Zone Regulations, 2008
Table of Provisions (16)
Statutory Text (16 Articles)
L.N. 254 of 2008
MALTA RESOURCES AUTHORITY ACT
(CAP. 423)
Borehole Drilling and Excavation Works within the Saturated
Zone Regulations, 2008
IN EXERCISE of the powers conferred by Article 28 of the
Malta Resources Authority Act, the Minister for Resources and Rural
Affairs after consultation with the Malta Resources Authority, has
made the following regulations
(1) The title of these regulations is the Borehole Drilling Title, scope and
commencement.
and Excavation Works within the Saturated Zone Regulations, 2008.
(2) The scope of these regulations is the establishment of a
regulatory framework for borehole drilling and excavation works
carried out partly or totally within the saturated zone.
(3)
These regulations shall come into force on the 7th October,
2008.
In these regulations, unless the context otherwise requires: Interpretation.
“Act” means the Malta Resources Authority Act;
“aquifer” means a subsurface layer or layers of rock or
other geological strata of sufficient porosity and permeability
to allow either a significant flow of groundwater or the
extraction of significant quantities of groundwater;
“Authority” means the Malta Resources Authority as
established by the Act;
“body of groundwater” means a distinct volume of
groundwater within any aquifer;
“borehole” means any means any shaft, adit, opening, hole,
spring outlet or well artificially dug in the ground or artificially
enlarged, which has access to groundwater or from which
groundwater is extracted or can be extracted or which is
vertically deeper than half the distance between the well head
and the nearest water table at that point, but it does not include
a water retaining cistern;
“borehole geological log” means a register containing
information regarding the drilling of a borehole;
“casing” means a conduit, pipe, fixture or constructional
element which is inserted and attached to the circumference of
the borehole to prevent any transfer of fluid between the
borehole and its surrounding geological formation;
“officer” includes any person engaged by, detailed for duty
with, or in any manner whatsoever performing duties for or on
behalf of the Authority;
“permit” means a permit issued under these regulations to
construct a borehole or to carry out any form of excavation
works within the saturated zone;
“saturated zone” means that part of an aquifer in which all
interconnected openings within the geological formation are
completely filled with water;
“seawell” means a borehole drilled at a distance of not
more than 50 metres from the nearest point along the coastline;
These regulations shall not apply to
(a) any borehole constructed for the purposes of the
installation of an earth electrode
Provided that such a borehole does not reach the
saturated zone;
(b) any borehole constructed for site investigation
purposes
Provided that such borehole does not reach the
saturated zone;
(c) any borehole or excavation works constructed for the
purposes of foundations to buildings or for other engineering
works
Provided that such borehole or excavation works do not reach
the saturated zone.
The drilling of a borehole or any form of excavation works Prohibition.
carried out partly or totally within the saturated zone is prohibited,
unless a permit to this effect is issued by the Authority.
(1) Any person who intends to drill a borehole or carry Applications
permit to drill a
out any form of excavation works partly or totally within the saturated borehole or to
zone shall submit an application in writing to the Authority in such carry
excavation works
form and manner as the Authority may prescribe.
within the
saturated zone.
Such application shall at least include
(a) details of the applicant, the person drilling the
borehole or carrying out the excavation works and the qualified
Perit under whose supervision such borehole will be
constructed or such excavation works will be carried out;
(b) full technical details of the location, size and depth
of the borehole or excavation works;
(c) details of the purposes for construction of the borehole
or excavation works and declarations to this effect from the
applicant and the Perit
(2) A non-refundable application fee of two hundred and Application fee.
thirty euro (€ 230) shall be paid to the Authority with the application
form submitted for the purposes of these regulations.
(1) For a minimum period of 12 months from the date of Moratorium
borehole drilling.
entry into force of these regulations or until such further period of
time as the Authority may subsequently decide, the Authority shall
not accept or process any application for the drilling of any borehole
or excavation works to be carried out within the saturated zone and
the Authority shall not issue any permit for such purposes.
(2) The provisions of sub-regulation (1) shall not apply
to the following
(a) any borehole constructed for the purposes of the
installation of an earth electrode within the saturated zone;
(b) any borehole constructed for site investigation
purposes within the saturated zone;
(c) any borehole or excavation works carried out for the
purposes of the construction of foundations to buildings or for
the purposes of other engineering works, and where such
borehole or excavation works lie partly or totally within the
saturated zone;
(d)
any seawell.
(3)
Any person, after drilling a seawell shall
(a) carry out such appropriate water quality tests to
establish the electrical conductivity of the water extracted from
the seawell. Where the electrical conductivity of such water is
found by such water quality tests to be less than 50,000 µS/cm,
such person shall immediately inform the Authority of the
quality of the water extracted and shall cease to extract water
from such seawell for such period of time as the Authority may
decide;
(b) construct a casing to the seawell for a minimum depth
of 10 metres below sea level.
(4) When the Authority determines that the extraction of
water from any seawell has a significant impact on a body of
groundwater or a source or sources of groundwater, the Authority
may order the cessation of a source or water extracted and the closure
of the seawell.
(1) The Authority shall establish its procedure for
determining an application for a permit to drill a borehole or for
excavation works within the saturated zone.
(2) The Authority shall communicate to the applicant in
writing within eight weeks from the date of receipt of a valid
application containing all such information and documentation
requested by the Authority and accompanied by the appropriate
application fee, any decision taken concerning an application for a
permit to drill a borehole or carry out excavation works within the
saturated zone.
(3) An application for a permit issued under these
regulations shall be determined by the Authority in accordance with
the following criteria. The Authority shall have to be satisfied that
by granting the permit
(a)
there will be no significant impact on water resources;
(b) water resources will be used efficiently in the course
of any activities carried out under the permit;
(c) the water environment is protected including the
limitation of discharges to the environment;
(d)
the public interest in general is safeguarded.
(4) In the case of a refusal to grant a permit, the Authority
shall give reasons for its decision.
(1) The Authority shall have the power, through the Powers to impose
conditions of
permit, to establish such conditions as the Authority considers permit.
requisite or necessary.
(2) The permit holder shall at all times comply with these
regulations and with the conditions of the permit.
(3) The conditions included in the permit may contain,
but not necessarily be limited to, provisions regarding
(a)
the grant and term of the permit;
(b) compliance requirements to conditions for drilling the
borehole or carrying out the excavation works including
directions, standards, guidelines, codes of good drilling practice
or rules issued by the Authority;
(c) prevention of groundwater pollution by means of the
discharge of substances in the course of drilling operations and
in the course of any activity carried out under the permit;
(d) submission of data regarding the borehole’s
geological log and other such information as the Authority may
require;
(e) inspection, making of copies and taking of extracts
from records held by the permit holder and, or driller with
respect to the drilling of the borehole or carrying out of the
excavation works.
The issue of a permit to drill a borehole or to carry out Rights of use with
respect to
excavation works within the saturated zone does not in any way groundwater
give any right to draw water from such a source or to dispose of any extraction.
material whether liquid or solid.
Where the Authority determines that a borehole drilled or
that excavation works which are carried out partly or totally within
the saturated zone have a significant impact on a body of groundwater
or other source or sources of groundwater, the Authority may
(a) order the immediate cessation of such activity and
water extraction or the reduction in the amount of water being
extracted;
(b)
order the closure of such borehole or cessation of such
works.
The Authority may, at any time order the suspension,
revocation or cancellation of a permit where the Authority is satisfied
that
(a) there is a significant impact on a body of groundwater
or other source or sources of groundwater arising from any
activity carried out under a permit issued under these
regulations;
(b) the permit holder has failed or is failing to abide by
any conditions of the permit or by these regulations; or
(c) the permit holder does not possess all other relevant
permits and licences that are issued by any other authority or
regulatory body; or
(d) the permit holder is contravening any requirement
imposed by law; or
(e) the permit holder fails to comply with any direction
given by the Authority as to such matters as are specified in the
permit or are of a description so specified; or
(f) any information submitted in the application for a
permit and for which the permit has been issued is determined
to be false or incorrect.
(1) The Authority shall keep a register or registers of
permits issued under these regulations which shall include records
(a)
all permits granted under these regulations; and
(b)
all applications for a permit received and refused.
(2) The register or registers of permits shall be kept under
review and up to date.
(1) Without prejudice to regulation 11, where the Enforcement
Orders.
Authority is satisfied that
(a) a permit holder is contravening any condition of the
permit; or
(b) a permit holder is contravening any requirement
imposed by law; or
(c) any person is carrying out any activity referred to in
these regulations without being authorised to do so by the
Authority, the Authority may issue an enforcement order taking
such measures as are requisite for the purpose of securing
compliance with the conditions or requirements, as the case
may be, or to cease such unauthorised activity.
(2) An enforcement order mentioned in sub-regulation (1)
(a) shall require the person to do, or not to do, such things
as are specified in the order, or are of a description so specified,
including but not necessarily limited to
(i) cessation of drilling of the borehole or of the
excavation works;
(ii) permanent backfilling of the borehole or
excavation works;
(iii)
sealing of the borehole or excavation works;
(b) shall take effect at such time, being the earliest
practicable time, as is determined by or under the order;
(c) shall be published in such a manner as the Authority
considers appropriate for the purpose of bringing the matters to
which it refers, to the attention of persons likely to be affected
by it;
(d)
may be revoked at any time by the Authority.
The Authority shall not be liable for any damages, actual
or potential, arising out of any activity permitted under these
regulations.
(1) Any person who, solely or jointly with others, drills
a borehole or carries out any excavation works within the saturated
zone without a permit issued by the Authority in terms of these
regulations shall, on conviction be liable to
(a) a fine (multa) of not less than twenty thousand euros
(€ 20,000) but not exceeding fifty thousand euros (€ 50,000)
or to imprisonment for a term from twelve months to eighteen
months, or to both such fine and imprisonment;
(b) confiscation of the equipment used for the drilling
of a borehole or for carrying out the excavation works;
(c) reimbursment to the Authority for any inspection,
enforcement and monitoring costs incurred.
(2) The fine (multa) and costs referred to in sub-
regulation (1) shall be payable within a period of time as the Court
in passing sentence shall determine.
(3) The fine (multa) and confiscation of equipment shall
be without prejudice to any other punishment for which such person
may be liable under any other law or regulation.