S.I. No. 136/2013 - Electricity Regulation Act 1999 (Petroleum Safety) Levy Order 2013.
Table of Provisions (11)
Statutory Text (11 Articles)
1. Under the Act, as amended by the
Petroleum (Exploration and Extraction) Safety Act 2010
, the Commission is required to establish and implement a risk-based petroleum safety framework (the “safety framework”). The levy will recover the Commission’s costs for establishing and implementing the safety framework (the “Establishment Costs”).
2. The Establishment Costs for the Levy Year are €2,870,000.
3. Establishment Costs will be recovered from Relevant Undertakings.
4. For Relevant Undertakings, the apportionment of Establishment Costs will be split as follows
a) 40% based on infrastructure; and
b) 60% based on estimated production volumes for a 15 year period.
Establishment Cost Recovery Methodology — Infrastructure
5. The infrastructure portion of the Establishment Costs will be apportioned based on (
a
) petroleum infrastructure in situ; and (
b
) petroleum infrastructure proposed to be in situ. Table 1 below identifies the types of infrastructure that will incur costs under the levy for Establishment Costs along with their associated weighting.
Reference
Infrastructure
Weighting
A
Onshore Facility
5
B
Manned Offshore Facility
5
C
Unmanned Offshore Facility
2
D
Subsea infrastructure
3
E
Onshore Pipeline
3
Table 1: Infrastructure types for Establishment Costs and associated weightings
*The infrastructure term ‘Subsea Infrastructure’ incorporates the subsea pipeline(
s
) and subsea wells and well infrastructure.
Variable Weightings
6. The CER recognises that different infrastructure employed by Relevant Undertakings has the potential to require different levels of safety regulation by the CER under the safety framework. To this end, all weightings indicated in Table 1 are variable and indicate the maximum weighting that can be applied.
7. To determine the weighting for a specific piece of infrastructure, the CER will make an assessment to determine the intensity of resources required to perform the CER’s safety regulatory functions under the Act in relation to such infrastructure (and associated Production Activity). The assessment of the appropriate weighting for such infrastructure for each Relevant Undertaking will be carried out on a case by case basis and in accordance with the CER’s duty to act consistently. The CER will consult with Relevant Undertakings on the proposed weighting to be applied to it before it is imposed. Following the assessment and where deemed equitable by the CER, the CER may lower the weighting to zero.
8. The combined weightings of all Relevant Undertakings will be the total weighting. Each Relevant Undertaking will pay an Establishment Costs levy amount equivalent to the proportion of their weighting to the total weighting. The calculation is
Relevant Undertaking’s weighting
______________ * 40% Establishment Costs
Total weighting
Establishment Cost Recovery Methodology — Production Volumes
9. Relevant Undertakings will submit their estimated production volume profile for a 15 year period to the CER.The data submitted may be independently verified by the CER.
10. The combined estimated production volumes submitted by all Relevant Undertakings will be the total estimated production volume. Each Relevant Undertaking will pay the estimated production volume portion of the Establishment Costs based on the proportion of their estimated production volume to the total estimated production volume. The calculation is
Relevant Undertaking’s Estimated Production Volume (15 year)
______________ * 60% Establishment Costs
Total Estimated Production Volumes
Estimated production volumes are to be submitted to the CER using billion cubic metres (bcm) of gas or the equivalent metric for oil.
Sealed with the common seal of the Commission for Energy Regulation
on the 23 April 2013.
DERMOT NOLAN,
Chairperson of the Commission.
EXPLANATORY NOTE
(This note is not part of the Instrument and does not purport to be a legal interpretation.)
This order imposes a levy on certain specified classes of petroleum undertakings, for the purpose of meeting expenses properly incurred by the Commission for Energy Regulation in the discharge of its functions under the
Petroleum (Exploration and Extraction) Safety Act 2010
.
Notice of the making of this Statutory Instrument was published in
“Iris Oifigiúil” of
26
th April
, 2013.
The Commission for Energy Regulation in exercise of the powers conferred on it by the
Electricity Regulation Act 1999
(No. 23 of 1999) as amended by the
Petroleum (Exploration and Extraction) Safety Act 2010
(No. 4 of 2010), hereby makes the following Order