Control of Legionella Regulations, 2006
Table of Provisions (26)
Statutory Text (26 Articles)
L.N. 5 of 2006
PUBLIC HEALTH ACT, 2003
(ACT NO. XIII of 2003)
Control of Legionella Regulations, 2006
IN exercise of the powers conferred by article 26 (i) of the Public
Health Act, 2003, the Minister of Health, the Elderly and Community
Care has made the following regulations>-
The title of these regulations is the Control of Legionella Title.
Regulations, 2006.
In these regulations, unless the context otherwise requires>-
FREKWENZI TA ’ SPEZZJONI RAKKOMANDATI GĦALL - EVALWAZZJONI TA ’ RISKJU
LISTA TA ’ KONTROLLI 1: INSTALLAZJONIJIET GĦAT - TKESSIĦ TA ’ L - ILMA
SISTEMA / SERVIZZI
INKARIGU
FREKWENZA
Cooling tower u
Monitoraġġ tal-kwalità ta’ l-ilma, l-użu ta’ l-ilma u l-użu
Kull sitt xhur
kondensaturi
ta’ bioċida/kimika biex tiġi evalwata u żgurata l-effettività
evaporattivi
tar-reġim tat-trattament ta’ l-ilma, inklużi l-parametri
ewlenin kimiċi u mikrobioloġiċi u osservazzjonijiet tal-
kondizjoni interna ta’ l-għadira, pack u ilma
Funzjoni ta’ kontroll ċentrali, kalibrazzjoni tas-sensor
Kull xahar sa tlett
konduttiv, funzjoni ta’ blowdown, uniformità fid-
xhur, skond ir-riskju
distribuzzjoni ta’ l-ilma, il-kundizzjoni ta’ sprays/troughs,
eliminators, pack, għadira, immersion heaters, fann u
apparat li-jtaffi l-ħoss
Tindif u disinfettar ta’ cooling towers/kondensaturi
Kull sitt xhur
evaporattivi, make up tanks u sistemi assoċjati, inklużi l-
uċuħ mxarrba kollha, hekk li titnehħa l-ġebla kollha fejn
dan ikun meħtieġ.
Il-packs għandhom jiġu maqlugħa u mnaddfa meta dan
ikun prattikabli
LISTA TA ’ KONTROLLI 2: SERVIZZI TA ’ ILMA SĦUN U KIESAĦ
SERVIZZI
INKARIGU
FREKWENZA
Servizzi ta’ ilma sħun
Agħmel mezz li l-kampjuni jittieħdu mil-heaters ta’ l-ilma
Kull sitt xhur
sħun, biex tiġi osservata l-kondizzjoni ta’ l-ilma mid-
drain.
Ivverifika t-temperaturi tal-flow u irritorn fil-calorifiers
Kuljum
Ivverifika t-temperatura sa minuta biex tara jekk tkunx
Kull gimgħa
laħqet il-50 o C fis-sentinal taps
Ivverifika viżwalment l-uċuħ interni tal-water heaters
Kull sena
għal-ġebla u l-ħama.
Ivverifika l-vitien rappreżentattivi għat-temperatura
Kull xahar
bħalma hu indikat hawn qabel fuq bażi ta’ rotazzjoni
Servizzi ta’ ilma
Ivverifika t-temperatura ta’ l-ilma fit-tank il bogħod mill-
Kull sitt xhur
kiesaħ
balla u innota it-temperatura massima reġistrata minn
termometri fissi għat-temperaturi massimi/minimi meta
dawn ikunu mwaħħla
Ivverifika li t-temperatura tkun anqas minn 20 o C wara s-
Nota: Jista’ jkun li din
Kull ġimgħa
it-temperatura ma
sentinal taps jinfetħu għal żewg minuti
tinlaħaqx f’Malta
matul ix-xhur tas-sajf
Spezzjona viżwalment it-tankijiet ta’ l-ilma kiesaħ u
Kull sitt xhur
għamel xogħol rimedjali meta dan ikun meħtieġ
Ivverifika l-vitien rapreżentattivi għat-temperatura bhalma
Kull xahar
hu indikat hawn qabel fuq bażi ta’ rotazzjoni
Mnejn joħroġ l-ilma
Żarma, nadaf u neħħi il-ġebla mnejn joħroġ l-ilma tad-
Kull tlett xhur, jew
tad-doxxa
doxxa u manek
qabel jekk ikun hekk
meħtieġ
Żbokki li ma tantx
Ifflaxxja sew u itfa fid-drain
Kull ġimgħa
jintużaw
LISTA TA ’ KONTROLLI 3: SISTEMI OĦRA TA ’ RISKJU
SISTEMA / SERVIZZ
INKARIGU
FREKWENZA
Spray humidifiers, air
Naddaf u iddisinfetta spray humidifiers/air washers u
Kull sitt xhur
washers
u
wet
make up tanks inklużi l-uċuħ kollha mxarrba, u titneħħa l-
scrubbers
ġebla fejn ikun meħtieġ
Ikkonferma l-operazzjoni tat-trattament ta’ l-ilma mhux
Kull ġimgħa
kimiku (jekk preżenti)
Water softeners
Nadaf u iddisinfetta reżina u tankijiet ta’ ilma salmastru –
Kif ikun
ivverifika mal-manifattur x’tip ta’ kimika tista’ tintuża
rakkomandatt mill-
biex jiġi disinfettat il-qigħ tar-reżina
manifattur
Doxxox ta’ emerġenza
Ifflaxxja sew u itfa fid-drain
Kull sitt xhur jew
u sprays għat-tbaħbiħ
aktar frekwenti jekk
ta’ l-għajnejn
ikun hekk
rakkomandat mill-
manifattur
Sistemi ta’ bexxiexa u
Meta tkun preżenti għal testijiet ta’ bexxiexa u romblu ta’
Kull tlett xhur
romblu ta’ manka
manka żgura ruħek li jkun hemm riskju minimu ta’
esposjizzjoni għall-aerosols
Sistemi li jkessħu torn
Naddaf u iddisinfetta is-sistemi ta’ ħażna u ta’
Kull sitt xhur
u għodda ta’
distribuzzjoni
makkinarju
Banjijiet spa
Ivverifika il-filtri – filtri tar-ramel għandhom jiġu
Kuljum
backwashed ta’ kuljum
Ivverifika t-trattament ta’ l-ilma – pools għandhom jiġu
Tlett darbiet kuljum
trattati kontinwament b’bioċida ossidanti
Naddaf u iddisinfetta s-sistema kollha
Kull ġimgħa
Sistemi ta’ tbexxix fl-
Naddaf u iddisinfetta il-pajpijiet ta’ distribuzzjoni, spray
Kull sena
ortikultura
heads u make up tanks, inklużi l-uċuħ mxarrba kollha, u
neħħi l-ġebla fejn ikun neħtieġ
Funtani u apparat ieħor
Naddaf u iddisinfetta kull għadira, spray heads u make up
Kull ġimgħa
ta’ l-ilma
tanks, inklużi l-uċuħ mxarrba kollha, u neħħi l-ġebla fejn
(partikolarment fuq
ikun meħtieġ
ġewwa)
Ġaladarba r-riżultati mikrobioloġiċi jindikaw dawn il-livelli ta’
Wara li jittieħdu l-kampjuni u jiġi konfermat l-istess numru, is-
Suprintendent għandu jiġi informat bil-miktub fi żmien 24 siegħa
li jasal ir-rapport tal-laboratorju u għandu jinkludi kopji ta’
riżultati tal-laboratorju flimkien mal-miżuri ta’ kontroll li jkunu
qegħdin jittieħdu mill-persuna responsabbli biex jirrimedja s-
għadd ta’ batterji, il-persuna responsabbli għandha tinforma fi
Suprintendent billi ċċempillu jew bil-miktub fi żmiem 48 siegħa,
u dak ir-rapport għandu jinkludi kopji tar-riżultati tal-laboratorju
flimkien mal-miżuri ta’ kontroll li jkunu qegħdin jittieħdu biex
żmien 24 siegħa minn x’hin tirċievi r-rapport tal-laboratorju, lis-
LIVELLI TA ’ AZZJONI WARA LI JSIR MONITORAĠĠ MIKROBIOLOĠIKU GĦAS - SISTEMI TAL - COOLING TOWERS U TAL - KONDENSATURI EVAPORATTIVI
AVVIŻ LIS - SUPRINTENDENT
is-sitwazzjoni tiġi rimedjata.
L-għadd tal-kolonja jiġi determinat bi pour plate method skond ISO 6222(20) jew bi spread plate method fuq il-yeast extract agar
sitwazzjoni.
Xejn
jerġgħu jittieħdu kampjuni. Jekk l-istess numru jerġa’
jinstab, il-miżuri ta’ kontroll u evalwazzjoni ta’ riskju
għandhom jerġgħu jiġu riveduti biex tiġi identifikata kull
Għandhom immedjatament jerġgħu jittieħdu l-kampjuni.
Wara għandha tkun shot dosed b’biocida kif suppost
bħala prekawzjoni. L-evalwazzjoni ta’ riskju u il-miżuri
ta’ kontroll għandhom jiġu riveduti biex jiġu identifikati
L-għadd għandu jiġi konfermat billi immedjatament
AZZJONI RIKJESTA FUQ IS - SISTEMA
Definitions.
“accredited laboratory” means a laboratory which takes part
in an external quality assessment scheme for the isolation of
legionella from water and where the interpretation of any results
is carried out by an experienced microbiologist<
“the Act” means the Public Health Act<
“authorised officer” means any duly qualified person
authorised by the Superintendent to carry out any functions under
these regulations and includes any nominated officer<
“biocide” means a physical or chemical agent capable of
killing micro-organisms, including Legionella<
“clean” means to render free from visible sludge, foam, slime
(including algae and fungi), rust, scale, dirt, and any deposit or
accumulation of impurities or other foreign material<
“cold water system” means an installation of plant, pipes and
fittings in which cold water is stored, distributed and subsequently
discharged<
“cooling tower systems” includes>-
(a) a cooling tower, or a number of interconnected
cooling towers that use the same recirculating water< and
(b) any machinery that is used to operate any such
tower< and
(c) any associated tanks, pipes, valves, pumps or
controls<
“cooling tower” means a device whose main purpose is to
cool water by direct contact between that water and a stream of
air<
“designated area” means any premises or part thereof to which
the public or a section of the public has access, whether on payment
or otherwise<
“disinfect” means to carry out a process which is intended to
kill or remove pathogenic micro-organisms<
“drift” means the water aerosol which emerges from the
airflow outlet of a cooling system<
“evaporative condenser” means a device whose main purpose
is to cool a fluid by passing that fluid through a heat exchanger
which is itself cooled by the contact of water passing through a
stream of air<
“guidelines” means the European Guidelines for Control and
Prevention of Travel Associated Legionnaires’ Disease produced
by the European Working Group for Legionella Infections
(EWGLI) and endorsed by the Committee for the Epidemiological
Surveillance and Control of Communicable Diseases in the
Community, instituted by Decision 2119#98#EC of the European
Parliament and the Council<
“heat exchanger” means a device for transferring heat between
fluids which are not in direct contact with one another<
“heterotrophic colony count” means an estimate of the number
of viable units of bacteria per millilitre of water made using the
pour plate, spread plate or membrane filter test (also known as the
total bacterial count, total plate count or viable bacterial count test)
method<
“legionella” means bacteria belonging to the genus Legionella<
“premises” includes all non-domestic premises used for or in
connection with the carrying on of a trade or business (whether for
profit or not) and should include any healthcare facility and schools<
“responsible person” includes the person who owns, manages
or controls the cooling tower systems, or evaporative condensers,
or hot and cold water systems, or water fountains or a number of
these systems in the same premises<
“sentinel taps”, in relation to a hot water system, means the
first and last taps on a recirculating system. For cold water systems
(or non-recirculating hot water systems), the nearest and furthest
taps from the storage tank. The choice of sentinel taps may also
include taps which are considered to represent a particular risk<
“spa pool” includes a bath or a small pool where warm water
is constantly recirculated, through high velocity jets or with the
injection of air to agitate the water<
“the Superintendent” means the Superintendent of Public
Health.
“warm water system” means a piped water supply, including
any thermostatic mixing valve, which is designed to supply water
at a temperature of between 30 o C and 60 o C<
“water” means water supplied through the main water
distribution system or water supplied by an authorised private water
supplier or through a water supply approved by the Superintendent
or by the relevant competent authorities<
“water fountain” means any water feature located in a
designated area.
Impliment azzjoni ta’ azzjoni korrettiva –
Erġa irrevedi il-program operattiv –
azzjonijiet rimedjali.
Sistema taħt kontrol
azzjoni rimedjali.
>1000 u sa 10,000
BATTERJI TAL -
LEĠJONELLA
CFU / LITRU
>10,000
≤1000
determinat skond ISO 11731(19)
( INKUBAZZJONI TA ’
E TEROTROFIKA 1
CFU / ML F ’ 30 C
MILL - INQAS 48
G ĦADD TAL -
O
>10,000 u sa
KOLONJA
>100,000
SIEGĦA )
≤10,000
100,000
Normalment l-iktar post konvenjenti biex jitkejjel huwa
Din il-verifika tiżgura li s-sistema kollha tkun qed taħdem
ritorn f’kull dawra jibqa’ ma tinbidilx, jiġifieri kull dawra
Mod kif tista’ tkejjel dan huwa billi jintuża surface
Jekk ikun hemm wieħed imwaħħal, pocket għat-
termometru fil-wiċċ tal-ħażna tal-heater ta’ l-ilma sħun u
fuq ir-ritorn huma punti tajbin mnejn tista’ titkejjel it-
temperatura eżatta. Jekk ikun hemm pocket bħal dak
installat, dan il-kejl jista’ jsir u jiġi mniżżel minn building
fejn ikun hemm il-ħruġ tal-balla għal ġot-tank tal-ħażna
Dan it-test jiżgura li t-temperatura tal-provvista u tar-
tkun qed tiffunzjona kif meħtieġ
NOTI
management system.
temperature probe.
ta’ l-ilma kiesaħ
KONTROLL TA ’ TEMPERATURA GĦAS - SISTEMI TA ’ ILMA SĦUN U KIESAĦ
sew
l-ilma
għandha tkun ta’ l-inqas 50 o C
it-temperatura tal-provvista ta’
l-ilma għat-TMV għandha mill-
inqas tkun ta’ 50 o C sa minuta
l-ilma li joħroġ għandu jkun
mill-inqas 60 o C, u jirritorna
f’temperatura ta’ mill-inqas
l-ilma
għandha tkun ta’ l-inqas 50 o C fi
żmien minuta min meta l-ilma
jibda nieżel. Id-differenza bejn
l-ogħla u l-inqas temperatura
meħuda tal-vitien wara minuta
ma għandiex tkun ta’ iktar minn
minn meta jibda niezel l-ilma
f’minuta li l-ilma jibda jinżel
ILMA SĦUN
ta’
ta’
It-temperatura
It-temperatura
(1) Cooling tower systems and evaporative condensers Installation of new
are prohibited to be newly installed on healthcare facilities and cooling
systems and
schools.
evaporative
condensers.
(2) Installation of new cooling tower system or evaporative
condenser on any other premises should be restricted to those cases
only where no other suitable dry cooling facility is possible as an
alternative.
LIVELL LI JRID JINTLAĦAQ
50 o C
10 o C
l-ilma
inqas wara li l-ilma jitħalla
l-ilma
wara li l-ilma jitħalla nieżel għal
għandha tkun taħt 20 o C jew
nieżel għal mill-inqas żewġ
Preferibilment l-ilma għandu
jkun inqas minn 20 o C il-ħin
għandha tkun 20 o C jew inqas
ILMA KIESAĦ
ta’
ta’
It-temperatura
It-temperatura
żewġ minuti
minuti
kollu
Jekk hemm, l-input
għat-themostatic mixer
valves (TMV) fuq bażi
l-ilma li joħroġ u li
jerġa lura għal water
Id-dħul mnejn jidħol l-
ilma kiesaħ (ta’ l-inqas
vitien
darba fix-xitwa u darba
fuq
bażi ta’ rotazzjoni
IVVERIFIKA
rappreżentattivi
ta’
Sentinal taps
ta’ sentinellà
fis-sajf)
Għadd
heater
Kull sitt xhur
Kull sitt xhur
FREKWENZA
Kull gimgħa
Kull xahar
Wara li jittieħdu il-kampjuni mill-ġdid u jiġi konfermat li l-għadd
ikun l-istess, is-Suprintendent għandu jiġi informat bil-miktub fi
żmien 24 siegħa minn meta jirċievi r-rapport tal-laboratorju, kif ukoll
kopji tar-riżultati tal-laboratorju flimkien mal-miżuri ta’ kontroll li l-
Ġaladarba r-riżultati mikrobioloġiċi jindikaw dawk il-livelli ta’għadd
ta’ batterji, il-persuna responsabbli għandha fi żmien 24 siegħa li
tirċievi r-rapport tal-laboratorju, tinforma lis-Suprintendent billi
ċċempillu, u bil-miktub fi żmien 48 siegħa, u dak ir-rapport għandu
jinkludi kopji tar-riżultati tal-laboratorju flimkien mal-miżuri ta’
persuna responsabbli tkun qegħda tieħu biex tirrimedja s-sitwazzjoni.
kontroll li jkunu qegħdin jittieħdu biex is-sitwazzjoni tiġi rimedjata.
AVVIŻ LIS - SUPRINTENDENT
LIVELLI TA ’ AZZJONI WARA LI JSIR MONITORAĠĠ MIKROBIOLOGIKU ĠĦAS - SISTEMI TA ’ L - ILMA SĦUN U KIESAĦ
Xejn
Jekk kampjun wieħed biss jew tnejn ikunu pożittivi,
għandhom jerġgħu jittieħdu kampjuni tas-sistemi. Jekk l-
għadd ikun l-istess, il-miżuri ta’ kontrol għandhom jiġu
riveduti u għandha ssir evalwazzjoni tar-riskju biex tiġi
Jekk il-maġġoranza ta’ kampjuni tkun pożittiva, is-sistema
tista tiġi kolonizzata, forsi fuq livell baxx, bil-leġjonella.
Id-disinfettar tas-sistema għandu jiġi kunsidrat, iżda wkoll
il-miżuri ta’ kontroll għandhom jiġu riveduti u ssir
evalwazzjoni tar-riskju biex tiġi identifikata kull azzjoni
Il-kampjuni tas-sistema għandhom jerġgħu jittieħdu u immedjatament il-
miżuri ta’ kontroll jiġu riveduti biex tiġi identifikata l-azzjoni rimedjali,
(1) At the stage of installation of cooling tower system or an Design and
evaporative condenser, inspection shall be carried out by competent construction
cooling tower
persons so that the cooling tower and evaporative condenser pose system and
evaporative
minimal health risk to occupants of the premises and members of the condenser.
public.
(2) Cooling systems shall be designed and constructed so as
to minimise the release of drift and to aid safe operation, regular cleaning
and disinfection.
AZZJONI MEĦTIEĠA FUQ IS - SISTEMA
rimedjali oħra li tista’ tkun meħtieġa.
identifikata kull azzjoni rimedjali;
kif ukoll il-possibiltà ta’ disinfettar tas-sistema.
Sistema taħt kontrol
(ii)
(i)
determinat skond ISO 11731(19)
Jew
>1000 u sa 10,000
BATTERJI TAL -
L EĠJONELLA
CFU / LITRU
>10,000
≤1000
The cooling tower or evaporative condenser shall be located
at least five metres away from air circulating and ventilating inlets,
open windows and occupied areas, pedestrian thorough fares, traffic
areas, areas of public access, exhaust discharge from kitchens, air
handling systems or other areas where nutrients conveyed from these
systems could assist in the growth of legionella.
DIKJARAZZJONI TA ’ KONFERMA TA ’ ĦLAS DOVUT LIS - SUPRINTENDENT TAS - SAĦĦA PUBBLIKA
Suprintendent tas-Saħħa Pubblika
Diviżjoni tas-Saħħa
Jien, hawn taħt fil-kapaċità tiegħi ta’ ..........................(kariga) ta’ ........................................... (isem
tal-fond) hawn niddikjara li nħallas, fi żmien xaħar minn meta nirċivi l-fattura, l-ispejjeż kollha li
d-Diviżjoni tas-Saħħa tagħmel biex tieħu ..........(għadd) kampjuni, tittrasporthom, tippreparhom u
tanalizzhom, wara li dawn ġew miġburin mill- .................................................. (isem tal-fond) fi-
............................(data meta jittieħdu il-kampjuni) bħala parti mill-investigazzjoni ta’ każ jew
każ suspett tal-marda tal-Leġjonella.
(Firma)
Isem u Kunjom
F’isem
Numru tal-Karta ta’ Identità
Data tat-Twelid
Post tat-Twelid
Isem u Kunjom tal-Ġenituri
Indirizz ta’ Residenza
Indirizz fejn tintbgħat il-Fattura
Numru tal-VAT
Data
Make-up water shall be supplied either through the main
distribution system or by an authorised water supplier or through a water
supply approved by the Superintendent.
A WTORITÀ TAS -S AĦĦA
A VVIŻ TA ’ I NFURZAR
(Skond ir-regolament 18(2) tar-Regolamenti ta’ 2005 dwar il-Kontroll tal-Leġjonella)
Data
Lil
1. Wara li saru investigazzjonijiet mis-Suprintendent tas-Saħħa Pubblika, instab li r-
riskju
ta’
infezzjoni
mill
marda
tal-leġjonella
huwa
wieħed
sinifikanti
fi
2. Ir-riskju
ta’
infezzjoni
mill
marda
tal-leġjonella
għandu
x’jaqsam
ma’
3. Mingħajr preċudizzju għad-dritt li għandu s-Suprintendent li jieħu azzjoni skond id-
disposizzjonijoet tar-Regolamenti ta’ l-2005 dwar il-Kontroll tal-Leġjonella, qed tiġi mitlub li
tagħlaq IMMEDJATAMANT il- .....................................................................................................
sakemm tiġi informat xort’ oħra.
Suprintendent tas-Saħħa Pubblika
(1) Effluent water from cooling towers and evaporative
Discharge of water.
condensers shall be discharged into the public sewers as approved by
the respective competent authorities.
(2) The concentration of chemicals in the effluent shall be
within the limits established by the respective competent authorities.
Commissioning and
(1) Cooling towers and evaporative condensers shall be
commissioned, approved and certified by a competent warranted
engineer in terms of the Engineering Profession Act before use to ensure
that they operate correctly and safely.
(2) The entire air-conditioning system shall be clear of any
construction debris and dirt, and cleaned before operation starts.
(3) Precautions shall be taken to control the risks during
commissioning, start up and during the normal operation of the system
as per guidelines.
(1) It shall be the duty of the responsible person to ensure
that>
(a) any cooling tower system or evaporative condenser in
use is maintained and tested in accordance with the guidelines<
(b) the water of the cooling tower system or evaporative
condenser is maintained in a clean condition<
(c) the water of the cooling tower system or evaporative
condenser is continuously treated with>
i. one or more biocides to effectively control the growth
of micro-organisms, including Legionella< and
ii. chemicals or other agents to minimise scale
formation, corrosion and fouling<
(d) a chlorine-compatible bio-dispersant is added to the Disinfection,
cleaning and re-
recirculating water of the cooling tower system or evaporative disinfection.
condenser, and that the system is then disinfected, cleaned and re-
disinfected>
i. immediately prior to initial start up following
commissioning, or any shut down period of greater than one
month< and
ii. at intervals not exceeding six months<
(e) the cooling tower system or the evaporative condenser Routine inspections
and testing.
are inspected in accordance with the guidelines and Schedule 1<
(f) at least once every month take a sample of the recirculating Microbiological
sampling frequency.
water of the cooling tower system and the evaporative condenser
to an accredited laboratory for testing for heterotrophic colony
count and once every six months for legionella<
(g) a water sample shall be taken before the dosing of biocide Water sampling.
and in accordance with the guidelines.
(1) The responsible person must ensure that the actions Action levels
following
following microbiological monitoring of cooling towers and evaporative microbiological
condensers is in accordance with the procedures laid down in Schedule monitoring of
cooling tower
2 to these regulations.
systems and
evaporative
condensers.
(2) The responsible person shall immediately inform the
Superintended of any situation provided for in Schedule 2 of these
regulations.
(3) The responsible person shall carry out any further
monitoring and remedial actions as may be directed by the
Superintendent.
(4) The Superintendent may require the systems or part
thereof to be shutdown until all necessary remedial actions have been
taken by the responsible person and until microbiological sampling
results of any system would have returned within the recommended
acceptable levels as indicated in Schedule 2 to these regulations.
Maintenance of hot
(1)
The responsible person shall ensure that>
and cold water
systems.
(a) unless the system is shut down or drained of water or is
otherwise not in use, any hot and cold water system that the
responsible person owns, manages or controls is maintained and
tested in the manner set out in these regulations and according to
the guidelines<
(b) the hot and cold water system is disinfected by heat or
chlorination and cleaned immediately prior to initial start up
following commissioning, or any shut down period of greater than
one month<
(c) the hot and cold water system is disinfected by one or
more of the following methods>
i.
at least once each month by heat or chlorination< or
ii. continuously by means of automatic low level
chlorination< or
iii. continuously by means of ultra-violet light
treatment< or
iv.
a method approved in the guidelines<
(d) the hot and cold water system is inspected and that the
hot and cold water systems are maintained at all times in accordance
with the guidelines and Schedule 1 and 3<
(e) when biocides are used to treat water systems, they are
meticulously controlled and checked at least weekly or as otherwise
indicated to ensure that it is operating correctly<
(f) at least once every six months a sample of the water
from the hot and cold water system is taken and delivered to an
accredited laboratory for testing and reporting on Legionella.
(1) The responsible person must ensure that the actions
following microbiological monitoring of hot and cold water systems
are in accordance with the procedures laid down in Schedule 4 of these
regulations.
(2) The responsible person shall immediately inform the
Superintended of the situation provided for in Schedule 4 of these
regulations.
(3) The responsible person shall carry out any further
monitoring and remedial actions as may be directed by the
Superintendent.
(4) The Superintendent may require the systems or part
thereof to be shut down until all necessary remedial actions have been
taken by the responsible person and until microbiological sampling
results have returned within the recommended acceptable levels in
Schedule 4 of these regulations.
(1)
It shall be the duty of the responsible person to ensure Maintenance and
testing of water
that>
fountains.
(a) any water fountain under his responsibility is
maintained and tested in accordance with the guidelines and
Schedule 1<
Microbiological
(b) water in a water fountain is sampled>
sampling.
i. at least once a month for the purpose of determining
the heterotrophic colony counts< and
ii. at least once every six months for the purpose of
detecting legionella bacteria.
(2) The responsible person shall immediately inform the
Superintendent of the situation provided for in Schedule 2 of these
regulations.
(3) The Superintendent may require the responsible person Notice to carry out
inspection, test or
to carry out tests and maintenance of water fountains as he may deem maintenance of
necessary.
water fountains.
(1) It shall be the duty of the responsible person to ensure Maintenance and
testing of other risk
that any spa pool and any other type of water system under his systems.
responsibility is maintained and tested in accordance with the guidelines
and Schedule 1.
(2) Spa pools on display in retail outlets or exhibitions shall
be treated in the same manner as if they were being used.
(1) The responsible person shall>
Risk assessment.
(a) carry out a risk assessment to identify and assess the risk
of exposure to legionella bacteria from work activities and the water
systems on the premises under his control as identified in the
guidelines< and
(b) identify any necessary precautionary measures which
may need to be adopted< and
(c) review the assessment either annually or when the
situation changes or when the original assessment may no longer
be valid< and
(d)
keep a fully documented record of the risk assessment.
(2) When the risk assessment reveals that there is a
foreseeable risk which cannot be eliminated, the responsible person
shall adopt a scheme specifying the measures to be taken to minimise
the risk of exposure.
(3) The risk assessment and operation of the control
measures shall be audited by an independent competent person at least
every two years.
(4) All maintenance and risk assessment records shall be
retained for at least five years.
(1) The responsible person shall inform the Superintendent
of an outbreak of legionnaire’s disease or if it is suspected to have
occurred.
(2) In the event or on the suspicion of an outbreak of
legionnaires’ disease, the responsible person shall implement all
instructions which may be issued by the Superintendent.
(1) It shall be the duty of the Superintendent to investigate
any case or suspected case of Legionnaires’ disease at any premises
and to cause the sampling and analysis of any samples required to
investigate such case or suspected case.
(2) The expenses incurred for the elevation, transportation,
preparation and analysis of samples in case of initial investigation of a
case or suspected case of legionnaire’ disease shall be encumbered by
the Superintendent.
(3) If the results of the initial samples indicate the presence
of Legionella species, or if the investigation is within 24 months of the
first notified case or suspected case, the expenses of follow-up samples
or initial samples, as the case may be, shall be encumbered by the
responsible person>
Provided that the responsible person of the premises shall sign a
priori the declaration attached as Schedule 5 to these regulations
confirming his acceptance to pay any fees due to the Superintendent.
(4) Any person who fails to comply with sub-regulation (3)
of this regulation shall be guilty of an offence and the court, besides
awarding punishment, shall oblige the accused to pay the due fees.
(1) In the event that the responsible person fails to follow Closure of premises.
the instructions referred to in the preceding regulations, or the
Superintendent considers that the risk of infection with legionella from
that particular premises is significant, he may order that the premises,
part of the premises or any water related system, be immediately closed
until the risk of infection is controlled.
(2) The Superintendent shall issue an enforcement notice to Enforcement notice.
the responsible person and shall be in the form specified in Schedule 6
to these regulations, or in any other modified form as the Superintendent
may deem appropriate in the particular circumstances may deem.
(3) Once the premises, part of the premises or any water
related system has been closed by an enforcement notice issued by the
Superintendent, same enforcement notice may be lifted only after it is
confirmed by the Superintendent that the risk of infection has been
controlled.
(4) Any person who fails to comply with the enforcement Failure to comply
notice issued under sub regulation (2) of this regulation shall be guilty with
enforcement notice.
of an offence under the Act.
Any person who contravenes any of the provisions of these Offences.
regulations shall be guilty of an offence under the Act.
S CHEDULE 1
R ECOMMENDED I NSPECTION F REQUENCIES FOR R ISK S YSTEMS
C HECKLIST 1: C OOLING W ATER I NSTALLATIONS
S YSTEM /S ERVICES
T ASK
F REQUENCY
Cooling towers
and
Monitor water quality, water use and biocide/chemical use
6 monthly
evaporative
to assess and ensure effectiveness of water treatment
condensers
regime, including key chemical and microbiological
parameters and observations of internal condition of pond,
pack and water
Central control function, conductivity sensor calibration,
Monthly to 3
blow down function, uniformity of water distribution,
monthly, according
condition of sprays/troughs, eliminators, pack, pond,
to risk
immersion heater, fan and sound attenuators
Clean and disinfect cooling towers/evaporative
6 monthly
condensers, make up tanks and associated systems,
including all wetted surfaces, descaling as necessary.
Packs should be removed and cleaned where practicable.
C HECKLIST 2: H OT AND C OLD W ATER S ERVICES
S ERVICE
T ASK
F REQUENCY
Warm water services
Arrange for samples to be taken from hot water heaters, in
6 monthly
order to note condition of drain water
Check temperatures in flow and return at calorifiers
Daily
Check temperature up to 1 minute to see if it has reached
Weekly
50 o C in the sentinel taps
Visual check on internal surfaces of water heaters for scale
Annually
and sludge
Check representative taps for temperature as above on a
Monthly
rotational basis
Cold water services
Check tank water temperature remote from ball valve and
6 monthly
mains temperature at ball valve.
Note maximum
temperatures recorded by fixed max/min thermometers
where fitted
Check that temperature is below 20 o C after running the
Note: This temperature
Weekly
may not be reached
water for up to 2 minutes in sentinel taps
during the summer
months in Malta
Visually inspect cold water storage tanks and carry out
6 monthly
remedial work where necessary
Check representative taps for temperature as above on a
Monthly
rotational basis
Shower heads
Dismantle, clean and descale shower heads and hoses
Quarterly, or as
necessary, whichever
comes first
Little used outlets
Flush through and purge to drain
Weekly
C HECKLIST 3: O THER R ISK S YSTEMS
S YSTEM /S ERVICE
T ASK
F REQUENCY
Spray humidifiers, air
Clean and disinfect spray humidifiers/air washers and
6 monthly
washers
and
wet
make up tanks including all wetted surfaces, descaling as
scrubbers
necessary
Confirm the operation of non chemical water treatment (if
Weekly
present)
Water softeners
Clean and disinfect resin and brine tank – check with
As recommended by
manufacturer what chemicals can be used to disinfect resin
manufacturer
bed
Emergency
showers
Flush through and purge to drain
6 monthly or more
and eye wash sprays
frequently if
recommended by
manufacturer
Sprinkler and hose reel
When witnessing tests of sprinkler blow down and hose
Quarterly
systems
reels ensure that there is minimal risk of exposure to
aerosols
Lathe and machine
Clean and disinfect storage and distribution system
6 monthly
tool coolant systems
Spa baths
Check filters - sand filters should be backwashed daily
Daily
Check water treatment – pools should be continuously
3 times daily
treated with oxidising biocide
Clean and disinfect entire system
Weekly
Horticultural
misting
Clean and disinfect distribution pipe work, spray heads
Annually
systems
and make-up tanks, including all wetted surfaces,
descaling as necessary
Fountains and water
Clean and disinfect ponds, spray heads and make-up tanks,
Weekly
features (particularly
including all wetted surfaces, descaling as necessary
indoors)
laboratory report shall inform the Superintendent by phone and
Following resampling and similar counts are confirmed, the
receiving the laboratory report and should include copies of
laboratory results together with the control measures being taken
Once microbiological results indicate these levels of bacterial
counts, the responsible person within 24 hours of receiving the
Superintendent is to be informed in writing within 24 hours of
in writing within 48 hours which report should include copies of
the laboratory results together with the control measures being
N OTIFICATION TO S UPERINTENDENT
by the responsible person to remedy the situation.
taken to remedy the situation.
A CTION L EVELS F OLLOWING M ICROBIOLOGICAL M ONITORING FOR
Colony count determined by pour plate method according to ISO 6222(20) or by spread plate method on yeast extract agar
C OOLING T OWER S YSTEMS AND E VAPORATIVE C ONDENSERS
None
The system should immediately be re-sampled. It should
The count should be confirmed by immediate re-
sampling. If similar count is found again, a review of
the control measures and risk assessment should be
then be ‘shot dosed’ with an appropriate biocide, as a
precaution. The risk assessment and control measures
should be reviewed to identify remedial actions.
S CHEDULE 2
A CTION R EQUIRED ON S YSTEM
carried out to identify any remedial actions.
Review programme operation –
Implement corrective action –
System under control
Determined in accordance with ISO 11731(19)
L EGIONELLA
up to 10,000
B ACTERIA
>1000 and
CFU / LITRE
>10,000
≤1000
(Minimum 48 hours
C OLONY C OUNT 1
H ETEROTROPHIC
CFU / ML AT 30 C
up to 100,000
O
>10,000 and
incubation)
>100,000
≤10,000
temperatures on each loop are unchanged i.e. the loop is
If fitted, the thermometer pocket at the top of the hot
water storage heater and on the return leg are useful
points for accurate temperature measurement. If installed,
these measurements could be carried out and logged by a
This check makes sure that the supply and return
One way of measuring this is to use a surface temperature
The most convenient place to measure is usually at the
This check makes sure that the whole system is working
ball valve outlet to the cold water storage tank
N OTES
building management system.
functioning as required
T EMPERATURE C ONTROL FOR H OT AND C OLD W ATER S YSTEMS
properly
probe
temperature should be at least
Outgoing water should be at
difference between the highest
temperature
recorded at the taps after one
minute should not be greater
The water temperature should
be at least 50 o C within a minute
The water supply to the TMV
50 o C within a minute of running
The water temperature should
be at least 50 o C within a minute
The
least 60 o C, return at least 50 o C
of running the water.
H OT W ATER
of running the water
lowest
S CHEDULE 3
S TANDARD T O M EET
that 10 o C
water
and
be below 20 o C or less after
The water should preferably be
be 20 o C or less after running the
The water temperature should
running the water for up to two
The water temperature should
C OLD W ATER
below 20 o C at all times
water for two minutes
minutes
If fitted, input to
mixer
valves (TMV) on a
and
returning to the water
Incoming cold water
inlet (at least once in the
winter and once in
Representative number
of taps on a rotational
leaving
C HECK
sentinel basis
Sentinel taps
thermostatic
summer)
Water
heater
basis
F REQUENCY
Six monthly
Six monthly
Monthly
Weekly
receiving the laboratory report, and should include copies of
laboratory report shall inform the Superintendent by phone and
Following resampling and similar counts are confirmed, the
Superintendent is to be informed in writing within 24 hours of
laboratory results together with the control measures being taken
Once microbiological results indicate these levels of bacterial
counts, the responsible person within 24 hours of receiving the
in writing within 48 hours which report should include copies of
the laboratory results together with the control measures being
N OTIFICATION TO S UPERINTENDENT
by the responsible person to remedy the situation.
A CTION L EVELS F OLLOWING M ICROBIOLOGICAL M ONITORING FOR
taken to remedy the situation.
H OT AND C OLD W ATER S YSTEMS
None
S CHEDULE 4
assessment should be carried out to identify any
(ii) If the majority of samples are positive, the system
considered but an immediate review of control
measures and risk assessment should be carried out
(i) If only one or two samples are positive, systems
should be re sampled. If a similar count is found,
then review of the control measures and risk
may be colonised, albeit at a low level, with
Legionella. Disinfection of the system should be
The system should be re-sampled and an immediate
review of the control measures and risk assessment
carried out to identify and remedial actions, including
to identify any other remedial action required.
A CTION R EQUIRED ON S YSTEM
possible disinfection of the system.
remedial actions;
System under control
Determined in accordance with ISO 11731(19)
Either
L EGIONELLA
up to 10,000
B ACTERIA
>1000 and
CFU / LITRE
>10,000
≤1000
S CHEDULE 5
C ONFIRMATION D ECLARATION OF F EES D UE TO THE S UPERINTENDENT OF P UBLIC H EALTH
The Superintendent of Public Health
Health Division
I, the undersigned, in my capacity of .............................(position) of ...............................(premises
name) hereby declare that I will pay, within one month’s time of receipt of invoice, all the
expenses that the Health Division will incur in the sampling, transportation, preparation and
analysis
of
........(number)
of
samples,
which
have
been
taken
from
................................................(premises name and address) on the ........................(date of
sampling) as part of the investigation of a case or suspected case of Legionnaire’s disease.
(Sgd)
Name and Surname
o.b.o.
I.D. No.
Date of Birth
Place of Birth
Parent’s Name and Surname
Residential Address
Billing Address
VAT No.
Date
S CHEDULE 6
H EALTH A UTHORITY
E NFORCEMENT N OTICE
(As per regulation 18(2) of the Control of Legionella Regulations, 2005)
Date
1. Following investigations carried out by the Superintendent of Public Health, it was found
that the risk of infection from Legionnaire’s Diseases is significant at ...............................................
2. The risk of infection from Legionnaire’s Diseases relates to ..............................................
3. Without prejudice to the Superintendent’s right to take action in accordance with the
provisions of the Control of Legionella Regulations, 2005, you are hereby requested to
IMMEDIATELY close down the .................................................................................. until further
notice.
Superintendent of Public Health
Mitbug[ fl-Istamperija tal-Gvern — Printed at the Government Printing Press
Prezz72ç – Price 72c