1. 38No transportable, pre-assembled containerised Jenbacher J420 1.43MWe generator units. Each generator unit is typically housed in 2No stacked ISO shipping containers and in this case a top attenuation unit is added, with each generator set comprising/ incorporating the following

a. an engine container (approx. 6.05m L x 2.4m W x 2.6m H);

b. an engine cooling module container (approx. 6.05m L x 2.4m W x 2.6m H), stacked on top of each engine container;

c. an attenuation unit with an exhaust silencer (approx. 6.05m L x 2.4m W x 2.6m H) that sits on top of the cooling module container; and

d. one exhaust gas flue exit point with a diameter of approx. 0.4m (at approx. 8m height after the attenuator unit).

ISB SI

2. 2No to 4No exhaust flues each approx. 0.4m in diameter will be extended and grouped/bundled together and supported by a total of 12No 25m (above ground level) high chimney structures.

ISB SI

3. A 1250kVA mobile diesel generator for limited occasional black-starting the temporary emergency generation plant (approx. 6.05m L x 2.4m W x 2.6m H).

ISB SI

4. 10No 6.3MVA Transformers, (each approx. 6.05m L x 2.4m W x 2.6m H).

ISB SI

7. A 110kV Air-Insulated Switchgear (AIS) System (approx. 31.6m L x 6.6m W x 7m H).

ISB SI

10. High Pressure Gas Pressure Reduction Station (approx. 10m L x 6m W x 2.5m H).

ISB SI

11. 10No Medium Pressure Gas Trains (each approx. 4m L x 1m W x 1.4m H).

ISB SI

12. New High Pressure Gas Lines (28 and 42 barg) to the existing Huntstown Power Station Gas Networks Ireland (GNI) site, extension to the existing AGI boiler house (approx.4.0m L x 3.8m W x 3.5m H), and an increase in the capacity of the existing 28 barg gas supply system.

ISB SI

13. Above-ground pipe and cable-bridge(s) between the gas pressure reduction stations and the generator units and 110kV transformer.

ISB SI

14. 20ft Control room container to house the Supervisory Control and Data Acquisition (SCADA) panel.

ISB SI

16. Acoustic wall (approx. 102m L x 0.4m W x 7m H) to the immediate north and east of the 38No proposed generator units and 5m containers wall on part of the eastern side (approx. 55m L x 2.4m W x 5.2m H).

ISB SI

17. 2.6m high chainmail security fencing topped with barbed wire around the perimeter of the site.

ISB SI

19. Replacement/ relocated tarmacadam laydown area for existing displaced equipment and car/ vehicle parking and replacement storage buildings/ offices/ workshops.

ISB SI

20. New staff welfare facilities comprising a kitchen/diner container, a toilet block container, and an offices container (each approx. 6.05m L x 2.4m W x 2.6m H).

ISB SI

22. Extension to existing site stormwater drainage, including attenuation and hydrocarbon interceptor serving the proposed hardstanding areas.

ISB SI

23. 3No workshop/stock containers (each approx. 6.05m L x 2.4m W x 2.6m H).

ISB SI

26. Demolition of existing stores building (approx.34m L x 23m W x 8.0m H).

ISB SI

28. Site development works and landscaping.

Part 2

Site Location Map

Proposed site layout plan

GIVEN under my Official Seal,

16 December, 2022.

EAMON RYAN,

Minister for the Environment,

Climate and Communications.

ISB SI

Notice of the making of this Statutory Instrument was published in

“Iris Oifigiúil” of

23

rd December,

2022.

WHEREAS I, Eamon Ryan, Minister for the Environment, Climate and Communications –

(a) am satisfied that the carrying out of the development described in the Schedule proposed to be carried out by or on behalf of EirGrid, a statutory undertaker for the purposes of

section 181

of the

Planning and Development Act

(No. 30 of 2000), is required by reason of an emergency being the serious risk of a temporary shortfall of supply of electricity, which risk has been identified by the Commission for Regulation of Utilities,

(b) have made an application to An Bord Pleanála under

section 181

(2T)(a)(i) of the

Planning and Development Act 2000

for a determination as to whether the development so proposed to be carried out would be likely to have a significant effect on the environment or an adverse effect on the integrity of a European site,

(c) am satisfied, having had regard to the decisions of An Bord Pleanála dated 5 December 2022 (Case reference: SD06F.314777 and Board Order ABP-314777-22) and 7 December 2022 (Case reference: SP06F.314778 and Board Order ABP-314778-21), and Parts X and XAB of the

Planning and Development Act 2000

, that no environmental impact assessment or appropriate assessment of the development proposed to be carried out is or are required, and therefore am satisfied that an application to An Bord Pleanála for approval under

section 181

(2A)(b) of the

Planning and Development Act 2000

is not required, and

(d) have complied with

section 181

(2)(aa) of the

Planning and Development Act 2000

,

NOW THEREFORE I, Eamon Ryan, Minister for the Environment, Climate and Communications, in exercise of the powers conferred on me by

section 181

(2)(a) of the

Planning and Development Act 2000

(No. 30 of 2000), hereby make the following order