Electrical Installations Regulations, 2010
Table of Provisions (29)
Statutory Text (29 Articles)
L.N. 225 of 2010
MALTA RESOURCES AUTHORITY ACT
(CAP. 423)
Electrical Installations Regulations, 2010
IN exercise of the powers conferred by sub-article (1) of
article 28 of the Malta Resources Authority Act, the Minister for
Resources and Rural Affairs, after consultation with the Malta
Resources Authority has made the following regulations
(1) The title of these regulations is the Electrical
Installations Regulations, 2010.
(2) The scope of these regulations is to regulate the
provision of services related to electrical installation works and to
establish an authorisation scheme for service providers carrying out
such activity.
(3) These regulations are being made for the
safeguarding of the public interest and public safety. Any
requirements contained therein including those relating to
authorisations and to services are made for overriding reasons
relating to the public interest.
Regulation 5
Authorisation A Authorisation Application form A
Authorisation B Authorisation Application form B
The relative application form may be obtained from the Malta Resources
Authority website: www.mra.org.mt.
Along with this application form, the applicant shall attach and submit
• A birth certificate from the Public Registry;
• A copy of the applicant’s Identity card;
• A letter issued by the Registrar of Examinations showing a pass in the
Wireman’s examination as required for the application to be processed or any other
accepted certificate of qualification as listed above;
• Other certificates and testimonials relating to practical experience in
electrical installation, signed by the authorised persons under whom the experience
was attained
In the case of Authorisation A, testimonials shall be endorsed by a person
holding at least a Authorisation A; and
In the case of Authorisation B, testimonials shall be endorsed by either a
Authorisation B holder or a warranted electrical engineer.
B
(1) Unless stated otherwise in these regulations, the
definitions in the Act shall apply.
(2) For the purpose of these regulations and unless the
context otherwise requires
“the Act” means the Malta Resources Authority Act;
“application” means an application which is made to the
Authority for the issue of an authorisation by the Authority to
a person for carrying out the activity of electrical installation
works or to a person authorised to exercise such activity;
“the Authority” means the Malta Resources Authority as
established by article 3 of the Act;
“authorised provider” means a provider authorised by
the Authority to carry out the installation, alteration, extension
and certification of single phase electrical installations only
or to carry out the installation, alteration, extension and
certification of both single and three phase installations by
virtue of an authorisation issued in terms of these regulations
or a service provider who is authorised to operate under
any law in force in a Member State o or a state which is a
participant to the European Economic Area;
“customers” means wholesale and final customers of
electricity;
“distribution system operator” shall have the same
meaning as under the Electricity Regulations, 2004;
“electrical installation” means a system of electrical
wirings and equipment intended for conveying electricity and
the disconnecting apparatus located on the customer’s side of
the electricity service meter;
“electrical installation works” means the installation,
alteration, extension and certification of an electrical
installation;
“electricity service meter” means the electricity meter
and any associated equipment installed by the distribution
system operator or by the redistributor to register the
consumption and maximum demand on the customer’s
premises;
“Enemalta” means the Enemalta Corporation as
established under the Enemalta Corporation Act;
“establishment” means the actual pursuit of an economic
activity by a service provider for an indefinite period and
through stable infrastructure from where the business of
providing services is actually carried out;
“I.E.E. Regulations” means the IEE wiring Regulations
(BS 7671): Requirements for electrical installations,
according to the latest version in force;
“kW” means one kilo watt;
“Member State” means a member state of the European
Union;
“Minister” means the Minister responsible for resources;
“Malta Qualifications Recognition Information Centre”
means the Malta Qualifications Recognition Information
Centre as established under the Mutual Recognition of
Qualifications Act;
“multi customer facility” means a facility consisting of
more than one single phase and, or three phase customers.
“Network code” shall have the same meaning as under
the Electricity Regulations, 2004;
“Registrar of Examinations” means the Registrar of
Examinations as appointed under the Education Act;
“service provider” means any natural person who is a
national of a Member State, or any legal person established
in a Member State, who offers or provides the service of
electrical installation works;
“single phase electrical installation” means an electrical
installation designed for alternating current using a system
of wiring consisting of one live wire or phase, a neutral wire
and a separate protective earth conductor;
“technical committee” means a committee established
by the Authority under the Act and which is composed of
competent and qualified persons for the purpose of assessing
and verifying whether an applicant for an authorisation has
sufficient knowledge and expertise with regard to providing
the service of electrical installation works under these
regulations;
“temporary installation” means an electrical installation
not of a permanent nature and may include decorative street
lighting, public entertainment facilities, outdoor mobile units,
cranes and associated construction sites;
“three phase electrical installation ” means an electrical
installation designed for alternating current using a system
of wiring consisting of three live wires or phases, a neutral
wire and a separate protective earth conductor;
“the Treaty” means the Treaty establishing the European
Community.
Regulation 12, 13, 14, 15
Mandatory Certification
(a) All new installations / re-wires requiring connection / reconnection to the
distribution system operator network;
(b) All alterations to existing installations involving changes to the wiring
between the distribution system operator connection point/meter and the customer’s
main distribution point;
(c) All electrical installations where the distribution system operator has
disconnected supply with the customer’s consent for a period greater than six
months;
(d) As otherwise required by the Electricity Supply Regulations, and the
network code with respect to requirements posed on electrical installation before
there connection to the distribution system operator network, as amended and
approved by the Authority from time to time.
(e) All new electrical installations and alterations/extensions to existing
installations shall be verified and certified as complying with the relevant I.E.E and
these regulations.
This declaration shall be in the form of a completion certificate recognised by
the Authority and issued by the authorised provider who constructed and/or tested
the electrical installation (or alterations or extensions to an existing installation) in
question.
Where an electrical installation contains a sub-system provided by another
installer/contractor, a sub-system completion certificate shall be issued by an
installer/contractor in accordance with the relevant I.E.E. or these regulations. All
such sub-systems shall be covered by sub-system completion certificates.
(1) These regulations shall apply to all electrical wiring Applicability.
installations, alterations and extensions at voltage levels 230/400
(+/- 10%) Volts within buildings, factories, places of entertainment,
industrial and sport complexes, social and religious places, or any
other place where an electrical installation is required except for
categories excluded from the scope of these regulations in sub-
regulation (3).
(2) These regulations shall also apply to extensions or
alterations to extensions or alterations to an existing installation.
(3) These regulations shall not apply to the following
(a)
the system of distribution of electricity to the
public;
(b) marine craft;
(c) motor vehicles, except those to which the
IEE regulations concerning caravans or mobile units are
applicable;
(d) mobile and fixed offshore installations;
(e) aircraft;
(f) lightning protection systems.
Electrical installations under these regulations shall be Compliance with
carried out with the proper materials and in compliance with the standards
relevant regulations and standards.
(1) The installation, alteration, extension and
certification of single phase and three phase electrical installations
shall require an authorisation. There shall be two classes of
authorisations for electrical installation works
(a) authorisation A for the installation, alteration,
extension and certification of single phase electrical
installations; and
(b) authorisation B for installation, alteration, extension
and certification of single phase electrical installations and
three phase electrical installations rated up to 300Amps per
phase. The holder of an authorisation B may also carry out
installation, alteration, extension and certification work on
three phase electrical installations rated more than 300Amps
per phase but may not certify such electrical installations.
(2) Persons who are eligible to apply for an
authorisation under these regulations shall be the following
(a) any person who has passed an examination held for
such purpose by the Registrar of Examinations, and having
completed one year of practical experience in single phase
electrical installation works in the case of applicants for the
issue of an authorisation A and two years practical experience
in three phase electrical installation works in the case of
applicants for the issue of an authorisation B;
(b) any person qualified as an electrical engineer and
possessing a valid warrant recognized in Malta, and having
one year of experience in single phase electrical installation
works for authorisation A and two years experience in three
phase electrical installation works for authorisation B; and
(c) any person, although not possessing the
qualifications mentioned in paragraphs (a) and (b) of this sub-
regulation, who has the relevant and equivalent certification
and has obtained a recognition of qualifications statement
from the Malta Qualifications Recognition Information
Centre
Provided that with regard to any applicant service
provider from any other Member State, applicant service
providers, in possession of relevant qualifications, shall obtain
an evaluation report on comparability of qualifications from
the Authority.
(3) Examinations referred to in regulation 5(2)(a)
hereof, shall be held at least once a year on a date or dates to be
fixed by the Registrar of Examinations and as follows
(a) a notice of the holding of an examination shall be
published in the Gazette not less than two months before and
shall be made public in advance;
(b) the syllabus for the examinations shall be set by
the Authority; and
(c) any revised syllabus shall be published two years
before any examination is set.
(4) Where the Authority deems that there exists a
substantial difference regarding professional qualifications in Malta
and the applicant’s professional qualifications and training, the
Authority shall provide the applicant with the opportunity to prove,
by completing an aptitude test or undergoing an adaptation period,
that the applicant does possess the necessary qualifications.
(5) The applicant may choose between completing an
aptitude test or undergoing an adaptation period.
(6) In the case of an aptitude test, the Authority shall
provide the applicant with the list of subjects not covered by his
professional qualifications and training.
(7) The aptitude test shall be made in English and the
costs shall be borne by the applicant.
(8) Where an adaptation period is chosen by the
applicant, the applicant shall be required to exercise the activity
being pursued under the responsibility of an authorisation A or an
authorisation B holder, as the case may be, for a limited period
of time, which in case of an authorisation A application, shall be
of not more than one year and in the case of an authorisation B
application shall be of not more than two years, from the date
notified by the applicant as being from when such adaptation
period shall commence.
(9) The Authority shall determine the content of
the activities to be covered during the adaptation period and the
method of its assessment.
(10) It shall be the responsibility of the applicant
to make arrangements with any authorisation holder A or
authorisation holder B to undergo the adaptation period, with or
without pay
Provided that, the Authority shall make available, upon a
request being made by the applicant, a list of authorisation holders
together with their contact details for the purpose of allowing the
applicant to make his own arrangements to undergo the adaptation
period.
(1) Any person, who prior to the entry into force
of these regulations, was engaged in any activity relating to
wireman’s licence A for electricians authorised to carry out single
phase installations only and wireman’s licence B for electricians
authorised to carry out single and three phase installations and is in
possession of a valid licence to do so under the Electricity Supply
Regulations, may continue to perform such activities as authorised
under existing licence conditions until the 31st December, 2010 or
until the grant of a new authorisation, whichever is the earlier
Provided that any such person shall be required to apply
with the Authority for a new applicable authorisation as listed in
regulation 5(1) of these regulations within two months from the
day of the sending of a notice by the Authority to apply for such an
authorisation
Provided further that any such person shall comply
with such authorisation conditions as established in the new
authorisation that may be issued by the Authority with effect from
such date that the Authority may establish.
(2) Authorisations issued under these regulations
prior to the 31st December 2010, shall be automatically renewed
for a further three years after that date. The applicable annual
authorisation fee shall be due and paid pro rata until that date to
the Authority.
(1) Any person who wishes to apply for an authorisation
A or for an authorisation B, shall submit an application in writing
to the Authority in such form and manner as the Authority may
prescribe.
(2) A non-refundable application fee of €12 shall
be paid to the Authority together with the application for an
authorisation.
(3) The Authority shall communicate to the applicant
in writing within a reasonable time, which shall not be of more than
three months from the date of receipt of a valid application, any
decision taken concerning an application for an authorisation or
any valid reason impeding the Authority to reach such a decision.
(4) The Authority may modify, amend, replace, add or
delete any authorisation condition as the Authority may consider to
be reasonably justified.
(5) The application shall be accompanied by the
documents listed in the First Schedule to these regulations.
(1) The holders of an authorisation issued under
these regulations, shall, subject to compliance with authorisation
conditions, have their authorisation automatically renewed.
(2) An authorised provider shall, every three years
reckoned from the 1st day of January of the year in which their
authorisation is granted, pay an authorisation fee of € 35 per
annum in case of being the holder of an authorisation A and € 70
per annum in case of being the holder of an authorisation B.
(3) If any authorisation fee payable under sub-
regulation (2) is not paid within thirty days, the Authority shall
after the lapse of such time, communicate with the authorised
provider whose authorisation fee has not been paid, informing him
about his failure to pay such fee. A fee of €12 shall also be due to
the Authority as a late-payment fee in addition to the fee due under
sub-regulation (2) of this regulation.
(4) The Authority shall be deemed to have complied
with sub-regulation (3) if such communication is sent by registered
post, to the usual or last known address of the authorised provider
whose authorisation fee has not been so paid. It shall be the duty
of the authorised provider to make available to the Authority his
correct contact details.
(5) If any authorisation fee is not paid within thirty
days after the date on which the communication has been sent
by registered post, the authorisation to which it refers shall be
suspended, and if the authorised provider to whom it was granted
wishes to reactivate his authorisation, he shall then be required to
submit an application for such purpose. In considering any such
application, the Authority may take into consideration the previous
failure of the applicant to pay the authorisation fee and of any
explanation regarding that failure which the applicant may submit
to the Authority.
(6) The Authority may make public by means of a
public notice the names and details of authorised providers whose
authorisation is suspended, cancelled or lapsed.
The holder of an authorisation B shall be deemed to be in
possession of an authorisation A.
(1) Without prejudice to the Mutual Recognition
of Qualifications Act, and to the Recognition of Professional
Qualifications Regulations, 2007, any person established in another
Member State may practice the activity of carrying out electrical
installation works for the purposes of these regulations in Malta on
a temporary and occasional basis provided that such person
(a) is legally established in another Member State, for
the purpose of practising the activity of carrying out electrical
installation works in that Member State; and
(b) has practiced the activity of carrying out electrical
installation works for at least two years during the ten years
immediately preceding the provision of services where such
activity is not regulated in that Member State.
(2) Persons referred to in sub-regulation (1) shall
inform the Authority by means of a written declaration to be made
in advance which shall include the following
(a) proof of the nationality of the applicant;
(b) an attestation certifying that the applicant is
legally established in a Member State for the purpose of
pursuing the activities concerned and that such applicant is
not prohibited from practicing the activity of carrying out
electrical installation works even temporarily, at the moment
of delivering the attestations;
(c) evidence of professional qualifications recognised
by the Malta Qualifications Recognition Information Centre;
and
(d) where applicable, any means of proof that the
applicant has pursued the activity of carrying out electrical
installation works for at least two years during the previous
ten years immediately preceding the provision of services.
(3) Where the Authority deems that there is a
substantial difference between the professional qualifications of
the applicant and any of the qualifications and experience required
under these regulations, to the extent that the difference is such as
to be harmful to public health, safety and security, the Authority
shall give the applicant the opportunity to show, in particular by
means of an aptitude test, that he has acquired the knowledge,
competence or experience which he lacks.
(4) The Authority shall assess the temporary and
occasional nature of the provision of the service of carrying out
electrical installation works on a case by case basis.
(5) The Authority shall give its decision within one
month from the date of receipt of the declaration referred to in sub-
regulation (2).
(6) Whenever a decision could not be given during the
established time, the Authority shall notify this information to the
applicant within the period established in sub-regulation (5). The
Authority shall extend this period only once for another period of
one month.
(7) In the event that the Authority does not give its
decision within the period referred to in sub-regulation (6), the
service of carrying out electrical installation works falling under
this regulation may be provided.
(8) A person exercising the services under this
regulation shall be deemed to be an authorised provider and the
provisions of these regulations shall apply to him in the same
manner and to the same extent as with any other authorised
provider.
(1) The Authority may suspend the authorisation for a
determinate period of time for the following breaches
(a) breach of these regulations;
(b) failure to comply with the requirements of these
regulations;
(c) failure to comply with the requirements of an
authorisation issued by any authority having jurisdiction for
electrical installation works;
(d) failure to rectify defective installations or electrical
equipment pursuant to a written warning issued by any other
authority or by Enemalta;
(e) failure to pay any fee properly chargeable under
these regulations.
(2) An authorisation suspended in accordance with this
regulation shall be reinstated if the breach or failure is rectified in
accordance with these regulations, authorisation conditions or as
directed by the Authority.
No person, other than persons duly authorised under
these regulations, shall certify electrical installations included in
the Second Schedule to these regulations.
(1) An authorised provider before certifying an
electrical installation, shall in particular ensure that:-
(a) the insulation resistance between conductors and
to earth is not below that stipulated in the I.E.E. Regulations -
BS 7671 latest edition;
(b) all single pole switches, circuit breakers and fusible
cut-outs are inserted in the phase conductors only;
(c) where necessary, installation circuits are to be
sectionalised into final circuits and that socket outlets are
wired in final circuits entirely distinct from the lighting
circuits;
(d) all appliances and accessories, unless of the all
insulated type, are effectively earthed and when portable are
connected to earth through three-pin plugs;
(e) all metal forming part of the electrical equipment
in bathrooms, other than current carrying parts, and all
other exposed fixed metal-work in such rooms including
piping and bath and associated metal fittings but excluding
window frames, door locks and other similar furnishings are
connected together by an earth continuity conductor which is
permanently connected to earth;
(f) all accessories and electrical fixtures fitted in
bathrooms are inaccessible to aperson sitting in or on a bath
or under a shower;
(g) steel conduit or metal trunking is not used as
an earth continuity conductor. A separate insulated earth
continuity conductor shall be used with all types ofconduit
and trunking installations;
(h) all metal pipes forming part of the water
installation on the premises should bebonded together and
connected to earth;
(i) the earthing of equipment is in full compliance with
these regulations;
(j) every accessory or fitting in garages unless of a
totally enclosed type is fixednot less than one metres and
twenty centimetres above floor level.
(2) Unless otherwise specified in these regulations,
electrical installations shall comply to the latest edition of the
Requirements for Electrical Installations issued by the Institution
of Electrical Engineers (UK) - BS 7671 latest edition and with
generally accepted principles of good design and safe practices.
On completion of an electrical installation, including Tests on completion
the earthing system and after its testing, a form shall be filled by of
the authorised provider or the warranted electrical engineer, as
the case may be, in the manner approved by the Authority. The
authorised provider or the warranted electrical engineer shall give
a copy of this form together with a schematic and wiring layout
of the electrical installation, including type and composition of
circuits and the means and location of protection and isolation, to
the owner of the electrical installation, certifying compliance with
these regulations.
The design of an electrical installation rated at 300
Amps per phase and over and the test on completion must, in
addition, be certified by a warranted electrical engineer.
(1) Electrical installations, including the earthing Periodic inspection.
system, shall be periodically inspected and tested by an authorised
provider or a warranted electrical engineer, as the case may be.
The owner of the electrical installation shall ascertain that this
installation is so tested.
(2) The authorised provider shall recommend to the
owner of the electrical installations the frequency of the tests in
sub-regulation (1).
In the case of a temporary electrical installation the
authorised provider shall ensure that
(a) the electrical installation is provided with the
necessary disconnection, protective and other control
equipment housed in an insulated weatherproof enclosure (IP
54 or better) in particular for outdoor installations;
(b) electrical installations in public entertainment
facilities and outdoor mobile units
(i) are provided with a suitable means of
disconnection and over-current and earth leakage
protection which should be a residual current device with
an operating current not exceeding 30mA immediately
after the electricity service meter;
(ii) are provided with an effective temporary
earthing system and all exposed metal that could come
into contact with current carrying conductors is properly
bonded to the earth electrode;
(c)
electrical installations for cranes and construction
sites
(i) are equipped with suitable means for
disconnection and over current and earth leakage
protection (residual current type with an operating
current not exceeding 100mA) immediately after the
electricity service meter;
(ii) hand and mobile tool circuits and security
lighting shall be protected by means of residual current
type devices with operating current not exceeding
30mA;
(iii) an earth electrode shall be provided and all
exposed metal that can accidentally come into physical
contact with the current carrying conductors must be
bonded to the earth electrode.
(d) in the case of decorative street lighting
installations
(i) metal clad equipment such as fuse-switches
shall not be used in any part of the installation;
(ii) that reasonable care is taken such that no
installation component could come in physical contact
with any metal structure and objects;
(iii) where it is necessary to support and suspend
the installation components from such structures and
objects as in sub-paragraph (ii) hereof suitable non-
conductive material is used.
Generators intended to be used as standby to supply a
fixed electrical installation which is also connected to the electricity
distribution system
(a) shall be provided with a two pole (for single phase
installations) or a four pole (for three phase installations)
change over switch;
(b) shall not, under no circumstances, come in direct
or indirect connection with the electricity distribution system.
Generators intended to be connected to the electricity
distribution system
(a)
shall comply with the Network Code; and
(b) shall be provided with means of islanding
protection to disconnect the generator from the electricity
distribution system in the eventuality of a distribution system
failure.
(1) Single phase electrical installations and three phase Protective devices
installations not exceeding 60 Amps per phase shall be provided to
with a main double pole switch fuse or circuit breaker or four pole for installations not
switch fuse or four pole circuit breaker as applicable immediately exceeding
after of the electricity service meter to control the supply input to
the installation.
(2) Fuses and circuit breaker devices should be graded
to provide over current discrimination with the fuses provided by
the electricity supply service.
(3) The main switch fuse or circuit breaker shall be
mechanically linked so as to effect simultaneous disconnection of
all live conductors phases and neutral.
(4) An overvoltage protective device should be
installed immediately after the main switch fuse or circuit breaker.
(5) A residual current device with means for periodic
inspection and operating current of not more than 30mA to earth
shall be installed immediately after the overvoltage device
Provided that in the case of a multi customer facility
it shall be acceptable to install a residual current device with a
residual current of not more than 100mA near the metering point
immediately after the overvoltage protection followed by a 30mA
residual current protection device at the supply intake point in the
customer’s premises, unless
(a) sub-circuits are separately provided with such
residual current protection devices at the main distribution
point.
(b) where in the opinion of the authorised provider
the unintended interruption of supply gives rise to greater
risks, such as the de-energising of life support equipment,
provided that in cases falling within this paragraph alternative
arrangements may be made by the authorised provider.
(6) In the case of electrical installations in multi
consumer facilities mentioned in sub-regulation (5), the circuit
between the main switch fuse or circuit breaker and the individual
customer’s premises shall consist of separate and independent main
supply cables run in protective conduit to the individual customer’s
premises. Separate and independent metallic armoured cable may
also be used.
(7) Any compartment used in the electrical installation
shall be of the non metallic and non-hydroscopic type.
(1) Three phase installations exceeding 60 Amps per Protective devices
phase shall be provided with a four pole switch fuse or a four pole the supply point for
circuit breaker as the intake of the electricity supply service.
(2) The supply intake shall be adequately protected
by, but not limited to
(a) an over current device;
(b) an over voltage protective device;
(c) a residual current device.
The authorised provider shall ensure that the electrical Earthing systems.
installation is provided with a suitable and reliable connection to
earth by
(a) providing an independent connection to earth
through one or more earth electrodes as deemed appropriate,
suitably installed and tested, solidly connected by means of
a copper conductor of adequate cross sectional area but not
smaller than 16mm2 cross-sectional area insulated cable to a
main earthing terminal to which the protective conductor of
the electrical installation shall be connected.
(b) in addition to the requirement in paragraph (a)
of this regulation, the electrical installation earthing system
may also be connected to the earthing point in the Enemalta
substation supplying the installation, when this is technically
feasible.
(1) The authorised provider shall ensure that
(a) motor loads rated above 1.5 kW are of the three-
phase type and are provided with means to limit the starting
current unless this requirement is waived by Enemalta;
(b) motor loads rated at 30kW and above shall
have their starting current limited which may be subject to
conditions specified by Enemalta.
(2) Devices inhibiting automatic re-starting of motors
shall be provided wherever such restart, in the opinion of the
authorised provider, may cause danger.
(3) A phase failure device is to be provided for three-
phase motors to protect against single phasing.
(1) The Authority may appoint persons duly authorised
by it to inspect electrical installation works, installed, altered,
extended and certified, by an authorised provider, or installed,
altered or extended under the supervision of a warranted engineer
or certified by a warranted engineer.
(2) In the cases when the person appointed in terms
of sub-regulation (1) investigates a report on malpractice by
an authorised provider or a warranted engineer, an inspection
shall take place in the presence of the authorised provider or the
warranted engineer
Provided that if the authorised provider or the warranted
engineer fails to be available for the inspection for three times, after
being notified by the Authority, such inspection may take place
without the presence of the authorised provider or the warranted
engineer
Provided further that an inspection may take place even
without the authorised provider or the warranted engineer being
present in case of imminent danger being present.
(3) If any malpractice is discovered or defects are
found in the inspected electrical installation, the Authority shall
issue a directive to the authorised provider or the warranted
engineer, to rectify at his expense the defects or the result of the
malpractice, within a definite period of time as required by the
Authority.
(4) The failure by the authorised provider or the
warranted engineer to rectify at his expense the defects or the result
of the malpractice within the definite period of time required the
Authority, may give rise to the imposition by the Authority of an
administrative fine of €200 for each day of non-compliance.
(1) The Authority shall provide each authorised
provider with an identification card which shall serve as prima
facie evidence that the holder is an authorised provider authorised
under these regulations.
(2) Where an authorised provider’s identification card
is lost or destroyed, a replacement shall be issued by the Authority
to the authorised provider against a payment of a fee of € 30.
(3) Any person who purports to be an authorised
provider in terms of these regulations, when not being so
authorised, by making use of an identification card, shall be guilty
of an offence and shall be liable, on conviction, to a fine (multa) of
not more than one thousand euro (€1,000) and of not more than
one hundred thousand euro(€100,000).
(1) The Authority shall keep a register or registers
of authorisations, which shall be made public in part or in their
entirety, and which shall include records of
(a)
all authorisations granted under these regulations,
and
(b)
all applications for authorisations received and
refused.
(2) The contents of the registers to be made public
as mentioned in sub-regulation (1) shall include the following
information
(a) name, surname and address of the authorised
provider;
(b) authorisation number;
(c) telephone or mobile number of the authorised
provider, if available.
(3) The register or registers of authorisations shall be
kept under review and up to date by the Authority
Provided that, it shall be the duty of the authorised
provider to inform the Authority of any change in the information
mentioned in sub-regulation (2) of this regulation.
B