Art. 39 Strassengesetz (StrG) - Durchführung
III. Strassenbau - 2. Planverfahren
Art. 39 StrG · Durchführung
1. Für den Strassenbau wird das Planverfahren durchgeführt. Es ersetzt das Baubewilligungsverfahren.
2. Für Erlass und Änderung des Gemeindestrassenplans wird das Planverfahren sachgemäss durchgeführt.
Gerichtsentscheide zu dieser Bestimmung (19)
B.2024.94 · sg (Art. 12 ff., Art. 31 ff., Art. 39 ff. StrG)
Planning Authority Fails to Involve Preservation Authority in Development Decision
Cited in the initial summary to frame the scope of the road planning and construction procedure where the heritage authority should have been involved.
22.3994 · sg (Art. 39 Abs. 1 StrG)
Appeal Granted: Insufficient Access Road and Incorrect Setback Calculation for Building Permit
Cited because the planned sidewalk extension constitutes a public road construction project that requires the coordinated procedure under this article, replacing the building permit procedure.
21.8950 · sg (Art. 39 Abs. 2 StrG)
Appeal Granted Against Road Rehabilitation and Turning Area Approval Due to Forest Placement and Deficiencies
Cited in reasoning to explain that the plan procedure replaces the building permit procedure, thus making a separate forestry permit unnecessary at this stage.
20.8164 · sg (Art. 39 ff. StrG)
Bus Stop Modification vs. Route Planning Appeal Dismissed
The court rules that the appeal object is limited to the construction works of the bus stops, which are subject to the road plan procedure under these articles.
19.7156.19.7173 · sg (Art. 39 Abs. 1 StrG)
Building Permit Annulled Due to Uncoordinated Road Works and Zoning Violations
The need for a road planning procedure (Strassenbau) for the sidewalk adjustments and the access road was established, which necessitated coordination.
19.7156.19.7173 · sg (Art. 39 Abs. 1 StrG)
Building Permit Overturned Due to Procedural Flaws and Neighboring Interest Infringement
The annulment is grounded on the violation of coordination duties related to the necessary road planning procedure (Strassenbau) required for sidewalk adjustments.
20.1781.20.1809 · sg (Art. 39 StrG)
Appeal Regarding Building Permit Violations of Building Envelopes and Attic Regulations
Cited implicitly through the discussion in Erw. 8.3.1 about the missing partial road plan required for the creation and legal securing of the turning loop, which falls under the procedure regulated by this article.
20.1781.20.1809 · sg (Art. 39 StrG)
Building Permit Revocation Due to Building Envelope and Height Violations
Cited in the reasoning concerning the missing road line plan for the turning hammer, but not explicitly used in the final orders.
20.8164 · sg (Art. 39 StrG)
Bus Route Implementation vs. Suspensive Effect of Appeal
Cited in the reasoning regarding the planning procedure but not cited in the final orders.
20.728 · sg (Art. 39 ff. StrG)
Appeal Against Road Plan and Building Permit Approval Due to Insufficient Access and Zoning Violations
The court annulled the zoning/road plan because the underlying road construction project required approval under this section of the Road Act.
20.728 · sg (Art. 8 und 39 ff. StrG)
Road Classification and Building Permit Annulment Due to Traffic Safety Deficiencies
Cited in the reasoning clarifying the scope of the road planning procedure (Teilstrassenplan), the basis for which is annulled in order 1.b.
18.1478.18.1509 · sg (Art. 39 f. StrG)
Planning Instruments Annulment Due to Environmental Assessment Omission and Procedural Defects
Cited regarding the procedural requirements for road construction plans (Teilstrassenplan), the violation of which was a ground for annulment.
18.1478.18.1509 · sg (Art. 39 f. StrG)
Administrative Appeal Against Planning Decisions Due to Flawed Environmental Assessment and Procedural Violations
Cited in the reasoning section (Erw. 7) to establish the procedural defect regarding the partial road plan, leading to its nullification in the dispositive.
19.4505.19.4339 · sg (Art. 39 Abs. 1 StrG)
Municipal Road Plan Annulment Over Pre-Classified Access Strip
Cited in the context of discussing that the procedure for road construction replaces the building permit procedure, justifying the annulment of the plan due to missing project details.
19.4505.19.4339 · sg (Art. 39 Abs. 1 StrG)
Appeal Against Partial Road Plan Classification Upheld
This article was cited as the basis for the annulment of the contested development plan, as it was found to be lacking a necessary underlying road construction project.