) development with a site area smaller than 1,000m²;
(ix) development not involving the demolition of building
structures which are indicated on the 1968 survey sheets or 1957 aerial
photos; and
(x) development not abutting onto a schemed stairway.
(b) Any of the following apply
(i) new residential development or alterations or extensions with
less than 20 units;
(ii) new garages or extensions to garages with less than 25 parking
spaces;
(iii) new hotel and tourist accommodation projects and extensions
with a gross floorspace smaller than 100m²;
(iv) new commercial development or extensions or alterations
with a gross floorspace less than 250m²;
(v) new sports or entertainment projects and extensions or
alterations with gross floorspace smaller than 100m²;
(vi) new hospitals, clinics, old people’s homes, and child care
facilities and extensions or alterations with a gross floorspace smaller
than 100m²;
(vii) new schools and extensions with a gross floorspace smaller
than 100m²; or
(viii) new or alterations to shopfronts, billboards or signs.
B. The following development proposed to be located outside the limits of
the development zone established in a local plan or other plan, subject to both (a)
and (b) below
(a) All the following apply
(i) development not on scheduled buildings, scheduled areas,
Special Areas of Conservation, or a special constraint area as established
by the Authority, including Civil Aviation Public Safety Zones, water
galleries, springs and major utility infrastructure;
(ii) non-marine development or development not affecting the
seabed or the shore; and
(iii) development not requiring a specialized assessment as
required by the Authority, or technical assessment, such as a fire safety
and ventilation report or noise report.
(b) Any of the following apply
(i) residential development within Category 1 or 2 ODZ
Settlements with a gross floorspace not larger than 200m²;
(ii) buildings or structures with a gross floorspace not larger than
100m² in area; or
B
(iii) change of use with a site area not larger than 150m².
Any development not specified in the criteria A(b) and B(b) listed in this
Schedule shall not qualify under this Schedule.
Schedule 3: Consultees
A External consultees
(1) Any regulatory authority established under any Law;
(2) Superintendent of Cultural Heritage.
External consultees with representative office at the Authority
(1) Enemalta Corporation;
(2) Kummissjoni Nazzjonali Persuni b’Diżabilità;
(3) Sanitary Engineering Officer.
B
Schedule 4: Shut Down Period
The offices of the Authority shall be closed between 23rd December of any
year and 1st January of the following year, both days included.
B
Schedule 5: Staggering of payments
(1) In the case of an application for a development listed in Schedule 1, the
Authority may, in the screening letter issued in accordance with the provisions of
regulation 3(3) hereof, request the applicant to pay up to 50% of the Development
Permit Fee between the date of issue of the screening letter and the date of
validation of the application.
(2) In the case of an application where the fees payable to the Authority are
in excess of one hundred thousand euro (€100,000), the Authority shall validate
the application if the applicant specifically notifies in writing that only the full
amount of both the Development Permit Fee and Environmental Fee, and 10%
of the Infrastructure Services Contribution are being paid with the submission
of the application. The remaining balance of 90% of the Infrastructure Services
Contribution shall be payable by the applicant upon the determination of the
application but prior to the issue of the development permission, and the provisions
of regulation 9(5) hereof shall apply.
€2.70