Energy End-use Efficiency and Energy Services Regulations,
Table of Provisions (14)
Statutory Text (14 Articles)
L.N. 289 of 2008
MALTA RESOURCES AUTHORITY ACT
(CAP. 423)
Energy End-use Efficiency and Energy Services Regulations,
IN exercise of the powers conferred by article 28 of the Malta
Resources Authority Act, the Minister for Resources and Rural Affairs
after consultation with the Malta Resources Authority, has made the
following regulations>-
(1) The title of these regulations is the Energy End-use Title, scope and
commencement.
Efficiency and Energy Services Regulations, 2008.
(2) The scope of these regulations is to transpose Directive
32#2006#EC and to enhance the cost-effective improvement of energy
end-use efficiency in Malta by>
(a) removing existing market barriers and imperfections that
impede the efficient end use of energy< and
(b) creating the conditions for the development and
promotion of a market for energy services and for the delivery of
other energy efficiency improvement measures to final consumers.
(3) These regulations shall be deemed to have come into
force on the 17 th May 2008.
(1) Unless otherwise stated in these regulations, the Interpretation.
definitions in the Malta Resources Authority Act shall apply. The
definitions in the Electricity Regulations, 2004, shall also apply, unless L.N. 511 of 2004.
they are inconsistent with these regulations.
(2)
In these regulations, unless the context otherwise
requires>
“Act” means the Malta Resources Authority Act<
“Authority” means the Malta Resources Authority<
“distribution system operator” means a natural or legal person
responsible for operating, ensuring the maintenance of and, if
necessary, developing the distribution system of electricity in a
given area and, where applicable, its interconnections with other
systems, and for ensuring the long term ability of the system to
meet reasonable demands for the distribution of electricity<
“energy” means all forms of commercially available energy,
including electricity, liquefied petroleum gas, any fuel for heating
and cooling, coal, transport fuels excluding aviation and maritime
bunker fuels and biomass as defined in the Promotion of Electricity
produced from Renewable Energy Sources Regulations, 2004<
“energy audit” means a systematic procedure to obtain
adequate knowledge of the existing energy consumption profile
of a building or group of buildings, of an industrial operation and,
or installation or of a private or public service, identify and quantify
cost-effective energy savings opportunities, and report the findings<
“energy distributor” means a natural or legal person
responsible for transporting energy with a view to its delivery to
final consumers and to distribution stations that sell energy to final
consumers. This definition excludes electricity distribution system
operators having the same meaning as that given to distribution
system operator<
“energy efficiency” means a ratio between an output of
performance, service, goods or energy, and an input of energy<
“energy efficiency improvement” means an increase in energy
end-use efficiency as a result of technological, behaviour and, or
economic changes<
“energy efficiency improvement measures” means all actions
that normally lead to verifiable and measurable or estimable energy
efficiency improvement<
“energy efficiency mechanisms” means general instruments
used by the Government of Malta to create a supportive framework
or incentives for market actors to provide and purchase energy
services and other energy efficiency improvement measures<
“energy efficiency improvement programmes” means
activities that focus on groups of final consumers and that normally
lead to verifiable and measurable or estimable energy efficiency
improvement<
“energy performance contracting” means a contractual
arrangement between the beneficiary and the provider of an energy
efficiency improvement measure, normally an energy service
company, where investments in that measure are paid for in relation
to contractually agreed level of energy efficiency improvement<
“energy savings” means an amount of saved energy
determined by measuring and, or estimating consumption before
and after implementation of one or more energy efficiency
improvement measures, whilst ensuring normalisation for external
conditions that affect energy consumption<
“energy service” means the physical benefit, utility or good
derived from a combination of energy with energy efficient
technology and, or action, which may include the operations,
maintenance and control necessary to deliver the service, which is
delivered on the basis of a contract and in normal circumstances
has proven to lead to verifiable and measurable or estimable energy
efficiency improvement and, or primary energy savings<
“energy service company” (ESCO) means a natural or legal
person that delivers energy services and, or other energy efficiency
improvement measures in a user’s facility or premises, and accepts
some degree of financial risk in so doing. The payment for the
services delivered is based, either wholly or in part, on the
achievement of energy efficiency improvements and on the meeting
of the other agreed performance criteria<
“final consumer” means a natural or legal person that
purchases energy for his own end use<
“financial instruments for energy savings” means all financial
instruments such as funds, subsidies, tax rebates, loans, third party
financing, energy performance contracting, guarantee of energy
savings contracts, energy outsourcing and other related contracts
that are made available to the market place by public or private
bodies in order to cover partly or totally the initial project cost for
implementing energy efficiency improvement measures<
“Minister” means the Minister responsible for resources<
“retail energy sales company” means a natural or legal person
that sells energy to final consumers<
“small distributor, small distribution system operator and retail
energy sales company” means a natural or legal person that
distributes or sells energy to final consumers, and distributes or
sells less than the equivalent of 75 GWh energy per year or employs
fewer than 10 persons or whose annual turnover and annual balance
sheet total does not exceed EUR 2,000,000<
“third-party financing” means a contractual arrangement
involving a third party, in addition to the energy supplier and the
beneficiary of the energy efficiency improvement measure, that
provides the capital for that measure and charges the beneficiary a
fee equivalent to a part of the energy savings achieved as a result
of the energy efficiency improvement measure. That third party
may or may not be an ESCO.
These regulations shall apply to>
(a) providers of energy efficiency improvement measures,
energy distributors, distribution system operators and retail energy
sales companies<
(b) final consumers<
(c) the armed forces, only to the extent that their application
does not cause any conflict with the nature and primary aim of the
activities of the armed forces and with the exception of material
used exclusively for military purposes>
Provided that these regulations shall not apply to those
undertakings involved in categories of activities listed in Schedule
1 to the European Community Greenhouse Gas Emissions Trading
Scheme Regulations, 2005.
(1) An overall national indicative energy savings target of 9
% by the year 2017 shall be achieved by way of energy services and
other energy efficiency improvement measures>
Provided that such measures shall be cost-effective,
practicable and reasonable>
Provided also that such national indicative energy savings
target shall be established and calculated in accordance with the
provisions and methodology set out in the First Schedule.
(2) For purposes of comparison of energy savings and for
conversion to a comparable unit, the conversion factors set out in the
Second Schedule shall apply unless the use of other conversion factors
can be justified, while the Third Schedule sets out a list of eligible
energy efficiency improvement measures and the Fourth Schedule
establishes a general framework for the measurement and verification
of energy savings.
(3) For the purpose of the first Energy Efficiency Action
Plan to be submitted in accordance with regulation 13, the Authority
shall propose an intermediate national indicative energy savings target
by 2011, and provide an overview of a strategy for the achievement of
the intermediate and overall targets>
Provided that such intermediate target shall be realistic and
consistent with the overall national indicative energy savings target
referred to in sub-regulation (1) of this regulation.
(4) The Authority shall submit to the Minister programmes
and measures to improve energy efficiency.
(5) The Authority shall also have the overall control and
responsibility for overseeing the framework set up in relation to the
target mentioned in sub-regulation (1) of this regulation. The Authority
shall thereafter verify the energy savings as a result of energy services
and other energy efficiency improvement measures including existing
national energy efficiency improvement measures, and report the result.
The Authority shall have the administrative and managerial Energy end-use
efficiency in the
responsibility to monitor the implementation for the integration of energy public sector.
efficiency improvement measures by>
(a) publishing guidelines on energy efficiency and energy
savings as a possible assessment criterion in competitive tendering
for public contracts<
(b) facilitating and enabling the exchange of best practices
between public sector bodies for example on energy efficient public
procurement practices, both at the national and international level<
(c) monitoring the implementation by the Government of
at least two measures from the list set out in the Sixth Schedule<
(d) monitoring that energy efficiency improvement
measures are taken by the public sector, focusing on cost-effective
measures which generate the largest energy savings in the shortest
time span in the public sector>
Provided that such measures shall be taken at the appropriate
national and, or local level and may consist of legislative initiatives.
and, or voluntary agreements, or other schemes with an equivalent
effect.
(1) Energy distributors, distribution system operators and,
or retail energy sales companies shall>
(a) provide on request, yearly, aggregated statistical
information on their final consumers to the Authority>
Provided that such information must be sufficient to properly
design and implement energy efficiency improvement programmes
and to promote and monitor energy services and other improvement
measures<
(b) refrain from activities that might impede the demand
for and delivery of energy services and other energy efficiency
improvement measures, or hinder the development of markets for
energy services and other energy efficiency improvement measures.
The Authority shall take the necessary measures to bring such
activities to an end where they occur.
(2) Energy distributors, distribution system operators and,
or retail energy sales companies, directly and, or indirectly through other
providers of energy services or energy efficiency improvement measures
shall>
(a) ensure the offer to their final consumers, and the
promotion of competitively priced energy services< or
(b) ensure the availability to their final consumers, and the
promotion of competitively-priced energy audits conducted in an
independent manner and, or energy efficiency improvement
measures, in accordance with regulations 9 and 11< or
(c) contribute to the funds and funding mechanisms referred
to in regulation 10. The level of such contributions shall as a
minimum correspond to the estimated costs of offering any of the
activities referred to in this sub-regulation and shall be agreed with
the Authority.
(1) The Authority shall ensure that information on energy
efficiency mechanisms and financial and legal frameworks adopted with
the aim of reaching the national indicative energy savings target is
transparent and widely disseminated to the relevant market actors.
(2) The Authority shall also encourage the promotion of
energy end-use efficiency and shall establish appropriate conditions
for market operators to provide more information and advice to final
consumers on energy end-use efficiency.
The Authority, where it deems it necessary, shall ensure the Availability of
qualification,
availability of the requirements related to appropriate qualification, accreditation and
accreditation and certification schemes in order for these to be made certification
schemes.
available for providers of energy services, energy audits and energy
efficiency improvement measures as referred to in sub-regulation (2),
paragraphs (a) and (b) of regulation 6, in order to achieve a high level
of technical competence, objectivity and reliability.
The Authority shall make available model contracts for those Financial
instruments for
financial instruments available to existing and potential purchasers of energy saving.
energy services and other energy efficiency improvement measures in
the public and private sectors.
(1) The Authority may administer funds to subsidise the Funds and funding
mechanisms.
delivery of energy efficiency improvement programmes and other
energy efficiency improvement measures and to promote the
development of a market for energy efficiency improvement measures
which, shall include the promotion of energy auditing, financial
instruments for energy savings and, where appropriate, improved
metering and informative billing. The funds shall also target end-use
sectors with higher transaction costs and higher risks>
Provided that if established the funds may provide for grants,
loans, financial guarantees and, or other types of financing that guarantee
results.
(2) In its administration of the funds, the Authority shall
not discriminate between final consumers, providers of energy efficiency
improvement measures, independent energy advisors, energy
distributors, distribution system operators, retail energy sales companies
and installers.
(3) The Authority shall ensure that such funds complement
and do not compete with commercially-financed energy efficiency
improvement measures.
(1) Efficient and high-quality energy audit schemes which Energy audits.
are designed to identify potential energy efficiency improvement
measures and which are carried out in an independent manner shall be
made available to all final consumers, including domestic, commercial
and small and medium-sized industrial consumers, taking into account
regulation 10 (1).
(2) Energy audits shall be made available for market
segments where they are not sold commercially, taking into account
regulation 10 (1).
(3) Energy performance certificates relating to the energy
performance of buildings shall be regarded as equivalent to an energy
audit meeting the requirements set out in sub-regulations (1) and (2) of
this regulation and as equivalent to an energy audit as referred to
paragraph (e) of the Sixth Schedule to these regulations.
(1) Energy distributors, distribution system operators and,
or retail energy sales companies shall, in so far as it is technically
possible, financially reasonable and proportionate in relation to the
potential energy savings, provide final consumers making use of
electricity, heating and, or cooling and domestic hot water with
competitively priced individual meters that accurately reflect the final
consumer’s actual energy consumption and which provide information
on actual time of use>
Provided that when an existing meter is replaced, such
competitively priced individual meters shall always be provided, unless
this is technically impossible or not cost-effective in relation to the
estimated potential savings in the long term>
Provided also that when a new connection is made in a new
building or when a building undergoes major renovations, as set out in
sub-regulation 3 of regulation 11, such competitively priced individual
meters shall always be provided.
(2) Energy billing performed by energy distributors,
distribution system operators and retail energy sales companies shall,
where appropriate, be based on actual energy consumption and
whosoever is responsible for the issuing of such billing shall ensure
that this is presented in clear and understandable terms>
Provided that appropriate information shall be made available
with the bill in order to provide final consumers with a comprehensive
account of current energy costs.
(3) Energy distributors, distribution system operators or
retail sale companies shall, where appropriate and in clear and
understandable terms, make available to final consumers in or with their
bills, contracts, transactions and, or receipts at distribution stations, the
following information>
(a)
current actual prices and actual consumption of energy<
(b) comparisons of the final consumer’s current energy
consumption with consumption for the same period in the previous
year<
(c) contact information for consumers’ organisations, energy
agencies or similar bodies, including website addresses from which
information may be obtained on available energy efficiency
improvement measures, comparative end user profiles and, or
objective technical specifications for energy-using equipment.
(1) The Authority shall submit to the Minister an Energy Reports.
Efficiency Action Plan by not later than the 30 th March 2011, and another
Energy Efficiency Action Plan by not later than the 30 th March 2014.
(2) All the reports shall describe the energy efficiency
improvement measures planned to reach the targets set out in sub-
regulations (1) and (2) of regulation 4, as well as to comply with the
provisions on the exemplary role of the public sector and provision of
information and advice to final consumers set out in regulations 5 and
7 (2) respectively.
(3) The Energy Efficiency Action Plans shall>
(a) include a thorough analysis and evaluation of the
preceding Energy Efficiency Action Plan<
(b) include the final results with regard to the fulfilment of
the energy savings targets set out in regulation 4 (1) and (2)<
(c) include plans for and information on the anticipated
effects of additional measures which address any existing or
expected shortfall vis-à-vis the target<
(d) use and gradually increase the use of harmonised
efficiency indicators and benchmarks, both for the evaluation of
past measures and estimated effects of planned future measures<
(e) be based on available data and supplemented with
estimates.
(4) The Energy Efficiency Action Plan shall identify the
progress made in achieving Malta’s national indicative energy savings
targets.
(5) The Minister may approve the reports referred to in this
regulation, in whole or in part, with or without modifications or
conditions, or may refer it back to the Authority. When such reports
are approved, the Authority shall publish the reports together with a
statement of the representations it has received and the responses it has
made to those representations.
First Schedule
Regulation 4
Methodology for calculating the national indicative energy savings target
The methodology used for calculating the national indicative energy savings target set
out in regulation 4 shall be the following
1. The Authority shall use the annual final inland energy consumption of all energy
users within the scope of these regulations for the most recent five-year period previous
to the implementation of these regulations for which official data are available, to
calculate an annual average amount of consumption. This final energy consumption
shall be the amount of energy distributed or sold to final consumers during the five-year
period, not adjusted for degree days, structural changes or production changes.
On the basis of this annual average amount of consumption, the national indicative
energy savings target shall be calculated once and the resulting absolute amount of
energy to be saved applied for the total duration of these regulations.
The national indicative energy savings target shall
(a) consist of 9 % of the annual average amount of consumption referred to above;
(b) be measured after the ninth year of application of these regulations;
(c) be the result of cumulative annual energy savings achieved throughout the nine-year
application period of these regulations;
(d) be reached by way of energy services and other energy efficiency improvement
measures.
This methodology for measuring energy savings ensures that the total energy savings
prescribed by these regulations are a fixed amount, and thus independent of future GDP
growth and of any future increase in energy consumption.
2. The national indicative energy savings target shall be expressed in absolute terms in
GWh, or equivalent, calculated in accordance with the Second Schedule.
3. Energy savings in a particular year following the entry into force of these regulations
that result from energy efficiency improvement measures initiated in a previous year not
earlier than 1995 and that have a lasting effect may be taken into account in the
calculation of the annual energy savings. In certain cases, where circumstances can
justify it, measures initiated before 1995 but not earlier than 1991 may be taken into
account. Measures of a technological nature should either have been updated to take
account of technological progress, or be assessed in relation to the benchmark for such
measures.
In all cases, the resulting energy savings must still be verifiable and measurable or
estimable, in accordance with the general framework in the Fourth Schedule.
B
Second Schedule
Regulations 4 and 5
Third Schedule
Regulation 4
Indicative list of examples of eligible energy efficiency improvement measures
This Schedule provides examples of areas in which energy efficiency improvement
programmes and other energy efficiency improvement measures may be developed and
implemented in the context of regulation 4.
To be taken into account, these energy efficiency improvement measures must result in
energy savings that can be clearly measured and verified or estimated in accordance
with the guidelines in Schedule 4, and their impacts on energy savings must not already
be counted in other specific measures. The following lists are not exhaustive but are
intended to provide guidance.
Examples of eligible energy efficiency improvement measures
Residential and tertiary sectors
(a) heating and cooling (e.g. heat pumps, new efficient boilers, installation/efficient
update of district heating/ cooling systems);
(b) insulation and ventilation (e.g. wall cavity and roof insulation, double/triple glazing
of windows, passive heating and cooling);
(c) hot water (e.g. installation of new devices, direct and efficient use in space heating,
washing machines);
(d) lighting (e.g. new efficient bulbs and ballasts, digital control systems, use of motion
detectors for lighting systems in commercial buildings);
(e) cooking and refrigeration (e.g. new efficient devices, heat recovery systems);
(f) other equipment and appliances (e.g. combined heat and power appliances, new
efficient devices, time control for optimised energy use, stand-by loss reduction,
installation of capacitors to reduce reactive power, transformers with low losses);
(g) domestic generation of renewable energy sources, whereby the amount of purchased
energy is reduced (e.g. solar thermal applications, domestic hot water and solar-assisted
space heating and cooling);
Industry sector
(h) product manufacturing processes (e.g. more efficient use of compressed air,
condensate and switches and valves, use of automatic and integrated systems, efficient
stand-by modes);
(i) motors and drives (e.g. increase in the use of electronic controls, variable speed
drives, integrated application programming, frequency conversion, electrical motor with
high efficiency);
(j) fans, variable speed drives and ventilation (e.g. new devices/systems, use of natural
ventilation);
(k) demand response management (e.g. load management, peak shaving control
systems);
(l) high-efficiency cogeneration (e.g. combined heat and power appliances);
Transport sector
(m) mode of travel used (e.g. promotion of energy-efficient vehicles, energy-efficient
use of vehicles including tyre pressure adjustment schemes, energy efficiency devices
and add-on devices for vehicles, fuel additives which improve energy efficiency, high-
lubricity oils and low-resistance tyres);
(n) modal shifts of travel (e.g. car free home/office transportation arrangements, car
sharing, modal shifts from more energy-consuming modes of transport to less energy-
consuming ones, per passenger-km or tonne-km);
(o) car-free days;
Cross-sectoral measures
(p) standards and norms that aim primarily at improving the energy efficiency of
products and services, including buildings;
(q) energy labelling schemes;
(r) metering, intelligent metering systems such as individual metering instruments
managed by remote and informative billing;
(s) training and education that lead to application of energy-efficient technology and/or
techniques;
Horizontal measures
(t) regulations, taxes etc. that have the effect of reducing energy end-use consumption;
(u) focused information campaigns that promote energy efficiency improvement and
energy efficiency improvement measures.
Fourth Schedule
Regulation 4
General framework for measurement and verification of energy savings
1. Energy savings measurements and calculations and their normalisation
1.1. Measuring energy savings
General
In measuring the realised energy savings as set out in regulation 4 with a view to
capturing the overall improvement in energy efficiency and to ascertaining the impact of
individual measures, a harmonised calculation model which uses a combination of top-
down and bottom-up calculation methods shall be used to measure the annual
improvements in energy efficiency for the EEAPs referred to in regulation 13.
Top-down calculations
A top-down calculation method means that the amount of energy savings is calculated
using the national or larger-scale aggregated sectoral levels of energy savings as the
starting point. Adjustments of the annual data are then made for extraneous factors such
as degree days, structural changes, product mix, etc. to derive a measure that gives a fair
indication of total energy efficiency improvement, as described in point 1.2.
This method does not provide exact measurements at a detailed level nor does it show
cause and effect relationships between measures and their resulting energy savings.
However, it is usually simpler and less costly and is often referred to as ‘energy
efficiency indicators’ because it gives an indication of developments.
Bottom-up calculations
A bottom-up calculation method means that energy savings obtained through the
implementation of a specific energy efficiency improvement measure are measured in
kilowatt-hours (kWh), in Joules (J) or in kilogram oil equivalent (kgoe) and added to
energy savings results from other specific energy efficiency improvement measures.
The Authority shall ensure that double counting of energy savings, which results from a
combination of energy efficiency improvement measures (including mechanisms), is
avoided. For the bottom-up calculation method, data and methods referred to in points
2.1 and 2.2 may be used.
The Authority may use further bottom-up measurements in addition to the part
prescribed by the harmonised bottom-up model, on the basis of a description of the
methodology presented by the Authority.
1.2. How energy savings measurements should be normalised
Energy savings shall be determined by measuring and/or estimating consumption,
before and after the implementation of the measure, while ensuring adjustment and
normalisation for external conditions commonly affecting energy use. Conditions
commonly affecting energy use may also differ over time. Such conditions may be the
likely impact of one or several plausible factors, such as
(a) weather conditions, such as degree days;
(b) occupancy levels;
(c) opening hours for non-domestic buildings;
(d) installed equipment intensity (plant throughput); product mix;
(e) plant throughput, level of production, volume or added value, including changes in
GDP level;
(f) schedules for installation and vehicles;
(g) relationship with other units.
2. Data and methods that may be used (measurability)
Several methods for collecting data to measure and/or estimate energy savings exist. At
the time of the evaluation of an energy service or energy efficiency improvement
measure, it will often be impossible to rely only on measurements. A distinction is
therefore made between methods measuring energy savings and methods estimating
energy savings, where the latter is the more common practice.
2.1. Data and methods based on measurements
Bills from distribution companies or retailers
Metered energy bills may form the basis for measurement for a representative period
before the introduction of the energy efficiency improvement measure. These may then
be compared to metered bills for the period after the introduction and use of the
measure, also for a representative period of time. The findings should be compared to a
control group (non-participation group) if possible or, alternatively, normalised as
described in point 1.2.
Energy Sales data
The consumption of different types of energy (e.g. electricity, gas, heating oil) may be
measured by comparing the sales data from the retailer or distributor obtained before the
introduction of the energy efficiency improvement measures with the sales data from
the time after the measure. A control group may be used or the data normalised.
Equipment and appliance sales data
Performance of equipment and appliances may be calculated on the basis of information
obtained directly from the manufacturer. Data on equipment and appliance sales can
generally be obtained from the retailers. Special surveys and measurements may also be
carried out. The accessible data can be checked against sales figures to determine the
size of energy savings. When using this method, adjustment should be made for changes
in the use of the equipment or appliance.
End-use load data
Energy use of a building or facility can be fully monitored to record energy demand
before and after the introduction of an energy efficiency improvement measure.
Important relevant factors (e.g. production process, special equipment, heating
installations) may be metered more closely.
2.2. Data and methods based on estimates
Simple engineering estimated data
Simple engineering estimated data calculation without on-site inspection is the most
common method for obtaining data for measuring deemed energy savings. Data may be
estimated using engineering principles, without using on-site data, but with assumptions
based on equipment specifications, performance characteristics, operation profiles of
measures installed and statistics, etc.
Enhanced engineering estimated data: Inspection
Energy data may be calculated on the basis of information obtained by an external
expert during an audit of, or other type of visit to, one or several targeted sites. On this
basis, more sophisticated algorithms/simulation models could be developed and be
applied to a larger population of sites (e.g. buildings, facilities, vehicles). This type of
measurement can often be used to complement and calibrate simple engineering
estimated data.
3. How to deal with uncertainty
All the methods listed in point 2 may entail some degree of uncertainty. Uncertainty
may derive from 1
(a) instrumentation errors: these typically occur because of errors in specifications given
by the product manufacturer;
(b) modelling errors: these typically refer to errors in the model used to estimate
parameters for the data collected;
(c) sampling errors: these typically refer to errors resulting from the fact that a sample of
units was observed rather than the entire set of units under study.
Uncertainty may also derive from planned and unplanned assumptions; these are
typically associated with estimates, stipulations and/or the use of engineering data. The
occurrence of errors is also related to the chosen system of data collection that is
outlined in points 2.1 and 2.2. A further specification of uncertainty is advised.
The Authority may choose to use the method of quantified uncertainty when reporting
on the targets set out in these regulations.
Quantified uncertainty shall then be
expressed in a statistically meaningful way, declaring both accuracy and confidence
level. For example, ‘the quantifiable error is found with 90 % confidence to be ± 20 %’.
If the method of quantified uncertainty is used, the Authority is also to take into account
that the acceptable level of uncertainty required in energy savings calculations is a
function of the level of savings and the cost effectiveness of decreasing uncertainty.
A model for establishing a level of quantifiable uncertainty based on these three errors is given in Appendix B
in the International Performance Measurement & Verification Protocol (IPMVP).
4. Harmonised lifetimes of energy efficiency improvement measures in bottom-up
calculations
Some energy efficiency improvement measures last for decades while other measures
last for a shorter period of time. The list below gives some examples of the average
lifetime of energy efficiency improvement measures
Loft insulation of private dwellings
30 years
Cavity wall insulation of private dwellings
40 years
Glazing E to C rated (in m2)
20 years
Boilers B to A rated 15 years
Heating controls — upgrade with boiler replacement
15 years
CFLs — retail
16 years
5. How to deal with multiplier effects of energy savings and how to avoid double
counting in mixed top down and bottom-up calculation methods
The implementation of one energy efficiency improvement measure, e.g. hot water tank
and pipe insulation in a building, or another measure with equivalent effect, may have
future multiplier effects in the market, meaning that the market will implement a
measure automatically without any further involvement from the Authority or any
private-sector energy services provider. A measure with multiplier potential would in
most cases be more cost-effective than measures that need to be repeated on a regular
basis.
The Authority shall estimate the energy savings potential of such measures including
their multiplier effects and verify the total effects in an ex-post evaluation using
indicators when appropriate.
With regard to the evaluation of horizontal measures, energy efficiency indicators may
be used, provided that the way in which they would have developed without the
horizontal measures can be determined. However, it must be possible to rule out, as far
as possible, double counting with savings achieved through targeted energy efficiency
programmes, energy services and other policy instruments. This applies particularly to
energy or CO 2 taxes and information campaigns. Corrections shall be made for double
counting of energy savings. The use of matrices that enable the summation of impacts of
measures is encouraged.
Potential energy savings resulting after the target period shall not be taken into account
when the Authority reports on the overall target set out in regulation 4. Measures that
promote long-term market effects should in any case be encouraged and measures that
have already resulted in multiplier energy savings effects should be taken into account
when reporting on the targets set out in regulation 4, provided they can be measured and
verified using the guidance given in this Schedule.
6. How to verify energy savings
If deemed cost-effective and necessary, the energy savings obtained through a specific
energy service or other energy efficiency improvement measure shall be verified by a
third party. This may be done by independent consultants, ESCOs or other market
actors. The Authority may provide further instructions on this matter.
Fifth Schedule
Regulation 13
Indicative list of energy conversion markets and sub-markets for which
benchmarks can be worked out
1. The market for household appliances/information technology and lighting
1.1. Kitchen appliances (white goods);
1.2. Entertainment/information technology;
1.3. Lighting.
2. The market for domestic heating technology
2.1. Heating;
2.2. Hot-water provision;
2.3. Air conditioning;
2.4. Ventilation;
2.5. Heat insulation;
2.6. Windows.
3. The market for industrial ovens.
4. The market for motorised power in industry.
5. The market for public-sector institutions
B
5.1. Schools/public administration;
5.2. Hospitals;
5.3. Swimming pools;
5.4. Street lighting.
6. The market for transport services.
Sixth Schedule
Regulations 5 and 11
List of eligible energy efficient public procurement measures
Without prejudice to national and Community public procurement legislation, the public
sector shall apply at least two requirements from the following list in the context of the
exemplary role of the public sector as referred to in regulation 5
(a) requirements concerning the use of financial instruments for energy savings,
including energy performance contracting, that stipulate the delivery of measurable and
pre-determined energy savings (including whenever public administrations have
outsourced responsibilities);
(b) requirements to purchase equipment and vehicles based on lists of energy-efficient
product specifications of different categories of equipment and vehicles to be drawn up
by the Authority using, where applicable, minimised life-cycle cost analysis or
comparable methods to ensure cost effectiveness;
(c) requirements to purchase equipment that has efficient energy consumption in all
modes, including in standby mode, using, where applicable, minimised life-cycle cost
analysis or comparable methods to ensure cost effectiveness;
(d) requirements to replace or retrofit existing equipment and vehicles with the
equipment listed in points (b) and(c);
(e) requirements to use energy audits and implement the resulting cost-effective
recommendations;
(f) requirements to purchase or rent energy-efficient buildings or parts thereof, or
requirements to replace or retrofit purchased or rented buildings or parts thereof in order
to render them more energy-efficient.