ACT No. XVIII of 2016 AN ACT to amend the Utilities and Services (Regulation of Certain Works) Act, to implement measures to reduce the cost of deployment of high-speed electronic communications networks, to make provision with respect to matters ancillary thereto or connected
Table of Provisions (44)
Statutory Text (44 Articles)
I assent.
M ARIE L OUISE
(L.S.)
C OLEIRO P RECA
President
12th April, 2016
ACT No. XVIII of 2016
AN ACT to amend the Utilities and Services (Regulation of
Certain Works) Act, to implement measures to reduce the cost of
deployment of high-speed electronic communications networks, to
make provision with respect to matters ancillary thereto or connected
therewith and to provide for certain measures relating to electronic
communications.
BE IT ENACTED by the President, by and with the advice and
consent of the House of Representatives, in this present Parliament
assembled, and by the authority of the same, as follows:-
(1) The short title of this Act is the Utilities and Services
(Regulation of Certain Works) (Amendment) Act, 2016, and this Act
shall be read and construed as one with the Utilities and Services
(Regulation of Certain Works) Act, hereinafter referred to as "the
principal Act".
(2) This Act shall come into force on such date as the Minister
responsible for infrastructure may by notice in the Gazette appoint,
and different dates may be appointed for different purposes and
different provisions of this Act.
(Article 2)
In accordance with the provisions of article 2 of this Act, in the
context of the definition of the words "competent utility regulator"
the following public sector bodies are designated as "competent
utility regulators"
The Malta Communications Authority ("MCA") is
responsible for the regulation of electronic communications
services and networks;
(2) The Regulator for Energy and Water Services
("REWS") is responsible for the regulation of energy services
and networks and the regulation of water services and networks;
and
(3) The Authority for Transport in Malta ("TM") is
responsible for the exercise of regulatory functions relating to
roads and to transport by air, rail, road or sea.
The purpose of this Act is to amend the Utilities and
Services (Regulation of Certain Works) Act, to implement Directive
2014/61/EU of the European Parliament and of the Council of 15
May 2014 on measures to reduce the cost of deploying high-speed
electronic communications networks, the regulation of certain works
in connection with utilities and other services, and to amend other
existing laws that relate to such measures and to the provision of
electronic communications services.
(Article 21)
Regulations listed in accordance with the provisions of article
21 of this Act
The Electronic Communications Networks and Services
(General) Regulations (S.L. 399.28).
Immediately before article 1 of the principal Act there Addition of
heading
shall be added the following new heading
immediately
before article 1
of the principal
"PART I
Act.
Preliminary".
(Article 24)
The remuneration payable to the President where the person
appointed is a former judge or a former magistrate and to the two
ordinary members of the Dispute Resolution Board shall be as
follows
(1)
In the case of the President for
•
the first hour of a sitting or part thereof seventy
five euro (€75), and
•
every subsequent hour or part thereof sixty-five
euro (€65).
(2)
In the case of an ordinary member for
•
the first hour of a sitting or part thereof sixty
euro (€60), and
•
every subsequent hour or part thereof fifty euro
(€50).
Provided that in the case of any sittings which are held outside
the venue designated for the holding of Board sittings, the fee due to
the President and to the ordinary members shall be increased by ten
euro (€10) per hour or part thereof.".
20. The enactments in the First Column of the Schedule to this Amendment of
Act shall have effect subject to the amendments appearing relative other
enactments.
thereto in the Second Column of the said Schedule.
Article 2 of the principal Act shall be substituted by the Substitution of
article 2 of the
following
principal Act.
" Interpretation.
2. (1) In this Act unless the context
otherwise requires
"access point" means a physical point,
located inside or outside the building, accessible
to undertakings providing or authorized to
provide public communications networks, where
connection to the high-speed-ready in-building
physical infrastructure is made available;
"bodies governed by public law" means
bodies that have all of the following
characteristics
(a)
they are established for the
specific purpose of meeting needs in the
general interest, not having an industrial or
commercial character;
(b) they have legal personality;
and
(c)
they are financed, in full or for
the most part, by the State, or regional or
local authorities, or by other bodies
governed by public law; or are subject to
management
supervision
by
those
authorities or bodies; or have an
administrative, managerial or supervisory
board, more than half of whose members
are appointed by the State, regional or
local authorities or by other bodies
governed by public law;
"civil works" means every outcome of
building or civil engineering works taken as a
whole which is sufficient of itself to fulfil an
economic or technical function and entails one
or more elements of a physical infrastructure;
"competent authority for permit granting"
or "competent authorities for permit granting"
means such public sector body or bodies
responsible for the granting of civil works
permits;
"competent infrastructure regulator" or
"competent infrastructure regulators" means
such public sector body or bodies responsible for
the infrastructure regulation as may be listed in
the First Schedule, which Schedule may from
time to time be amended by the Minister
responsible for infrastructure by means of a
notice in the Gazette;
"competent
utility
regulator"
or
"competent utility regulators" means any such
public sector body or bodies responsible at law
for the regulation of those utility services listed
in accordance with the Second Schedule, which
list shall state the authority responsible for the
regulation of each of the different utility services
and, where applicable the networks therein
listed
Provided that this Schedule may from time
to time be amended by the Prime Minister by
notice in the Gazette;
"Dispute Resolution Board" or "Board"
means the Utilities Networks Dispute Resolution
Board established under Part IV;
"electronic communications network" and
"electronic communications service" shall
respectively have the same meaning as under the
Electronic Communications (Regulation) Act;
"energy" includes electrical energy, fuel,
heat when transmitted as a commercial activity,
and energy derived from renewable sources;
"high-speed electronic communications
network" means an electronic communications
network which is capable of delivering
broadband access services at speeds of at least
thirty Mbps
Provided that the Minister responsible for
electronic communications may by notice in the
Gazette vary such speeds;
"high-speed-ready in-building physical
infrastructure" means in-building physical
infrastructure intended to host elements or
enable delivery of high-speed electronic
communications networks;
"in-building physical infrastructure" means
physical infrastructure or installations at the
end-user’s location, including elements under
joint ownership, intended to host wired and, or
wireless access networks, where such access
networks are capable of delivering electronic
communications services and connecting the
building access point with the network
termination point;
"major renovation works" means building
or civil engineering works at the end-user’s
location encompassing structural modifications
of the entire in-building physical infrastructure
or a significant part thereof, including the
common parts, and requiring a building permit;
"network"
means
any
physical
infrastructure utilised by a network operator;
"network operator" means an undertaking
providing or authorized to provide public
communications networks as well as an
undertaking providing a physical infrastructure
intended to provide
(a)
a service of production,
transport or distribution of
(i) gas;
(ii) electricity,
including
public lighting;
(iii) heating;
(iv) water, including disposal
or treatment of waste and sewage,
and drainage services;
(b) transport services, including
railways, roads, ports and airports;
"owner" includes occupier and user;
"permit" means an explicit or implicit
decision of a competent authority for permit
granting following any procedure under which
an undertaking is required to take steps in order
to legally carry out building or civil engineering
works;
"physical infrastructure" means any
element of a network which is intended to host
other elements of a network without becoming
itself an active element of the network, including
but not limited to, pipes, masts, ducts, inspection
chambers, manholes, cabinets, buildings or
entries to buildings, antenna buildings, towers
and poles
Provided that cables, including dark fibre,
as well as elements of networks used for the
provision of water intended for human
consumption as defined in regulation 3 of the
Water Intended for Human Consumption
Regulations are not physical infrastructure
within the meaning of this Act;
"public sector body" means a state,
regional or local authority, a body governed by
public law or an association formed by one or
several such authorities or one or several such
bodies governed by public law;
"Single Information Point" means the
public entity appointed under article 19 to
perform the functions of a single point of
contact;
"tenement" means any tenement whether
private or public and includes any road, path,
building or construction however so described,
or water;
"Tribunal" means the Administrative
Review Tribunal established by article 5 of the
Administrative Justice Act;
"undertaking" means, unless stated
otherwise in this Act, an undertaking providing
or authorized to provide public communications
networks;
"utilities"
includes
electronic
communications services, gas, electricity
including public lighting, heating, water
including disposal or treatment of waste and
sewage, and drainage systems, transport services
including roads, ports and airports, and such
other services as the Minister responsible for
infrastructure may by notice in the Gazette
designate as “utilities” for the purposes of this
Act; and
"Utilities Committee" means the Utilities
Services Advisory Committee established under
article 22.
(2) For the words "the Authority for
Transport in Malta", wherever they occur in the
principal Act, there shall be substituted the
words "the competent infrastructure regulator".
Amendment of Laws
First Column
Second Column
Enactment
Extent of Amendments
1. Article 12 thereof shall be substituted by the
Communications following
(Regulation) Act. " Imposition of
12. The Authority may as necessary,
sharing of wiring
impose obligations in relation to the sharing
obligations.
of wiring inside buildings or up to the first
concentration or distribution point where
this is located outside the building, on an
undertaking
providing
electronic
communications networks which has the
right to install facilities on, over or under
public or private property and, or on the
owner of such wiring, where this is justified
on the grounds that duplication of such
infrastructure would be economically
inefficient or physically impracticable
Provided that such sharing or co-
ordination arrangements shall include rules
for apportioning the costs of facility or
property sharing adjusted for risk where
appropriate.".
2. Immediately after article 12 thereof, there shall be
added the following new article
" Access to in-
12A. (1) The provisions of article 2 of
building physical
the Utilities and Services (Regulation of
infrastructure.
Certain Works) Act shall, unless provided
otherwise, apply with regard to the
provisions of this article.
(2) The holder of a right to use the
access point and the in-building physical
infrastructure shall meet all reasonable
requests for access from undertakings under
fair and non-discriminatory terms and
conditions,
including
where
appropriate.
(3) An undertaking has the right
(a)
to roll out its network at its
own costs up to the access point; and
(b) to access any existing in-
building physical infrastructure with a
view to deploying a high-speed
electronic communications network if
duplication is technically impossible
or economically inefficient
Provided that if access referred to in
paragraphs (a) or (b) is not achieved within
two months from the date of receipt of a
formal written request for access, then an
aggrieved party may refer the dispute to the
Dispute Resolution Board in order to assess
compliance with the requirements provided
with in the aforesaid paragraphs.
(4) The Dispute Resolution Board shall
in determining any dispute referred to it in
accordance with this article, take full
account of the principle of proportionality,
issue a binding decision to resolve the
dispute raised within the shortest possible
time frame and in any case within two
months from the date of the receipt of the
complete request except in exceptional
circumstances in accordance with article 32
of the Utilities and Services (Regulation of
Certain Works) Act.
(5) The Authority may, after having
consulted with any other utility regulator or
regulators as the case may be and with any
such other public sector body or bodies as it
may
consider
necessary
in
the
circumstances, provide for exemptions from
the obligations provided for in sub-article (3)
for buildings where access to an existing
network that terminates at the location of the
end-user and that is suitable for the provision
of high-speed electronic communications
services, is ensured on objective,
transparent,
proportionate
and
non-
discriminatory terms and conditions.
(6) In the absence of available high-
speed-ready in-building infrastructure, an
undertaking may terminate its network at the
premises of the subscriber subject to the
agreement of the subscriber provided that it
minimizes the impact on the private property
of third parties.
(7) The provisions of this article are
without prejudice to the right to property of
the owner of the access point or the in-
building physical infrastructure, in cases
where the holder of a right to use that
infrastructure or access point is not the
owner thereof, and to the right to property of
other third parties such as landowners and
building owners.
(8) A person suffering damages as a
result of the exercise of the rights under this
article shall be entitled to adequate financial
compensation in accordance with applicable
national legislation.".
3. Article 4 thereof shall be amended as follows
(a) sub-article (13) thereof shall be deleted; and
(b) sub-article (14) thereof shall be renumbered as
sub-article (13).
4. Sub-article (1) of article 31 thereof shall be amended
as follows
(a)
for the words "or who fails to comply with
any decision given by the Authority or with any
authorization condition:" there shall be substituted the
words "or who fails to comply with any decision given
by the Authority or with any decision given by the
Utilities Networks Dispute Resolution Board where the
Authority considers that non-compliance by any person
with such a decision may impact negatively on the
provision of electronic communications services or
networks, or with any authorization condition:"; and
(b) immediately after paragraph (c) thereof
there shall be added the following new proviso
"Provided that a reference to a decision given
by the Utilities Networks Dispute Resolution
Board includes any decision of the Board which
is appealed from before the Court of Appeal but
has not been suspended by the Court of Appeal,
and any decision of the Court of Appeal
following an appeal from any decision of the
Board.".
5. Article 46 thereof shall be amended as follows
(a)
article 46 thereof shall be renumbered as
sub-article (1) of the said article; and
(b) immediately after sub-article (1) thereof, as
re-numbered, there shall be added the following new
sub-article
"(2) The Minister may, after consultation
with the Authority, by order in the Gazette list in
the Second Schedule, any European Union
legislation however so described or part thereof
which is directly applicable to Malta, which
legislation, once so listed, shall be considered to
be a law enforced by the Authority in
accordance with its powers under Part VI
Provided that the Minister may, after
consultation with the Authority, by order in the
Gazette amend such list.".
6. The Schedule thereof shall be renumbered as the First
Schedule.
7. Immediately after the First Schedule thereof, as
renumbered, there shall be added the following new Schedule
"SECOND SCHEDULE
(Article 46(2))
The following legislation is being listed in
accordance with the provisions of article 46(2)
(i) Regulation (EU) No 531/2012 of the
European Parliament and of the Council of 13
June 2012 on roaming on public mobile
communications networks within the Union; and
(ii) Regulation (EU) 2015/2120 of the
European Parliament and of the Council of the
25 November 2015 laying down measures
concerning open internet access and amending
Directive 2002/22/EC on universal service and
users’
rights
relating
to
electronic
communications networks and services and
Regulation (EU) No 531/2012 on roaming on
public mobile communications networks within
the Union.".
8. Article 47 thereof shall be amended as follows
(a)
the marginal note shall be substituted by the
following
"Administrative penalties."; and
(b) sub-article (1) thereof shall be substituted by
the following
"(1) Unless stated otherwise at law, the
Authority shall have the power to impose in
respect of any person who infringes any
provisions of this Act, of any regulations made
thereunder, or of those provisions of the Utilities
and Services (Regulation of Certain Works) Act
which the Authority is empowered to enforce or
who fails to comply with any directive, decision
or order however so described given by the
Authority, an administrative penalty using such
procedures as may be established in this Act or
regulations made thereunder.".
Passed by the House of Representatives at Sitting No. 371 of the
4th April, 2016.
A NĠLU F ARRUGIA
Speaker
R AYMOND S CICLUNA
Clerk of the House of Representatives
€4.32
Article 3 of the principal Act shall be deleted.
Deletion of
article 3 of the
principal Act.
Immediately before article 4 of the principal Act there Addition of
heading to the
shall be added the following new heading
principal Act.
"PART II
Regulation of Utilities’ Infrastructure Access"
Article 4 of the principal Act shall be substituted by the Substitution of
article 4 of the
following
principal Act.
" Power to
4. For the purposes of this Act, it shall
order placing
be lawful for the competent infrastructure
of cable, etc.
regulator to order that cables and wires be placed
or other works be carried out either below,
above, by the side of or in any building, entry to
or common parts of any building or tenement
and that trenches, pits, poles, stays, brackets and
all other accessories essential to the proper
working of the networks be cut, placed, erected
in or affixed to or within any building, entry to
or common area of any building or any
tenement; and any such order shall be notified to
the owner of the said tenement at least ten days
prior to the carrying out of any of the works
aforesaid.".
Immediately after article 4 of the principal Act there shall Addition of new
articles to the
principal Act.
be added the following new articles
" Power to
4A. (1) The competent infrastructure
order
regulator may order the collocation, use or
collocation, etc.
sharing of the same facilities on, over or under
public or private property in relation to any
cables, wires, physical infrastructure or other
accessories, however so described, used or to be
used for the provision of any utilities by a
provider of any such utilities in any buildings,
common areas, entries to buildings, trenches,
pits, ducts, conduits, manholes, cabinets or on
any poles, masts, antennae, towers or other
supporting constructions, stays or brackets, cut,
placed, erected or affixed by another provider of
any such utilities
Provided that the competent infrastructure
regulator may order the taking of such measures
as it may consider necessary to facilitate the
coordination of public works in order to protect
the environment, public health, public security
or to meet town planning and country objectives.
In doing so the competent infrastructure
regulator may also provide for rules of
apportioning the costs of facility or property
sharing.
(2) An order under sub-article (1) may
be issued by the competent infrastructure
regulator acting of its own initiative or following
the written request of a competent utility
regulator who considers the issue of such an
order necessary for the provision of a utility
service
Provided that before deciding whether to
issue an order, the competent infrastructure
regulator shall where appropriate in writing
consult with the competent utility regulator or
regulators as the case may be
Provided further that no such order shall be
issued if it relates to a dispute lodged before the
Dispute Resolution Board under this Act, or to
an appeal before the competent appellate forum
contesting a final decision issued by that Board
on any such dispute lodged before it.
(3) The
competent
infrastructure
regulator shall notify any order made under sub-
article (1) to the provider of the utility service
impacted by the order of collocation, and to any
other persons as it may consider appropriate in
the circumstances where it considers that such
persons may have an interest in knowing about
the issue of the order, at least ten days prior to
the carrying out of any of the works aforesaid
Provided that the competent infrastructure
regulator shall before issuing any such order
afford such reasonable opportunity as it may
consider appropriate in the circumstances to all
interested persons to express their views in
writing.
(4) Any measures taken by the
competent infrastructure regulator in accordance
with this article shall be objective, transparent,
non-discriminatory, and proportionate, and
where appropriate, these measures shall be
carried out in coordination with the competent
utility regulator or regulators and any other
relevant public sector body.
4B. An order issued in accordance with
Coming into
effect of orders,
article 4 or article 4A shall have effect
etc.
immediately on the lapse of the tenth day
following its notification; and the recipient of
the order shall thereupon fully, immediately and
properly, implement the same or allow the full,
immediate and proper implementation thereof,
and shall refrain from causing or continuing to
cause any impediment or hindrance to the said
implementation
Provided that the implementation of any
such order shall not be impeded, restricted or
delayed by reason of any claim for charges made
by the recipient of the order.
4C. (1) The recipient of an order made
Charging for
collocation and
under article 4A shall be allowed to charge for
dispute related
thereto.
the collocation or the use of the facilities affixed
or erected by it at rates based on reasonable
relevant costs. Charges for collocation or use of
the same facilities shall be cost-oriented and
shall not include charges for overheads such as
marketing, personnel or maintenance costs,
other than those directly incurred on the
facilities used.
(2) The recipient of an order made under
article 4A shall submit its charges to the
provider collocating or making use of the
facilities affixed or erected by the said recipient
within thirty days of commencement of
collocation or use as aforesaid
Provided that if the provider collocating or
making such use disagrees with such charges it
may, within twenty days of receipt of the same,
make a dispute before the Dispute Resolution
Board which Board shall resolve any such
dispute within the shortest time frame and in any
case within two months from the date of receipt
of the dispute except in exceptional
circumstances in accordance with the provisions
of article 32.
(3) The
competent
infrastructure
regulator may, following consultation in writing
with the competent utility regulator or
regulators, upon application by the recipient of
an order made under article 4A, order the person
allowed to collocate or to make use of the
facilities affixed or erected by the said recipient
to provide security for the payment of charges
due hereunder in respect of such collocation or
use in an amount and in such form as may be
determined by the competent infrastructure
regulator.
4D. The
competent
infrastructure
Exercise of
functions by
regulator in the exercise of its functions under
the competent
infrastructure
this Act shall
regulator.
(a)
act on the basis of simple,
efficient,
transparent
and
publicly
available procedures, applied without
discrimination and without delay, and shall
in any case make a decision within four
months from the application date;
(b) follow the principles of
transparency and non-discrimination in
attaching conditions to any rights it may
grant to a utility service provider; and
(c)
give reasons for its decisions
Provided that the competent infrastructure
regulator shall, in relation to any fees it may be
authorized to impose by or under this Act
relating to such works, ensure that fees are
objectively
justified,
transparent,
non-
discriminatory and proportionate in relation to
their intended purpose
Provided further that the competent
infrastructure regulator shall, in relation to
amendments that it may consider making to any
rights, conditions and procedures relating to
such works, ensure that any amendment is only
made in objectively justified cases and in a
proportionate manner. Before making any such
amendment, the competent infrastructure
regulator shall give notice in such manner as it
considers appropriate of its intention, inviting
interested parties including users and
consumers, to make representations on the
proposed amendments within a period of not less
than thirty days as may be specified in the
notice. The competent infrastructure regulator
may in those circumstances which it considers to
be exceptional, shorten such period
Provided further that the competent
infrastructure regulator shall in writing consult
with the competent utility regulator or regulators
in relation to amendments that it may consider
making to collocation orders which were
previously issued.
4E. A person or a competent utility
Contestation of
a regulatory
regulator aggrieved by any regulatory decision
decision.
however so described taken under this Part may
appeal to the Tribunal
Provided that any such person in appealing
shall explain his juridical interest in impugning
the decision appealed from
Provided further that where applicable the
competent utility regulator which has an interest
in the matter, shall also be notified with any
appeal filed under this article and shall be
entitled to intervene in such proceedings and
make submissions thereon.".
In article 5 of the principal Act, for the words "in the last
preceding article" there shall be substituted the words "in articles 4
and 4A"; and for the words "to the Court of Appeal" there shall be
substituted the words "to the First Hall of the Civil Court".
Article 6 of the principal Act shall be amended as follows
(a)
in sub-article (1) thereof, for the words "to the
regulator concerned" there shall be substituted the words "to the
competent infrastructure regulator";
(b) in paragraph (c) of sub-article (2) thereof, for the
words "to the regulator concerned" there shall be substituted the
words "to the provider of the utility service concerned";
(c)
sub-article (3) thereof shall be substituted by the
following
"(3) Before taking a decision further to any request
under this article the competent infrastructure regulator
in dealing with such a request, shall -
(a) where necessary, consult in writing with the
competent utility regulator or regulators; or, and
(b) consult in writing with any persons who the
competent infrastructure regulator considers may be
effected in a negative manner, giving such persons a
reasonable opportunity to make their submissions in
writing.".
Immediately after article 6 of the principal Act there shall
be added the following new article
" Applicability
6A. For the purpose of inspecting, testing
of article 471
or maintaining in good state of repair any work
of the Civil
carried out under this Act, the provisions of
Code.
article 471 of the Civil Code shall apply.".
Article 7 of the principal Act shall be substituted by the Substitution of
article 7 of the
following
principal Act.
" Where the
7. (1) Where the owner of a tenement
owner of the
in, over or upon which there is any cable, wire,
tenement may
pole, stay, bracket or other essential accessory,
ask for removal
of a cable, etc.
intends to make alterations in the tenement and
such alterations cannot be effected unless -
(a)
the cable, wire, pole, stay,
bracket or other essential accessory is
temporarily or permanently removed; or
(b) the position of such cable,
wire, pole, stay or bracket or other
essential accessory cannot be changed,
then the owner may request that such work be
temporarily or permanently removed, or else that
the position of such work be changed, this
notwithstanding that the owner had given his
consent for the execution of the work or had
received compensation in terms of this Part.
(2) A request under sub-article (1) shall
be made by application before the First Hall of
the Civil Court whereby the owner shall state
under oath why in accordance with the
provisions of sub-article (1) the request is being
made
Provided that the owner in filing such a
request shall
(a)
notify
the
competent
infrastructure regulator, any competent
utility regulator or regulators where
applicable, and any network operator who
may be effected in a negative manner; and
(b) give three months notice of his
intention to affect the alterations aforesaid.
(3) A network operator may, within
twenty days from notification of a request made
under this article, contest such request only if it
can prove that the owner has other reasonable
means of making the alterations and that it shall
be affected in a negative manner if the request is
upheld.
(4) If the request under this article is not
contested, the owner may without any further
notice proceed with the alterations on the lapse
of the three month notice period referred to in
sub-article (2)(b)
Provided that the owner shall, where his
request has not been contested or, if contested,
the contestation thereof has been rejected,
refund any compensation which he may have
received.".
In article 8 of the principal Act, for the words "and
telegraphic communications systems" there shall be substituted the
words "and electronic communications networks".
In article 9 of the principal Act, for the words "to a fine
(multa) not exceeding two hundred and thirty-two euro and ninety-
four cents (232.94) or imprisonment for a term not exceeding one
month or to both such fine and imprisonment" there shall be
substituted the words "to a fine (multa) not exceeding five thousand
euro (€5,000)".
In article 10 of the principal Act, for the words
"telegraphic communications systems" there shall be substituted the
words "electronic communications networks"; and for the words "to a
fine (multa) not exceeding two hundred and thirty-two euro and
ninety-four cents (232.94) or imprisonment for a term not exceeding
three months or to both such fine and imprisonment" there shall be
substituted the words "to a fine (multa) not exceeding five thousand
euro (€5,000)".
Articles 11 and 12 of the principal Act shall be deleted.
In article 13 of the principal Act, for the words "with
article 11" there shall be substituted the words "with article 37".
Immediately after article 13 of the principal Act, as
amended, there shall be added the following new Parts and articles
"PART III
Facilitating High-Speed Electronic
Communications Networks
14. (1) A network operator shall meet
Access to
existing
all reasonable requests made in writing by an
physical
infrastructure.
undertaking requesting access to its physical
infrastructure under fair and reasonable terms
and conditions, including price, with a view to
deploying elements of high-speed electronic
communications networks
Provided that the undertaking concerned
shall in its request specify the elements of the
project for which the access is requested,
including a specific time frame
Provided further that nothing in this Part
shall be construed as prohibiting network
operators from offering access to their physical
infrastructure.
(2) Any refusal of access following a
request made in accordance with sub-article (1)
shall be based on objective, transparent, and
proportionate criteria including but not limited
to
(a) the technical suitability of the
physical infrastructure to which access has
been requested to host any of the elements
of high-speed electronic communications
networks referred to in sub-article (1);
(b) availability of space to host the
elements of the high-speed electronic
communications networks referred to in
sub-article (1), including that the future
needs for space of the network operator are
sufficiently demonstrated;
(c)
safety and public health
concerns;
(d) integrity and security of any
network, in particular of critical national
infrastructure;
(e)
the risk of serious interferences
of the planned electronic communications
services with the provision of other
services over the same physical
infrastructure;
(f)
the availability of viable
alternative means of wholesale physical
network infrastructure access provided by
the network operator and suitable for the
provision of high-speed electronic
communications networks, provided that
such access is offered under fair and
reasonable terms and conditions.
(3) The network operator when giving its
refusal shall in writing state its reasons for
refusing the request, which reasons must be
given within two months from the date of receipt
of the complete request for access
Provided that in doing so the network
operator shall, where applicable, provide the
undertaking making the request with any
relevant documentation in support of its refusal.
(4) Where access is refused or an
agreement on specific terms and conditions,
including price, has not been reached within two
months from the date of receipt of the complete
request for access, then either party may file a
dispute with the Dispute Resolution Board on the
lapse of the two months period referred to in this
sub-article.
(5) The Dispute Resolution Board shall,
in determining any dispute, referred to it in
accordance with this article, taking into account
the principle of proportionality, issue a binding
decision to resolve the dispute, including the
setting of fair and reasonable terms and
conditions, including price where appropriate
Provided that where the dispute relates to
access to the infrastructure of an electronic
communications network provider, the Board
shall, where appropriate, take into account the
objectives set out in article 4 of the Electronic
Communications (Regulation) Act
Provided further that any price set by the
Board shall ensure that the access provider has a
fair opportunity to recover its costs and shall
take into account the impact of the requested
access on the business plan of the access
provider, including the investments made by the
network operator to whom access is requested,
in particular in the physical infrastructures used
for the provision of high-speed electronic
communications services.
(6) The Dispute Resolution Board shall
resolve any dispute referred to it in accordance
with this article within the shortest possible time
frame and in any case within four months from
the date of the receipt of the complete request,
except in exceptional circumstances in
accordance with the provisions of article 32.
(7) The provisions of this article shall be
without prejudice to the right to property of the
owner of the physical infrastructure in cases
where the network operator is not the owner, and
to the right to property of any other third parties,
such as landowners and private property owners.
15. (1) An undertaking in the course of
Transparency
concerning
requesting access to physical infrastructure in
physical
infrastructure.
accordance with article 14(1), has the right to
access, upon request, the following minimum
information concerning the existing physical
infrastructure of any network operator
(a)
location, and route;
(b) type and current use of
infrastructure; and
(c)
a contact point
Provided that, in doing so, the undertaking
shall specify the area in which it envisages
deploying elements of the high-speed electronic
communications networks
Provided further that the provision of any
such information to the undertaking may be
subject to any limitations consequential to the
security of the networks and their integrity,
national security, public health or safety,
confidentiality or operating and business secrets
as may be determined by the competent
infrastructure regulator.
(2) A public sector body holding in
electronic format, by reason of its tasks,
elements of the minimum information referred
to in sub-article (1) concerning the physical
infrastructure of a network operator, shall make
such information available
(a)
through the Single Information
Point by electronic means; and, or
(b) to an undertaking upon the
request in writing of that undertaking, this
without prejudice to the limitations stated
in sub-article (1)
Provided that any update to that
information or any new element of minimum
information referred to in sub-article (1)
received by the public sector body shall be made
available to the Single Information Point within
two months from the date of its receipt, which
period of such two months may be extended by a
further period not extending one month, where
this is required to guarantee the reliability of the
information provided
Provided further that any information
provided to the Single Information Point shall be
updated forthwith by the entity responsible for
the provision of such information which entity
shall inform the Single Information Point
accordingly.
(3) Minimum information made available
to the Single Information Point in accordance
with sub-article (2) shall be accessible promptly,
through the Single Information Point, in
electronic format and under proportionate, non-
discriminatory and transparent terms. Such
access shall be made available through the
Single Information Point by not later than the 1
January 2017.
(4) Where the minimum information
referred to in sub-article (1) is not available
through the Single Information Point, then
network operators shall provide access to such
information upon the specific written request by
an undertaking. In making such a request the
undertaking shall specify the area envisaged for
the deployment of elements of high-speed
electronic communications networks
Provided that access to information shall
be granted within two months from the date of
receipt of the written request under
proportionate,
non-discriminatory
and
transparent terms without prejudice to the
limitations under sub-article (1).
(5) Upon the specific written request of
an undertaking, a network operator shall meet
reasonable requests for on-site surveys of
specific elements of its physical infrastructures.
In making such a request the undertaking shall
specify the elements of the network concerned
with a view to deploying elements of high-speed
electronic communications networks
Provided that on-site surveys of the
specified network elements shall be granted
under proportionate, non-discriminatory and
transparent terms within one month from the
date of receipt of the written request, without
prejudice to the limitations in sub-article (1).
(6) In the event of a dispute arising in
connection with the rights and obligations
provided for in this article, either party may refer
the dispute to the Dispute Resolution Board
which shall, after taking full account of the
principle of proportionality, issue a binding
decision to resolve the dispute within the
shortest possible time frame and in any case
within two months, except in exceptional cases
in accordance with article 32.
(7) The Single Information Point
following consultation with any competent
utility regulator or regulators as the case may be,
and such other public sector body or bodies as it
may consider necessary, may provide for
exemptions from the obligations in sub-articles
(1) to (5) in the case of existing physical
infrastructures considered not technically
suitable for the deployment of electronic
communications networks or in the case of
critical infrastructure. In doing so it shall give its
reasons in writing and shall before taking a final
decision, give any interested parties the
opportunity to make any written submissions
within such reasonable time as it may establish.
(8) An undertaking which obtains any
information pursuant to the provisions of this
article shall, where appropriate, ensure that the
information so acquired is treated with due
consideration to confidentiality, and operating
and business secrets.
16. (1) A network operator has the right
Coordination
of civil works.
to negotiate agreements concerning the
coordination of civil works with undertakings
with a view to deploying elements of high-speed
electronic communications networks.
(2) A network operator performing
directly or indirectly civil works, either fully or
partially financed by public means, shall comply
with any reasonable written request to
coordinate civil works on transparent and non-
discriminatory terms, made by an undertaking,
with a view to deploying elements of high-speed
electronic communications networks, provided
that
(a) such request does not entail
any additional costs, including because of
additional delays, for the initially
envisaged civil works;
(b) such request does not impede
control over the coordination of the works;
and
(c) the request to coordinate is
filed as soon as possible and in any case at
least one month before the submission of
the final project to the competent
authorities for permit granting
Provided that the Minister responsible for
infrastructure may make such regulations as he
may consider necessary on apportioning the
costs associated with the coordination of civil
works. In doing so the Minister shall consult
with the competent utility regulator or regulators
as the case may be and with any public sector
body or bodies as he may consider necessary in
the circumstances.
(3) If an agreement on the coordination
of civil works in accordance with sub-article (2)
is not achieved within one month from the date
of receipt of the formal written request to
negotiate, then any aggrieved party may refer
the dispute to the Dispute Resolution Board.
(4) The Dispute Resolution Board shall,
in determining any dispute referred to it in
accordance with this article, taking full account
of the principle of proportionality, issue a
binding decision to resolve the dispute raised,
including the setting of fair and non-
discriminatory terms and conditions, and
charges where appropriate
Provided that the Board shall resolve any
dispute referred to it in accordance with this
article within the shortest possible time frame
and in any case within two months from the date
of the receipt of the dispute except in
exceptional circumstances in accordance with
article 32.
(5) The competent authority for permit
granting may, following consultation in writing
with the competent utility regulator or regulators
as the case may be and with such other public
sector body or bodies as it may consider
necessary, provide for exemptions from the
obligations in this article for civil works of
insignificant importance, such as in terms of
value, size or duration, or in the case of critical
national infrastructure
Provided that in so doing, the competent
authority for permit granting shall give its
reasons in writing and shall before taking a final
decision, give any interested parties the
opportunity to make any written submissions on
the draft exemptions within such reasonable
time as it may establish.
17. (1) In order to negotiate agreements
Transparency
concerning
on the coordination of civil works referred to in
civil works.
article 16, a network operator shall make
available upon the specific written request of an
undertaking,
the
following
minimum
information concerning on-going or planned
civil works related to its physical infrastructure
for which a permit has been granted, a permit
granting procedure is pending or a first
submission to the competent authority for permit
granting is envisaged in the following six
months
(a)
the location and the type of
works;
(b) the network elements involved;
(c)
the estimated date for starting
the works and their duration; and
(d) a contact point
Provided that the provision of any such
information to the undertaking shall be subject
to any limitations consequential to the security
of the networks and their integrity, national
security, public health or safety, confidentiality
or operating and business secrets.
(2) The undertaking shall in making its
request, specify the area in which it envisages
deploying elements of high-speed electronic
communications networks
Provided that within fourteen days from
the date of receipt of the written request,
network operators shall provide the requested
information
under
proportionate,
non-
discriminatory and transparent terms.
(3) The network operator may refuse the
request made under sub-article (1) if
(a)
it had made the requested
information publicly available in electronic
format; or
(b) access to such information is
ensured through the Single Information
Point.
(4) The network operator shall make the
requested minimum information referred to in
sub-article (1) available through the Single
Information Point.
(5) If on the lapse of the fourteen days
period referred to in sub-article (2), the
information requested in accordance with the
provisions of this article is not provided, then an
aggrieved party may on the lapse of the aforesaid
fourteen days, refer a dispute it may have in
connection with the rights and obligations under
this article, to the Dispute Resolution Board
which shall in determining any dispute referred
to it in accordance with this article, taking full
account of the principle of proportionality, issue
a binding decision to resolve the dispute raised,
including the setting of fair and non-
discriminatory terms and conditions and charges
where appropriate
Provided that the Board shall resolve any
dispute referred to it in accordance with this
article within the shortest possible time frame
and in any case within two months from the date
of the receipt of the complete request except in
exceptional circumstances in accordance with
article 32, without prejudice to the possibility of
any party to refer the case to court.
(6) The competent authority for permit
granting following consultation in writing with
the competent utility regulator or regulators as
the case may be and with any public sector body
or bodies as it may consider necessary, provide
for exemptions from the obligations in this
article for civil works of insignificant value or in
the case of critical national infrastructure. In
doing so it shall give its reasons in writing and
shall before taking a final decision, give any
interested parties the opportunity to make any
written submissions on the draft exemptions
within such reasonable time as it may establish.
18. (1) All
relevant
information
Permit-granting
procedure.
concerning the conditions and procedures
applicable for granting permits for civil works
needed with a view to deploying elements of
high-speed
electronic
communications
networks, including any information concerning
exemptions applicable to such elements as
regards some or all permits required under
national law, shall be available through the
Single Information Point.
(2) An undertaking may by electronic
means through the Single Information Point,
submit applications for permits required for civil
works which are needed with a view to
deploying elements of high-speed electronic
communications networks.
(3) The competent authority for permit
granting shall grant or refuse a permit within
four months from the date of the receipt of a
complete permit request, without prejudice to
other specific deadlines or obligations laid down
for the proper conduct of the procedure which
are applicable to the permit granting procedure
in accordance with national or European Union
law or of dispute resolution or litigation
proceedings however so described
Provided that any refusal shall be duly
justified on the basis of objective, transparent,
non-discriminatory and proportionate criteria
Provided further that exceptionally in duly
justified cases, the deadline may be extended,
which extension shall be the shortest possible in
order to grant or refuse the permit.
(4) An undertaking which has suffered
damages as a result of non-compliance with
deadlines under this article has the right to seek
compensation in accordance with the applicable
national legislation.
(1) The functions of the Single
Single
Information
Information Point under this Act shall be
Point.
performed by the competent infrastructure
regulator.
(2) Any person who, in accordance with
this Act, is required to provide any information
however so described, shall ensure that such
information is provided to the Single
Information Point in a timely manner and in
accordance with any time frames established in
accordance with this Act, or in the absence of
such time frames within such time frames as the
Single Information Point may reasonably
establish.
(3) Any person who acts in breach of any
requirement under this Part in so far as it relates
to the provision of any information to the Single
Information Point shall be liable to an
administrative fine not exceeding ten thousand
euro (€10,000) and, or to a daily administrative
fine not exceeding five hundred euro (€500).
(1) Where applicable any person or
Notification of
Commission
body who grants an exemption in accordance
when granting
exemptions.
with the provisions of this Part, shall forthwith
in writing inform the Utilities Committee of the
granting of such an exemption and where
applicable any public sector body.
(2) The Utilities Committee shall notify
the European Commission of any exemptions
granted in accordance with the provisions of this
Act.
In the event of conflict the provisions
Provisions of
the Electronic
of the Electronic Communications (Regulation)
Communi-
cations
Act and of any regulations listed under the Third
(Regulation)
Schedule shall prevail over any of the provisions
Act, etc., to
prevail.
of this Part
Provided that the Minister responsible for
electronic communications may, from time to
time by notice in the Gazette, amend the list of
regulations stated in the aforesaid Schedule.
(1) There shall be a body to be
Establishment
and role of the
known as the Utilities Services Advisory
Utilities
Services
Committee, which body shall be appointed by
Advisory
the Minister responsible for infrastructure for a
Committee.
term, which may be renewed, of not less than
one year and not more than three years, which
body shall be composed of
(a)
a chairman chosen by the
Minister responsible for infrastructure
from among persons with expertise of
infrastructure utility sharing;
(b) a representative of each utility
regulator appointed by the respective
utility regulator as may from time to time
be listed in the Second Schedule;
(c) a representative from any other
government body that the Minister
responsible for infrastructure may consider
as being relevant;
(d) at least one person with proven
expertise in utility infrastructure sharing.
(2) The Utilities Committee shall
perform any function that it may be required to
undertake in accordance with this Act,
including
(a)
the making of guidelines on
any aspect regulated by this Act in so far as
such
guidelines
relate
to
utility
infrastructure access and, or the
determination of any disputes related
thereto including but not limited to
guidelines
(i) on the criteria for refusal
of access to physical infrastructure;
(ii) on
the
format
of
information
requirements
for
requests to access a utility
infrastructure;
(iii) on the format of the
provision of information on the
physical infrastructure of a network
operator to the Single Information
Point;
(iv) on
the
minimum
information, if any, to be provided
because of the security of the
networks or their integrity, or
because of national security, public
health or safety, confidentiality or
commercially
sensitive
information;
(v) to assist any adjudicative
or regulatory body in determining
any disputes however so described
as may be referred to that body for
determination under this Act;
(b) advising on the making of rules
on the apportioning of the costs related to
the coordination of civil works;
(c)
advising on the making of rules
with regard to infrastructure access charges
and, or technical aspects in relation to such
infrastructure access;
(d) where applicable dealing with
requests for exemptions made under this
Act; and
(e)
such other tasks as the Minister
for infrastructure in line with the purposes
of this Act may assign to it.
(3) Nothing in this article shall be
construed as precluding any public sector body
from the making of any guidelines or rules
however so described with respect to any
matters referred to in sub-article (2) in so far as
such guidelines or rules relate to the networks or
services regulated by the public sector body
concerned
Provided that such guidelines or rules
shall, once issued, be communicated to any such
other public sector bodies which the issuing
public sector body considers has an interest in
knowing about the issue of such guidelines or
rules in that these may impact the regulatory
work of such other public sector bodies.
PART IV
Utilities Networks Dispute Resolution Board
There shall be a dispute resolution
Appointment
of the Utilities
board to be known as the Utilities Networks
Networks
Dispute
Dispute Resolution Board which Board shall
Resolution
exercise and perform the functions assigned to it
Board.
by this Act and by any other law.
(1) The Dispute Resolution Board
Composition of
the Utilities
shall be composed of a President, who shall be a
Networks
Dispute
judge or an ex-judge or a magistrate or an ex-
Resolution
magistrate appointed by the President of Malta
Board.
acting on the advice of the Prime Minister, and
two members selected by the President of the
Board from a panel of ordinary members
Provided that if the President is an ex-judge
or an ex-magistrate his appointment shall be for a
term of five years and he shall vacate his office
at the expiration of the term of the said
appointment.
(2) There shall be a panel of six ordinary
members, all with at least ten years relevant
experience, appointed by the President of Malta
acting on the advice of the Prime Minister, from
amongst persons having relevant qualifications
in any one or more of the fields of expertise
related to the matters regulated by this Act or
that may from to time to time be referred to the
Board for resolution.
(3) In selecting the two ordinary
members to sit on the Board under sub-article
(1), the President shall take due account of the
nature of the case and the market concerned.
(4) The ordinary members of the Board
shall be appointed for a term of five years which
term of office may be renewed for one other term
of up to five years.
(5) The ordinary members of the Dispute
Resolution Board may resign their office by a
letter addressed to the President of Malta. The
resignation shall take effect when the letter
signifying the resignation is received by the
President of Malta or by any person authorized
by him.
(6) An ordinary member of the Dispute
Resolution Board may not be removed from
office except by the President of Malta acting on
the advice of the Prime Minister on the ground
of proved inability to perform the functions of
his office whether arising from infirmity of body
or mind or any other cause, or proved
misbehaviour.
(7) Notice of all appointments to the
Dispute Resolution Board and of all other
changes in its membership shall be published in
the Gazette.
(8) The Dispute Resolution Board shall
be independent from all parties to the dispute in
the performance of its functions, and the
members thereof in the exercise of their
functions shall act on their own individual
judgment and shall not be subject to the
direction or control of any person or authority.
(9) The ordinary members of the Dispute
Resolution Board shall not be precluded from
the exercise of their respective professions.
(10) The ordinary members of the Dispute
Resolution
Board
shall
receive
such
remuneration established in accordance with the
Fourth Schedule, which remuneration shall not
be altered during the tenure of their appointment
to their disadvantage
Provided that the said Schedule may from
time to time be varied by the Prime Minister
Provided
further
that
any
such
remuneration shall be paid out of the
Consolidated Fund without the necessity of any
further appropriation.
(11) A person shall not be qualified to be
appointed or remain an ordinary member of the
Dispute Resolution Board if
(a)
he has been declared an
undischarged bankrupt; or
(b) he has been sentenced to
imprisonment for six months or more by
any court; or
(c)
he has been found guilty of any
offence against this Act, any law relating
to the regulation of any utility service or
any regulations made under this Act or any
such laws; or
(d) he is a Member of the House of
Representatives or of the European
Parliament or of a Local Council.
(12) An ordinary member of the Dispute
Resolution
Board
shall,
before
the
commencement of any case, declare any interest
he may have in the proceedings and the
President shall, where he considers that such
interest may prejudice the independence of the
member concerned, appoint another member
from the panel.
(13) Where proceedings have commenced
and no final decision has yet been delivered and
the member has ceased to be a member thereof
or for any other reason is unable to perform the
functions of his office, the President may elect to
appoint another member from the panel in his
stead, and should it be strictly necessary for the
proper determination of the dispute recommence
proceedings, or continue to hear the dispute with
only one ordinary member
Provided that where the term of
appointment has expired and the ordinary
member has not been reappointed, the ordinary
member shall continue to hear the dispute until it
is concluded.
(14) The President where he is an ex-judge
or ex-magistrate and the ordinary members of the
Dispute Resolution Board, shall, during their term
of office, act with integrity and not engage in
any activity which would harm the proper
administration of justice or which, due to
knowledge gained from business secrets or other
confidential information during the tenure of
their office, would give rise to conflict of
interest and harm the interests of any parties to
the proceedings before the Board. Any person
who acts in contravention of this sub-article
shall be guilty of an offence against this Act and
shall on conviction be liable to a fine (multa) of
not less than five thousand euro (€5,000) and not
more than twenty fifty thousand euro (€25,000),
and the court may, in addition, award the
punishment of temporary or perpetual general
interdiction from occupying any public office.
(1) Upon taking cognizance of a
Conduct of
proceedings
dispute, the Dispute Resolution Board shall
and
determination
notify the parties concerned of the matter under
of disputes.
dispute, allowing them such reasonable time as
may be determined by the Board to produce
relevant information and to make their
representations.
(2) The Dispute Resolution Board shall
in all instances endeavour to determine any
dispute referred to it within the shortest possible
time, and in any case in accordance with the
specific time frames established under this Act
or under any other applicable law under which it
may be empowered to determine disputes
Provided that it shall be at the discretion of
the Board on how it shall conduct proceedings
before it. In particular the Board may, if it
considers it appropriate in the circumstances,
determine a dispute only on the basis of such
written submissions and documentation as it
may require, and it shall be at its discretion to
determine whether oral hearings and, or on site
visits are necessary
Provided further that the Board shall in all
instances abide with the principles of natural
justice.
(3) The Dispute Resolution Board shall,
after examining the facts and any representations
submitted to it and such other information as it
may require, determine the dispute.
(4) The Dispute Resolution Board may
at its discretion whether of its own initiative or
following a request of a party to the dispute if it
considers such a request as being reasonable
given the specific circumstances of the dispute,
assist the parties in arriving at an amicable
settlement on all or some of the issues in dispute
before proceeding or continuing with the
determination of the dispute
Provided that in doing so the Board shall in
all instances factor the need to settle the dispute
in the shortest time possible and any negative
impact that a party may suffer if there is a delay
in resolving the dispute
Provided further that an aggrieved party
shall before making a dispute under this Part,
where feasible, endeavour to settle any such
dispute by seeking the mediation of the
competent utility or infrastructure regulator or
regulators as the case may be.
(1) The Registrar of Courts or any
Registry of the
Dispute
other person acting in his stead or on his behalf
Resolution
Board.
in accordance with the Code of Organization and
Civil Procedure shall be the Registrar of the
Dispute Resolution Board appointed in
accordance with this Part.
(2) All acts brought before the Dispute
Resolution Board shall be kept in the Registry of
the Inferior Courts which shall be the registry of
the Board.
(3) The Minister responsible for justice
may by regulations under this Act establish
(a)
the fees that may be due to the
Registry of the Dispute Resolution Board;
(b) the fees that may be due to
advocates, legal procurators and other
persons representing the parties appearing
before the Board; and
(c) the fees that may be due to
experts appearing before the Board
Provided that until fees are prescribed by
the Minister responsible for justice under
paragraphs (a) to (c), the fees established in the
Code of Organization and Civil Procedure shall
apply.
(4) The Registry of the Dispute
Resolution Board shall, where applicable, keep
both a non-confidential version, and where
applicable when directed by the Board a
confidential version of the records of each
dispute referred to the Board.
(5) The records of the Dispute
Resolution Board shall be accessible to all
persons, and copies shall be given on payment of
the prescribed fee to any person on request
Provided that due regard shall be had to the
protection of any confidential information and
business secrets.
(6) All acts shall be filed, issued and
served in accordance with the provisions of the
Code of Organization and Civil Procedure,
subject to any rules made under this Act, or
regulations made thereunder or unless the
Minister responsible for justice shall by
regulation otherwise prescribe.
(1) The Registrar shall provide the
Personnel and
sittings of the
necessary personnel for the holding of sittings of
Dispute
Resolution
the Dispute Resolution Board. The officials so
Board.
designated shall, in execution of their duties,
enjoy and exercise all such powers as are vested
by the Code of Organization and Civil Procedure
in officials performing similar duties.
(2) The sittings of the Dispute
Resolution Board shall, where applicable be held
on such days and at such times as shall be fixed
by the President in the building of the Courts in
Malta and, or in Gozo or in any such other place
in Malta and, or in Gozo as the President may
consider appropriate in the circumstances.
(1) The Dispute Resolution Board
Power to make
regulations
shall have the powers and shall follow the
relating to the
procedure to be
procedures laid out in the provisions of this Act
followed before
and any regulations made thereunder.
the Dispute
Resolution
(2) The Minister responsible for justice
Board.
may make rules not inconsistent with this Act,
and any regulations made thereunder,
prescribing the procedures and the forms to be
followed and used before the Dispute Resolution
Board.
(3) In the absence of provisions or rules
as aforesaid, the Dispute Resolution Board shall
regulate its own procedures.
(1) The Dispute Resolution Board,
Dispute
Resolution
in determining any dispute referred to it, may
Board may
appoint experts
(a)
require any public sector body
or require input
from public
to provide any information or submit any
sector bodies
report which the Board considers may be
and power to
summon
necessary to assist it in determining the
witnesses.
said dispute; and, or
(b) appoint a qualified expert in
any areas falling within the remit of the
Board, to report to the Board on any aspect
of any dispute referred to the Board
Provided that the Board in requiring any
such information and, or any such report, shall
establish such time frames and such conditions
as it may consider reasonable in the
circumstances, including in the case of any such
report as it may require in accordance with this
article, the matters in relation to which it is
seeking input from the said body or expert.
(2) The Dispute Resolution Board may,
through its President, summon any person to
appear before it and give evidence and produce
documents, and the President shall have the
power to administer the oath.
(1) Any party to a dispute referred
Right of appeal
to the Court of
to the Dispute Resolution Board who feels
Appeal.
aggrieved with any decision given by the Board
following its determination of any dispute
referred to it may on a point of law contest such
a decision before the Court of Appeal (Inferior
Jurisdiction) as constituted in accordance with
article 41(6) of the Code of Organization and
Civil Procedure by means of an application filed
in the registry of that court within twenty days
from the date of the decision of the Dispute
Resolution Board.
(2) The Minister responsible for justice
may by regulations under this sub-article
establish the fees payable in the registry of the
court in relation to the filing of judicial acts in
connection with appeals under this article
Provided that until such fees are so
established, the fees in Schedule A to the Code
of Organization and Civil Procedure shall apply.
(1) The decision of the Dispute
Decision, if
appealed, to
Resolution Board pending an appeal before the
stand unless
Court of
Court of Appeal (Inferior Jurisdiction) shall
Appeal decides
stand and shall be adhered to by all the parties to
otherwise.
whom the decision applies.
(2) The Court of Appeal (Inferior
Jurisdiction), where it considers it to be
appropriate, may, on the application of a party to
the appeal, suspend in whole or in part the
decision which is the subject of the appeal
pending the final determination of the appeal.
The Court of Appeal (Inferior Jurisdiction) in
deciding whether or not to suspend the decision
shall state its reasons and shall take into account
all the relevant circumstances, including
(a)
the urgency of the matter,
(b) the effect on the party making
the request if the application for
suspension is not upheld, and
(c)
the effect on competition and,
or on end-users if the application is upheld
Provided that a party, in making an
application under this article, shall state the
factual and legal grounds establishing a prima
facie case for the suspension of the decision. The
Court of Appeal (Inferior Jurisdiction) shall on
receipt of any such application order the
notification thereof to the other party or parties
to the appeal affording them reasonable
opportunity to make their response thereto
Provided further that the Court of Appeal
(Inferior Jurisdiction) in determining any such
application may include such conditions as it
considers necessary in the circumstances.
In those instances where the Act
Time frame to
determine a
establishes that the maximum time frames for
dispute may be
extended in
the resolution of a dispute referred to the
exceptional
Dispute Resolution Board may in exceptional
circumstances.
circumstances be extended and the Board
decides to extend the time frame, the Board shall
in writing notify all the parties to the dispute
accordingly, stating the reasons why the time
frame is being extended, the period of extension
and when it envisages that the dispute shall be
determined.
The right to refer a dispute under this
Right to seek
civil redress
Act to the Dispute Resolution Board shall be
before the
ordinary courts.
without prejudice to civil redress, including
claims for any damages suffered, that a party
may be entitled to seek at law before the
ordinary courts.
(1) The Dispute Resolution Board
Powers of the
Dispute
shall have all such powers as are, by the Code of
Resolution
Board.
Organization and Civil Procedure vested in the
First Hall of the Civil Court.
(2) The enforcement of the decisions of
the Dispute Resolution Board, in the manner
provided for in the Code of Organization and
Civil Procedure, shall vest in the Board itself.
(3) In giving a decision in relation to a
dispute under Part III of this Act, the Dispute
Resolution Board may, where it considers that a
party to the dispute has in a frivolous or
vexatious manner failed to comply with a
requirement under this Part, request the
competent utility regulator to take such
measures as that regulator may, in accordance
with its powers at law, consider appropriate in
the circumstances, including the imposition of
administrative fines
Provided that in deciding on what
measures, if any, to take, the competent
regulator shall consider if any such act or
omission has impacted negatively on the cost of
deployment of the high speed electronic
communications networks.
Any person who files a dispute
Notification of
disputes, etc.,
before the Dispute Resolution Board or an
to the
competent
appeal from a decision given by the Board
infrastructure
before the Court of Appeal (Inferior
regulator and
to the Malta
Jurisdiction), shall forthwith notify in writing
Communica-
tions
the competent infrastructure regulator and the
Authority.
Malta Communications Authority with such
dispute or appeal as the case may be.
(1) A party may in writing request
Compliance
with decisions
the Malta Communications Authority to take
issued by the
Dispute
such measures as the Authority in accordance
Resolution
with its powers at law may consider appropriate,
Board.
to ensure that a decision issued by the Dispute
Resolution Board is complied with
Provided that in doing so the party
concerned shall state its reasons why it considers
it necessary that the Authority should intervene
to ensure compliance
Provided further that any such request may
only be submitted if the aggrieved party
demonstrates to the satisfaction of the Authority
that continued non-compliance with the decision
may impact negatively on its provision of
electronic communications services and, or
networks.
(2) The
Malta
Communications
Authority may of its own initiative undertake
any such measures in accordance with its powers
at law if it considers that the continued non-
compliance of a decision issued by the Dispute
Resolution Board is impacting negatively on the
provision of electronic communications services
and, or networks in Malta.
PART V
Miscellaneous
(1) Unless otherwise provided in
Power to make
regulations.
this Act the Minister responsible for
infrastructure may, of his initiative or where he
considers necessary after consultation with any
other Minister or Ministers responsible for other
public sector bodies, make, vary or revoke any
regulations in relation to any matters dealt with
under this Act or required for the carrying into
effect of this Act including but not limited to the
following
(a)
any matter relating to rights of
way including fees that may be charged for
such rights; and, or
(b) for the manner in which any
trench, pit, pole, stay, bracket or other
essential accessory in connection with
fixed electrical power and, or electronic
communications network in Malta shall be
cut, placed, erected or fixed and generally
for the proper working of any such
networks however so described.
(2) Any
person
who
acts
in
contravention of any regulations made under this
article shall be liable to a fine (multa) not
exceeding ten thousand euro (€10,000).
Unless otherwise provided in this Act
Service of
notice.
any service of notice however so described to be
given to any person in accordance with this Act
shall be addressed to that person and shall be
given to the person concerned in any of the
following ways
(a)
by delivering it to the person;
(b) by leaving it at the address at
which the person ordinarily resides or
carries on business;
(c)
by sending it by registered post
to the person at the address at which the
person ordinarily resides or carries on
business;
(d) if an address for the service of
notices has been provided by the person,
by leaving it at, or sending it by registered
post addressed to the person to that
address;
(e)
in any case where the
immediate giving of the notice is required,
by sending it, by means of a facsimile
machine or by electronic mail, to a device
or facility for the reception of facsimiles or
electronic mail located at the address at
which the person ordinarily resides or
carries on business or, if an address for the
service of notices has been furnished by
the person, that address, provided that the
facsimile machine of the sender generates
a
message
confirming
successful
transmission of the total number of pages
of the notice or the facility of the sender
for the reception of electronic mail
generates a message confirming receipt of
the electronic mail
Provided that the provisions of this
paragraph shall not apply to the
notification of documents filed before the
Tribunal, the Dispute Resolution Board or
any Court however so described.
The Minister may, where appropriate,
Minister may
vary certain
on the advice of or after consultation with the
time frames in
Part III.
competent infrastructure regulator or regulators
and, or with the competent utility regulator or
regulators, by legal notice lessen the time frames
stated in the article 14(3), article 15(2) or article
15(4)
Provided that before doing so the Minister
shall undertake a public consultation and
consider any such submissions as may be made
in the course of such a consultation.".
19. Immediately after article 39, as added to the principal Act,
there shall be added the following new schedules
"FIRST SCHEDULE
(Article 2)
In accordance with provisions of article 2 of this Act, within the
context of the definition of the words "competent infrastructure
regulator" the following public sector body is designated a
"competent infrastructure regulator"