Strategic Environmental Assessment Regulations, 2010
Table of Provisions (21)
Statutory Text (21 Articles)
VERZJONIELETTRONlKA
L.N. 497 of 2010
ENVIRONMENT PROTECTION ACT
(CAP. 435)
Strategic Environmental Assessment Regulations, 2010
IN exercise of the powers conferred by article 17 of the
Environment Protection Act, the Prime Minister has made the
following regulations:-
Part I
Preliminary
(1) The title of these regulations
the Strategic Citation and
IS
.
1 A ssessment Regu I·
atlOns, 2010 .
commencement.
EnVlronmenta
(2) These regulations shall come into force on such date as the
Minister responsible for the environment may by notice in the Gazette
appoint, and different dates may be so appointed for different
purposes and different provisions of these regulations.
Information referred to in regulation 6( 1)
The information to be provided under regulation 6(1), subject to regulation
6(2) and (3), is the following
(a)
an outline of the contents, main objectives of the plan or programme
and relationship with other relevant plans and programmes;
(b)
the relevant aspects of the current state of the environment and the
likely evolution thereof without implementation of the plan or
programme;
(c)
the environmental characteristics of areas likely to be significantly
affected;
(d)
any existing environmental problems which are relevant to the plan or
programme including, in particular, those relating to any areas of a
particular environmental importance, such as areas designated pursuant
to Directives 79/409/EEC and 92/43/EEC;
(e)
the environmental protection objectives, established at international,
European or national level, which are relevant to the plan or programme
and the way those objectives and any environmental considerations
have been taken into account during its preparation;
(f)
the likely significant effects on the environment, including on issues
such as biodiversity, population, human health, fauna, flora, soil, water,
air, climatic factors, material assets, cultural heritage including
architectural and archaeological heritage, landscape and the inter-
relationship between the above factors. These effects should include
secondary, cumulative, synergistic, short, medium and long-term
permanent and temporary, positive and negative effects;
(g) . the measures envisaged to prevent, reduce and as fully as possible offset
any significant adverse effects on the environment of implementing the
plan or programme;
(h)
an outline of the reasons for selecting the alternatives dealt with, and a
description of how the assessment was undertaken including any
difficulties, such as technical deficiencies or lack of know-how,
encountered in compiling the required information;
(i)
a description of the measures envisaged concerning monitoring m
accordance with regulation 11;
(j)
a non-technical summary of the information provided under the above
VERZJONIELETTRONlKA
headings.
(1)
The objective of these regulations is to provide for a Objectives.
high level of protection of the environment and to contribute to the
integration of environmental considerations into the preparation and
adoption of plans and programmes with a view to promoting
sustainable development, by ensuring that, in accordance with these
regulations, a strategic environmental assessment is carried out of
certain plans and programmes which are likely to have significant
effects on the environment.
(2) These regulations transpose the prOVlSlons of Directive
2001l42/EC of the European Parliament and of the Council on the
-assessment of the effects of certain plans and programmes on the
environment.
Criteria for determining the likely significance of effects
referred to in regulation 4(5)
1. The characteristics of plans and programmes, having regard,
III
(a)
the degree to which the plan or programme sets a framework for
projects and other activities, either with regard to the location, nature, size
and operating conditions or by allocating resources,
(b)
the degree to which the plan or programme influences other plans
and programmes including those in a hierarchy,
(c)
the relevance of the plan or programme for the integration of
environmental considerations in particular with a view to promoting
sustainable development,
(d)
environmental problems relevant to the plan or programme,
(e)
the relevance of the plan or programme for the implementation of
Community legislation on the environment, such as plans and programmes
linked to waste-management or water protection.
2. Characteristics of the effects and of the area likely to be affected, having
regard, in particular, to
(a)
the probability, duration, frequency and reversibility of the
(b)
the cumulative nature of the effects,
(c)
the transboundary nature of the effects,
(d)
the risks to human health or the environment (e.g. due to
accidents),
(e)
the magnitude and spatial extent of the effects (geographical area
and size of the population likely to be affected),
(f)
the value and vulnerability of the area likely to be affected due to
(i)
special natural characteristics or cultural heritage,
VERZJONIELETTRONlKA
(ii)
exceeded environmental quality standards or limit values,
(iii) intensive land-use,
(g)
the effects on areas or landscapes which have a recognised
national, Community or international protection status.
lppubblikat mid·Dipartiment taI.Informazzjoni (doi.gov.mt) - Valletta - Published by the Department ojlnjormoJion (doi.gov.mt) - Valletta
Mitbugh II-Istamperija taI-Gvern fuq karta riciklata - Printed at the Government Printing Press on recycled paper
Prez:z1Price
€1.30
(1)
In these regulations, unless the context otherwise Interpretation.
reqUIres -
"the Act" means the Environment Protection Act;
"competent authority" means the Strategic Environmental
Assessment Focal Point, hereinafter referred to as the "SEA Focal
Point" established under regulation 15;
"environmental report" means the part of the plan or programme _
VERZJONIELETTRONIKA
documentation containing the information required in regulation 6
and in Schedule I;
"make available to the public" means publishing in the Gazette
or in at least one daily newspaper in the English language and in the
Maltese language, a notice indicating where the document may be
. viewed or acquired; the price of the said document shall not exceed
the cost of its printing and distribution;
"plans and programmes" means plans and programmes,
including those co-financed by the European Community, as well as
any modifications to them
(a)
which are subject to preparation and, or adoption by
an authority at national, regional or local level or which are
prepared by an authority for adoption, through a legislative
procedure by Parliament or Government, and
(b)
which are required by legislative, regulatory or
administrative provisions;
"the public" shall mean one or more natural or legal persons
and, in accordance with national legislation or practice, their
associations, organisations or groups;
"responsible authority", in relation to a plan or programme,
means the authority by which, or on whose behalf, any plan or
programme is prepared. A responsible authority shall only cease to be
lawfully responsible for its plan or programme at such time as a new
responsible authority accepts formal responsibility in writing.
Where more than one responsible authority is responsible for a
plan or programme, or parts of it, the responsible authority shall be
(a)
the authority nominated by agreement between the
responsible authorities responsible for that plan or programme;
or
(b)
determined by the SEA Focal Point, if there is no
such agreement;
"strategic environmental assessment" means the preparation of
an environmental report, the carrying out of consultations, the taking
into account of the environmental report and the results of the
consultations in decision making and the provision of information on
the decision in accordance with regulations 5 to 1 O.
(2) All other terms shall have the same meaning as assigned to
VERZJONIELETTRONIKA
them in the Act.
Part II
General Conditions
(1)
An strategic environmental assessment, in Scope.
accordance with regulations 5 to 10, shall be carried out by the
responsible authority for plans and programmes referred to in sub-
regulations (2) to (4) which are likely to have significant
environmental effects.
(2) Subject to the provisions of sub-regulation (3), a strategic
environmental assessment shall be carried out for all plans and
programmes which -
(a)
are prepared for agriculture, forestry, fisheries,
energy, industry, transport, waste management, water
management, telecommunications, tourism, town and country
planning or land use and which set the framework for future
development consent of projects listed in Annexes I and II to
Directive 85/337/EEC,or
(b)
in view of the likely effect on sites, have been
determined to require an assessment pursuant to Article 6 or 7
of Directive 92/43/EEC.
(3) Plans and programmes referred to in sub-regulation (2),
which determine the use of. small areas at local level, and minor
modifications to plans and programmes referred to in sub-regulation
(2), shall require a strategic environmental assessment only where the
responsible authority determines that they are likely to have
significant environmental effects.
(4) In addition, the responsible authority shall determine
whether its plans and programmes, other than those referred to in sub-
regulation (2), which set the framework for future development
consent of projects, are likely to have significant environmental
effects.
(5) The responsible authority shall determine whether plans or
programmes referred to in sub-regulations (3) and (4) are likely to
have significant environmental effects either through case by case
examination or by specifying types of plans and programmes or by
combining both approaches. For this purpose the responsible
authority shall in all cases take into account relevant criteria set out in
Schedule II, in order to ensure that plans and programmes with likely
significant effects on the environment are covered by these
VERZJONIELETTRONlKA
regulations.
(6) In the case by case examination and in specifying types of
plans and programmes in accordance with sub-regulation (5), the
authorities referred to in regulation 7(3) shall be consulted.
(7) The responsible authority shall ensure that its conclusions
pursuant to sub-regulation (5), including the reasons for not requiring
a strategic environmental assessment pursuant to regulations 5 to 10,
are made available to the public, the designated authorities referred to
in regulation 7(3) and the competent authority.
(8) (a)
Without prejudice to any of these regulations, the
competent authority may at any time request a responsible authority
at national or local level to submit a plan or programme description
statement which provides sufficient detail for it to be able to identify
the likely effects on the environment, such that it may determine
whether a strategic environmental assessment is required.
(b)
The competent authority shall, after' submission of
the plan or programme description statement by the authority at
national or local level, indicate whether the plan or programme
requires a strategic environmental assessment.
(c)
The decision of the competent authority shall be
final.
(9) The following plans and programmes are not subject to
these regulations
(a)
plans and programmes the sole purpose of which is
to serve national defence or civil emergency,
(b)
financial or budget plans and programmes,
(c)
plans and programmes co-financed under the current
respective programming periods for Council Regulations (EC)
No 1260/99 and No 1257/99.
(1)
The strategic environmental assessment referred to
in regulation 4 shall be carried out during the preparation of a plan or
programme and before its adoption or submission to the legislative
procedure.
(2) Where plans and programmes form part of a hierarchy, the
responsible authority shall, with a view to avoiding duplication of the
assessment, take into account the fact that the assessment will be
carried out, in accordance with these regulations, at different levels of
VERZJONIELETTRONlKA
the hierarchy. For the purpose of, among other things, avoiding
duplication of assessment, the responsible authority shall apply
regulation 6(2) and (3).
(1)
Where a strategic environmental assessment is Environmental
required under regulation 4(1), an environmental report shall be report.
prepared in which the likely significant effects on the environment of
implementing the plan or programme, and reasonable alternatives,
taking into account the objectives and the geographical scope of the
plan or programme, are identified, described and evaluated. The
information to be given for this purpose is referred to in Schedule I. .
(2) The environmental report prepared pursuant to sub-
regulation (1) shall include the information that may reasonably be
required taking into account current knowledge and methods of
assessment, the contents and level of detail in the plan or programme,
its stage in the decision-making process and the extent to which
certain matters are more appropriately assessed at different levels in
that process in order to avoid duplication of the assessment.
(3) Relevant information available on environmental effects of
the plans and programmes and obtained at other levels of decision
making or through other legislation may be used for providing the
information referred to in Schedule I.
(4) The authorities referred to in regulation 7(3) as well as the
competent authority shall be consulted when deciding on the scope
and level of detail of the information which is to be inch~ded in the
environmental report.
(1)
The draft plan or programme and the environmental Consultations.
report prepared in accordance with regulation 6 shall be made
available, by the responsible authority, to the authorities referred to in
sub-regulation (3), the competent authority and the public.
(2) The responsible authority shall ensure that the authorities
referred to in sub-regulation (3) and the public referred to in sub-
regulation (4) shall be given an early and effective opportunity within
an adequate time-frame, to express their opinion on the· draft plan or
programme and the accompanying environmental report before the
adoption of the plan or programme or its submission to the legislative
procedure. Such time-frames shall not exceed sixteen weeks from the
publication of the plan or programme and its environmental report.
(3) The designated authorities to be consulted which, by
reason of their specific environmental responsibilities, are likely to be
concerned by the environmental effects of implementing plans and
programmes, shall be the following
VERZJONIELETTRONlKA
(a)
the Malta Environment and Planning Authority
(MEPA) or any successor entity responsible for the
environment; and where applicable -
(b) the Malta Resources Authority (MRA) or any
successor entity or entities responsible for water, energy and
resources;
(c)
the competent authority responsible for agriculture;
(d)
the competent authority responsible for fisheries;
( e)
any other authority which is deemed by the
responsible authority to have an input into the strategic
environmental assessment process.
(4) The responsible authority shall make the plan or
programme and its environmental report available to the public
electronically and in published form for viewing at its offices for the
purposes of sub-regulation (2).
(5) In order to reach out to the public affected or likely to be
affected by, or having an interest in, the decision making subject to
these regulations, including relevant non-governmental organisations,
such as those promoting environmental protection and other
organisations concerned, the notice of availability of the plan or
programme and the environmental report shall be published in at least
the Gazette together with specific details of where the documentation
is available and how comments can be submitted and by which date.
(1) Where the responsible authority considers that the
implementation of a plan or programme being prepared in relation to
its territory is likely to have significant effects on the environment in
another Member State, or where a Member State likely to be
significantly affected so requests, the Member State in whose
territory the plan or programme is being prepared shall, before its
adoption or submission to the legislative procedure, forward a copy of
the draft plan or programme and the relevant environmental report to
the other Member State at the earliest stage possible.
(2) Where a Member State is sent a copy of a draft plan or
programme and an environmental report under sub-regulation (1), it
shall indicate to the other Member State whether it wishes to enter
into consultations before the adoption of the plan or programme or its
submission to the legislative procedure and, if it so indicates, the
Member States concerned shall enter into consultations concerning
the likely transboundary environmental effects of implementing the
plan or programme and the measures envisaged to reduce or eliminate
VERZJONIELETTRONlKA
such effects
Provided that where such consultations take place, the
Member States concerned shall agree on detailed arrangements to
ensure that the authorities referred to in regulation 7(3) and the
relevant public in the Member State likely to be significantly affected
are informed and given an opportunity to forward their opinion within
a reasonable time.
(3) Where Member States are required under this regulation to
enter into consultations, they shall agree, at the beginning of such
consultations, on a reasonable time for the duration of consultations.
(4) In the case where a Member State consults Malta on
potential trans boundary effects, the provisions of sub-regulations (1),
(2) and (3) shall apply mutatis mutandis.
The environmental report prepared pursuant to regulation Decision
6, the opinions expressed pursuant to regulation 7 and the results of making.
any transboundary consultations entered into pursuant to regulation 8
shall be taken into account during the preparation of the plan or
programme and before its adoption or submission to the legislative
procedure.
(1)
The responsible authority shall ensure that, when a Information on
plan or programme is adopted, the authorities referred to in regulation the decision.
7(3), the competent authority, the public and any Member State
consulted under regulation 8 are informed and the following items are
made available to those so informed
(a)
the plan or programme as adopted;
(b)
a statement summansmg how environmental
considerations have been integrated into the plan or programme
and how the environmental report prepared pursuant to
regulation 6, the opinions expressed pursuant to regulation 7
and the results of consultations entered into pursuant to
regulation 8 have been taken into account in accordance with
regulation 9 and the reasons for choosing the plan or
programme as adopted, in the light of the other reasonable
alternatives dealt with; and
(c)
the measures that have been decided concernmg
monitoring in accordance with regulation 11.
(2) The provisions of regulation 7(4) and (5) shall apply for
the publication of the local information relating to sub-regulation (1)
whilst the publication of the information of other Member States shall
VERZJONIELETTRONIKA
be effected through the respective Member State itself.
(3) Responsible authorities shall ensure that all outcomes of
these regulations are reported to the competent authority immediately
as the process evolves.
(1)
The responsible authority shall monitor the
significant environmental effects of the implementation of plans and
programmes in order, among other things, to identify at an early stage
unforeseen adverse effects, and to be able to undertake appropriate
remedial action.
(2) In order to comply with sub-regulation (1), eXlstmg
monitoring arrangements may be used, if appropriate, with a view to
avoiding duplication of monitoring.
(3) The competent authority shall be kept informed on each
outcome of the monitoring carried out.
(1)
A strategic environmental assessment carried out
under these regulations shall be without prejudice to any
requirements under Directive 85/337/EEC and to any other legislative
requirements.
(2) For plans and programmes for which the obligation to
carry out assessments of the effects on the environment arises
simultaneously from these regulations and other legislation, the
responsible authority may provide for coordinated or joint procedures
fulfilling the requirements of the relevant legislation in order, among
others, to avoid duplication of assessment.
(3) For plans and programmes co-financed by the European
Community, the strategic environmental assessment in accordance
with these regulations shall be carried out in conformity with the
specific provisions in relevant local and Community legislation.
(1)
The competent authority and the Commission shall
exchange information on the experience gained in applying these
regulations.
(2) The responsible authority shall ensure that environmental
reports are of a sufficient quality to meet the requirements of these
regulations and the spirit of Directive 2001l42/EC.
(3) The competent authority shall communicate to the
Commission any measures taken concerning the quality of these
reports.
The obligation referred to in regulation 5(1) shall apply to Implementation.
the plans and programmes of which the first formal preparatory act
was subsequent to the 21 st July, 2004. Plans and programmes of
which the first formal preparatory act was before this date and which
are adopted or submitted to the legislative procedure more than
twenty-four months thereafter, shall be made subject to the obligation
referred to in regulation 5(1) unless the responsible authority decides
on a case by case basis that this is not feasible and informs the public
of its decision.
Part III
Establishment of the Competent Authority
(1)
There shall be created the SEA Focal Point which Establishment
shall be tasked with overseeing the implementation of these of
authority.
regulations.
(2) The SEA Focal Point shall be composed of a Chairperson
and two other members.
(3) The Chairperson and the members of the SEA Focal Point
shall be appointed by the Prime Minister from among persons who in
the opinion of the Prime Minister are persons of known integrity and
who appear to him to have knowledge and experience in matters
relating to the strategic environment assessment of plans and
programmes.
(4) The Chairperson and the members of the SEA Focal Point
shall hold office for a period of three years and shall be eligible for re-
appointment.
(5) The Chairperson and members of the SEA Focal Point may
only be removed from office by the Prime Minister on the grounds of
gross negligence, incompetence or acts, omissions or conduct
unbecoming a member of the Board.
(1)
The competent authority shall have the following Functions.
duties and powers
(a)
to create awareness on the scope and necessity of
strategic environmental assessments;
(b)
to be informed by the responsible authority, or
responsible authorities if applicable, that a strategic
environmental assessment is being conducted on a particular
plan or programme;
VERZJONIELETTRONIKA
(c)
to be informed by the responsible authority, or
responsible authorities if applicable, on why a strategic
environmental assessment has not been undertaken on a plan or
programme;
(d)
to implement fully the provisions of regulation 4(8);
(e)
to ensure to the best of its ability that the responsible
authority, or responsible authorities if applicable, have followed
the provisions of these regulations and to document the process
adopted inclusive of any supporting documentation and
consultation material;
(f)
to act as a repository of all material related to a
strategic environmental assessment for a plan or programme;
(g)
to demand any information it deems is related to any
strategic environmental assessment from any entity inclusive of
information that results from a decision for a strategic
environmental assessment to be undertaken or otherwise;
(h)
to provide guidance to responsible authorities;
(i)
to represent Malta in any local and international fora
on strategic environmental assessments;
to act as the Focal Point for other Member States
(j)
who wish to consult Malta in cases of transboundary effects;
(k)
to promote the use of a strategic environmental
assessments in Malta;
(1)
to audit the quality of a strategic environmental
assessments to provide third party input into securing the true
quality of the strategic environmental assessment process.
(2) Nothing contained in these regulations shall be construed
as implying that the competent authority shall be responsible for the
carrying out of any strategic environmental assessment. Any strategic
environmental assessment as shall be required to be carried out in
terms of these regulations shall fall under the responsible authority.
VERZJONIELETTRONlKA
Part IV
Revocation and Transitory Provisions
The Strategic Environmental Assessment Regulations, Revocation of
Strategic
2005 are hereby being revoked, and are hereinafter referred to as "the Environmental
Assessment
revoked regulations".
Regulations,
2005. L.N. 418 of
2005.
(1)
To the extent that such responsibility is provided in Assessments
already in
terms of these regulations, the competent authority shall assume all progress.
responsibility assigned to the SEA Audit Team under the revoked
regulations and shall enjoy all the rights and benefits previously
enjoyed by SEA Audit Team with effect from the entry into force of
these regulations.
(2) All documents and resources that were the property of the
SEA Audit Team shall become the property of the competent
authority, without the necessity for the conclusion of any legal
procedures.