S.I. No. 304/1973 - Harbour Rates (Foynes Harbour) Order, 1973.
Statutory Text (3 Articles)
1. (1) This Order may be cited as the Harbour Rates (Foynes Harbour) Order, 1973.
(2) This Order shall come into operation on the 27th day of November, 1973.
2. The Harbour Rates (Foynes Harbour) Order, 1955 (
S.I. No. 63 of 1955
), is hereby amended by—
(
a
) the substitution for the First Schedule thereto of the matter contained in Part I of the Schedule to this Order,
(
b
) the substitution for the Second Schedule thereto of the matter contained in Part II of the Schedule to this Order, and
(
c
) the substitution for the Third Schedule thereto of the matter contained in Part III of the Schedule to this Order.
Schedule
PART I.
FIRST SCHEDULE.
MAXIMUM GOODS RATES.
Ref. No.
Commodity
Unit of Quantity
Rate
(1)
(2)
(3)
(4)
1.
Assembled Articles
Per tonne
£1·50
2.
Containers or Flats Laden or partly laden
(a)
Up to 20 feet in length
Each
£1·50
(b)
Over 20 feet in length
Each
£3·00
3.
Containers or Flats empty
Per tonne
15p
4.
Chemicals and Mineral Products
Per tonne
8p
5.
Fats, Acids
Per tonne
13p
6.
Foodstuffs, Animal, Vegetable, and Fish Oil, and extracts
Per tonne
15p
7.
Fuel Solid
Per tonne
5p
8.
Fuel Liquid, Petroleum Oil
Per tonne
15p
9.
Grains, Seeds
Per tonne
10p
10.
Metals, Iron and Steel
Per tonne
8p
11.
Nonferrous metals
Per tonne
10p
12.
Manufactures of Metal
Per tonne
25p
13.
Mineral Ores as mined
Per tonne
7p
14.
Mineral Ore Concentrates
Per tonne
9p
15.
Paper, Cardboard
Per tonne
20p
16.
Textiles, Fibres
Per tonne
15p
17.
Wood, all sorts
Per tonne
8p
18.
Livestock
Each
25p
19.
Goods not mentioned in any other reference in this schedule.
Per tonne
25p
Rates on Exports shall be the same as rates on Imports, except in the case of goods imported at the Port of Foynes from any port for export to any other port and on which Import Goods Rates have been paid; in such case the export rate will be half the import rate provided:—
(
a
) That the Goods are exported in the same form and if imported in packages in the same packages as they arrived.
(
b
) That the Goods remain the bona fide sole property of the same person throughout.
(
c
) That the export takes place within two months of the date of arrival of the importing vessel.
PART II.
SECOND SCHEDULE.
MAXIMUM TONNAGE RATES.
Ref. No.
Description of Charge
Rate
(1)
(2)
(3)
(1)
For every Ton of the admeasurement of every Vessel trading solely in the River Shannon for each time of entering the Port a sum not exceeding
4p
(2)
For every Ton of the admeasurement of every Vessel acting only as a tug, towing vessels into or out of or within the limits of the Port a sum not exceeding
2p
(3)
For every Ton of the admeasurement of every Vessel not trading solely in the River Shannon but loading or discharging in the Port of Foynes cargo for or from any other port in the River Shannon a sum not exceeding
5p
(4)
For every Ton of the admeasurement of every Vessel (except as hereinafter provided) arriving from or departing to any Port outside the River Shannon a sum not exceeding
12p
(5)
For every Ton of every Vessel remaining within the limits of Foynes Harbour after the expiration of a period of one week for each week or part thereof in excess of the first week in addition to any other sum payable under the Schedule a sum not exceeding
(a) while undergoing repairs
2p
(b) for any other purpose
4p
The Tonnage of a vessel upon which tonnage rates shall be based and chargeable mentioned at Reference numbers (1) to (5) inclusive of this Schedule shall be the Net Register Tonnage or fifty per cent of the Gross Tonnage of the vessel concerned, whichever is the greater.
The word "week" in Reference Number 5 in this Schedule means any period of 7 consecutive days.
PART III.
THIRD SCHEDULE.
OTHER (MAXIMUM) CHARGES.
Ref. No.
Description of Charge
Rate
(1)
(2)
(3)
1.
For the use of the Foynes Harbour Trustees' 50 tonne Weighbridge, for each tonne weighed a sum not exceeding
£0·05
2.
For providing a Watchman for any period not exceeding 8 hours a sum not exceeding
The actual cost plus 25%
3.
For the use of the Foynes Harbour Trustees' shed
For the first 7 days
18p per square yard per week or part of a week
or
4p per tonne per week or part of a week, whichever is the greater
For the second 7 days
23p per square yard per week or part of a week
or
5p per tonne per week or part of a week whichever is the greater
For any period after the second 7 days
30p per square yard per week or part of a week
or
7p per tonne per week or part of a week, whichever is the greater.
GIVEN under my Official Seal, this 13th day of November, 1973.
PETER BARRY,
Minister for Transport and Power.
EXPLANATORY NOTE.
The effect of this Order is to revise goods and tonnage rates and other charges at Foynes Harbour.
S.I. No. 304 of 1973.
HARBOUR RATES (FOYNES HARBOUR) ORDER, 1973.
I, PETER BARRY, Minister for Transport and Power, in exercise of the powers conferred on me by
section 104
of the
Harbours Act, 1946
(No. 9 of 1946), and the Transport, Fuel and Power (Transfer of Departmental Administration and Ministerial Functions) Order, 1959 (
S.I. No. 125 of 1959
), and after compliance with section 106 of that Act, hereby order as follows