Trans-European Road Network Regulations, 2006
Table of Provisions (13)
Statutory Text (13 Articles)
L.N. 149 of 2006
MALTA TRANSPORT AUTHORITY ACT
(CAP. 332)
Safety Requirements for Tunnels in the
Trans-European Road Network Regulations, 2006
IN exercise of the powers conferred by article 32 of the Malta
Transport Authority Act, the Minister for Urban Development and Roads
has, after consultation with the Malta Transport Authority, made the
following regulations>-
The title of these regulations is the Safety Requirements for Title.
Tunnels in the Trans-European Road Network Regulations, 2006.
In these regulations, unless the context otherwise requires>
(Regulations 3 and 9)
Safety measures
1. Basis for deciding on safety measures
Safety parameters
1.1.1. Safety measures to be implemented in a tunnel shall be based on a systematic
consideration of all aspects of the system composed of the infrastructure,
operation, users and vehicles.
1.1.2. The following parameters shall be taken into account
— tunnel length,
— number of tubes,
— number of lanes,
— cross-sectional geometry,
— vertical and horizontal alignment,
— type of construction,
— uni-directional or bi-directional traffic,
— traffic volume per tube (including its time distribution),
— risk of congestion (daily or seasonal),
— access time for the emergency services,
— presence and percentage of heavy goods vehicles,
— presence, percentage and type of dangerous goods traffic,
— characteristics of the access roads,
— lane width,
— speed considerations,
— geographical and meteorological environment.
1.1.3. Where a tunnel has a special characteristic as regards the aforementioned
parameters, a risk analysis shall be carried out in accordance with regulation 9
of these regulations to establish whether additional safety measures and, or
supplementary equipment is necessary to ensure a high level of tunnel safety.
This risk analysis shall take into consideration possible accidents, which
clearly affect the safety of road users in tunnels and which might occur during
the operating stage and the nature and magnitude of their possible
consequences.
Minimum requirements
1.2.1. The safety measures required by the following paragraphs shall be
implemented at a minimum in order to ensure a minimum level of safety in all
the tunnels covered by these regulations. Limited derogations from these
requirements may be allowed provided that the following procedure is
completed successfully. The Authority shall send to the European Commission
information on the following
— the limited derogation(s) envisaged,
— the imperative reasons underlying the limited derogation envisaged,
— the alternative risk reduction measures which are to be used or reinforced
in order to ensure at least an equivalent level of safety, including proof
therefor in the form of an analysis of relevant risks.
The Commission shall transmit any request for a limited derogation to the
Authority as soon as possible, and in any case within one month of receipt.
If, within a period of three months after receipt of the request by the
Commission, neither the Commission nor the Authority formulates objections,
the limited derogation shall be deemed granted and the Commission shall
inform the Authority accordingly. If objections are expressed, the Commission
shall make a proposal in accordance with the procedure referred to in articles 5
and 7 of Council Decision 1999/468/EC laying down the procedures for the
exercise of implementing powers conferred on the Commission. Where the
decision is negative, the limited derogation shall not be allowed.
1.2.2. In order to provide a unified interface in all tunnels to which these regulations
apply, no derogation from the requirements of the following paragraphs shall
be allowed regarding the design of the safety facilities at the disposal of the
tunnel users (emergency stations, signs, lay-bys, emergency exits, radio re-
broadcasting when required).
Traffic volume
1.3.1. Where “traffic volume” is mentioned in this Schedule, it refers to the annual
average daily traffic through a tunnel per lane. For the purpose of determining
the traffic volume, each motor vehicle shall be counted as one unit.
1.3.2. Where the number of heavy goods vehicles over 3.5 tons exceeds 15% of the
annual average daily traffic, or seasonal daily traffic significantly exceeds the
annual average daily traffic, the additional risk will be assessed and taken into
account by increasing the traffic volume of the tunnel for the application of the
following paragraphs.
2. Infrastructure measures
Number of tubes and lanes
2.1.1. The main criteria for deciding whether to build a single or a twin-tube tunnel
shall be projected traffic volume and safety, taking into account aspects such
as the percentage of heavy goods vehicles, gradient and length.
2.1.2. In any case, where, for tunnels at the design stage, a 15-year forecast shows that
the traffic volume will exceed 10,000 vehicles per day per lane, a twin-tube
tunnel with unidirectional traffic shall be in place at the time when this value
will be exceeded.
2.1.3. With the exception of the emergency lane, the same number of lanes shall be
maintained inside and outside the tunnel. Any change in the number of lanes
shall occur at a sufficient distance in front of the tunnel portal; this distance
shall be at least the distance covered in 10 seconds by a vehicle travelling at
the speed limit. When geographic circumstances prevent this, additional and,
or reinforced measures shall be taken to enhance safety.
Tunnel geometry
2.2.1. Special consideration shall be given to safety when designing the cross-
sectional geometry and the horizontal and vertical alignment of a tunnel and
its access roads, as these parameters have a significant influence on the
probability and severity of accidents.
2.2.2. Longitudinal gradients above 5% shall not be permitted in new tunnels, unless
no other solution is geographically possible.
2.2.3. In tunnels with gradients higher than 3%, additional and, or reinforced
measures shall be taken to enhance safety on the basis of a risk analysis.
2.2.4. Where the width of the slow lane is less than 3,5 m and heavy goods vehicles
are allowed, additional and, or reinforced measures shall be taken to enhance
safety on the basis of a risk analysis.
Escape routes and emergency exits
2.3.1. In new tunnels without an emergency lane, emergency walkways, elevated or
not, shall be provided for use by tunnel users in the event of a breakdown or
an accident. This provision does not apply if the construction characteristics of
the tunnel do not allow it or allow it only at disproportional cost and the tunnel
is unidirectional and is equipped with a permanent surveillance and lane
closure system.
2.3.2. In existing tunnels where there is neither an emergency lane nor an emergency
walkway, additional and, or reinforced measures shall be taken to ensure
safety.
2.3.3. Emergency exits allow tunnel users to leave the tunnel without their vehicles
and reach a safe place in the event of an accident or a fire and also provide
access on foot to the tunnel for emergency services. Examples of such
emergency exits are
— direct exits from the tunnel to the outside,
— cross-connections between tunnel tubes,
— exits to an emergency gallery,
— shelters with an escape route separate from the tunnel tube.
2.3.4. Shelters without an exit leading to escape routes to the open shall not be built.
2.3.5. Emergency exits shall be provided if an analysis of relevant risks, including
how far and how quickly smoke travels under local conditions, shows that the
ventilation and other safety provisions are insufficient to ensure the safety of
road users.
2.3.6. In any event, in new tunnels, emergency exits shall be provided where the
traffic volume is higher than 2,000 vehicles per lane.
2.3.7. In existing tunnels longer than 1,000 metres, with a traffic volume higher than
2,000 vehicles per lane, the feasibility and effectiveness of the implementation
of new emergency exits shall be evaluated.
2.3.8. Where emergency exits are provided, the distance between two emergency
exits shall not exceed 500 metres.
2.3.9. Appropriate means, such as doors, shall be used to prevent smoke and heat
from reaching the escape routes behind the emergency exit, so that the tunnel
users can safely reach the outside and the emergency services can have access
to the tunnel.
Access for emergency services
2.4.1. In twin-tube tunnels where the tubes are at the same level or nearly, cross-
connections suitable for the use of emergency services shall be provided at
least every 1,500 metres.
2.4.2. Wherever geographically possible, crossing of the central reserve (median
strip) shall be made possible outside each portal of a twin- or multi-tube
tunnel. This measure will allow emergency services to gain immediate access
to either tube.
Lay-bys
2.5.1. For new bi-directional tunnels longer than 1,500 metres where traffic volume
is higher than 2,000 vehicles per lane, lay-bys shall be provided at distances
which do not exceed 1,000 metres, if emergency lanes are not provided.
2.5.2. In existing bi-directional tunnels longer than 1,500 metres with a traffic
volume higher than 2,000 vehicles per lane but no emergency lane, the
feasibility and effectiveness of the implementation of lay-bys shall be
evaluated.
2.5.3. If the construction characteristics of the tunnel do not allow it or allow it only
at disproportionate cost, lay-bys do not have to be provided if the total tunnel
width which is accessible to vehicles, excluding elevated parts and normal
traffic lanes, is at least equal to the width of one normal traffic lane.
2.5.4. Lay-bys shall include an emergency station.
Drainage
2.6.1. Where the transport of dangerous goods is permitted, the drainage of
flammable and toxic liquids shall be provided for through well-designed slot
gutters or other measures within the tunnel cross sections. Additionally, the
drainage system shall be designed and maintained to prevent fire and
flammable and toxic liquids from spreading inside tubes and between tubes.
2.6.2. If in existing tunnels that requirement cannot be met or can be met only at
disproportionate cost, this shall be taken into consideration when deciding
whether to allow the transport of dangerous goods on the basis of an analysis
of relevant risks.
Fire resistance of structures
The main structure of all tunnels where a local collapse of the structure could
have catastrophic consequences, e.g. immersed tunnels or tunnels which can
cause the collapse of important neighbouring structures, shall ensure a
sufficient level of fire resistance.
Lighting
2.8.1. Normal lighting shall be provided so as to ensure appropriate visibility day
and night for drivers in the entrance zone as well as in the interior of the
tunnel.
2.8.2. Safety lighting shall be provided to allow a minimum visibility for tunnel
users to evacuate the tunnel in their vehicles in the event of a breakdown of
the power supply.
2.8.3. Evacuation lighting, such as evacuation marker lights, at a height of no more
than 1.5 m, shall be provided to guide tunnel users to evacuate the tunnel on
foot, in the event of emergency.
Ventilation
2.9.1. The design, construction and operation of the ventilation system shall take into
account
— the control of pollutants emitted by road vehicles, under normal and
peak traffic flow,
— the control of pollutants emitted by road vehicles where traffic is
stopped due to an incident or an accident,
— the control of heat and smoke in the event of a fire.
2.9.2. A mechanical ventilation system shall be installed in all tunnels longer than
1,000 m with a traffic volume higher than 2,000 vehicles per lane.
2.9.3. In tunnels with bi-directional and, or congested unidirectional traffic,
longitudinal ventilation shall be allowed only if a risk analysis according to
regulation 9 of these regulations shows it is acceptable and, or specific
measures are taken, such as appropriate traffic management, shorter
emergency exit distances, smoke exhausts at intervals.
2.9.4. Transverse or semi-transverse ventilation systems shall be used in tunnels
where a mechanical ventilation system is necessary and longitudinal
ventilation is not allowed under point 2.9.3. These systems must be capable of
evacuating smoke in the event of a fire.
2.9.5. For tunnels with bi-directional traffic, with a traffic volume higher than 2,000
vehicles per lane, longer than 3,000 metres and with a control centre and
transverse and, or. semi-transverse ventilation, the following minimum
measures shall be taken as regards ventilation
— air and smoke extraction dampers shall be installed which can be
operated separately or in groups,
— the longitudinal air velocity shall be monitored constantly and the
steering process of the ventilation system (dampers, fans, etc.)
adjusted accordingly.
Emergency stations
2.10.1. Emergency stations are intended to provide various items of safety equipment,
in particular emergency telephones and extinguishers, but are not intended to
protect road users from the effects of fire.
2.10.2. Emergency stations can consist of a box on the sidewall or preferably a recess
in the sidewall. They shall be equipped with at least an emergency telephone
and two fire extinguishers.
2.10.3. Emergency stations shall be provided near the portals and inside at intervals
which for new tunnels shall not exceed 150 metres and which in existing
tunnels shall not exceed 250 metres.
Water supply
A water supply shall be provided for all tunnels. Hydrants shall be provided
near the portals and inside at intervals which shall not exceed 250 metres. If a
water supply is not available, it is mandatory to verify that sufficient water is
provided otherwise.
Road signs
Specific signs shall be used for all safety facilities provided for tunnel users.
Signs and panels for use in tunnels are given in the Third Schedule.
Control centre
2.13.1. A control centre shall be provided for all tunnels longer than 3,000 metres
with a traffic volume higher than 2,000 vehicles per lane.
2.13.2. Surveillance of several tunnels may be centralised at a single control centre.
2.14. Monitoring systems
2.14.1. Video monitoring systems and a system able to automatically detect traffic
incidents (such as stopping vehicles) and, or fires shall be installed in all
tunnels with a control centre.
2.14.2. Automatic fire detection systems shall be installed in all tunnels which do not
have a control centre where the operation of mechanical ventilation for smoke
control is different from the automatic operation of ventilation for the control
of pollutants.
Tunnel closing equipment
2.15.1. In all tunnels longer than 1,000 metres, traffic signals shall be installed before
the entrances so that the tunnel can be closed in case of an emergency.
Additional means, such as variable message signs and barriers, can be
provided to ensure that instructions are obeyed.
2.15.2. Inside all tunnels longer than 3,000 metres, with a control centre and a traffic
volume higher than 2,000 vehicles per lane, equipment to stop vehicles in the
event of an emergency is recommended at intervals not exceeding 1,000 m.
This equipment shall consist of traffic signals and possibly additional means,
such as loudspeakers, variable message signs and barriers.
Communication systems
2.16.1. Radio re-broadcasting equipment for emergency service use shall be installed
in all tunnels longer than 1,000 metres with a traffic volume higher than 2,000
vehicles per lane.
2.16.2. Where there is a control centre, it must be possible to interrupt radio re-
broadcasting of channels intended for tunnel users, if available, in order to
give emergency messages.
2.16.3. Shelters and other facilities where evacuating tunnel users must wait before
they can reach the outside shall be equipped with loudspeakers for the
provision of information to users.
Power supply and electrical circuits
2.17.1. All tunnels shall have an emergency power supply capable of ensuring the
operation of safety equipment indispensable for evacuation until all users have
evacuated the tunnel.
2.17.2. Electrical, measurement and control circuits shall be designed in such a way
that a local failure, such as one due to a fire, does not affect unimpaired
circuits.
Fire resistance of equipment
The level of fire resistance of all tunnel equipment shall take into account the
technological possibilities and aim at maintaining the necessary safety
functions in the event of a fire.
Table displaying informative summary of minimum requirements
The table set out hereafter gives a summary of the minimum requirements laid
down in the previous paragraphs. The minimum requirements are those set out
in the operative text of this Schedule.
Mandatory in twin-tube tunnels longer than 1,500 m.
Mandatory where there is no emergency lane, unless
new and existing tunnels, depending on extra usable
tunnels > 1,500 m: depending on analysis. For both
Mandatory in new bi-directional tunnels > 1,500 m
without emergency lanes. In existing bi-directional
Mandatory where transport of dangerous goods is
Implementation of emergency exists in existing
Mandatory where a 15-year forecast shows that
Additional conditions for implementation to be
additional / reinforced measures shall be taken.
Mandatory unless not geographically possible.
Mandatory outside twin- or multi-tube tunnels
emergency lane, nor an emergency walkway
In existing tunnels where there is neither an
Mandatory where a local collapse can have
tunnels to be evaluated case-by-case.
the condition in §2.3.1 is respected.
wherever geographically possible.
traffic > 10,000 vehicles per lane.
catastrophic consequences.
mandatory, or comments
tunnel width.
allowed.
>3,000 m
/ z
z
z
z
1,000 m 3,000 m
1,000 –
/ z
/ z
vehicles per lane
Traffic > 2,000
z
z
500-
z
z
1,000 m >1,000 m
/ z
vehicles per lane
Traffic < 2,000
z
z
500-
z
z
§2.3.1
§2.3.2
§2.3.9
§2.4.1
§2.3.3
§2.4.2
§2.1
§2.2
§2.5
§2.6
§2.7
not mandatory
B recommended
-
.
.
Lay-bys at least every 1,000 m
Crossing of the central reserve
Drainage for flammable and
Fire resistance of structures
emergency services at least
Emergency exists at least
SUMMARY OF MINIMUM
Emergency walkways
Cross-connections for
outside each portal
Gradients < 5 %
2 tubes or more
every 1,500 m
mandatory with exceptions
every 500 m
toxic liquids
z mandatory for all tunnels
REQUIREMENTS
Structural
measures
For all safety facilities provided for tunnel users (see
Mandatory in bi-directional tunnels where there is a
Surveillance of several tunnels may be centralised
maximum interval of 250 m is allowed in existing
Recommended if there is a control centre and the
Equipped with telephone and 2 extinguishers. A
If not available, mandatory to provide sufficient
At least one of the two systems is mandatory in
Additional conditions for implementation to be
Mandatory where there is a control centre.
tunnels with a control centre.
into a single control centre.
mandatory, or comments
length exceeds 3,000 m.
the Third Schedule)
water otherwise.
control centre.
tunnels.
>3,000 m
B
z
z
z
z
z
z
z
z
z
z
z
1,000 m 3,000 m
1,000 –
vehicles per lane
Traffic > 2,000
z
z
z
z
z
z
z
z
500-
z
z
z
z
z
z
1,000 m >1,000 m
vehicles per lane
Traffic < 2,000
z
z
z
z
z
z
z
500-
z
z
z
z
z
z
§2.15.1
§2.15.2
§2.8.3
§2.8.1
§2.8.2
§2.9.5
§2.10
§2.11
§2.12
§2.13
§2.14
§2.14
not mandatory
§2.9
B recommended
tunnel at least every 1,000
Traffic signals before the
Traffic signals inside the
Mechanical ventilation
SUMMARY OF MINIMUM
Special provisions for
At least every 150 m
At least every 250 m
detection and/or fire
Evacuation lighting
Automatic incident
(semi-) transverse
Normal lighting
Safety lighting
mandatory with exceptions
z mandatory for all tunnels
ventilation
REQUIREMENTS
entrances
detection
Video
m
Control centre
Equipment to
Water supply
Emergency
Monitoring
Ventilation
Road signs
close the
Lighting
systems
stations
tunnel
equipment at least during evacuation of tunnel users.
Shall aim to maintain the necessary safety functions.
Mandatory where evacuating users must wait before
Mandatory where radio is re-broadcasted for tunnel
To ensure the functioning of indispensable safety
Additional conditions for implementation to be
users and where there is a control centre.
they can reach the outside.
mandatory, or comments
>3,000 m
z
z
z
z
z
1,000 m 3,000 m
1,000-
vehicles per lane
Traffic > 2,000
z
z
z
z
z
500-
z
z
z
z
>1,000 m
vehicles per lane
Traffic < 2,000
z
z
z
z
1,000 m
500-
z
z
z
z
§2.16.1
§2.16.1
§2.16.3
§2.17
§2.18
not mandatory
B recommended
Emergency radio messages
Radio re-broadcasting for
Loudspeakers in shelters
SUMMARY OF MINIMUM
emergency services
for tunnel users
mandatory with exceptions
and exists
Fire resistance of equipment
z mandatory for all tunnels
REQUIREMENTS
Emergency power supply
Communication
system
3. Measures concerning operations
Operating means
Tunnel operation shall be organised and dispose of such means as will ensure
the continuity and safety of the traffic through the tunnel. The personnel
involved in the operation as well as the emergency services shall receive
appropriate initial and continuing training.
Emergency planning
Emergency response plans shall be available for all tunnels.
Works in tunnels
Complete or partial closure of lanes due to construction or maintenance works
planned in advance shall always begin outside the tunnel. Variable message
signs, traffic signals and mechanical barriers may be used for this purpose.
Management of accidents and incidents
In the event of a serious accident or incident, all appropriate tunnel tubes shall
be closed immediately to traffic.
This shall be done by simultaneous activation not only of the abovementioned
equipment before the portals, but also of variable message signs, traffic signals
and mechanical barriers inside the tunnel, if available, so that all the traffic can
be stopped as soon as possible outside and inside the tunnel. Tunnels of less
than 1,000 m may be closed by other means. Traffic shall be managed in such
a way that unaffected vehicles can quickly leave the tunnel.
The access time for emergency services in the event of an incident in a tunnel
shall be as short as possible and shall be measured during periodic exercises.
In addition, it may be measured during incidents. In major bi-directional
tunnels with high traffic volumes, a risk analysis in accordance with regulation
9 of these regulations shall establish whether emergency services shall be
stationed at the two extremities of the tunnel.
Activity of the control centre
For all tunnels requiring a control centre a single control centre shall have full
control at any given time.
Tunnel closure
In the event of tunnel closure (long or short-term), users shall be informed of
the best alternative itineraries, by means of easily accessible information
systems.
Such alternative itineraries shall form part of systematic contingency plans.
They should aim to maintain traffic flow as much as possible and minimise
secondary safety effects on the surrounding areas.
Transport of dangerous goods
The following measures shall be applied concerning access to tunnels for
vehicles transporting dangerous goods, as defined in the relevant European
legislation regarding the transport of dangerous goods by road
— perform a risk analysis in accordance with regulation 9 of these
regulations before the regulations and requirements regarding the
transportation of dangerous goods through a tunnel are defined or
modified,
— place appropriate signs to enforce the regulation before the last possible
exit before the tunnel and at tunnel entrances, as well as in advance so
as to allow drivers to choose alternative routes,
— consider specific operating measures designed to reduce the risks
related to some or all of the vehicles transporting dangerous goods in
tunnels, such as declaration before entering or passage in convoys
escorted by accompanying vehicles, on a case by case basis further to
the aforementioned risk analysis.
Overtaking in tunnels
A risk analysis shall be carried out in order to decide whether heavy goods
vehicles should be allowed to overtake in tunnels with more than one lane in
each direction.
Distances between vehicles and speed
The appropriate speed of vehicles and the safe distance between them are
especially important in tunnels and shall be given close attention. This shall
include advising tunnel users of appropriate speeds and distances.
Enforcement measures shall be initiated as appropriate.
Road users driving passenger cars should under normal conditions maintain a
minimum distance from the vehicle in front of them equivalent to the distance
travelled by a vehicle in 2 seconds. For heavy goods vehicles this distance
should be doubled. When traffic stops in a tunnel, road users should maintain
a minimum distance of 5 metres from the vehicle in front, except if this is not
possible due to an emergency stop.
4. Information campaigns
Information campaigns regarding safety in tunnels shall be regularly organised
and implemented in conjunction with interested parties on the basis of the
harmonised work of international organisations. These information campaigns
shall cover the correct behaviour of road users when approaching and driving
through tunnels, especially in connection with vehicle breakdown, congestion,
accidents and fires.
Information on the safety equipment available and proper road user behaviour
in tunnels shall be provided in convenient places for tunnel users (i.e. at rest
areas before tunnels, at tunnel entrances when the traffic is stopped or on the
internet).
Interpretation.
“the Authority” means the Malta Transport Authority
established under the Malta Transport Authority Act<
“emergency services” means all local services, whether public
or private or part of the tunnel staff, which intervene in the event
of an accident, including police services, fire brigades and rescue
teams<
“Trans-European Road Network” means the road network
identified in Section 2 of Annex I to Decision No 1692#96#EC of
the European Parliament and the Council on Community guidelines
for the development of the trans-European transport network and
illustrated by maps and, or described in Annex II to that Decision<
“tunnel” means, for the purpose of these regulations, an
underground passage with a length of over 500 metres<
“tunnel length” means the length of the longest traffic lane,
measured on the fully enclosed part of the tunnel.
(Regulation 4)
Approval of the design, safety documentation,
commissioning of a tunnel, modifications and periodic exercises
1. Approval of the design
The provisions of these regulations shall be applied from the preliminary
design stage onward.
Before any construction work begins, the Tunnel Manager shall compile the
safety documentation described under points 2.2 and 2.3 for a tunnel at the
design stage and shall consult the Safety Officer. The Tunnel Manager shall
submit the safety documentation to the Authority and attach the opinion of the
Safety Officer, and, or of the Inspection Entity when available.
The design, as appropriate, shall be approved by the Authority, which shall
inform the Tunnel Manager of its decision.
2. Safety documentation
The Tunnel Manager shall compile safety documentation for each tunnel and
keep it permanently up-to-date. He shall provide a copy of the safety
documentation to the Safety Officer.
The safety documentation shall describe the preventive and safeguard
measures needed to ensure the safety of users, taking into account people with
reduced mobility and disabled people, the nature of the route, the
configuration of the structure, its surroundings, the nature of the traffic and the
scope for action by the emergency services defined in regulation 2 of these
regulations.
In particular, the safety documentation for a tunnel at the design stage shall
include
— a description of the planned structure and access to it, together with
the plans necessary for understanding its design and anticipated
operating arrangements,
— a traffic forecast study specifying and justifying the conditions
expected for the transport of dangerous goods, together with the
risk analysis requested by point 3.7 of the First Schedule,
— a specific hazard investigation describing possible accidents which
clearly affect safety of road users in tunnels which might occur
during the operating stage and the nature and magnitude of their
possible consequences; this investigation must specify and
substantiate measures for reducing the likelihood of accidents and
their consequences,
— an opinion on safety from an expert or organisation specialising in
this field, which could be the Inspection Entity.
The safety documentation for a tunnel which is at the commissioning stage
shall include in addition to the documentation required at the design stage
— a description of the organisation, human and material resources and
instructions specified by the Tunnel Manager to ensure operation
and maintenance of the tunnel,
— an emergency response plan drawn up jointly with the emergency
services which also takes into account people with reduced
mobility and disabled people,
— a description of the system of permanent feedback of experience
through which significant incidents and accidents can be recorded
and analysed.
The safety documentation for a tunnel which is in operation shall include in
addition to the documentation required at the commissioning stage
— a report and analysis on significant incidents and accidents, which
have taken place since the entry into force of these regulations,
— a list of the safety exercises carried out and an analysis of the
lessons learned from them.
3. Commissioning
The initial opening of a tunnel to public traffic shall be subject to authorisation
by the Authority (commissioning) in accordance with the following procedure.
This procedure also applies to the opening of a tunnel to public traffic after
any major change in construction or operation or any substantial modification
work on the tunnel which might significantly alter any of the constituent
components of the safety documentation.
The Tunnel Manager shall transmit the safety documentation mentioned in
point 2.4 to the Safety Officer, who shall give his opinion on the opening of
the tunnel to public traffic.
The Tunnel Manager shall forward this safety documentation to the Authority,
and shall attach the opinion of the Safety Officer. The Authority shall decide
whether or not to authorise the opening of the tunnel to public traffic, or
whether to do so with restrictive conditions, and shall notify this to the Tunnel
Manager. A copy of this decision shall be forwarded to the emergency
services.
4. Modifications
For any substantial modification in the structure, equipment or operation,
which might significantly alter any of the constituent components of the safety
documentation, the Tunnel Manager shall ask for a new authorisation of
operation following the procedure described under point 3.
The Tunnel Manager shall inform the Safety Officer of any other change in
construction and operation. Furthermore, prior to any modification work on
the tunnel, the Tunnel Manager shall provide the Safety Officer with
documentation detailing the proposals.
The Safety Officer shall examine the consequences of the modification and in
any event give his opinion to the Tunnel Manager, who shall send a copy to
the Authority and to the emergency services.
5. Periodic exercises
The Tunnel Manager and the emergency services shall, in cooperation with the
Safety Officer, organise joint periodic exercises for tunnel staff and the
emergency services.
The exercises
— should be as realistic as possible and should correspond to the
defined incident scenarios,
— should yield clear evaluation results,
— should prevent any damage to the tunnel,
— may also, in part, be conducted as table top or computer simulation
exercises for complementary results.
(a) Full scale exercises under conditions that are as realistic as possible shall
be conducted in each tunnel at least every four years. Tunnel closure will
only be required if acceptable arrangements can be made for diverting
traffic. Partial and, or simulation exercises shall be conducted every year
in between. In areas where several tunnels are located in close proximity
to each other, a full scale exercise must be conducted in at least one of
those tunnels.
(b) The Safety Officer and the emergency services shall evaluate jointly these
exercises, draw up a report and make appropriate proposals.
(1) The Authority shall be responsible for ensuring that any Minimum safety
requirements.
tunnel constructed along the Trans-European Road Network route in
Malta shall meet the minimum safety requirements laid down in the
First Schedule to these regulations.
(2) The Authority shall ensure that>
(a) tunnels are tested and inspected on a regular basis and
that safety requirements pertaining thereto are drawn up<
(b) organisational and operational schemes, including
emergency response plans, for the training and equipping of
emergency services are put in place<
(c) the procedure for immediate closure of a tunnel in an
emergency is clearly defined< and
(d)
the necessary risk reduction measures are implemented.
(First Schedule)
Signing for tunnels
1. General requirements
The following are road signs and symbols to be used for tunnels. Road signs
mentioned in this section are described in the Vienna Convention on Road
Signs and Signals of 1968, unless otherwise specified.
In order to facilitate international understanding of signs, the system of signs
and signals prescribed in this Schedule is based on the use of shapes and
colours characteristic of each class of sign and, wherever possible, on the use
of graphic symbols rather than words.
Road signs shall be used to designate the following safety facilities in tunnels
Lay-bys;
Emergency exits: the same sign shall be used for all kinds of emergency exits;
Escape routes: the two nearest emergency exits shall be signed on the
sidewalls at distances of no more than 25 metres, at a height of 1.0 to 1.5
metres above escape route level, with an indication of the distances to the
exits;
Emergency stations: signs to indicate the presence of emergency phones and
fire extinguishers.
Radio
In tunnels where users can receive information via their radio, appropriate
signs placed before the entrance shall inform users on how to receive this
information.
Signs and markings shall be designed and positioned so that they are clearly
visible.
2. Description of signs and panels
Appropriate signs shall be used, if necessary, in the advance warning area of
the tunnel, inside the tunnel and after the end of the tunnel. When designing
the signs for a tunnel, local traffic and construction conditions as well as other
local conditions shall be considered. Signs according to the Vienna
Convention on Road Signs and Signals shall be used.
Tunnel sign
The following sign shall be put at each entrance of the tunnel
Sign El 1A for Road Tunnels of the Vienna Convention;
The length shall be included either in the lower part of the panel or on a
additional panel H2.
For tunnels over 3,000 metres, the remaining length of the tunnel shall be
indicated every 1,000 metres .
The name of the tunnel may also be indicated.
Horizontal signing
Horizontal delineation should be used at the roadside edge.
In the case of bi-directional tunnels, clearly visible means should be used
along the median line (single or twin) separating the two directions.
Signs and panels for signing of facilities
Emergency stations
Emergency stations shall bear informative signs, which shall be F signs
according to the Vienna Convention and indicate the equipment available to
road users, such as
Emergency telephone
Extinguisher
In emergency stations which are separated from the tunnel by a door, a clearly
legible text, written in appropriate languages, shall indicate that the emergency
station does not ensure protection in case of fire. An example is given below
“THIS AREA DOES NOT PROVIDE
PROTECTION FROM FIRE
Follow signs to emergency exits”
Lay-bys
The signs to indicate lay-bys should be E signs according to the Vienna
Convention. Telephones and fire extinguishers shall be indicated by an
additional panel or incorporated in the sign itself.
Emergency exits
The signs to indicate “Emergency exits” should be G signs according to the
Vienna Convention. Examples are shown below
It is also necessary to sign the two nearest exits on the sidewalls. Examples are
shown below.
Lane signals
These signs can be circular or rectangular
Variable message signing
Any variable message signs shall have clear indications to inform tunnel users
of congestion, breakdown, accident, fire or any other hazards.
The Authority shall only commission tunnels in accordance
with the procedure laid down in the Second Schedule to these regulations.
The Authority shall either itself appoint a Tunnel Manager to
be responsible for the management of each tunnel along the Trans-
European Road Network route in Malta, whether it is in the design,
construction or operating stage, or else shall identify as Tunnel Manager
any other public or private body responsible for the management of the
tunnel at the stage in question.
(1) The Tunnel Manager shall, with the prior approval of
the Authority, nominate one Safety Officer for each tunnel.
(2) The Safety Officer shall coordinate all preventive and
safeguards measures to ensure the safety of users and operational staff.
(3) The Safety Officer may be a member of the tunnel staff
or the emergency services, shall be independent in all road tunnel safety
issues and shall not be under instructions from an employer in respect
of those issues.
(4) The said officer may perform his tasks and functions in
more than one tunnel along the route.
(5) The Safety Officer shall perform the following tasks
and functions>
(a) ensure coordination with emergency services and take
part in the preparation of operational schemes<
(b) take part in the planning, implementation and evaluation
of emergency operations<
(c) take part in the definition of safety schemes and the
specification of the structure, equipment and operation in respect
of both new tunnels and modifications to existing tunnels<
(d) verify that operational staff and emergency services are
trained, and he shall take part in the organisation of exercises held
at regular intervals<
(e) give advice on the commissioning of the structure,
equipment and operation of tunnels<
(f) verify that the tunnel structure and equipment are
maintained and repaired< and
(g) take part in the evaluation of any significant incident or
accident as mentioned in regulation 7 of these regulations.
(1) The Tunnel Manager shall prepare an incident report on Incident report.
any significant incident or accident occurring in a tunnel along the Trans-
European Road Network route in Malta.
(2) The said report shall be forwarded to the Safety Officer,
referred to in regulation 6 of these regulations, to the Authority and to
the emergency services within a maximum period of one calendar month.
(3) Where an investigation report is drawn up analysing the
circumstances of the incident or accident referred to in sub-regulation
(1) hereof or the conclusions that can be drawn from it, the Tunnel
Manager shall forward this report to the Safety Officer, the Authority
and the emergency services no later than one calendar month after he
receives it himself.
(1) The Authority shall appoint highly competent and Inspections.
qualified inspection entities to perform on a regular basis inspections,
evaluations and tests in tunnels falling within the scope of these
regulations to ensure that the tunnels comply with the provisions of
these regulations.
(2) The Authority shall ensure that such inspection entities
are functionally independent from the Tunnel Manager.
(3) The period between two consecutive inspections of any
given tunnel shall not exceed six years.
(4) Where, on the basis of the report of the inspection entity,
the Authority finds that a tunnel does not comply with the provisions of
these regulations, the Authority shall notify the Tunnel Manager and
the Safety Officer that appropriate measures to increase tunnel safety
shall be adopted. The Authority shall also define the conditions for
continuing to operate the tunnel or for re-opening the tunnel which will
apply until remedial measures and any further relevant restrictions or
conditions are implemented.
(5) Where the remedial measures include any substantial
modification in the tunnel’s construction or operation, once these
measures have been taken, the tunnel shall be subject to a new
authorisation to operate in accordance with the procedure laid down in
the Second Schedule to these regulations.
(1) Where certain structural requirements laid down in the
First Schedule to these regulations can only be satisfied through technical
solutions which either cannot be achieved or can be achieved only at
disproportionate cost, the Authority may accept the implementation of
risk reduction measures, provided that such measures will result in
equivalent or improved protection.
(2) The efficiency of these measures shall be demonstrated
through a risk analysis in conformity with this regulation.
(3) The risk analysis, where necessary, shall be carried out
by a body which is functionally independent from the Tunnel Manager.
(4) The risk analysis shall take into account all design factors
and traffic conditions that affect safety, notably traffic characteristics
and type, tunnel length and tunnel geometry, as well as the forecast
number of heavy goods vehicles each day.
(5) The content and results of the risk analysis shall be
included in the safety documentation submitted to the Authority.