Legislator Case Law & Legislation
ln_2008_254 MT

Zone Regulations, 2008

16 Articles / Provisions · Malta
Open official source Machine-readable Markdown (.md)

Table of Provisions (16)

Statutory Text (16 Articles)

Malta Government Gazette — Legal Notice 2008 254 — Zone Regulations, 2008

L.N. 254 of 2008

MALTA RESOURCES AUTHORITY ACT

(CAP. 423)

Borehole Drilling and Excavation Works within the Saturated

Zone Regulations, 2008

IN EXERCISE of the powers conferred by Article 28 of the

Malta Resources Authority Act, the Minister for Resources and Rural

Affairs after consultation with the Malta Resources Authority, has

made the following regulations

Malta Government Gazette — Legal Notice 2008 254 — Zone Regulations, 2008

(1) The title of these regulations is the Borehole Drilling Title, scope and

commencement.

and Excavation Works within the Saturated Zone Regulations, 2008.

(2) The scope of these regulations is the establishment of a

regulatory framework for borehole drilling and excavation works

carried out partly or totally within the saturated zone.

(3)

These regulations shall come into force on the 7th October,

2008.

Malta Government Gazette — Legal Notice 2008 254 — Zone Regulations, 2008

In these regulations, unless the context otherwise requires: Interpretation.

“Act” means the Malta Resources Authority Act;

“aquifer” means a subsurface layer or layers of rock or

other geological strata of sufficient porosity and permeability

to allow either a significant flow of groundwater or the

extraction of significant quantities of groundwater;

“Authority” means the Malta Resources Authority as

established by the Act;

“body of groundwater” means a distinct volume of

groundwater within any aquifer;

“borehole” means any means any shaft, adit, opening, hole,

spring outlet or well artificially dug in the ground or artificially

enlarged, which has access to groundwater or from which

groundwater is extracted or can be extracted or which is

vertically deeper than half the distance between the well head

and the nearest water table at that point, but it does not include

a water retaining cistern;

“borehole geological log” means a register containing

information regarding the drilling of a borehole;

“casing” means a conduit, pipe, fixture or constructional

element which is inserted and attached to the circumference of

the borehole to prevent any transfer of fluid between the

borehole and its surrounding geological formation;

“officer” includes any person engaged by, detailed for duty

with, or in any manner whatsoever performing duties for or on

behalf of the Authority;

“permit” means a permit issued under these regulations to

construct a borehole or to carry out any form of excavation

works within the saturated zone;

“saturated zone” means that part of an aquifer in which all

interconnected openings within the geological formation are

completely filled with water;

“seawell” means a borehole drilled at a distance of not

more than 50 metres from the nearest point along the coastline;

Malta Government Gazette — Legal Notice 2008 254 — Zone Regulations, 2008

These regulations shall not apply to

(a) any borehole constructed for the purposes of the

installation of an earth electrode

Provided that such a borehole does not reach the

saturated zone;

(b) any borehole constructed for site investigation

purposes

Provided that such borehole does not reach the

saturated zone;

(c) any borehole or excavation works constructed for the

purposes of foundations to buildings or for other engineering

works

Provided that such borehole or excavation works do not reach

the saturated zone.

Malta Government Gazette — Legal Notice 2008 254 — Zone Regulations, 2008

The drilling of a borehole or any form of excavation works Prohibition.

carried out partly or totally within the saturated zone is prohibited,

unless a permit to this effect is issued by the Authority.

Malta Government Gazette — Legal Notice 2008 254 — Zone Regulations, 2008

(1) Any person who intends to drill a borehole or carry Applications

permit to drill a

out any form of excavation works partly or totally within the saturated borehole or to

zone shall submit an application in writing to the Authority in such carry

excavation works

form and manner as the Authority may prescribe.

within the

saturated zone.

Such application shall at least include

(a) details of the applicant, the person drilling the

borehole or carrying out the excavation works and the qualified

Perit under whose supervision such borehole will be

constructed or such excavation works will be carried out;

(b) full technical details of the location, size and depth

of the borehole or excavation works;

(c) details of the purposes for construction of the borehole

or excavation works and declarations to this effect from the

applicant and the Perit

(2) A non-refundable application fee of two hundred and Application fee.

thirty euro (€ 230) shall be paid to the Authority with the application

form submitted for the purposes of these regulations.

Malta Government Gazette — Legal Notice 2008 254 — Zone Regulations, 2008

(1) For a minimum period of 12 months from the date of Moratorium

borehole drilling.

entry into force of these regulations or until such further period of

time as the Authority may subsequently decide, the Authority shall

not accept or process any application for the drilling of any borehole

or excavation works to be carried out within the saturated zone and

the Authority shall not issue any permit for such purposes.

(2) The provisions of sub-regulation (1) shall not apply

to the following

(a) any borehole constructed for the purposes of the

installation of an earth electrode within the saturated zone;

(b) any borehole constructed for site investigation

purposes within the saturated zone;

(c) any borehole or excavation works carried out for the

purposes of the construction of foundations to buildings or for

the purposes of other engineering works, and where such

borehole or excavation works lie partly or totally within the

saturated zone;

(d)

any seawell.

(3)

Any person, after drilling a seawell shall

(a) carry out such appropriate water quality tests to

establish the electrical conductivity of the water extracted from

the seawell. Where the electrical conductivity of such water is

found by such water quality tests to be less than 50,000 µS/cm,

such person shall immediately inform the Authority of the

quality of the water extracted and shall cease to extract water

from such seawell for such period of time as the Authority may

decide;

(b) construct a casing to the seawell for a minimum depth

of 10 metres below sea level.

(4) When the Authority determines that the extraction of

water from any seawell has a significant impact on a body of

groundwater or a source or sources of groundwater, the Authority

may order the cessation of a source or water extracted and the closure

of the seawell.

Malta Government Gazette — Legal Notice 2008 254 — Zone Regulations, 2008

(1) The Authority shall establish its procedure for

determining an application for a permit to drill a borehole or for

excavation works within the saturated zone.

(2) The Authority shall communicate to the applicant in

writing within eight weeks from the date of receipt of a valid

application containing all such information and documentation

requested by the Authority and accompanied by the appropriate

application fee, any decision taken concerning an application for a

permit to drill a borehole or carry out excavation works within the

saturated zone.

(3) An application for a permit issued under these

regulations shall be determined by the Authority in accordance with

the following criteria. The Authority shall have to be satisfied that

by granting the permit

(a)

there will be no significant impact on water resources;

(b) water resources will be used efficiently in the course

of any activities carried out under the permit;

(c) the water environment is protected including the

limitation of discharges to the environment;

(d)

the public interest in general is safeguarded.

(4) In the case of a refusal to grant a permit, the Authority

shall give reasons for its decision.

Malta Government Gazette — Legal Notice 2008 254 — Zone Regulations, 2008

(1) The Authority shall have the power, through the Powers to impose

conditions of

permit, to establish such conditions as the Authority considers permit.

requisite or necessary.

(2) The permit holder shall at all times comply with these

regulations and with the conditions of the permit.

(3) The conditions included in the permit may contain,

but not necessarily be limited to, provisions regarding

(a)

the grant and term of the permit;

(b) compliance requirements to conditions for drilling the

borehole or carrying out the excavation works including

directions, standards, guidelines, codes of good drilling practice

or rules issued by the Authority;

(c) prevention of groundwater pollution by means of the

discharge of substances in the course of drilling operations and

in the course of any activity carried out under the permit;

(d) submission of data regarding the borehole’s

geological log and other such information as the Authority may

require;

(e) inspection, making of copies and taking of extracts

from records held by the permit holder and, or driller with

respect to the drilling of the borehole or carrying out of the

excavation works.

Malta Government Gazette — Legal Notice 2008 254 — Zone Regulations, 2008

The issue of a permit to drill a borehole or to carry out Rights of use with

respect to

excavation works within the saturated zone does not in any way groundwater

give any right to draw water from such a source or to dispose of any extraction.

material whether liquid or solid.

Malta Government Gazette — Legal Notice 2008 254 — Zone Regulations, 2008

Where the Authority determines that a borehole drilled or

that excavation works which are carried out partly or totally within

the saturated zone have a significant impact on a body of groundwater

or other source or sources of groundwater, the Authority may

(a) order the immediate cessation of such activity and

water extraction or the reduction in the amount of water being

extracted;

(b)

order the closure of such borehole or cessation of such

works.

Malta Government Gazette — Legal Notice 2008 254 — Zone Regulations, 2008

The Authority may, at any time order the suspension,

revocation or cancellation of a permit where the Authority is satisfied

that

(a) there is a significant impact on a body of groundwater

or other source or sources of groundwater arising from any

activity carried out under a permit issued under these

regulations;

(b) the permit holder has failed or is failing to abide by

any conditions of the permit or by these regulations; or

(c) the permit holder does not possess all other relevant

permits and licences that are issued by any other authority or

regulatory body; or

(d) the permit holder is contravening any requirement

imposed by law; or

(e) the permit holder fails to comply with any direction

given by the Authority as to such matters as are specified in the

permit or are of a description so specified; or

(f) any information submitted in the application for a

permit and for which the permit has been issued is determined

to be false or incorrect.

Malta Government Gazette — Legal Notice 2008 254 — Zone Regulations, 2008

(1) The Authority shall keep a register or registers of

permits issued under these regulations which shall include records

(a)

all permits granted under these regulations; and

(b)

all applications for a permit received and refused.

(2) The register or registers of permits shall be kept under

review and up to date.

Malta Government Gazette — Legal Notice 2008 254 — Zone Regulations, 2008

(1) Without prejudice to regulation 11, where the Enforcement

Orders.

Authority is satisfied that

(a) a permit holder is contravening any condition of the

permit; or

(b) a permit holder is contravening any requirement

imposed by law; or

(c) any person is carrying out any activity referred to in

these regulations without being authorised to do so by the

Authority, the Authority may issue an enforcement order taking

such measures as are requisite for the purpose of securing

compliance with the conditions or requirements, as the case

may be, or to cease such unauthorised activity.

(2) An enforcement order mentioned in sub-regulation (1)

(a) shall require the person to do, or not to do, such things

as are specified in the order, or are of a description so specified,

including but not necessarily limited to

(i) cessation of drilling of the borehole or of the

excavation works;

(ii) permanent backfilling of the borehole or

excavation works;

(iii)

sealing of the borehole or excavation works;

(b) shall take effect at such time, being the earliest

practicable time, as is determined by or under the order;

(c) shall be published in such a manner as the Authority

considers appropriate for the purpose of bringing the matters to

which it refers, to the attention of persons likely to be affected

by it;

(d)

may be revoked at any time by the Authority.

Malta Government Gazette — Legal Notice 2008 254 — Zone Regulations, 2008

The Authority shall not be liable for any damages, actual

or potential, arising out of any activity permitted under these

regulations.

Malta Government Gazette — Legal Notice 2008 254 — Zone Regulations, 2008

(1) Any person who, solely or jointly with others, drills

a borehole or carries out any excavation works within the saturated

zone without a permit issued by the Authority in terms of these

regulations shall, on conviction be liable to

(a) a fine (multa) of not less than twenty thousand euros

(€ 20,000) but not exceeding fifty thousand euros (€ 50,000)

or to imprisonment for a term from twelve months to eighteen

months, or to both such fine and imprisonment;

(b) confiscation of the equipment used for the drilling

of a borehole or for carrying out the excavation works;

(c) reimbursment to the Authority for any inspection,

enforcement and monitoring costs incurred.

(2) The fine (multa) and costs referred to in sub-

regulation (1) shall be payable within a period of time as the Court

in passing sentence shall determine.

(3) The fine (multa) and confiscation of equipment shall

be without prejudice to any other punishment for which such person

may be liable under any other law or regulation.

Mitbug[ fl-Istamperija tal-Gvern — Printed at the Government Printing Press

Need to analyze how this provision applies to your matter?

Cross-reference this statute against case law, commentaries, and related legislative provisions inside Legislator AI.

Open in Legislator →