L.N. 422 of 2010
MALTA RESOURCES AUTHORITY ACT
(CAP. 423)
Feed-in Tariffs (Electricity Generated from Solar Photovoltaic
Installations) Regulations, 2010
BY virtue of the powers conferred by articles 28 and 32 of
the Malta Resources Authority Act, the Minister for Resources
and Rural Affairs, after consultation with the Malta Resources
Authority has made the following regulations:-
(1) The title of these regulations is the Feed-in Tariffs Title and purpose.
(Electricity Generated from Solar Photovoltaic Installations)
Regulations, 2010.
(2) The purpose of these regulations is to establish
a feed-in-tariff for electricity generated from solar photovoltaic
installations and hence to promote and support the generation of
electricity from renewable energy sources.
Regulation 4
Eligibility Criteria to participate in FIT scheme
Eligibility Criteria
The electricity generated by a solar photovoltaic installation and exported to the
distribution system is eligible to be paid at the established feed-in tariff rate determined
by these regulations subject to the following criteria being satisfied
1. The electricity is exclusively generated using solar radiation from solar photovoltaic
installations which are approved by the Authority.
2. The electricity generated by the solar photovoltaic installation and exported to the
distribution system is within the thresholds specified in the Second Schedule.
3. The solar photovoltaic installation has been approved by the Authority for
participation in the FIT scheme during the year for which the applicable feed-in tariff
is established. In the case of a solar photovoltaic installation mentioned in regulation
4 (1), the submission date of a request to participate in the FIT scheme shall be
considered in the determination of eligibility for the FIT scheme. In the case of a
solar photovoltaic installation mentioned in regulation 4 (2), the submission date of
the notification or application for authorisation (as applicable) shall be considered in
the determination of eligibility for the FIT scheme.
4. A solar photovoltaic installation shall be considered as eligible for participation in the
FIT scheme if the amount proposed for export to the distribution system may be
accommodated within the total maximum of electricity generated by solar
photovoltaic installations eligible to benefit from the FIT scheme for the applicable
year as determined in regulation 7 hereof and in the Third Schedule to these
regulations. Participation to the FIT scheme shall be determined on a first-come first-
served basis and each kW installed shall be attributed a generation of 1600kWh;
5. The solar photovoltaic installation is notified to or authorised by the Authority in
accordance with any applicable legislation.
6. The solar photovoltaic installation is commissioned at least within 12 months from
the date of -
a. notification to the Authority of the solar photovoltaic installation, or
b. authorisation granted by the Authority to construct the solar photovoltaic
installation.
7. The installation operator complies at all times with the obligations established in
these regulations, the Network Code and all other applicable legislation.
(1) Unless otherwise stated in these regulations, the
definitions in the Act shall apply.
(2)
In these regulations, unless the context otherwise
requires
“the Act” means the Malta Resources Authority Act;
“the Authority” means the Malta Resources Authority as
established by the Act;
“commissioned” means the first time a solar photovoltaic
installation is put into operation, following the establishment
of operational readiness;
“distribution” means the transport of electricity on high
voltage, medium voltage and low voltage distribution systems
with a view to its delivery to consumers, but not including
supply;
“distribution system” means all the interconnected
technical facilities used for conveying electricity to final
customers;
“domestic premises” means premises which include
private dwellings with no persons registered with Enemalta
as residing in them such as second homes, or private garages
and common areas including roofs, stairs, terraces, gardens
to buildings which are used solely for private dwellings.
“Enemalta” or “the Corporation” means the Enemalta
Corporation established by the Enemalta Corporation Act;
“FIT” means feed-in tariff;
“FIT scheme” means the annual scheme whereby a
specific amount of electricity generated by eligible solar
photovoltaic installations and exported to the distribution
system are paid a feed-in tariff as established in terms of these
regulations;
“generation” means the production of electricity;
“installation operator” means the owner of the solar
photovoltaic installation;
“Institutional households” shall include the following
premises
(a) healthcare institutions such as premises
used as a hospital, nursing home or as any institution
providing medical or nursing care;
(b) institutions for retired, elderly or disabled
persons, including premises used as a home for the
retired or elderly persons or persons with any disability;
(c) educational institutions including premises
used as a boarding school or for similar purposes;
(d) care institutions including premises used as
orphanages, shelter homes, open centres for refugees or
for similar purposes;
(e) religious institutions including premises used
as convents, retreat houses, or for similar purposes;
(f)
military institutions such as military barracks;
(g) other institutions including premises used as
boarding houses, penal or correctional facilities or for
similar purposes;
“kW” means kilo Watt;
“kWh” means kilo Watt hours;
“marginal cost per unit” means the additional cost
of producing one more unit as prescribed in the Fourth
Schedule;
“metering equipment” means the electricity meters
provided by Enemalta including smart meters, any voltage
and current transformers and any other associated equipment
and wiring required to measure the quantity of electricity
supplied or exported;
“the Minister” means the Minister responsible for
resources;
“non-residential premises” means a building or plot
of land which is used wholly or mainly for the purpose of
conducting an economic activity, but does not include any
building such as private garages or common areas to buildings
which are used solely as private dwellings;
“operational readiness” means the capability to function
in accordance with design and specifications;
“period of guaranteed payment of the feed-in tariff”
means the period of time over which the feed-in tariff for all
electricity generated from a solar photovoltaic installation is
guaranteed;
“renewable energy sources” means renewable non-fossil
energy sources, that is, wind, solar, geothermal, wave, tidal,
hydropower, biomass, landfill gas, sewage treatment plant gas
and biogases;
“residential premises” means any premises used solely
and regularly as a private dwelling where at least one person
resides but does not include institutional households;
“smart meters” shall have the same meaning as in the
Electricity Supply Regulations;
“spill-off tariff” means the tariff to be paid for every
unit generated by the installation operator in excess of own
consumption and exported to the distribution system;
“solar photovoltaic installation” means a solar
photovoltaic system that generates electricity exclusively from
solar radiation and consisting of all accessories including
(a) an array or arrays of photovoltaic modules
that collect and absorb sunlight for conversion into
electricity;
(b)
an inverter or inverters;
(c) associated balance of system components,
including wiring, conduits, switchgear, protection
equipment, ancillary equipment and any other part of the
installation necessary for the production and conveyance
of electricity up to the metering equipment supplied by
Enemalta,
after the said solar photovoltaic installation has been approved
by the Authority as meeting the applicable criteria specified in
the First Schedule to these regulations;
“submission date” means, in the case of a solar
photovoltaic installation mentioned in regulation 4 (1) hereof,
the date on which the request to participate in the FIT scheme
is received by the Authority and, in the case of a solar
photovoltaic installation mentioned in regulation 4 (2), the
date when a notification or an application for an authorisation
to construct a solar photovoltaic installation, as the case may
be, is received by the Authority.
Regulation 3, 5, 6
1. Electricity generated exclusively by solar photovoltaic installations installed on
residential or domestic premises in accordance with regulation 3 and exported to
the distribution system up to a threshold of 4800kWh/annum;
The feed-in tariff to be paid by Enemalta to an installation operator for electricity
generated from solar photovoltaic installations approved for the FIT scheme in the year
2010 and installed on residential or domestic premises shall amount to
(a) 25 cents per kWh for a period of guaranteed payment of the feed-in tariff of 8
years for electricity generated from solar photovoltaic installations located in Malta.
(b) 28 cents per kWh for a period of guaranteed payment of the feed-in tariff of 8
years for electricity generated from solar photovoltaic installations located in Gozo.
2. Electricity generated exclusively by solar photovoltaic installations installed on
non-residential premises or institutional households in accordance with regulation 3
and exported to the distribution system up to a threshold of 160,000kWh.
The feed-in tariff paid by Enemalta to an installation operator for electricity generated
from solar photovoltaic installations approved for the FIT scheme in the year 2010 and
installed on non residential premises or institutional household premises in accordance
with regulation 3 for a period of guaranteed payment of the feed-in tariff of 7 years shall
amount to 20 cents per kWh.
These regulations shall apply to any solar photovoltaic
installation which generates electricity exclusively using solar
photovoltaic panels and insofar as such solar photovoltaic
installation is installed either in a residential or domestic premises
or non-residential or institutional household and is connected to the
distribution system either directly or indirectly with the appropriate
protection and metering equipment
Provided that these regulations shall not apply to
installation operators who may benefit from more than 50% grant
on the initial capital investment, or are benefiting from a project
specific feed-in tariff agreement, or are benefiting from any other
arrangement approved by the Authority.
Regulation 7
Total maximum electricity generated by solar photovoltaic installations and
exported to the distribution system eligible to benefit from the feed-in tariff
Year
Total maximum electricity generated by
solar photovoltaic installations and
exported to the distribution system
eligible to benefit from the FIT scheme
12,000,000kWh
(1) In the case of a solar photovoltaic installation Sale of electricity
commissioned and connected to the distribution system with the generated
appropriate metering equipment provided by Enemalta prior to the installations.
entry into force of these regulations, the installation operator may
opt either to
(a) retain existing net metering arrangements with
Enemalta and be paid the spill-off tariff for any electricity
generated from the solar photovoltaic installation and
exported to the distribution system paid prior to the entry into
force of these regulations
Provided that the installation operator may not avail
himself of this option when an undertaking with Enemalta
existing prior to the entry into force of these regulations
requires him to switch over from existing net metering
arrangements to a feed-in tariff arrangement once this is
established; or
(b) request the Authority
(i) either to sell all electricity generated by the
solar photovoltaic installation to Enemalta in accordance
with regulation 6 hereof,
(ii) or to generate electricity primarily for own
consumption in the premises where the photovoltaic
installation is located and to be paid the feed-in tariff
in accordance with regulation 6 hereof for any excess
electricity generated and exported to the distribution
system.
(2) In the case of any solar photovoltaic installation
commissioned after the entry into force of these regulations and
satisfying the eligibility criteria established in the First Schedule to
these regulations, the installation operator may
(a) either sell all electricity generated by the solar
photovoltaic installation to Enemalta in accordance with
regulation 6 hereof;
(b) or generate electricity primarily for own
consumption in the premises where the solar photovoltaic
installation is located and be paid the feed-in tariff in
accordance with regulation 6 hereof for any excess electricity
generated and exported to the distribution system.
(3) Where an installation operator referred to in
regulation 4(1) opts for either of the options in regulation 4(1)(b),
such installation operator will not be permitted to revert to the net
metering arrangements provided in regulation 4 (1) (a).
(4) Any expenses incurred by the installation operator
for the reversion from the existing net metering arrangements to
the arrangements in regulation 4(1) (b) shall be borne by the
installation operator.
(5) Notwithstanding the provisions of regulation 4(1)
(a), an installation operator whose solar photovoltaic installation
has been installed prior to the entry into force of these regulations,
may not retain existing net metering arrangements if the capacity
of the solar photovoltaic installation is increased after the entry into
force of these regulations.
(6) The installation operator shall not be eligible for the
feed-in tariff unless the solar photovoltaic installation is compliant
with the eligibility criteria established by the First Schedule to these
regulations and he obtains the necessary authorisations, licences or
permits from the relevant competent authorities and Enemalta.
(7) In the case where the installation operator opts
to utilise the electricity generated by the solar photovoltaic
installation, Enemalta shall install metering equipment to measure
all the electricity generated by the solar photovoltaic installation in
addition to the import/export metering equipment.
Regulations 6, 9
Electricity rate per kWh applicable for electricity generated by the solar
photovoltaic installation and exported to the distribution system after the expiry of
the period of guaranteed payment of the feed in tariff or where the thresholds for
the eligibility of the FIT are exceeded.
The electricity rate per kWh referred to in regulations 6 and 9 that shall be paid by
Enemalta to the installation operator for any electricity generated by the solar
photovoltaic installation and exported to the distribution system for each year after period
of guaranteed payment of the feed-in tariff referred to in the Second Schedule or at any
time when in excess of the thresholds defined in the Second Schedule shall amount to the
marginal cost per unit of electricity incurred by Enemalta for the particular year as
approved by the Authority.
The Authority may define which cost items may be considered in the determination of the
marginal cost per unit of electricity incurred by Enemalta.
The marginal cost per unit for the year 2010 shall be of eleven cents (!0.11) per kWh.
€1.49
(1) The feed-in tariffs shall be due from the time
when the installation operator first produces electricity exclusively
from the solar photovoltaic installation and is connected to the
distribution system as provided in regulation 3 or, for those solar
photovoltaic installations commissioned prior to the entry into
force of these regulations and where the installation operator has
opted for either of the arrangements in accordance with regulation
4 (1) (b), from the date of the necessary modifications to the
installation connection effected by Enemalta which would permit
the arrangements in regulation 4(1)(b).
(2) The feed-in tariffs shall be paid for the period of
guaranteed payment of the feed-in tariff referred to in the Second
Schedule to these regulations depending upon the applicable
solar photovoltaic installation’s location and the type of premises
wherein it is installed.
(3) In the case of solar photovoltaic installations
commissioned prior to the entry into force of these regulations and
where the installation operator opts to sell all electricity generated
from the solar photovoltaic installation to Enemalta in accordance
with the provisions of regulation 4 (1) (b), the period of guaranteed
payment of the feed in tariff referred to in the Second Schedule
shall include the period of time during which the installation
operator has already benefited from net metering and spill off tariff
arrangements prior to the entry into force of these regulations
Provided that in the case where the installation operator
expands the existing capacity of the solar photovoltaic installation,
the period of guaranteed payment of the feed-in tariff applicable
for the entire installation after such expansion shall be considered
as commencing from the date of installation of the metering
equipment by Enemalta to enable the net metering arrangement for
the original installation.
(4) Where any person replaces the solar photovoltaic
installation in whole or in part, the installation operator shall not
be entitled to the recommencement or extension of the period of
guaranteed payment of the feed-in tariff.
(5) The feed-in tariff shall only be applicable up to
the extent of and for the total amount of electricity exported to
the distribution system by the solar photovoltaic installation as
approved by the Authority.
The feed-in tariff to be paid by Enemalta to installation
operators for electricity generated by solar photovoltaic
installations in accordance with regulation 3 hereof shall be as
established in the Second Schedule to these regulations
Provided that any electricity generated by the solar
photovoltaic installations and exported to the distribution system in
excess of the thresholds established in the Second Schedule shall
be paid at the applicable electricity rate as established in the Fourth
Schedule to these regulations.
(1) The total maximum electricity generated by solar
photovoltaic installations and exported to the distribution system
which shall be eligible to be paid the feed-in tariff for each annual
FIT scheme and after the entry into force of these regulations shall
be that established in the Third Schedule to these regulations.
(2) The maximum electricity generated by solar
photovoltaic installations and exported to the distribution system
established in the Third Schedule shall be composed of electricity
generated and exported to the distribution system by
(a) solar photovoltaic installations approved by
the Authority during the year for which the thresholds for
electricity generated and exported to the distribution has been
established; and
(b) solar photovoltaic installations approved by the
Authority, commissioned prior to the entry into force of these
regulations, and where the installation operators during the
year in which the thresholds for electricity generated and
exported to the distribution has been established have opted
for either of the options in regulation 4(1) (b).
(1) Enemalta may set off amounts due by an installation
operator for the supply of electricity against amounts due to the
installation operator for the exporting of electricity under these
regulations
Provided that such setting off shall only be permissible
where the claims are undisputed or are certain, liquidated and due.
(2) Where the amounts due to the installation operator
for the exporting of electricity referred to in subregulation 1 of
this regulation are in excess of the amounts due by an installation
operator for the supply of electricity by Enemalta, the Corporation
shall credit the installation operator the balance due by means of a
credit note
Provided that the installation operator may request to
be paid the balance due by means of such credit note after four
consecutive billing periods for the supply of electricity by Enemalta
to the installation operator have elapsed.
(3) Meter readings for the electricity exported shall be
taken with the same frequency as the readings of consumption of
electricity supplied by Enemalta.
(1) Following the expiry of the period of guaranteed
payment of the feed-in tariff, the installation operator may opt and
by written notice to Enemalta request the Corporation to effect
the necessary modification to the solar photovoltaic installation
connection to the distribution system to enable the installation
operator to utilise the electricity generated from the solar
photovoltaic installation for his own use within his premises and to
be compensated for any exported electricity at the applicable rate
for such electricity at the time as provided in the Fourth Schedule
to these regulations and subject to regulation 4(7)
Provided that Enemalta shall accede to the installation
operator’s request after effecting the necessary modifications to
the solar photovoltaic installation connection to the distribution
system.
(2) Any installation operator who opts for such
arrangements as established in regulation 9 (1) shall bear the
costs of any modifications necessary including those related to the
metering and connection required by Enemalta.
(3) Where the installation operator does not inform
Enemalta to effect the necessary modification to the solar
photovoltaic installation connection as provided in regulation 9 (1),
Enemalta shall continue to purchase all the electricity generated by
the solar photovoltaic installation and exported to the distribution
system, and shall reimburse the installation operator for such
electricity at the rate established in the Fourth Schedule to these
regulations.
Installation operators shall
(a) submit such information as the Authority may
reasonably require;
(b) inform the Authority and Enemalta, in the form and
manner they may reasonable require, if the solar photovoltaic
installation is disconnected or transferred, sold or in any
form modified in such a way as to degrade its performance
during the period of guaranteed payment of the feed-in tariff
established in terms of these regulations;
(c) comply at all times with the provisions of the
applicable legislation, notification, authorisation, licence
conditions and Network Code as approved by the Authority;
(d) make available to Enemalta and to the Authority
data required to be recorded for the purposes of these
regulations.
Where an installation operator is deceased, or by reason
of any other act or event, permanently ceases to be the installation
operator, payment of the feed-in tariffs for electricity generated
by solar photovoltaic installation under these regulations for the
remaining period of guaranteed payment of the feed-in tariff may
be transferable to the new installation owner
Provided that
(a) the new installation operator informs Enemalta
and the Authority of such change in ownership in such
form and manner as they may establish, together with any
documentary proof and information that they may establish
for such purposes;
(b) the new installation operator takes over all
obligations held by the previous installation operator;
(c) such person shall not be considered by Enemalta
and the Authority as a new installation operator if such
installation operator is not in compliance with any other law,
permit or any requirement in relation to the solar photovoltaic
installation.
In the case of change of use of premises during the
period of guaranteed payment of the feed-in tariff established
by these regulations, the applicable tariff and the period of
guaranteed payment of the feed-in tariff shall change accordingly
Provided that in such cases the period of guaranteed
payment of the feed-in tariff shall include the time for which the
installation operator has already benefited from a feed in-tariff.
Installation operators shall not be entitled to any
tradable green certificate for electricity generated from the
solar photovoltaic installation and for which the feed-in tariff is
paid or for which the installation operator enjoys a net metering
arrangement with a spill-off tariff or benefits from any of the
arrangements provided in regulation 9.
The provisions dealing with access, inspection, Access, inspection,
modification or tampering of meters found in the Electricity etc.
Supply Regulations, 1940 shall mutatis mutandis apply to solar G.N. 223 of 1940.
photovoltaic installation operators in the same manner as provided
for in those regulations.