S.I. No. 15/1968 - Turlough Hill Pumped Storage Scheme Approval Order, 1968.

6 Articles / Provisions · Ireland
Open official source Machine-readable Markdown (.md)

Table of Provisions (6)

Statutory Text (6 Articles)

ISB SI

1. The Scheme may be cited as the Turlough Hill Pumped Storage Scheme, 1968.

ISB SI

2. The Scheme provides for the generation of electricity by means of hydraulic power derived from the waters of the Glendasan River draining into Lough Nahanagan and, after their passage through the electricity generating plant, the storing of the waters in Lough Nahanagan and the pumping of the waters, at intervals, to a high level reservoir on Turlough Hill, being the hill with Easting Co-ordinate 306900 and Northing Co-ordinate 198700 on the National Grid and their use again for the purposes of such generation.

ISB SI

3. The works to be constructed for the purpose of the Scheme are:—

Work No.

1

A high level reservoir on the top of Turlough Hill with intake to high pressure shaft or shafts.

Work No.

2

Highpressure shaft or shafts from the upper reservoir to the power station.

Work No.

3

Underground power station.

Work No.

4

Tailrace tunnel or tunnels.

Work No.

5

Access tunnel to the underground power station.

Work No.

6

Spillway at the outlet of Lough Nahanagan.

Work No.

7

Control tunnel at outlet of Lough Nahanagan.

Work No.

8

Approach road from the main road near Wicklow gap to the site of the reservoir on the top of Turlough Hill.

Work No.

9

Approach road from the main road near Wicklow gap to the entrance to the access tunnel to the power station and to the outlet from Lough Nahanagan.

Work No.

10

Such other works and including any auxiliary buildings or other structures as may be found necessary by the Board for the complete anl satisfactory operation of the scheme.

ISB SI

4. The approximate capacity of the generating plant to be installed in the power station is 280,000 kilowatts.

ISB SI

5. The cost of the works at present day prices is estimated at £12,000,000 including compensation for lands, mineral and water rights, etc., but excluding the cost of transmission lines from the generating station to the points of demand.

GIVEN under the Official Seal of the Minister for Transport and Power this

8th day of January, 1968.

PATRICK J. LALOR.

A person authorised under

section 15

(1) of the

Ministers and Secretaries Act, 1924

to authenticate the seal of the said Minister.

EXPLANATORY NOTE.

The purpose of this Order is to authorise the Electricity Supply Board to provide for the generation of electricity by means of a scheme derived from the waters of the Glendasan River draining into Lough Nahangagan and, after their passage through the generating plant, the pumping of the water to a high level reservoir on Turlough Hill and their use again for generating purposes.

ISB SI

S.I. No. 15 of 1968.

TURLOUGH HILL PUMPED STORAGE SCHEME APPROVAL ORDER, 1968.

WHEREAS, under

section 4

(1) of the

Electricity (Supply) (Amendment) Act, 1945

(No. 12 of 1945), the Electricity Supply Board has submitted to the Minister for Transport and Power a scheme for the generation of electricity by means of hydraulic power derived from the waters of the Glendasan River, in the county of Wicklow

AND WHEREAS the said Minister has considered the said scheme and has consulted with the Minister for Agriculture and Fisheries as to the steps to be taken by the said Board for the protection of fisheries

NOW, the Minister for Transport and Power, in exercise of the powers conferred on him by the

Electricity (Supply) (Amendment) Act, 1945

(No. 12 of 1945), and the Transport, Fuel and Power (Transfer of Departmental Administration and Ministerial Functions) Order, 1959 (

S.I. No. 125 of 1959

), hereby orders as follows

Need to analyze how this provision applies to your matter?

Cross-reference this statute against case law, commentaries, and related legislative provisions inside Legislator AI.

Open in Legislator →