Rail System (Amendment) Regulations, 2009
Table of Provisions (9)
Statutory Text (9 Articles)
Suppliment tal-Gazzetta tal-Gvern ta’ Malta Nru. 18,384, 3 ta’ Marzu, 2009
Taqsima B
L.N. 56 of 2009
PRODUCT SAFETY ACT
(CAP. 427)
Interoperability of the Trans-European High-speed
Rail System (Amendment) Regulations, 2009
IN exercise of the powers conferred by articles 38 to 40 of
the Product Safety Act, the Minister of Finance, the Economy and
Investment, on the advice of the Malta Standards Authority, has
made the following regulations:-
(1) The title of these regulations is the Interoperability
of the Trans-European High-speed Rail System (Amendment)
Regulations, 2009 and they shall be read and construed as one
with the Interoperability of the Trans-European High-speed Rail
System Regulations, 2002, hereinafter referred to as “the principal
regulations”.
(2) These regulations shall be deemed to have come
into force on the 30 April, 2006.
For Schedule VI to the principal regulations there shall be
substituted the following new Schedule
B
“Schedule VI
Based on Annex VI of the Directive
VERIFICATION PROCEDURE FOR SUBSYSTEMS
1. INTRODUCTION
“EC” verification is the procedure whereby a notified body checks and certifies
that a subsystem
— complies with the Directive
— complies with the other regulations deriving from the Treaty, and may be put
into operation.
2. STAGES
The subsystem is checked at each of the following stages
— overall design,
— production: construction of subsystem, including, for example civil-
engineering activities, manufacturing, constituent assembly, overall adjustment,
— final testing of the subsystem.
For the design phase (including the type tests) and for the production phase
the main contractor (or the manufacturer) or its authorised representative established
within the Community may apply for an assessment as a first step.
In this case, this (these) assessment(s) lead to intermediate statement
verification(s) (ISV) issued by the Notified Body chosen by the main contractor (or
the manufacturer). This one in turn draws up an “EC declaration of intermediate
subsystem conformity” for the relevant phase(s).
CERTIFICATE
The Notified Body responsible for the “EC” verification draws up the certificate
of verification intended for the contracting entity or its authorised representative
established within the Community, which in turn draws up the “EC” declaration of
verification intended for the supervisory authority in the Member State in which the
subsystem is located and/or operates.
B
The Notified Body responsible for “EC” verification assesses the design and
production of the subsystem.
If available, the Notified Body takes into account the “Intermediate Statements
of Verification” (ISV(s)), and, in order to issue the “EC” certificate of verification,
it
— Checks that the subsystem
— is covered by relevant design and production ISVs delivered to the main
contractor (or the manufacturer) if it has asked the Notified Body for these two
phases,
—
or corresponds as produced to all aspects covered by the design ISV
delivered to the main contractor (or the manufacturer) if it has asked the Notified
Body only for the design phase,
— Verifies that they cover correctly the requirement of the TSI and assesses the
design and production elements that are not covered by the design and/or production
ISV(s) delivered to the main contractor (or the manufacturer).
TECHNICAL FILE
The technical file accompanying the declaration of verification must be made
up as follows
— for the infrastructure: engineering-structure plans, approval records for
excavations and reinforcement, testing and inspection reports on concrete, etc.,
— for the other subsystems: general and detailed drawings in line with
execution, electrical and hydraulic diagrams, control-circuit diagrams, description of
data-processing and automatic systems, operating and maintenance manuals, etc.,
— list of interoperability constituents, as referred to in Article 3, incorporated
into the subsystem,
— copies of the “EC” declarations of conformity or suitability for use with
which the above mentioned constituents must be provided in accordance with Article
13 of the Directive accompanied, where appropriate, by the corresponding calculation
notes and a copy of the records of the tests and examinations carried out by the
notified bodies on the basis of the common technical specifications,
— if available, the intermediate statement(s) of verification (ISV) and, in such a
case, the “EC” declaration(s) of intermediate subsystem conformity, that accompany
B
the “EC” certificate of verification, including the result of verification by the Notified
Body of their validity,
— certificate from the Notified Body responsible for “EC” verification,
accompanied by corresponding calculation notes and countersigned by itself, stating
that the project complies with this Directive and mentioning any reservations recorded
during performance of the activities and not withdrawn; the certificate should also
be accompanied by the inspection and audit reports drawn up by the same body in
connection with its task, as specified in sections 5.3 and 5.4.
MONITORING
5.1. The aim of “EC” monitoring is to ensure that the obligations deriving from
the technical file have been met during production of the subsystem.
5.2. The Notified Body responsible for checking production must have
permanent access to building sites, production workshops, storage areas and, where
appropriate, prefabrication or testing facilities and, more generally, to all premises
which it considers necessary for its task. The contracting entity or its authorised
representative within the Community must send it or have sent to it all the documents
needed for that purpose and, in particular, the implementation plans and technical
documentation concerning the subsystem.
5.3. The Notified Body responsible for checking implementation must
periodically carry out audits in order to confirm compliance with the Directive. It must
provide those responsible for implementation with an audit report. It may require to
be present at certain stages of the building operations.
5.4. In addition, the Notified Body may pay unexpected visits to the worksite or
to the production workshops. At the time of such visits the Notified Body may conduct
complete or partial audits. It must provide those responsible for implementation with
an inspection report and, if appropriate, an audit report.
SUBMISSION
The complete file referred to in paragraph 4 must be lodged with the contracting
entity or its authorised agent established within the Community in support of the
certificate of verification issued by the Notified Body responsible for verification of
the subsystem in working order. The file must be attached to the “EC” declaration
of verification which the contracting entity sends to the supervisory authority in the
Member State concerned.
A copy of the file must be kept by the contracting entity throughout the service
life of the subsystem. It must be sent to any other Member States which so request.
B
PUBLICATION
Each Notified Body must periodically publish relevant information
concerning
— requests for “EC” verification received;
— intermediate statements of verification (ISVs) issued or refused;
— certificates of verification issued or refused.
LANGUAGE
The files and correspondence relating to the “EC” verification procedures must
be written in an official language of the Member State in which the contracting entity
or its authorised representative within the Community is established or in a language
accepted by the entity.”.