Port Workers (Amendment) Regulations, 1980
Statutory Text (5 Articles)
L.N. 17 of 1980
PORT WORKERS ORDINANCE, 1962
(ORDINANCE NO. XIV OF 1962)
Port Workers (Amendment) Regulations, 1980
IN exercise of the powers conferred by section 16 of the Port
Workers Ordinance. 1962, the Minister of Development, Energy, Port
and Telecommunications, with the concurrence of the Minister of
Finance, Customs and People's Financial Investments, has made the
following regulations:-
These regulations may be cited as the Port Workers (Amend
ment) Regulations, ) 980, and shall be read and construed as one with
the Port Workers Regulations, 1966, hereinafter referred to as "the
principal regulations".
Tariff A of Schedule
to the principal regulations shall be
amended as follows
I
(a)
immediately after paragraph
thereof
there
shall be
added the following new paragraph
" 1 A. N otwithstanding the provisions of paragraph l of
this Tariff, the fees payable to a ship foreman engaged in the
supervision of the handling of unitised eargo consisting of
mobile equipment and motor vehicles whether moving on own
wheels or track or whether loaded on trailers and other unitised
cargo, imported by Baħħar u Sewwi Ltd to be repaired locally
for eventual re--shipment by them, shall be -
(I) unit loads not exceed-.
ing 20 tonnes
30e per unit
unit loads exceeding 20
(2)
.f 1.00 per unit. "; and
tonnes
(b) immediately after paragraph
2 thereof there shall be
added the following new paragraph
Notwithstanding the provisions of paragraph 2 of
"2A.
this Tariff, the fees payable to a shore foreman engaged in the
supervision of the handling of unitised cargo consisting of
mobile equipment and motor vehicles whether moving on own
wheels or track or whether loaded on trailer and other unitised
cargo. imported by Baħħar u Sewwi Ltd to be repaired 10cal1y
for eventual re-shipment by them. shall be -
(1) unitised cargo or unit loads
not exceeding 20 tonnes
50c per unit
(2) unitised cargo or unit loads
f. \.00 per unit.".
exceeding 20 tonnes ...
3, For the table appearing immediately after paragraph I of Part I
of Schedule 2 to the principal regulations there shaH be substituted the
following table
B
"Column l
Column 2
Column 3
!--
----I
-- -
---
--
-- -
I
Payable
by
Payable by
the owner, master
Description
of Work
other persons
or agent of
on whose behalf
ship
work ashore
a
is performed
SECTION A
Loading or unloading of
(a)
unitised cargo consisting of mobile
equipment and
motor vehicles
whether moving on own wheels 01'
track or whether loaded on trailers,
i mp or t ed b y Baħħar u Sewwi Ltd
to be repaired locally for eventual
re-shipment by them
not exeeeding 20 tonnes
(i)
each
25c per tonne
f2.00 per unit
(i i)
exceeding 20 tonnes but
not exeeeding 50 tonnes eaeh ...
25c per tonne
D.OO per unit
(iii)
e x c e e d i ng 50 tonnes but
exceeding 100 tonnes each
25c per tonne
Iloi
E4.00 per unit
(iv) exceeding 100 to nne s but
exceeding 130 tonnes each
25c per tonne
not
E5.00 p er unit
tonnes
(v)
exeeeding
eaeh
25c per tonne
f6.00 per unit
(b) Unloading of unitised
cargo consisting of machinery,
engines and spare parts, imported
hy Baħħar li Sewwi Ltd to b e in
corporated in the equipment and
vehic1es mentioned in item (a) of
25c per tonne
ihis S e c ti o n
20c per t onn e
(e)
Loading
unitised
of
cargo
(i)
locally
manufaetured
24c6 per tonne
25c4 per tonne
goods
(i i)
all o t h e r cargo excluding
cargo speeified in items (a) and
50c per tonne
(b) of this S ec ti on
25c4 per tonne
(d)
Unloading of unitised
cargo excluding cargo specified in
50c per tonne
25c4 per tonne
items (a) and (b) of this Section
.
.
.
I
Column 2
Column l
Column 3
:1
Payable by
Payable by
the owner, master
other persons
Description of Work
of agent of
011 whose behalf
ship
work ashore
a
is performed
SECTION B
Transhipment of unitis�d cargo
(a) Loading or unloading of
111otor vehic1es, unpacked, mobile -
motor cars
(i)
f2.50 per unit for
each operation
f3.75 per unit for
vans
(ii)
each operation
D.50 per unit for
(iii)
trucks and chassis
each operation
I
Provided that when the number of units unloaded from and/or
loaded on the same ship in one operation excceds 500, the fees specified
in this item shall be reduced by 50 per centUln.
(b) Loading or unloading of
other unitised cargo
45c per tonne
SECTION C
( l)
Shifting of unitised cargo
(a)
Motor
vehicles,
un
packed, mobi1e, shifted during
the loading or unloading of
transhipment cargo in unit loads
motor cars ...
(i)
75c per unit for
each operation
(iD
vans ...
lOO c per unit for
each operation
fl.25 per unit for
trucks and chassis
(iii)
each operation
(b) Other cargo in unit
loads, including motor vehicles,
l!nrac1�ed, mobile, not being
shifted in the course of tranship
ment operations as specified in
sub-item (a) of item (1) of this
25c per tonne for
Section
...
each operation
�-_._-
Column 1
Column 2
Column 3
Payable
by
Payable by
the owner. master
other persons
Description of Work
or agent of
on whose behalf
work ashore
ship
a
is performed
(2)
Loa d i n g or
unloading
of
empty containers
520c per unit
Loading
or
unloading
of
(3)
empty trailers
50c per unit
Loading
or
unloading of
(4)
empty containers o n t r a i1e r s
570c per un i t
R oad transport vehic1es or
(5)
b ow s e r s .
s hip ' s
(excluding
e qu i pment used to tow, push,
carry or move unitised cargo),
r o l led off or rolled on a
RORO ship to load or u n l oad
cargo. as the case may be --
250c per unit in
addition to the
charges on cargo
carried
Folding collapsible containers.
"
50c per tonne of
(6)
unloaded inter-
1,000
loaded
or
locked into one an o t her
kilogrammes
Mipf10k it-tabella li- tidher minnufih wara l-paragrafu l tal
Parti I ta' l-Iskeda 2 li tinsab mar-regolamenti prinċipali għandha tidħol
din li ġejja
Kolonna 2
Kolonna 3
"Kolonna l
!
J itħallas minn
[
JitħalIas mis-sid,
persuni oħra li
Deskrizzjoni tax-Xogħol
għalihom isir
kaptan jew aġent
I
tal-bastiment
ix-xogħol fuq
!
il-moll
__
__
_
SEZZJONI A
(a)
Tagħbija Jew ħatt ta'
merkanzija miġbura f'unita waħda
li tkun tagħmir mobiljari u vetturi
bil-mutur sew jekk jitmexxew bir
roti jew fuq it-track tagħhom stess
sew jekk mgħobbija fuq karrelli.
importati minn Baħħ;if u Sewwi
Ltd ħalli jissewwew lokalment biex
wara jerġgħu jitgħabbew fuq il
bastiment minnhom
<D
ta'
mhux
iżjed
minn
n,oo kull unita
20 tunnellata metrika l-waħda...
25c kull tunnel
lata metrika
(ii) ta' iżjed minn 20 tun
nellata metrika iżda mhux iżjed
minn 50
tunnellata
metrika
25c kull tunnel
B.OO kull unita
l-waħda
la ta metrika
(iii) ta' iżjed minn 50 tun
nellata metrika iżda mhux iżjed
minn 100 tunnellata metrika
25c kull tunnel
1:4.00 kull unita
l-waħda
la ta metrika
ta' iżjed minn 100
(iv)
tunnellata metrika iżda mhux
iżjed minn 130 tunnellata metri-
25c kull tunnel
1:5.00 kull unWt
ka l-waħda
lata metrika
(v) ta' iżjed minn 130 tun-
25c kull tunnel
1:6.00 kull unita
neilata metrika l-waħda
lata metrika
Kolonna l
Kolonna 3
Kolonna 2
J itħalIas minn
Deskrizzjoni tax-Xogħol
J itħal!as mis-sid,
persuni oħra li
kaptan jew aġent
għalihom isir
tal-bastiment
ix-xogħol fuq
il-moll
ta'
merkanzija
(b) Ħatt
f'unita waħda li tkun makkinarju.
makni u partijiet sfużi, i m por t a ti
minn Baħħar u Sewwi Ltd b i e x jiġu
I
nkorporati fit-tagħmir u fil-vetturi
msemmija fil-partita (a) ta' din is-
!25C
I
Sezzjoni
20c kull tunnel-
kull t u n n el
lata metrika
I
lata metrika
I
Tagħmir ta' m erkan z i ja
(ċ)
f'unita waħda
(i) oġġetti
manifatturati I
125c4 kull tunnel- 24c6 kull tunnel-
lokalment
lata metrika
lata metrika
I
kull merkanzija oħra
(ii)
I
barra mill-merkanzija speċifikata
fil-partiti (a) u (b) ta' dan lS
25c4 kull tunnel-
Sezzjoni ...
50c kull tunnel-
lata metrika
lata metrika
merkanzija
(d) Ħatt
ta'
f'unita waħda barra minn m e r k an
zija speċifikata fil-partiti (a) u (b)
25c4 kull tunnel-
ta' din is-Sezzjoni
...
50c kull tunnel-
lata metrika
I
l a t a m e t r i ka
SEZZJONI B
Trasbord ta' merkanzija f u ni ta
'
waħda
(a) Tagħbija jew ħatt ta' vet
turi bil-mutur, sfużi, mobbli -
n.50 kull unita
(i)
karrozzi bil-mutur
...
għal kull
o p e r a z z j o n i
fJ.75 k u l l unita
(ii)
v an n ij ie t
għal kull
operazzjoni
f7 .50 kull unita
trakkijiet u chassis .,.
(iii)
għal kull
operazzjoni
Iżda meta n-numru ta' u n it aj i e t li jinħattu minn u/jew jitgħab
bevv, fuq l istess b ast i m e n t f'operazzjoni waħda jeċ � edi .?OO, il-ħlasiji
et
..
speċifikati f'din il-partita għandhom jitnaqqsu b'50 fIl·mlJa.
B
Kolonna 3
Kolonna 2
K010nna
J itħallas minn
mi s sid
persuni 0 tu"a li
Deskrizz j oni tax-Xogħol
J itħallas
-
,
kaptan jew aġent
għalihom isir
tal-bastiment
ix-xogħol fuq
il-moll
(b) Tagħbija jew ħatt ta'
merkanzija oħra f'unita waħda ...
45c kull tunnel
lata metrika
SEZZJONI Ċ
(1)
ċaq1iq ta' merkanzija f'unita
waħda
(a) vetturi bil-mutur, sfużi,
mobbli, li jiċċaqalqu waqt it-tagħ
bija jew il-ħatt ta merkanzija tat
trasbord li tkun f'tagħbijiet f'unita
waħda
(i)
karrozzi bil-mutur
75c kull unita
għal kull
operazzjoni
(ii)
vannijiet
lOO c kull unita
għal kull
operazzjoni
(iii)
trakkijiet u chassis
125c kull unita
għal kull
operazzjoni
(b) merkanzija oħra f'tagħbi
jiet f'unita waħda, inklużi karrozzi
bil-mutur, sfużi, mobbli, li ma
jkunux ġew imċaqa1qa waqt l-ope
razzjonijiet ta' trasbord kif speċifi
kata fis-sub-partita (a) ta1-partita
(1) ta' din is-Sezzjoni
25c kull tunnel
lata metrika għal
kull operazzjoni
Tagħbija
jew
ħatt
ta'
(2)
containers vojta
520c kull unita
Tagħbija jew ħatt ta' karrelli
(3)
50c kull unita
vojta ...
I
(4)
Tagħbija
jew
ħatt
ta'
570c kull unita
containers vojta fuq karrelli ...
Vetturi għat-trasport fit-toroq
(5)
jew bowsers (barra minn tagħ
mir ta bastiment użat biex jir
monka, jimbotta, iġorr jew
iċaq1aq
merkanzija
f'unita
K o l o n n a l
Kolonna 2
Kolonna 3
Jitħallas minn
persuni oħra li
Deskrizzjoni tax-Xogħol
Jitħallas mis-sid,
kaptan jew aġent
għalihom isir
tal"bastiment
ix-xogħol fuq
il-moll
waħda), rollef ott jew rolled
fuq b a st i me nt RORO biex tit-
għ a b ba j e w ti n ħ a tt . me rk a nz i
-
ja, skond il-każ
250c kull urutit
barra mid-dritti-
jiet fuq il-mer-
kanzija li tinġarr
Containers li jintwew. jitgħab-
(6)
bew jew jinħattu mdaħħ1in ġo
xulxin,
' 50c kull tunnel-
"
lata metrika ta'
, l 000 kilogramm
For paragraph 2 of Schedule 3 to the principal regulations there
shall be substituted the following
"2. A person. o t h e r than a person mentioned in paragraph l
of this Schedule. who employs port workers or on whose behalf port
workers are employed. shall pay to the Manager of Port Workers a
levy as is specified hereunder in respect of c arg o loaded on. or
unloaded from. a ship by him or on his behalf
(a) Unitised cargo consisting of mobile equipment and
motor vehic1es whether moving on own wheels or track or
whether loaded on trailers. imported by Baħħar u Sewwi Ltd
to be repaired l o c a Ily for eventual re-shipment by them -
fl.50 per unit
not ex c e e di n g 15 tonnes ea ch
(i)
ex c eed in g 15 to n n es but not
(ii)
f:3.00 p e r unit
t onn es each
exceding
,(4.00 per unit;
(jii)
exceding 100 tonnes each ...
B
(b) lJnitisec1
cargo
consisting
of
machinery, engines and spare parts, import
ed by Baħħar u Sewwi Ltd to be incorpo
rated in the equipment or vehic1es referred
to in sub-paragraph (a) of this paragraph .
lOc per tonne
.
.
All other cargo ...
(c)
17c5 per tonne.".
l-Informazzjoni
Published by the DeparJmelll of Information
ta'
-
Stampat
fl-U.C.S.
Stamperija tal-Gvern
the
Gavemment
Prilllillg Press
Prinrer/ ar
C.O.S.
-
-
-
-